ML20207B477
| ML20207B477 | |
| Person / Time | |
|---|---|
| Site: | Catawba |
| Issue date: | 07/25/1988 |
| From: | DUKE POWER CO. |
| To: | |
| Shared Package | |
| ML20207B471 | List: |
| References | |
| NUDOCS 8808020348 | |
| Download: ML20207B477 (1) | |
Text
INSERT FOR PAGE 3/4 3-26 ACTION 29 - a.
With the number of OPERABLE channels one less than the Total Number of Channels:
1.
Place the inoperable channel in the start permissive mode within 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br />, and 2.
Restote the inoperable channel to OPERABLE status within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />, or be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in COLD SHUTDOWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.
b.
With the number of OPERABLE channels one less than the Minimum Channels OPERABLE requirement:
1.
Place the inoperable co nncir. in the termination mode within l
2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br />, and 2.
Apply the applicable ACTION statement (Containment Spray Technical Specification 3.6.?
Containment Air Return and Hydrogen Skimner System Technical Specification 3.6.5.6).
890B020340 000725 PDR ADOCK 05000413 P
PNU
-