MONTHYEARML20132C7801985-03-0606 March 1985 Forwards SER Re Effects of Breakout of Spirit Lake on Facility.Conclusion That Breakout Will Not Affect Safety Based on Unpublished USGS Study Rept & Subj to Change. Permanent Outlet Tunnel Under Const Will Resolve Concern Project stage: Request ML20129J0911985-05-31031 May 1985 Forwards Amend 1 to 10CFR50,App R Review Rept,Per C Trammell Request.Amend Provides Addl Mods in Fire Area E1,withdraws 850208 Exemption Request for Fire Area R1 & Incorporates 850306 Response to Re Safe Shutdown Review Project stage: Request ML20138K5081985-10-15015 October 1985 Forwards Safety Evaluation Accepting Util 840731 & 850306 Proposed Revised Sections III.G.3 & Iii.L of 10CFR50,App R Re Alternate Shutdown Capability W/Identified Mods & Compensatory Measures Project stage: Approval ML20138K5211985-10-15015 October 1985 Safety Evaluation Concluding That Util Proposed post-fire Alternate Shutdown Design Meets Requirements of 10CFR50,App R,Sections III.G.3 & Iii.L W/Proposed Mods & Interim Measures & Acceptable Project stage: Approval ML20136E9851985-11-15015 November 1985 Notification of 851126 Meeting W/Util & NRC Consultants in Columbia County,Or to Discuss Five Requested Exemptions from Requirements of App R,Section Iii.G Re Fire Protection for Four Affected Areas Project stage: Meeting ML20138Q0941985-12-20020 December 1985 Responds to NRC 851113 Request for Addl Info Re Util Jul 1984 App R Exemption Requests Project stage: Request ML20215H2071986-10-16016 October 1986 Requests Exemption from 10CFR50,App R Requirements Re 20-ft Separation Criteria.Extension of Automatic Sprinkler Sys Planned to Protect Exhaust Fans for Emergency Diesel Generator Rooms from Exposure Fire Project stage: Other ML20214A2941986-11-0404 November 1986 Portland General Electric Nuclear Plant Engineering Design Criteria:Extension of Automatic Sprinkler Sys Be (Rdc 84-048) Turbine Bldg Trojan Nuclear Power Plant Project stage: Other ML20214G3041986-11-17017 November 1986 Provides Addl Info Re 861016 Request for Exemption from Requirements of 10CFR50,App R.Field Check Verified That Lower Sprinkler Head Not Below All Cable Trays.Sketch of Elevation View Encl Project stage: Request ML20211H9541987-02-18018 February 1987 Requests That Dec 1987 Commitment Date Be Extended to Prior to Return to Power Following 1988 Refueling Outage to Complete Installation of Remote Shutdown Panel.Reasons for Extension & App R Commitments Affected by New Panel Listed Project stage: Other IR 05000344/19870121987-04-10010 April 1987 Insp Rept 50-344/87-12 on 870330-0403.No Noncompliance or Deviations Noted.Major Areas Inspected:Areas of Design Changes & Mods,Qa Program Measuring & Test Equipment, Followup of Previous Insp Findings & Closure of Open Items Project stage: Request ML20206K1271987-04-10010 April 1987 Advises That Implementation Schedule for 10CFR50.48 Fire Protection Mods for Util Determined to Be Completed by End of 1988 Refueling Outage (June 1988).Requests Util Notify NRC If Schedule Not Correct within 30 Days from Ltr Receipt Project stage: Other ML20214A2761987-05-0808 May 1987 Requests Withdrawal of Request for Exemption from 10CFR50, App R,Section III.G.2.b in Case of Emergency Diesel Generator Ventilation Exhaust Openings.In Lieu of Exemption, Util Requests NRC Review & Approval of Listed Encls Project stage: Withdrawal IR 05000344/19870151987-05-0808 May 1987 Insp Rept 50-344/87-15 on 870415-24.Violations Noted: Failure to Establish & Implement Radiation Protection Procedures,Failure to Provide Instructions to Workers & Failure to Perform Survey & Maintain Records Project stage: Request ML20214K0081987-05-20020 May 1987 Responds to NRC Re Schedule for Implementation of 10CFR50.48 Fire Protection Mods.Mods Completed W/Exception of Four Listed Items.Items 1 & 2 Will Be Completed by 1988 Refueling Outage.Items 3 & 4 Will Be Completed by 871231 Project stage: Other ML20236M8981987-10-27027 October 1987 Environ Assessment & Finding of No Significant Impact Supporting Exemption from Section Iii.G of App R of 10CFR50 Re Fire Protection of Equipment Important to Safe Shutdown Project stage: Approval ML20236M8321987-10-27027 October 1987 Forwards Environ Assessment & Finding of No Significant Impact Re Util 840731,850531,861016 & 1117 & s Requesting Exemption from Requirements of Section III.G.2 of App R of Tech Specs Project stage: Approval ML20236S4021987-11-12012 November 1987 Safety Evaluation Supporting Exemption from Requirements of 10CFR50,App R,Section III.G.2 Re Fire Protection of Safe Shutdown Capability Requirements Project stage: Approval ML20236S3991987-11-12012 November 1987 Forwards Exemption from Requirements of 10CFR50,App R, Section III.G.2 Re Fire Protection of Safe Shutdown Capability Requirements in Response to Util 840731,850531, 861016,1117 & 870508 Requests.Safety Evaluation Also Encl Project stage: Approval 1986-11-17
[Table View] |
Text
r Docket No. 50-344 October 15, 1985 Mr. Bart D. Withers Vice President Nuclear Portland General Electric Company 121 S.W. Salmon Street Portland, Oregon 97204
Dear Mr. Withers:
SUBJECT:
SAFETY EVALUATION, SECTIONS III.G.3 AND III.L OF APPENDIX R TO 10 CFR 50 - ALTERNATIVE SHUTDOWN Enclosed is the staff's Safety Evaluation (SE) regarding the alternative shutdown capability in the event of fire for the Trojan Nuclear Plant.
Previously, the results of the staff evaluation of your Topical Report No.
PGE-1012, " Trojan Nuclear Plant Fire Protection Review," were provided to you in Safety Evaluations dated March 9, 1978 and March 25, 1980. This SE was necessitated because of your proposed revised alternative shutdown design per the requirements of Appendix R, Sections III.G.3 and III.L. The enclosed evaluation is based on PGE submittals dated July 31, 1984 and March 6, 1985.
Based on our review, we conclude that your proposed revised Appendix R alternate shutdown capability with identified modifications and compensatory measures is acceptable for the Trojan Plant.
Sincerely, Edward J. Butcher, Acting Chief Operating Reactors Branch No. 3 Division of Licensing
Enclosure:
As stated cc w/ enclosure:
See next page Distribution: Docket Files.
NRC & L PDRs Branch Files Edordan PKreutzer JPartlow BGrimes Llazo ACRS 10 0 ELD ORB #3;DL ORB #3:DL 0
S: L PKeewtzer LLazo;ef E utdher
[ /g /85
/s//#/85 l0 /i//85 8510300228 851015 DR ADOCK 050003 4 p
Mr. Bart D. Withers Portland General Eletric Company Trojan Nuclear Plant cc:
Senior Resident Inspector U.S. Nuclear Regulatory Commission Trojan Nuclear Plant Post Office Box 0
~
Rainier, Oregon 97048 Robert M. Hunt, Chairman Board of County Commissioners Columbia County St. Helens, Oregon 97501 William T. Dixon Oregon Department of Energy Labor and Industries Building Room 111 Salem, Oregon 97310 Regional Administrator, Region V U.S. Nuclear Regulatory Commission Office of Executive Director for Operations i
1450 Maria Lane, Suite 210 Walnut Creek, California 94596 4
e O
9
_ - _ _.