ML20207B477

From kanterella
Jump to navigation Jump to search
Proposed Tech Specs for Page 3/4 3-26 Re Channels of Containment Pressure Control Sys
ML20207B477
Person / Time
Site: Catawba  Duke Energy icon.png
Issue date: 07/25/1988
From:
DUKE POWER CO.
To:
Shared Package
ML20207B471 List:
References
NUDOCS 8808020348
Download: ML20207B477 (1)


Text

INSERT FOR PAGE 3/4 3-26 ACTION 29 - a.

With the number of OPERABLE channels one less than the Total Number of Channels:

1.

Place the inoperable channel in the start permissive mode within 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br />, and 2.

Restote the inoperable channel to OPERABLE status within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />, or be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in COLD SHUTDOWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.

b.

With the number of OPERABLE channels one less than the Minimum Channels OPERABLE requirement:

1.

Place the inoperable co nncir. in the termination mode within l

2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br />, and 2.

Apply the applicable ACTION statement (Containment Spray Technical Specification 3.6.?

Containment Air Return and Hydrogen Skimner System Technical Specification 3.6.5.6).

890B020340 000725 PDR ADOCK 05000413 P

PNU

-