MONTHYEARML20132C7801985-03-0606 March 1985 Forwards SER Re Effects of Breakout of Spirit Lake on Facility.Conclusion That Breakout Will Not Affect Safety Based on Unpublished USGS Study Rept & Subj to Change. Permanent Outlet Tunnel Under Const Will Resolve Concern Project stage: Request ML20129J0911985-05-31031 May 1985 Forwards Amend 1 to 10CFR50,App R Review Rept,Per C Trammell Request.Amend Provides Addl Mods in Fire Area E1,withdraws 850208 Exemption Request for Fire Area R1 & Incorporates 850306 Response to Re Safe Shutdown Review Project stage: Request ML20138K5081985-10-15015 October 1985 Forwards Safety Evaluation Accepting Util 840731 & 850306 Proposed Revised Sections III.G.3 & Iii.L of 10CFR50,App R Re Alternate Shutdown Capability W/Identified Mods & Compensatory Measures Project stage: Approval ML20138K5211985-10-15015 October 1985 Safety Evaluation Concluding That Util Proposed post-fire Alternate Shutdown Design Meets Requirements of 10CFR50,App R,Sections III.G.3 & Iii.L W/Proposed Mods & Interim Measures & Acceptable Project stage: Approval ML20136E9851985-11-15015 November 1985 Notification of 851126 Meeting W/Util & NRC Consultants in Columbia County,Or to Discuss Five Requested Exemptions from Requirements of App R,Section Iii.G Re Fire Protection for Four Affected Areas Project stage: Meeting ML20138Q0941985-12-20020 December 1985 Responds to NRC 851113 Request for Addl Info Re Util Jul 1984 App R Exemption Requests Project stage: Request ML20215H2071986-10-16016 October 1986 Requests Exemption from 10CFR50,App R Requirements Re 20-ft Separation Criteria.Extension of Automatic Sprinkler Sys Planned to Protect Exhaust Fans for Emergency Diesel Generator Rooms from Exposure Fire Project stage: Other ML20214A2941986-11-0404 November 1986 Portland General Electric Nuclear Plant Engineering Design Criteria:Extension of Automatic Sprinkler Sys Be (Rdc 84-048) Turbine Bldg Trojan Nuclear Power Plant Project stage: Other ML20214G3041986-11-17017 November 1986 Provides Addl Info Re 861016 Request for Exemption from Requirements of 10CFR50,App R.Field Check Verified That Lower Sprinkler Head Not Below All Cable Trays.Sketch of Elevation View Encl Project stage: Request ML20211H9541987-02-18018 February 1987 Requests That Dec 1987 Commitment Date Be Extended to Prior to Return to Power Following 1988 Refueling Outage to Complete Installation of Remote Shutdown Panel.Reasons for Extension & App R Commitments Affected by New Panel Listed Project stage: Other IR 05000344/19870121987-04-10010 April 1987 Insp Rept 50-344/87-12 on 870330-0403.No Noncompliance or Deviations Noted.Major Areas Inspected:Areas of Design Changes & Mods,Qa Program Measuring & Test Equipment, Followup of Previous Insp Findings & Closure of Open Items Project stage: Request ML20206K1271987-04-10010 April 1987 Advises That Implementation Schedule for 10CFR50.48 Fire Protection Mods for Util Determined to Be Completed by End of 1988 Refueling Outage (June 1988).Requests Util Notify NRC If Schedule Not Correct within 30 Days from Ltr Receipt Project stage: Other ML20214A2761987-05-0808 May 1987 Requests Withdrawal of Request for Exemption from 10CFR50, App R,Section III.G.2.b in Case of Emergency Diesel Generator Ventilation Exhaust Openings.In Lieu of Exemption, Util Requests NRC Review & Approval of Listed Encls Project stage: Withdrawal IR 05000344/19870151987-05-0808 May 1987 Insp Rept 50-344/87-15 on 870415-24.Violations Noted: Failure to Establish & Implement Radiation Protection Procedures,Failure to Provide Instructions to Workers & Failure to Perform Survey & Maintain Records Project stage: Request ML20214K0081987-05-20020 May 1987 Responds to NRC Re Schedule for Implementation of 10CFR50.48 Fire Protection Mods.Mods Completed W/Exception of Four Listed Items.Items 1 & 2 Will Be Completed by 1988 Refueling Outage.Items 3 & 4 Will Be Completed by 871231 Project stage: Other ML20236M8981987-10-27027 October 1987 Environ Assessment & Finding of No Significant Impact Supporting Exemption from Section Iii.G of App R of 10CFR50 Re Fire Protection of Equipment Important to Safe Shutdown Project stage: Approval ML20236M8321987-10-27027 October 1987 Forwards Environ Assessment & Finding of No Significant Impact Re Util 840731,850531,861016 & 1117 & s Requesting Exemption from Requirements of Section III.G.2 of App R of Tech Specs Project stage: Approval ML20236S4021987-11-12012 November 1987 Safety Evaluation Supporting Exemption from Requirements of 10CFR50,App R,Section III.G.2 Re Fire Protection of Safe Shutdown Capability Requirements Project stage: Approval ML20236S3991987-11-12012 November 1987 Forwards Exemption from Requirements of 10CFR50,App R, Section III.G.2 Re Fire Protection of Safe Shutdown Capability Requirements in Response to Util 840731,850531, 861016,1117 & 870508 Requests.Safety Evaluation Also Encl Project stage: Approval 1986-11-17
[Table View] |
Text
m
\\
April 10, 1987-Docket No. 50-344 DISTRIBUTION seeweer.ne_9 B. Grimes
~~~
NRCPDR J. Partlow Local PDR N. Thompson PD#3 RDg.
ACRS(10)
E. Jordan C. Vogan Mr. David W. Cockfield T. Novak T. Chan Vice President, Nuclear OGC Portland General Electric Company 121 S.W. Salmon Street Portland, Oregon 97204
Dear Mr. Cockfield:
SUBJECT:
IMPLEMENTATION SCHEDULE FOR 10 CFR 50.48 FIRE PROTECTION MODIFICATIONS - TROJAN Generic Letter 86-10. " Implementation of Fire Protection Requirements" stated that the NPC would (1) review the dockets of' plants covered by 10 CFR 50.48 to determine the schedule deadlines for those plants, and (2) inform licensees of those schedule deadlines.
We have reviewed the docket related to the schedule for implementation of
.10 CFR 50.48 for Troian. Based on that review, we have determined that the fire protection and alternate or dedicated shutdown system modifications required to meet 10 CFR 50.48 have been scheduled by Portland General Electric Company (PGE) to be completed by the end of the 1988 refueling outage (June 1988).
Although the modifications were not completed consistent with the schedule requirements of 10 CFR 50.48 Trojan has been allowed to operate because of PGE's compensatory measures which have been approved by the NRC, We request that within 30 days from receipt of this letter, PGE notify the NRC Project Manager in writing, if this schedule is not correct. We also request that this office be kept apprised of any schedule delays, and of the completion of the 10 CFR 50.48 modifications.
Sincerely, Thomas M. Novak, Acting Director Division of PWR Licensing-A cc: See next page
- SEE PREVIOUS CONCURRENCE PD#3 PDf3 P
7Di
-A a
Tikv k CVogan*
TChan 4/2/87 4/(,/87 44
/87 4/g/87 s
l 8704160273 870410 PDR ADOCK 05000344 F
PDR
,,.,m m
e-w, w
,..p_-
3 e
+-----.e, r-g--4m-g w
g g-gy,g-yy+ - -
~
,u Occket No. 50-344 DISTRIBUTION Docket File B. Grimes NRCPDR J. Partlow Local PDR N. Thompson PD#3 RDg.
ACRS(10)
E. Jordan C. Vogan Mr. David W. Cockfield T. Novak T. Chan Vice President, Nuclear 0GC Portland General Electric Company 121 S.W. Salmon Street Portland, Oregon 97204
Dear Mr. Cockfield:
SUBJECT:
IMPLEMENTATION SCHEDULE FOR 10 CFR 50.48 FIRE PROTECTION MODIFICATIONS - TROJAN Generic Letter 86-10 "Imnlementation of Fire Protection Requirements" stated that the NRC would (1) review the dockets of plants covered by 50-48 to determine the schedule deadlines for those plants, and (2) inform licensees of those schedule deadlines.
We have reviewed the docket related to the schedule for implementation of 10 CFR 50.48 for Trojan. Based on that review, we have determined that the fire protection and alternate or dedicated shutdown system modifications required to meet 10 CFR 50.48 have been scheduled by Portland General Electric Company (PGE) to be completed by the end of the 1988 refueling outage (June 1988).
Although the modifications were not completed consistent with the schedule reoutrerrents of 10 CFR 50.48, Trojan has been allowed to operate because of PGE's compensatory measures which have been approved by the NRC.
We request that within 30 days from receipt of this letter, PGE notify the NPC Project Manager in writing, if this schedule is not correct. We also request that this office be kept appraised of any schedule delays, and of the completion of the 50.48 modifications.
Sincerely, Thomas M. Novak, Acting Director Division of PWR Licensing-A cc: See next page PD#3 PDf3 PD#3 A/D:PWR-A CVogan)
TChan SVarga TNovak 4/th/87 4/ /87 4/ /87 4/ /87
I Mr. David V. Cockfield Portland General Electric Company Trojan Nuclear Plant cc:
Senior Resident Inspector U.S. Nuclear Regulatory Commission Trojan Nuclear Plant Post Office Box 0 Rainier, Oregon 97048 Robert M. Hunt, Chairman Board of County Conmissioners Columbia County St. Helens, Oregon 97501 William T. Dixon Oregon Department of Energy Labor and Industries Building Room 111 Salem, Oregon 97310 Regianal Administrator, 7egion V U.S. Nuclear Regulatory Commission 1450 Paria Lane, Suite 210 Walnut Creek, California 94596