Notice of Violation from Insp on 860602-05
ML20207K052
Person / Time
Site: Catawba  Duke Energy icon.png
Issue date: 06/26/1986
From: Reyes L
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To:
Shared Package
ML20207K043 List:
References
50-413-86-23, 50-414-86-25, NUDOCS 8607290325
Download: ML20207K052 (1)


Text

_ _ _ _ _ _ _ _ _ _

ENCLOSURE 1 NOTICE OF VIOLATION Duke Power Company Catawba Nuclear Plant Docket Nos. 50-413 and 50-414 License Nos. NPF-35 and NPF-52 During the Nuclear Regulatory Commission (NRC) inspection conducted on June 2-5, 1986, a violation of NRC requirements was identified.

failure to follow procedures for gaseous effluent measurements.The violation involved In accordance with the " General Statement of Policy and Procedure for NRC Enforcement Actions,"

10 CFR Part 2, Appendix C (1985), the violation is listed below:

Technical implemented,Specification 6.8.1 requires procedures to be established, Appendix A of Regulatory Guide 1.33,and maintained for the applicable proce Revision 2, February 1978 and the Quality Assurance Program for effluent and environmental monitoring.

Procedure HP/0/B/1001/16, Operation & Calibration:

Analysis System, ORTEC ADCAM Gamma Section 4.1.1.8 requires that dead-time limits for gamma spectroscopy analysis do not exceed 10 percent.

Contrary to the above, the licensee failed to follow procedures in that from January through May 1986 numerous gamma spectroscopy effluent process samples exceeded the 10 percent dead-time limits. analyses of gaseous This is a Severity Level IV Violation (Supplement IV).

this Office within 30 days of the date of the letter transmitti a written statement or explanation in reply including:

of the violation, (2) the reason for the violation if (1) admission or denial admitted, (3) the corrective steps which have been taken and the results achieved, (4) the date when steps corrective which will will full compliance be taken to avoid further violations, and (5) the be achieved.

consideration will be given to extendir.g the response Where good cause is shown, time.

FOR THE NUCLEAR REGULATORY COMMISSION

Luis A. Reyes, Acting Director Division of Reactor Projects Dated at Atlanta, Georgia this n; day of June 1986 8607290325 860626 PDR G

ADOCK 05000413 PDR