MONTHYEARML20132C7801985-03-0606 March 1985
[Table View]Forwards SER Re Effects of Breakout of Spirit Lake on Facility.Conclusion That Breakout Will Not Affect Safety Based on Unpublished USGS Study Rept & Subj to Change. Permanent Outlet Tunnel Under Const Will Resolve Concern Project stage: Request ML20129J0911985-05-31031 May 1985 Forwards Amend 1 to 10CFR50,App R Review Rept,Per C Trammell Request.Amend Provides Addl Mods in Fire Area E1,withdraws 850208 Exemption Request for Fire Area R1 & Incorporates 850306 Response to Re Safe Shutdown Review Project stage: Request ML20138K5211985-10-15015 October 1985 Safety Evaluation Concluding That Util Proposed post-fire Alternate Shutdown Design Meets Requirements of 10CFR50,App R,Sections III.G.3 & Iii.L W/Proposed Mods & Interim Measures & Acceptable Project stage: Approval ML20138K5081985-10-15015 October 1985 Forwards Safety Evaluation Accepting Util 840731 & 850306 Proposed Revised Sections III.G.3 & Iii.L of 10CFR50,App R Re Alternate Shutdown Capability W/Identified Mods & Compensatory Measures Project stage: Approval ML20136E9851985-11-15015 November 1985 Notification of 851126 Meeting W/Util & NRC Consultants in Columbia County,Or to Discuss Five Requested Exemptions from Requirements of App R,Section Iii.G Re Fire Protection for Four Affected Areas Project stage: Meeting ML20138Q0941985-12-20020 December 1985 Responds to NRC 851113 Request for Addl Info Re Util Jul 1984 App R Exemption Requests Project stage: Request ML20215H2071986-10-16016 October 1986 Requests Exemption from 10CFR50,App R Requirements Re 20-ft Separation Criteria.Extension of Automatic Sprinkler Sys Planned to Protect Exhaust Fans for Emergency Diesel Generator Rooms from Exposure Fire Project stage: Other ML20214A2941986-11-0404 November 1986 Portland General Electric Nuclear Plant Engineering Design Criteria:Extension of Automatic Sprinkler Sys Be (Rdc 84-048) Turbine Bldg Trojan Nuclear Power Plant Project stage: Other ML20214G3041986-11-17017 November 1986 Provides Addl Info Re 861016 Request for Exemption from Requirements of 10CFR50,App R.Field Check Verified That Lower Sprinkler Head Not Below All Cable Trays.Sketch of Elevation View Encl Project stage: Request ML20211H9541987-02-18018 February 1987 Requests That Dec 1987 Commitment Date Be Extended to Prior to Return to Power Following 1988 Refueling Outage to Complete Installation of Remote Shutdown Panel.Reasons for Extension & App R Commitments Affected by New Panel Listed Project stage: Other IR 05000344/19870121987-04-10010 April 1987 Insp Rept 50-344/87-12 on 870330-0403.No Noncompliance or Deviations Noted.Major Areas Inspected:Areas of Design Changes & Mods,Qa Program Measuring & Test Equipment, Followup of Previous Insp Findings & Closure of Open Items Project stage: Request ML20206K1271987-04-10010 April 1987 Advises That Implementation Schedule for 10CFR50.48 Fire Protection Mods for Util Determined to Be Completed by End of 1988 Refueling Outage (June 1988).Requests Util Notify NRC If Schedule Not Correct within 30 Days from Ltr Receipt Project stage: Other IR 05000344/19870151987-05-0808 May 1987 Insp Rept 50-344/87-15 on 870415-24.Violations Noted: Failure to Establish & Implement Radiation Protection Procedures,Failure to Provide Instructions to Workers & Failure to Perform Survey & Maintain Records Project stage: Request ML20214A2761987-05-0808 May 1987 Requests Withdrawal of Request for Exemption from 10CFR50, App R,Section III.G.2.b in Case of Emergency Diesel Generator Ventilation Exhaust Openings.In Lieu of Exemption, Util Requests NRC Review & Approval of Listed Encls Project stage: Withdrawal ML20214K0081987-05-20020 May 1987 Responds to NRC Re Schedule for Implementation of 10CFR50.48 Fire Protection Mods.Mods Completed W/Exception of Four Listed Items.Items 1 & 2 Will Be Completed by 1988 Refueling Outage.Items 3 & 4 Will Be Completed by 871231 Project stage: Other ML20236M8981987-10-27027 October 1987 Environ Assessment & Finding of No Significant Impact Supporting Exemption from Section Iii.G of App R of 10CFR50 Re Fire Protection of Equipment Important to Safe Shutdown Project stage: Approval ML20236M8321987-10-27027 October 1987 Forwards Environ Assessment & Finding of No Significant Impact Re Util 840731,850531,861016 & 1117 & s Requesting Exemption from Requirements of Section III.G.2 of App R of Tech Specs Project stage: Approval ML20236S4021987-11-12012 November 1987 Safety Evaluation Supporting Exemption from Requirements of 10CFR50,App R,Section III.G.2 Re Fire Protection of Safe Shutdown Capability Requirements Project stage: Approval ML20236S3991987-11-12012 November 1987 Forwards Exemption from Requirements of 10CFR50,App R, Section III.G.2 Re Fire Protection of Safe Shutdown Capability Requirements in Response to Util 840731,850531, 861016,1117 & 870508 Requests.Safety Evaluation Also Encl Project stage: Approval 1986-11-17 |
ML20136E985 | |
Person / Time | |
---|---|
Site: | Trojan File:Portland General Electric icon.png |
Issue date: | 11/15/1985 |
From: | Tourigny E Office of Nuclear Reactor Regulation |
To: | Butcher E Office of Nuclear Reactor Regulation |
References | |
TAC-55831, NUDOCS 8511220004 | |
Download: ML20136E985 (2) | |
Similar Documents at Trojan | |
---|---|
Category:INTERNAL OR EXTERNAL MEMORANDUM
MONTHYEARML20217D1071999-09-16016 September 1999
[Table view]Provides Proposed Schedule for Review of Trojan License Termination Plan (Ltp),As Committed in 990903 Memo.Project Manager Should Schedule LTP Meeting Near Trojan Site for Late Nov or Early Dec,Based on Region IV Availability ML20216E4091999-09-0303 September 1999 Informs That Staff Has Performed Acceptance Review of Trojan Nuclear Plant License Termination Plan Submitted by Ltr Dtd 990805.NMSS Determined That Licensee Has Provided Sufficient Info for NRC to Proceed with Detailed Review ML20205R4091999-04-16016 April 1999 Informs That LTP for Trojan Nuclear Plant Did Not Provide Sufficient Info to Perform Detailed Review & Waste Mgt Recommends Returning LTP to Licensee So That LTP Can Be Resubmitted as Complete Application ML20195B6401998-11-10010 November 1998 Notification of 981119 Meeting with Util in Rockville,Md to Discuss Preliminary Plans for Plant Final Site Surveys ML20155G6571998-11-0303 November 1998 Notification of 981119-990331 Meeting with Util in Rockville,Md to Clarify Remaining Technical Issues Associated with Util Application for License to Operate ISFSI at Tpp ML20236S5361998-07-22022 July 1998 Notification of 980812 Meeting W/Portland General Electric in Arlington,Texas to Discuss Status of Decommissioning Activities at Trojan NPP ML20236R6931998-07-15015 July 1998 Notification of 980730 Meeting W/Util to Discuss Request for Addl Info Re Ongoing Review of Portland General Electric Co Request for Approval to Allow one-time Shipment of Trojan Decommissioned Reactor Vessel.Meeting Agenda Encl ML20236R6511998-07-15015 July 1998 Notification of 980730 Meeting W/Listed Participants in Kelso,Wa Re Proposed Request from Portland General Electric Co for Approval to Allow one-time Shipment of Plant Decommissioned Reactor Vessel.Meeting Agenda Encl ML20248L4691998-03-17017 March 1998 Notifies of in-house Research Project Re Digital I&C in NPP & Forwards Technical Training Div (TTD) ML20216E7421998-03-0606 March 1998 Notification of 980318 Meeting W/Portland General Electric in Rockville,Maryland to Discuss Proposed Shallow Land Disposal of Trojan Reactor Vessel ML20199D4951998-01-26026 January 1998 Notification of Licensee Meeting W/Util on 980209 in Arlington,Tx to Discuss Changes to Protected Area for Plant to Facilitate Ongoing Decommissioning of Site ML20199G1121998-01-20020 January 1998 Submits Addl Views on Proposal to Dispose of Trojan Reactor Vessel,Per SECY-97-244 ML20211M5671997-10-0303 October 1997 Forwards Regulatory Documents Comprising Regulatory History of Notice of Proposed Rulemaking Entitled Financial Assurance Requirements for Decommissioning Nuclear Power Reactors, Which Amended 10CFR50,published in Fr on 970910 ML20141G2911997-05-15015 May 1997 Forwards Page A-25 of Rev 5 to PGE-1060, Tnp Permanently Defueled Emergency Plan ML20137W9801997-04-16016 April 1997 Notification of Significant Licensee Meeting W/Util on 970508 in Rockville,Md to Discuss Plans for Decommissioning of Plant ML20137H2231997-03-31031 March 1997 Forwards Info in Support of Pnl Modeling for Fgeis Final Rule on Radiological Criteria for License Termination ML20135B1941997-01-30030 January 1997 Responds to Re Util Position Re Potential for Ash Fall at Trojan Site ML20138J2731997-01-21021 January 1997 Submits Comments on 970113-16 QA Insp of Sierra Nuclear Corp in Scott Valley,Ca ML20134B6001997-01-13013 January 1997 Provides Meeting Minutes from NRC Insp 97-201 Exit Meeting Re Insp of Trojan'S QA Program for Isfsi,From 970107-09 ML20133N2821997-01-0808 January 1997 Requests Comments on Poge Position Re Potential for Ashfall at Trojan Site ML20135B8581996-12-0303 December 1996 Requests Guidance on Use of 10CFR71.41(c) Per Licensee Request for Authorization to Transport Reactor Vessel as Type B Package ML20134D7161996-10-24024 October 1996 Requests That Encl Internet Mail Received from PM Blanch,Dtd Through 960930,be Placed in Pdr.No Distribution Outside of PDR Necessary ML20237F1891996-01-22022 January 1996 Notification of 960131 Meeting W/Util in Rockville,Md to Discuss Planned Removal of Plant Pressure Vessel ML20211M6231994-11-30030 November 1994 Provides Info to Commission on Status of Rulemaking Activities Re Power Reactor Decommissioning Cost Issues,Per 930714 SRM ML20057B6071993-09-16016 September 1993 Notification of 930928 Meeting W/Util in Rockville,Md to Discuss Status of Decommission Activities & Physical Security ML20057A6651993-08-27027 August 1993 Forwards Notice of Consideration of Issuance of Amend to License NPF-1 & Proposed NSHC Determination & Opportunity for Hearing ML20056E5331993-08-16016 August 1993 Notification of 930901 Mtg W/Util & State of or in Rainier, or to Discuss Proposed Studies of Plant Sys at Plant ML20056E4451993-08-0606 August 1993 Notifies of 930812 Meeting W/Util in Rockville,Md for Presentation on Plant Decommissioned TS ML20056E4571993-08-0505 August 1993 Forwards Technical Review Rept Re, Tardy Licensee Actions Initiated Because of Delayed Replacement of Batteries in Uninterruptible Power Supplies at Plant ML20128G0061993-02-0101 February 1993 Notifies of Cancelled 930210 Meeting W/Technical Analysis Corp to Discuss Shutdown Plans & Decommissioning Strategies for Plant ML20127L9741993-01-22022 January 1993 Notification of 930204 Meeting W/Util in Rockville,Md to Discuss Shutdown Plans & Decommissioning Strategies for Plant ML20127J7691993-01-15015 January 1993 Discusses Interim Plugging Criteria for Util & Provides Discription of Core Damage Frequency Derivation & Present RES Plans for Addl Work on Steam Generator Tube NDE That RES Intends to Do This Year ML20127E7821993-01-11011 January 1993 Notification of Significant Licensee Meeting W/Util on 930120 to Discuss Shutdown Plans & Decommissioning Strategies for Facility ML20127A5381993-01-0707 January 1993 Discusses QC Concerns W/Mine Safety Appliances Co Full Face Negative Pressure Respirators (Ultra View & Ultra Twin) W/Potential 10CFR21 Implications ML20127F4461993-01-0707 January 1993 Revised Notification of Significant Meeting W/Util on 930202 to Discuss One Violation of 10CFR50.7(f) Identified During OI Investigation of Security Department at Plant ML20127A5701993-01-0505 January 1993 Provides Position on Interim Plugging Criteria for Plant ML20126G9861992-12-22022 December 1992 Notification of Significant Licensee Meeting W/Util on 930113 to Discuss One Violation of 10CFR50.7(f) Identified During OI Investigation of Security Dept at Plant ML20126F4821992-12-18018 December 1992 Notification of Cancellation of 921230 Meeting W/Util in Rockville,Md to Discuss SG Insp Program & Results as Consequence of 921109 primary-to-secondary SG Tube Leak Event & Recent Issues Raised Re Interim Plugging Criteria ML20126E6501992-12-18018 December 1992 Notification of or Energy Facility Siting Council Special Meeting & Hearing on 930105 & 06 in Portland,Or to Discuss Tnp SG Tube Cracking Issue,Interim SG Tube Plugging Criteria & Issues from Current Forced Outage.Agenda Encl ML20126F4271992-12-18018 December 1992 Notification of 921230 Meeting W/Util in Rockville,Md to to Discuss Steam Generator Insp Program & Results as Consequence of primary-to-secondary Steam Generator Leak Event on 921109 ML20126E7641992-12-16016 December 1992 Notification of 921223 Meeting W/Util in Rockville,Md to Discuss Steam Generator Insp Program & Results as Consequence of 921109 primary-to-secondary Steam Generator Tube Leak Event ML20126F4651992-12-16016 December 1992 Cancelled Notification of 921223 Meeting W/Util in Rockville,Md to Discuss SG Insp Program & Results as Consequence of 921109,primary-to-secondary SG Tube Leak Event ML20125C7641992-12-0909 December 1992 Discusses Technical Aspects of Rationale Used to Support Steam Generator Tube Interim Plugging Criteria for Plant & Independent Conclusions on Viability of Independent Plugging Criteria for One Fuel Cycle ML20126F4711992-12-0707 December 1992 Forwards Draft Rept of RES Position on Steam Generator Tube Integrity ML20126E5221992-11-30030 November 1992 Informs Staff Revised Prioritization Will Be Forwarded for Further Comments in Response to 921124 Memo Re GI 163, Multiple Steam Geneator Tube Leakage ML20125A6311992-11-25025 November 1992 Notification of 921201 Meeting W/Util to Discuss Assessment of Recent SG Tube Leak ML20128C3491992-06-16016 June 1992 Discusses Proposal of New Generic Issue, Multiple SG Tube Leakage, as Resolution to DPO Received Addressing Operation of SGs W/Microscopic Tube Wall Cracks.Dpo Encl ML20128C3141992-03-27027 March 1992 Submits Analysis, Safety Issue Re Continuous Operation W/ Degraded SG Tubes, Indicating Core Melt Probability Frequency of 10 -4/Ry W/Containment Bypass NUREG-5055, Notification of 901017 Meeting W/Util in Rockville,Md,To Discuss Proposed Mods to Control Bldg Per NUREG-50551990-10-10010 October 1990 Notification of 901017 Meeting W/Util in Rockville,Md,To Discuss Proposed Mods to Control Bldg Per NUREG-5055 ML20059C1331990-08-21021 August 1990 Notification of Enforcement Conference 90-143 W/Util on 900830 to Discuss Violation Noted During Special Security Insp 1999-09-03 Category:MEMORANDUMS-CORRESPONDENCE MONTHYEARML20217D1071999-09-16016 September 1999
[Table view]Provides Proposed Schedule for Review of Trojan License Termination Plan (Ltp),As Committed in 990903 Memo.Project Manager Should Schedule LTP Meeting Near Trojan Site for Late Nov or Early Dec,Based on Region IV Availability ML20216E4091999-09-0303 September 1999 Informs That Staff Has Performed Acceptance Review of Trojan Nuclear Plant License Termination Plan Submitted by Ltr Dtd 990805.NMSS Determined That Licensee Has Provided Sufficient Info for NRC to Proceed with Detailed Review ML20205R4091999-04-16016 April 1999 Informs That LTP for Trojan Nuclear Plant Did Not Provide Sufficient Info to Perform Detailed Review & Waste Mgt Recommends Returning LTP to Licensee So That LTP Can Be Resubmitted as Complete Application ML20195B6401998-11-10010 November 1998 Notification of 981119 Meeting with Util in Rockville,Md to Discuss Preliminary Plans for Plant Final Site Surveys ML20155G6571998-11-0303 November 1998 Notification of 981119-990331 Meeting with Util in Rockville,Md to Clarify Remaining Technical Issues Associated with Util Application for License to Operate ISFSI at Tpp ML20236S5361998-07-22022 July 1998 Notification of 980812 Meeting W/Portland General Electric in Arlington,Texas to Discuss Status of Decommissioning Activities at Trojan NPP ML20236R6511998-07-15015 July 1998 Notification of 980730 Meeting W/Listed Participants in Kelso,Wa Re Proposed Request from Portland General Electric Co for Approval to Allow one-time Shipment of Plant Decommissioned Reactor Vessel.Meeting Agenda Encl ML20236R6931998-07-15015 July 1998 Notification of 980730 Meeting W/Util to Discuss Request for Addl Info Re Ongoing Review of Portland General Electric Co Request for Approval to Allow one-time Shipment of Trojan Decommissioned Reactor Vessel.Meeting Agenda Encl ML20248L4691998-03-17017 March 1998 Notifies of in-house Research Project Re Digital I&C in NPP & Forwards Technical Training Div (TTD) ML20216E7421998-03-0606 March 1998 Notification of 980318 Meeting W/Portland General Electric in Rockville,Maryland to Discuss Proposed Shallow Land Disposal of Trojan Reactor Vessel ML20199D4951998-01-26026 January 1998 Notification of Licensee Meeting W/Util on 980209 in Arlington,Tx to Discuss Changes to Protected Area for Plant to Facilitate Ongoing Decommissioning of Site ML20199G1561998-01-22022 January 1998 Staff Requirements Memo Re SECY-97-244, Waste Classification of Plant Reactor Vessel ML20199G1121998-01-20020 January 1998 Submits Addl Views on Proposal to Dispose of Trojan Reactor Vessel,Per SECY-97-244 ML20211M5671997-10-0303 October 1997 Forwards Regulatory Documents Comprising Regulatory History of Notice of Proposed Rulemaking Entitled Financial Assurance Requirements for Decommissioning Nuclear Power Reactors, Which Amended 10CFR50,published in Fr on 970910 ML20216F2611997-08-26026 August 1997 Staff Requirements Memo Re SECY-97-164, Shipment of Decommissioned Reactor Vessel,Containing Irradiated Internals,From Trojan Nuclear Plant to Hanford Nuclear Reservation,Richland,Wa ML20141G2911997-05-15015 May 1997 Forwards Page A-25 of Rev 5 to PGE-1060, Tnp Permanently Defueled Emergency Plan ML20137W9801997-04-16016 April 1997 Notification of Significant Licensee Meeting W/Util on 970508 in Rockville,Md to Discuss Plans for Decommissioning of Plant ML20137H2231997-03-31031 March 1997 Forwards Info in Support of Pnl Modeling for Fgeis Final Rule on Radiological Criteria for License Termination ML20135B1941997-01-30030 January 1997 Responds to Re Util Position Re Potential for Ash Fall at Trojan Site ML20138J2731997-01-21021 January 1997 Submits Comments on 970113-16 QA Insp of Sierra Nuclear Corp in Scott Valley,Ca ML20134B6001997-01-13013 January 1997 Provides Meeting Minutes from NRC Insp 97-201 Exit Meeting Re Insp of Trojan'S QA Program for Isfsi,From 970107-09 ML20133N2821997-01-0808 January 1997 Requests Comments on Poge Position Re Potential for Ashfall at Trojan Site ML20135B8581996-12-0303 December 1996 Requests Guidance on Use of 10CFR71.41(c) Per Licensee Request for Authorization to Transport Reactor Vessel as Type B Package ML20134D7161996-10-24024 October 1996 Requests That Encl Internet Mail Received from PM Blanch,Dtd Through 960930,be Placed in Pdr.No Distribution Outside of PDR Necessary ML20237F1891996-01-22022 January 1996 Notification of 960131 Meeting W/Util in Rockville,Md to Discuss Planned Removal of Plant Pressure Vessel ML20211M6231994-11-30030 November 1994 Provides Info to Commission on Status of Rulemaking Activities Re Power Reactor Decommissioning Cost Issues,Per 930714 SRM ML20057B6071993-09-16016 September 1993 Notification of 930928 Meeting W/Util in Rockville,Md to Discuss Status of Decommission Activities & Physical Security ML20057A6651993-08-27027 August 1993 Forwards Notice of Consideration of Issuance of Amend to License NPF-1 & Proposed NSHC Determination & Opportunity for Hearing ML20056E5331993-08-16016 August 1993 Notification of 930901 Mtg W/Util & State of or in Rainier, or to Discuss Proposed Studies of Plant Sys at Plant ML20056E4451993-08-0606 August 1993 Notifies of 930812 Meeting W/Util in Rockville,Md for Presentation on Plant Decommissioned TS ML20056E4571993-08-0505 August 1993 Forwards Technical Review Rept Re, Tardy Licensee Actions Initiated Because of Delayed Replacement of Batteries in Uninterruptible Power Supplies at Plant ML20128G0061993-02-0101 February 1993 Notifies of Cancelled 930210 Meeting W/Technical Analysis Corp to Discuss Shutdown Plans & Decommissioning Strategies for Plant ML20127L9741993-01-22022 January 1993 Notification of 930204 Meeting W/Util in Rockville,Md to Discuss Shutdown Plans & Decommissioning Strategies for Plant ML20127J7691993-01-15015 January 1993 Discusses Interim Plugging Criteria for Util & Provides Discription of Core Damage Frequency Derivation & Present RES Plans for Addl Work on Steam Generator Tube NDE That RES Intends to Do This Year ML20127E7821993-01-11011 January 1993 Notification of Significant Licensee Meeting W/Util on 930120 to Discuss Shutdown Plans & Decommissioning Strategies for Facility ML20127A5381993-01-0707 January 1993 Discusses QC Concerns W/Mine Safety Appliances Co Full Face Negative Pressure Respirators (Ultra View & Ultra Twin) W/Potential 10CFR21 Implications ML20127F4461993-01-0707 January 1993 Revised Notification of Significant Meeting W/Util on 930202 to Discuss One Violation of 10CFR50.7(f) Identified During OI Investigation of Security Department at Plant ML20127A5701993-01-0505 January 1993 Provides Position on Interim Plugging Criteria for Plant ML20126G9861992-12-22022 December 1992 Notification of Significant Licensee Meeting W/Util on 930113 to Discuss One Violation of 10CFR50.7(f) Identified During OI Investigation of Security Dept at Plant ML20126E6501992-12-18018 December 1992 Notification of or Energy Facility Siting Council Special Meeting & Hearing on 930105 & 06 in Portland,Or to Discuss Tnp SG Tube Cracking Issue,Interim SG Tube Plugging Criteria & Issues from Current Forced Outage.Agenda Encl ML20126F4271992-12-18018 December 1992 Notification of 921230 Meeting W/Util in Rockville,Md to to Discuss Steam Generator Insp Program & Results as Consequence of primary-to-secondary Steam Generator Leak Event on 921109 ML20126F4821992-12-18018 December 1992 Notification of Cancellation of 921230 Meeting W/Util in Rockville,Md to Discuss SG Insp Program & Results as Consequence of 921109 primary-to-secondary SG Tube Leak Event & Recent Issues Raised Re Interim Plugging Criteria ML20126E7641992-12-16016 December 1992 Notification of 921223 Meeting W/Util in Rockville,Md to Discuss Steam Generator Insp Program & Results as Consequence of 921109 primary-to-secondary Steam Generator Tube Leak Event ML20126F4651992-12-16016 December 1992 Cancelled Notification of 921223 Meeting W/Util in Rockville,Md to Discuss SG Insp Program & Results as Consequence of 921109,primary-to-secondary SG Tube Leak Event ML20125C7641992-12-0909 December 1992 Discusses Technical Aspects of Rationale Used to Support Steam Generator Tube Interim Plugging Criteria for Plant & Independent Conclusions on Viability of Independent Plugging Criteria for One Fuel Cycle ML20126F4711992-12-0707 December 1992 Forwards Draft Rept of RES Position on Steam Generator Tube Integrity ML20126E5221992-11-30030 November 1992 Informs Staff Revised Prioritization Will Be Forwarded for Further Comments in Response to 921124 Memo Re GI 163, Multiple Steam Geneator Tube Leakage ML20125A6311992-11-25025 November 1992 Notification of 921201 Meeting W/Util to Discuss Assessment of Recent SG Tube Leak ML20128C3491992-06-16016 June 1992 Discusses Proposal of New Generic Issue, Multiple SG Tube Leakage, as Resolution to DPO Received Addressing Operation of SGs W/Microscopic Tube Wall Cracks.Dpo Encl ML20128C3141992-03-27027 March 1992 Submits Analysis, Safety Issue Re Continuous Operation W/ Degraded SG Tubes, Indicating Core Melt Probability Frequency of 10 -4/Ry W/Containment Bypass 1999-09-03 |
Text
C&
November 15, 1985 Olb
, Docket No. 50-344 MEMORANDUM FOR: Edward J. Butcher, Acting Chief, Operating Reactors Branch #3, DL FROM: Ed Tourigny, Project Manager, Operating Reactors Branch #3, DL
SUBJECT:
FORTHCOMING MEETING WITH PORTLAND GENERAL ELECTRIC COMPANY (PGE), LICENSEE FOR THE TROJAN NUCLEAR PLANT Time & Date: Tuesday, November 26, 1985 9:00 a.m.
Location: Adminstration Building Conference Room
~
Trojan Nuclear Plant Columbia County, Oregon
Purpose:
To discuss five requested exemptions from the specific requirements of Section III.G of Appendix R (Fire Protection) and to tour the affected five areas.
Requested
Participants:
NRC- PGE Ed Tourigny, PM, Trojan Gary Zimmerman, et al.,
NRC Consultant Jack Klevan Rolf Jensen, Subcontractor to Franklin Research Center Ed Tourigny, Project Manager Operating Reactors Branch #3, DL cc: See next page B511220004 851115 PDR ADOCK 05000344 F PDR I l ORBf3:Digy g 0 .3 l ETourigny;ef E tcrer
.j/n /85 ll /er /85
! a MEETING NOTICE DISTRIBUTION OPERATING REACTORS BRANCH #3, DIVISION OF LICENSING Docket File NRC PDR L PDR ORB #3 Rdg ETourigny
+
EButcher Glainas BGrimes OELD GHolahan, ORAB HDenton ELJordan, IE ACRS-10 MSchaaf NSIC Receptionist-Phillips Building
- Regional Administrator Resident-Inspector 1
1
_ - - . ._ __ _ _ _ _ _ _ _ _ _ . _ _ - _ - _ _ __ _ _ _ _ - _ _ _ _ _ _ - - _ _ . . _ _ _ _ _ _ - _ _ _ - - _ - _ _ - - _ _ . _ _ .