'o UNITED STATES
?
NUCLEAR REGULATORY COMMISSION e
{'
WASHING TO N, D. C. 20666
\\,...../
NEBRASKA PUBLIC POWER DISTRICT DOCKET NO. 50-298 COOPER NUCLEAR STATION AMENDMENT TO FACILITY OPERATING LICENSE Amendment No.125 License No. OPR-46 1.
The Nuclear Regulatory Comission lthe Comission) has found that:
A.
The application for amendment by Nebraska Public Power District (the licensee) dated July 5,1988, complies with the standards ard requirements of the Atceic Energy Act of 1954, as amended (the Act), and the Comission's rules and regulations set forth in 10 CFR Chapter I; B.
The facility will operate in conformity with the application, as amended, the previsions of the Act, and the rules and regulations of the Comission; C.
There is reasonable assurance:
(1) that the f.ctivities authorized by this amendment can be conducted without enfangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Connission's regulations; D.
The issuance of this license amendment will 1:ct be inimical to the comen defense and sectirity or to the health and safety of the public; and E.
The issuance of this amendment is in accordance with 10 CFR Part 51 of the Connission's regulations and all applicable requirements tave been satisfied.
e 1
\\,
P
. 2.
Accordingly, the license is amended by changes to the Technical Specifi-cations as indicated in the attachment to this license amendrent and Paragraph 2 C.(2) cf Facility Operating License No. DPR 46 is hereby amended to read as follows:
2.
Technical Specifications The Technical Specifications contained in Appendix A, as revised through Amendment No.125, are hereby incorporated in the license.
The licensee shall operate the facility in accordance with the Technical Specifications.
3.
The license amendment is effective as of its date of issuance.
FOR THE NUCLEAR REGULATORY COMMISSION IIs6# Jose A. Calvo, Director Project Directorate - 1Y Division of Reactor Projects - III, IV, V and Special Projects Office of Nuclear Reactor Regulation
Attachment:
Changes to the Technical Specifications Date of Issuance: August 8,1988 e
W
ATTACHMENT TO LICENSE AMENDMENT NO.125 FACILITY OPERATING LICENSE NO. OPR-46 DOCKET NO. 50-298 Replace the following page of the Appendix A Technical Specifications with the enclosed page. The revised area is indicated by a marginal line.
.P.a21 a
167 4
i J
I j
1 l
i,try,tINGENDITTONs eun vre.KAuVN 5URVEILLANCE REQUIREMENTS 3.7.D (cont'd.)
4.7.D (cont'd.)
b.
At least once per quarter:
)
(1) All normally open power operated isola-tion valves (except for the main steam line power-operated isolation valves) shall be fully closed ano reopened.
(2) With the reactor power less than 75%,
trip main steam isolation valves individually and verify closure time.
c.
At least once per operating cycle the operability of the reactor coolant system instrument line flow check v?.1ves shall be verified. '
i i
l 2.
In the event any isolation valve 2.
Whenever an isolation valve listed in specified in Table 3.7.1 becomes Table 3.7.1 is inoperable, the position inoperable, reactor power operation of at least one other valve in each may continue provided at least una line having an inoperable valve shall valve in each line having an inop-be recorded daily.
i arable valve shall be in the mode corresponding to the isolated condi-tion.
3.
If Specification t.7.D.1 and 3.7.D.2 cannot be met, an orderly shutdown shall be initiated and the reactor shall be in the Cold Shutdown ceri.dition within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.
l J
k Amendment No.125
<167-
.