MONTHYEARML20210U1681984-04-0404 April 1984 Changes 0 to 0 of PT/0/A/4150/11A, Control Rod Worth Measurement:Rod Swap Project stage: Other ML20210T9801984-04-26026 April 1984 Changes 0 to 3 of PT/0/A/4150/11, Control Rod Worth Measurement Project stage: Other ML20215C4021985-08-28028 August 1985 Forwards DPC-NE-1003, Rod Swap Methodology Rept for Startup Physics Testing Project stage: Other ML20215C4221985-08-31031 August 1985 Rod Swap Methodology Rept for Startup Physics Testing Project stage: Other ML20135D9861985-09-10010 September 1985 Forwards Summary of Review Criteria Evaluations,Per WCAP-9863-A, Rod Bank Worth Measurement Utilizing Bank Exchange & Ser.On 850626,measured 12.5% Below Predicted Value.No Safety Analysis Input Assumptions Effected Project stage: Other ML20210D6961986-09-15015 September 1986 Informs of Results of Cycle 3 Startup Physics Tests Conducted Using Method Described in, Rod Bank Worth Measurement Utilizing Bank Exchange. Ref Bank,Shutdown C, Worth Measured 14% Below Predicted Value Project stage: Other ML20215C3731986-10-0101 October 1986 Forwards Forwarding Rept Re Rod Swap Methodology, Which Was Never Docketed.Info Not Revised in Any Way, Submitted for Docketing Purposes Only Project stage: Other ML20214W9281986-12-0404 December 1986 Forwards Rev 1 to DPC-NE-1003, Rod Swap Methodology Rept for Startup Physics Testing Project stage: Other ML20214W9461986-12-31031 December 1986 Rev 1 to DPC-NE-1003, Rod Swap Methodology Rept for Startup Physics Testing Project stage: Other ML20207N2931987-01-12012 January 1987 Forwards Request for Addl Info to Complete Review of DPC-NE-1103, Rod Swap Methodology Rept for Startup Physics Testing. Info Required within 30 Days to Meet Review Completion Prior to Approval of Plant Reloads Project stage: RAI ML20213A5551987-01-28028 January 1987 Requests Remittance of Application Fee for Review of Rod Swap Methodology Rept for Startup Physics Testing Project stage: Approval ML20210U0201987-01-29029 January 1987 Changes 0 to 5 of PT/0/A/4150/11A, Control Rod Worth Measurement:Rod Swap Project stage: Other ML20210T9491987-01-29029 January 1987 Changes 0 to 31 of PT/0/A/4150/21, Post-Refueling Controlling Procedure for Criticality,Zero Power Physics & Power Escalation Testing Project stage: Other ML20210T8691987-02-11011 February 1987 Forwards Response to NRC 870112 Request for Addl Info Re Determination of Rod Worth Using Rod Swap Methodology. Methodology Described in 861204 Submittal Will Be Used for 870501 Reloads of Plants Project stage: Request ML20211G8511987-02-16016 February 1987 Comments on D Hood Re 14.5% Discrepancy Between Predicted & Measured Worths of Ref Bank of Unit 2,Cycle 3. Caused by Shortcomings in Measurement Technique.Procedure Used to Measure Rod Worths Will Be Revised Project stage: Other ML20207R7451987-03-11011 March 1987 Forwards Revised Responses to Questions 6 & 7 Re Determination of Rod Worth Using Rod Swap Methodology,Per Ds Hood 870112 Request & 870219 & 0310 Telcons Between Ds Hood & SA Gewehr Project stage: Other ML20214M3101987-05-22022 May 1987 Forwards SER Based on Review of Rod Swap Methodology Rept for Startup Physics Testing & 870211 & 0311 Supplemental Info.Rod Swap Methodology Acceptable for Rod Worth Measurement of Reload Cores for Plants Project stage: Approval ML20214M3361987-05-22022 May 1987 Safety Evaluation Supporting Util Rept Entitled, Rod Swap Methodology Rept for Startup Physics Testing Project stage: Approval 1986-12-04
[Table View] |
Text
b~
4 DuxE POWER GOMPm P.O. BOX 30189 CHARLOTTE. N.C. 28242 TE LE PHONE MALB.Tt:CKER (704) 373-4531 vice passmaw NCCLSAS.
August 28, 1985 Mr. Harold R. Denton, Director Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Washington, D. C. 20555 Attention:
E. G. Adensam, Chief Licensing Branch, No. 4
Subject:
McGuire Nuclear Station Catawba Nuclear Station Docket Nos.
50-369, 50-370, 50-413, 50-414 Rod Swap Methodology
Dear Mr. Denton:
Please find attached a report entitled " Rod Swap Methodology Report for Start-up Physics Testing". This report was developed by Duke Power Company for McGuire Nuclear Station and Catawba Nuclear Station.
During the initial Startup Physics testing at McGuire, Units 1 and 2, and Catawba, Unit 1, the Boration/ Dilution method was used to measure control and shutdown bank worths. During subsequent startups at McGuire, an approved vendor Rod Swap Methodology has been used.
Duke Power has developed a Rod Swap Methodology as an extension of its startup physics testing program. The attached report describes the calcula-tional procedures used to develop the rod swap constants and describes the measurement procedure used to determine the inferred bank worths. The report also presents a comparison between the calculated and inferred bank worths for McGuire Unit 1 Cycles 2 and 3, and McGuire Unit 2 Cycle 2.
The calculations as performed in this procedure utilize approved physics codes and methodologies.
Duke Power intends to utilize the attached rod swap methodology during all future startups at McGuire and Catawba Nulcear Stations. This report is being submitted to the NRC for information only, however, if there are any questions regarding the report, please contact us.
Very truly yours,
- /R E L y Hal B. Tucker WHM/hrp 8610100267 861001 PDR ADOCK 05000369 Attachmen, P
PDR l
Mr. Harold R. Denton, Director August 27, 1985 Page 2 1
cc:
Mr. W. T. Orders NRC Resident Inspecotr McGuire Nuclear Station P. H. Skinner NRC Resident Inspector Catawba Nuclear Station i
a (4
I l
I i
,-~.- -.
Mr. Harold R. Denton, Director August 27, 1985 Page 3 bec:
N. A. Rutherford 1
K. S. Canady R. L. Gill R. O. Sharpe S. A. Gewehr J. B. Day P. B. Nardoci L. T. Parker W. L. Hannersten J. H. Randles C. L. Hartzell L. H. Flores i
R. H. Clark s
E. O. McCraw M. Kitlan (MNS)
D. Robinson (CNS)
File: MC-801.01 CN-801.01 g
?
~
i a
k l
ll
=
s Y
1 1
5 4
l l
l 4
s
...,.,n..,..-
v_,,
,,,w,.,.-__w.
w
-an,.,~-n
,,w ve-wm
.~~~v--,-w---
-