Text

m -

\

,- April 10, 1987-Docket No. 50-344 DISTRIBUTION seeweer.ne_9 ~~~

B. Grimes NRCPDR J. Partlow Local PDR N. Thompson PD#3 RDg. ACRS(10)

E. Jordan C. Vogan Mr. David W. Cockfield T. Novak T. Chan Vice President, Nuclear OGC Portland General Electric Company 121 S.W. Salmon Street Portland, Oregon 97204

Dear Mr. Cockfield:

SUBJECT:

IMPLEMENTATION SCHEDULE FOR 10 CFR 50.48 FIRE PROTECTION MODIFICATIONS - TROJAN Generic Letter 86-10. " Implementation of Fire Protection Requirements" stated that the NPC would (1) review the dockets of' plants covered by 10 CFR 50.48 to determine the schedule deadlines for those plants, and (2) inform licensees of -

those schedule deadlines. .

We have reviewed the docket related to the schedule for implementation of

.10 CFR 50.48 for Troian. Based on that review, we have determined that the ,

fire protection and alternate or dedicated shutdown system modifications required to meet 10 CFR 50.48 have been scheduled by Portland General Electric Company (PGE) to be completed by the end of the 1988 refueling outage (June 1988). ,

Although the modifications were not completed consistent with the schedule requirements of 10 CFR 50.48 Trojan has been allowed to operate because of PGE's compensatory measures which have been approved by the NRC, _

We request that within 30 days from receipt of this letter, PGE notify the NRC Project Manager in writing, if this schedule is not correct. We also request that this office be kept apprised of any schedule delays, and of the '

completion of the 10 CFR 50.48 modifications.

Sincerely, Thomas M. Novak, Acting Director Division of PWR Licensing-A cc: See next page

  • SEE PREVIOUS CONCURRENCE PD#3 PDf3 P 7Di -A CVogan* TChan < a Tikv k 4/2/87 4/(,/87 44 /87 4/g/87 s

l 8704160273 870410 I PDR ADOCK 05000344 F PDR

~

,,.,m m e-w, w ,..p_- 3 -

e +-----.e, r-g--4m- g w g g- gy,g- yy+ - -

,u Occket No. 50-344 DISTRIBUTION Docket File B. Grimes l NRCPDR J. Partlow Local PDR N. Thompson PD#3 RDg. ACRS(10)

E. Jordan C. Vogan Mr. David W. Cockfield T. Novak T. Chan Vice President, Nuclear 0GC Portland General Electric Company 121 S.W. Salmon Street Portland, Oregon 97204

Dear Mr. Cockfield:

SUBJECT:

IMPLEMENTATION SCHEDULE FOR 10 CFR 50.48 FIRE PROTECTION MODIFICATIONS - TROJAN Generic Letter 86-10 "Imnlementation of Fire Protection Requirements" stated that the NRC would (1) review the dockets of plants covered by 50-48 to determine the schedule deadlines for those plants, and (2) inform licensees of those schedule deadlines.

We have reviewed the docket related to the schedule for implementation of 10 CFR 50.48 for Trojan. Based on that review, we have determined that the fire protection and alternate or dedicated shutdown system modifications required to meet 10 CFR 50.48 have been scheduled by Portland General Electric Company (PGE) to be completed by the end of the 1988 refueling outage (June 1988).

Although the modifications were not completed consistent with the schedule reoutrerrents of 10 CFR 50.48, Trojan has been allowed to operate because of PGE's compensatory measures which have been approved by the NRC.

We request that within 30 days from receipt of this letter, PGE notify the NPC Project Manager in writing, if this schedule is not correct. We also request that this office be kept appraised of any schedule delays, and of the completion of the 50.48 modifications.

Sincerely, Thomas M. Novak, Acting Director Division of PWR Licensing-A cc: See next page PD#3 PDf3 PD#3 A/D:PWR-A CVogan) TChan SVarga TNovak 4/th/87 4/ /87 4/ /87 4/ /87

I Mr. David V. Cockfield Trojan Nuclear Plant Portland General Electric Company cc:

Senior Resident Inspector U.S. Nuclear Regulatory Commission Trojan Nuclear Plant Post Office Box 0 Rainier, Oregon 97048 Robert M. Hunt, Chairman Board of County Conmissioners Columbia County St. Helens, Oregon 97501 William T. Dixon Oregon Department of Energy Labor and Industries Building Room 111 Salem, Oregon 97310 Regianal Administrator, 7egion V U.S. Nuclear Regulatory Commission 1450 Paria Lane, Suite 210 Walnut Creek, California 94596