ML20138K508

From kanterella
Jump to navigation Jump to search

Forwards Safety Evaluation Accepting Util 840731 & 850306 Proposed Revised Sections III.G.3 & Iii.L of 10CFR50,App R Re Alternate Shutdown Capability W/Identified Mods & Compensatory Measures
ML20138K508
Person / Time
Site: Trojan File:Portland General Electric icon.png
Issue date: 10/15/1985
From: Butcher E
Office of Nuclear Reactor Regulation
To: Withers B
PORTLAND GENERAL ELECTRIC CO.
Shared Package
ML20138K513 List:
References
TAC-55560, NUDOCS 8510300228
Download: ML20138K508 (2)


Text

r Docket No. 50-344 October 15, 1985 Mr. Bart D. Withers Vice President Nuclear Portland General Electric Company 121 S.W. Salmon Street Portland, Oregon 97204

Dear Mr. Withers:

SUBJECT:

SAFETY EVALUATION, SECTIONS III.G.3 AND III.L OF APPENDIX R TO 10 CFR 50 - ALTERNATIVE SHUTDOWN Enclosed is the staff's Safety Evaluation (SE) regarding the alternative shutdown capability in the event of fire for the Trojan Nuclear Plant.

Previously, the results of the staff evaluation of your Topical Report No.

PGE-1012, " Trojan Nuclear Plant Fire Protection Review," were provided to you in Safety Evaluations dated March 9, 1978 and March 25, 1980. This SE was necessitated because of your proposed revised alternative shutdown design per the requirements of Appendix R, Sections III.G.3 and III.L. The enclosed evaluation is based on PGE submittals dated July 31, 1984 and March 6, 1985.

Based on our review, we conclude that your proposed revised Appendix R alternate shutdown capability with identified modifications and compensatory measures is acceptable for the Trojan Plant.

Sincerely, Edward J. Butcher, Acting Chief Operating Reactors Branch No. 3 Division of Licensing

Enclosure:

As stated cc w/ enclosure:

See next page Distribution: Docket Files.

NRC & L PDRs Branch Files Edordan PKreutzer JPartlow BGrimes Llazo ACRS 10 0 ELD ORB #3;DL ORB #3:DL 0

S: L PKeewtzer LLazo;ef E utdher

[ /g /85

/s//#/85 l0 /i//85 8510300228 851015 DR ADOCK 050003 4 p

Mr. Bart D. Withers Portland General Eletric Company Trojan Nuclear Plant cc:

Senior Resident Inspector U.S. Nuclear Regulatory Commission Trojan Nuclear Plant Post Office Box 0

~

Rainier, Oregon 97048 Robert M. Hunt, Chairman Board of County Commissioners Columbia County St. Helens, Oregon 97501 William T. Dixon Oregon Department of Energy Labor and Industries Building Room 111 Salem, Oregon 97310 Regional Administrator, Region V U.S. Nuclear Regulatory Commission Office of Executive Director for Operations i

1450 Maria Lane, Suite 210 Walnut Creek, California 94596 4

e O

9

_ - _ _.