JUN 2 6 586
Docket Nos. 50-413 and 50-414
License Nos. NPF-35 and NPF-52
.
Duke Pow r Company
ATTN:
r. H. B. Tucker, Vice President
Nuclear Production Department-
422 South Church Street
Charlotte, NC 28242
Gentlemen:
SUBJECT: NOTICE OF VIOLATION
(NRC INSPECTION REPORT NOS. 50-413/86-23 AND 50-414/86-25)
This refers to the Nuclear Regulatory Commission (NRC) inspection conducted by
G. B. Kuzo on June 2-5, 1986.
The inspection included a review of activities
authorized for your Catawba facility.
At the conclusion of the inspection, the
findings were discussed with those members of your staff identified in the
enclosed inspection report.
Areas examined during the inspection are identified in the report.
Within these
the inspection consisted of selective examinations of procedures and
areas,
representative records, interviews with personnel, and observation of activities
in progress.
The inspection findings indicate that certain activities appeared to violate NRC
requirements.
The violation, references to pertinent requirements, and elements
to be included in your response are described in the enclosed Notice of
Violation.
In accordance with Section 2.790 of the NRC's " Rules of Practice,"
Title 10, Code of Federal Regulations, a copy of this letter and its enclosures
Part 2,
will be placed in the NRC Public Document Room.
The responses directed by this letter and its enclosure are not subject to the
clearance procedures of the Office of Management and Budget as required by the
'
Paperwork Reduction Act of 1980, PL 96-511.
Should you have any questions concerning this letter, please contact us.
Sincerely,
Original Signed by
Luis A. Reyes
Luis A. Reyes, Acting Director
Division of Reactor Projects
Enclosures:
(See page 2)
i
8607290321 860626
'
~
ADOCK 05000413
G
4
--
--
-
-
'h
2 0/
-
.
-
,
l
Duke Power Company
2
Enclosures:
1.
2.
Inspection Report
,
.
c w/encis:
. L. Dick, Vice President - Construction
. W. Hampton, Station Manager
/bec w/encls:
J K. N. Jabbour, NRR
/NRCResidentInspector
JDocument Control Desk
jStateofSouthCarolina
,
J
4
,
/
'g
RII
RII
RII
GBKuzo:y1e e(
e
RII4g
RII
RI
PsIIp#3
VBrownlee)
PGSt ddart
DMCollins
JPStohr
C urger
les
06/6 /86
06(q/86
06//f/86
06/#/86 06//f/86 06/q/86
6/g(/86
. .
.
.
,____._._ - _ - _ _ _ _ _ _ . _ . . . - . _ -