MONTHYEARML20211K8611999-09-0101 September 1999 Informs That There Has Been Some Confusion Re Recently Issued ODCM Generic Section Rev Which Needs to Be Clarified. Clarifications Are Listed ML20210P1361999-08-0404 August 1999 Notification of 990817 Meeting with Util in Rockville, Maryland to Discuss Status of Licensing Actions Submitted by Comm Ed & Plan for Proposed Licensing Workshop ML20206U2721999-05-13013 May 1999 Revised Notification of 990527 Meeting with Util in Lisle,Il to Discuss Results of Licensee Evaluation on Potential Chilling Effect Concern within Working Environ & Use of Overtime within Operations Dept Organization at Plant ML20206E9331999-05-0303 May 1999 Notification of 990524 Meeting with Commonwealth Edison,Co in Rockville,Md to Discuss Technical Issues Related to Proposed re-rack of SFPs at Braidwood Station & Byron Station ML20206U2801999-04-28028 April 1999 Notification of 990527 Meeting with Util in Lisle,Il to Discuss Results of Licensee Evaluation on Potential Chilling Effect Concern within Working Environ & Use of Overtime within Operations Dept Organization at Byron Station ML20155F6291998-11-0303 November 1998 Forwards Facility Outline & Initial Exam Submittal for Operator Licensing Exam Administered Wk of 980914 ML20155G4661998-11-0303 November 1998 Forwards Exam Repts 50-454/98-301(OL) & 50-455/98-301(OL) Administered on 980914-22 with as-given Written Exam Attached for Processing Through Nudocs & Distribution to NRC Staff,Including NRC PDR ML20151V2951998-09-0202 September 1998 Informs That Braidwood Station Concurs with Encl Proposed 980904 Util Response to NRC Re IPEEE ML20197C8041998-09-0202 September 1998 Informs That Braidwood Station Concurs with Proposed Encl Response to NRC Re RPV Integrity at Braidwood & Byron Stations ML20197C8301998-09-0101 September 1998 Informs That Rev 2 to Calculation BYR98-109/BRW-98-339-E Has Been Reviewed & Found Acceptable for Transmittal to Nrc. Draft Util Ltr Re Thermo-Lag Ampacity Derating Factor Calculation,Encl ML20237D4331998-08-21021 August 1998 Notification of 980903 & 04 Meetings W/Util in Rockville,Md to Discuss Technical Issues Related to Byron & Braidwood Improved Std TSs Conversion,Including Section 3.3,beyond Scope Issues,Closeout Packages & Amends to Current TSs ML20249A2231998-06-12012 June 1998 Notification of 980625-26 Meeting W/Util in Rockville,Md to Discuss Technical Issues Re Byron & Braidwood Improved Std TSs Conversion ML20217E3881998-04-23023 April 1998 Notification of 980506 & 07 Meetings W/Util in Rockville,Md to Discuss Technical Issues Re Plants Improved STS Conversion ML20217H5421998-03-31031 March 1998 Discusses Completion of SG Replacement Proj at Plant,Unit 1. Plant Resumed Power Operation on 980308 ML20216H6971998-03-17017 March 1998 Notification of 980326 Meeting W/Commonwealth Edison Co in Lisle,Il to Discuss Comed Request to Consolidate near-site Emergency Operations Facility Into Single Central EOF ML20216H3401998-03-17017 March 1998 Notification of 980331-0402 Meeting W/Util in Rockville,Md to Discuss Reviewer Comments on Byron & Braidwood Improved Std TS Submittal ML20203G8551998-02-23023 February 1998 Notification of 980305 Meeting W/Util in Rockville,Md to Discuss Status of Byron & Braidwood Licensing Issues ML20202E5831997-11-25025 November 1997 Notification of 971215 Meeting W/Commonwealth Edison Co in Rockville,Md to Review Schedule for Listed Plants Improved Std TS Conversion & Supplemental Submittals ML20203C3621997-11-25025 November 1997 Revised Notification W/New Starting Time of Meeting W/Ceco on 971215 in Rockville,Maryland to Discuss Review Schedule Byron & Braidwood Improved TS Conversion & Supplemental Submittals ML20236N5111997-10-22022 October 1997 Fowards Staff Response to 960912 TIA Re Containment Spray Additive Sys Conformance W/Design Basis & Tss.Analysis Concluded That 2,400-2,600 Ppm in RWST Acceptable ML20217K8271997-10-16016 October 1997 Notification of 971024 Meeting W/Util to Discuss Results of Comed Investigation Into Sensitivity of Proposed voltage- Dependent Growth Rates to Binning Strategy for ODSCC Indicators ML20217D4261997-09-30030 September 1997 Informs of Scheduled Visits W/Nuclear Services at Gpu on Nov 14th & Visit at Commonwealth Edison on Dec 3rd & Would Like to Receive Any Info Available.Supporting Documentation Encl ML20217E1591997-09-26026 September 1997 Notification of 971001 Meeting W/Ceco in Rockville,Maryland to Discuss Licensee Plans for SG Replacement Program at Byron,Unit 1 ML20217B3901997-09-23023 September 1997 Forwards Questions Re Ceco Submittal of Revised SG Tube Rupture Analysis for Byron,Unit 1 & Braidwood,Unit 1 ML20210S8461997-09-0202 September 1997 Notification of 970904 Meeting W/Util in Rockville,Md to Discuss Comed Methodology,Including Assumptions for Calculating Radiation Exposure Doses Resulting from Predicted SG Tube Leakage in Event of Msb ML20217Q9531997-08-28028 August 1997 Notification of 970904 Meeting W/Util in Rockville,Md to Discuss CE Methodology,Including Assumptions for Calculating Radiation Exposure Doses Resulting from Predicted SG Tube Leakage in Event of Msb ML20210L7831997-08-18018 August 1997 Notification of 970826 Meeting W/Util in Rockville,Md to Discuss Comeds Methodology Including Assumptions for Calculating Radiation Exposure Doses Resulting from Predicted SG Tube Leakage in Event of Main Steamline Break ML20149L1901997-07-22022 July 1997 Notification of 970723 Meeting W/Commonwealth Edison Co in Rockville,Md to Discuss Results of Spring 1997,Braidwood,1 SG Tube Eddy Current Insp.Time of Meeting Rescheduled ML20149F2731997-07-0303 July 1997 Notification of 970723 Meeting W/Util in Rockville,Md to Discuss Results of Spring 1997 Plant,Unit 1 SG Tube Eddy Current Insp Including Determination of Impact of Data ML20138D2781997-04-28028 April 1997 Notification of 970430 Meeting W/Util in Rockville,Md to Discuss Results of EC Insps of Plant SGs Conducted During Present Refueling Outage ML20217D5461997-04-18018 April 1997 Forwards Partially Withheld Background Briefing Package in Preparation for 970425 Meeting Between Comed & Commission IA-97-178, Forwards Partially Withheld Background Briefing Package in Preparation for 970425 Meeting Between Comed & Commission1997-04-18018 April 1997 Forwards Partially Withheld Background Briefing Package in Preparation for 970425 Meeting Between Comed & Commission ML20147J2391997-04-0909 April 1997 Notification of Meeting on 970416 W/Util in Rockville,Md to Discuss Overall Response & Present Addl Details Re Performance Indicators Used to Monitor Performance Stations ML20138J7671997-02-0505 February 1997 Informs That NRC Plans to Administer Generic Fundamentals Exam Section of Written Operator Licenseing Exam on 970409. Ltr W/Copy to Chief,Operator Licensing Branch Must Be Submitted to Listed Address in Order to Register Personnel ML20149M6901997-01-19019 January 1997 Notification of 970128 Meeting W/Commonwealth Edison Co to Discuss Licensee Proposed Program for Use of Mixed Oxide Fuel ML20133J5811997-01-15015 January 1997 Notification of 970122 Meeting W/Util in Rockville,Md to Discuss Licensee Status of Program for Replacement & Operation of New SG at Byron 1 & Braidwood 1 ML20133J4821997-01-15015 January 1997 Notification of 970123 Meeting W/Licensees in Rockville,Md to Discuss Contents of Plants TS Conversion Submittal, Provide Staff Comments Based on Initial Screening Review & Discuss Review Schedule ML20135C4761996-12-0505 December 1996 Forwards Request for Addl Info Re Application to Amend Licenses Extending Steam Generator Replacement for Byron Unit 1 and Braidwood Unit 1 ML20135D8861996-12-0505 December 1996 Notification of 961219 Meeting W/Util in Rockville,Md to Discuss Licensee Proposal of 961018 & to Delete Plant,Unit 1 mid-cycle SG Insp ML20135D1241996-12-0404 December 1996 Forwards NRC Approved Operator Licensing Exam (Facility Outline & Initial Exam Submittal & as-given Operating Exam) for Tests Administered on 960930-1014 ML20135B4811996-12-0303 December 1996 Forwards Info Re Eddy Current Indications Located on cold-leg Side of Plant SG Tubes ML20210N4271996-12-0202 December 1996 Informs About Drop in Meeting on 961203 for Update on Industry Restructuring & Deregulation,Unicom Strategic Planning & Mixed Oxide Fuel ML20217D5421996-11-27027 November 1996 Forwards Partially Withheld Background Briefing Package in Preparation for 961203 Meeting Between Comed,Nuclear Strategic Services & Chairman Jackson ML20136E6221996-11-19019 November 1996 Informs That Draft in on Operator Activities Affecting Reactivity Being Distributed ML20149L7721996-11-14014 November 1996 Notification of 961114 Meeting W/Util in Rockville,Md to Discuss Methodology & Database Proposed by Comed to Determine Length of Operating Cycle Between SG Tube Eddy Current Insps for Plants,Unit 1 ML20210N3761996-08-12012 August 1996 Informs About Meeting on 960513 to Brief Chairman Jackson on Comed Response to Deregulation ML20217D4761996-07-31031 July 1996 Forwards Background Briefing Package in Prepartion of 960813 Meeting Between Commonwealth Edison Co & Chairman Jackson. Purpose of Visit to Discuss Recent Organizational Changes at Comed & Company Mgt Focus for Immediate Future ML20210N3381996-05-14014 May 1996 Discusses Courtesy Visit to Ceco on 960513 Re Listed Plants ML20210N2681995-11-13013 November 1995 Discusses Paritially Withheld Chairman Briefing by Ceco on 951116 ML20217D5321995-11-0909 November 1995 Forwards Partially Withheld Background Briefing Package in Preparation for 951116 Meeting Between Commission & Senior Comed Mgt.Purpose of Visit to Discuss Performance at Each of Sites & Challenges & Issues Needed to Be Addressed 1999-09-01
[Table view] Category:MEMORANDUMS-CORRESPONDENCE
MONTHYEARML20211K8611999-09-0101 September 1999 Informs That There Has Been Some Confusion Re Recently Issued ODCM Generic Section Rev Which Needs to Be Clarified. Clarifications Are Listed ML20210P1361999-08-0404 August 1999 Notification of 990817 Meeting with Util in Rockville, Maryland to Discuss Status of Licensing Actions Submitted by Comm Ed & Plan for Proposed Licensing Workshop ML20206U2721999-05-13013 May 1999 Revised Notification of 990527 Meeting with Util in Lisle,Il to Discuss Results of Licensee Evaluation on Potential Chilling Effect Concern within Working Environ & Use of Overtime within Operations Dept Organization at Plant ML20206E9331999-05-0303 May 1999 Notification of 990524 Meeting with Commonwealth Edison,Co in Rockville,Md to Discuss Technical Issues Related to Proposed re-rack of SFPs at Braidwood Station & Byron Station ML20206U2801999-04-28028 April 1999 Notification of 990527 Meeting with Util in Lisle,Il to Discuss Results of Licensee Evaluation on Potential Chilling Effect Concern within Working Environ & Use of Overtime within Operations Dept Organization at Byron Station ML20155F6291998-11-0303 November 1998 Forwards Facility Outline & Initial Exam Submittal for Operator Licensing Exam Administered Wk of 980914 ML20155G4661998-11-0303 November 1998 Forwards Exam Repts 50-454/98-301(OL) & 50-455/98-301(OL) Administered on 980914-22 with as-given Written Exam Attached for Processing Through Nudocs & Distribution to NRC Staff,Including NRC PDR ML20197C8041998-09-0202 September 1998 Informs That Braidwood Station Concurs with Proposed Encl Response to NRC Re RPV Integrity at Braidwood & Byron Stations ML20151V2951998-09-0202 September 1998 Informs That Braidwood Station Concurs with Encl Proposed 980904 Util Response to NRC Re IPEEE ML20197C8301998-09-0101 September 1998 Informs That Rev 2 to Calculation BYR98-109/BRW-98-339-E Has Been Reviewed & Found Acceptable for Transmittal to Nrc. Draft Util Ltr Re Thermo-Lag Ampacity Derating Factor Calculation,Encl ML20237D4331998-08-21021 August 1998 Notification of 980903 & 04 Meetings W/Util in Rockville,Md to Discuss Technical Issues Related to Byron & Braidwood Improved Std TSs Conversion,Including Section 3.3,beyond Scope Issues,Closeout Packages & Amends to Current TSs ML20249A2231998-06-12012 June 1998 Notification of 980625-26 Meeting W/Util in Rockville,Md to Discuss Technical Issues Re Byron & Braidwood Improved Std TSs Conversion ML20217E3881998-04-23023 April 1998 Notification of 980506 & 07 Meetings W/Util in Rockville,Md to Discuss Technical Issues Re Plants Improved STS Conversion ML20217H5421998-03-31031 March 1998 Discusses Completion of SG Replacement Proj at Plant,Unit 1. Plant Resumed Power Operation on 980308 ML20216H6971998-03-17017 March 1998 Notification of 980326 Meeting W/Commonwealth Edison Co in Lisle,Il to Discuss Comed Request to Consolidate near-site Emergency Operations Facility Into Single Central EOF ML20216H3401998-03-17017 March 1998 Notification of 980331-0402 Meeting W/Util in Rockville,Md to Discuss Reviewer Comments on Byron & Braidwood Improved Std TS Submittal ML20203G8551998-02-23023 February 1998 Notification of 980305 Meeting W/Util in Rockville,Md to Discuss Status of Byron & Braidwood Licensing Issues ML20202E5831997-11-25025 November 1997 Notification of 971215 Meeting W/Commonwealth Edison Co in Rockville,Md to Review Schedule for Listed Plants Improved Std TS Conversion & Supplemental Submittals ML20203C3621997-11-25025 November 1997 Revised Notification W/New Starting Time of Meeting W/Ceco on 971215 in Rockville,Maryland to Discuss Review Schedule Byron & Braidwood Improved TS Conversion & Supplemental Submittals ML20236N5111997-10-22022 October 1997 Fowards Staff Response to 960912 TIA Re Containment Spray Additive Sys Conformance W/Design Basis & Tss.Analysis Concluded That 2,400-2,600 Ppm in RWST Acceptable ML20217K8271997-10-16016 October 1997 Notification of 971024 Meeting W/Util to Discuss Results of Comed Investigation Into Sensitivity of Proposed voltage- Dependent Growth Rates to Binning Strategy for ODSCC Indicators ML20217D4261997-09-30030 September 1997 Informs of Scheduled Visits W/Nuclear Services at Gpu on Nov 14th & Visit at Commonwealth Edison on Dec 3rd & Would Like to Receive Any Info Available.Supporting Documentation Encl ML20217E1591997-09-26026 September 1997 Notification of 971001 Meeting W/Ceco in Rockville,Maryland to Discuss Licensee Plans for SG Replacement Program at Byron,Unit 1 ML20217B3901997-09-23023 September 1997 Forwards Questions Re Ceco Submittal of Revised SG Tube Rupture Analysis for Byron,Unit 1 & Braidwood,Unit 1 ML20210S8461997-09-0202 September 1997 Notification of 970904 Meeting W/Util in Rockville,Md to Discuss Comed Methodology,Including Assumptions for Calculating Radiation Exposure Doses Resulting from Predicted SG Tube Leakage in Event of Msb ML20217Q9531997-08-28028 August 1997 Notification of 970904 Meeting W/Util in Rockville,Md to Discuss CE Methodology,Including Assumptions for Calculating Radiation Exposure Doses Resulting from Predicted SG Tube Leakage in Event of Msb ML20210L7831997-08-18018 August 1997 Notification of 970826 Meeting W/Util in Rockville,Md to Discuss Comeds Methodology Including Assumptions for Calculating Radiation Exposure Doses Resulting from Predicted SG Tube Leakage in Event of Main Steamline Break ML20149L1901997-07-22022 July 1997 Notification of 970723 Meeting W/Commonwealth Edison Co in Rockville,Md to Discuss Results of Spring 1997,Braidwood,1 SG Tube Eddy Current Insp.Time of Meeting Rescheduled ML20149F2731997-07-0303 July 1997 Notification of 970723 Meeting W/Util in Rockville,Md to Discuss Results of Spring 1997 Plant,Unit 1 SG Tube Eddy Current Insp Including Determination of Impact of Data ML20138D2781997-04-28028 April 1997 Notification of 970430 Meeting W/Util in Rockville,Md to Discuss Results of EC Insps of Plant SGs Conducted During Present Refueling Outage ML20217D5461997-04-18018 April 1997 Forwards Partially Withheld Background Briefing Package in Preparation for 970425 Meeting Between Comed & Commission IA-97-178, Forwards Partially Withheld Background Briefing Package in Preparation for 970425 Meeting Between Comed & Commission1997-04-18018 April 1997 Forwards Partially Withheld Background Briefing Package in Preparation for 970425 Meeting Between Comed & Commission ML20147J2391997-04-0909 April 1997 Notification of Meeting on 970416 W/Util in Rockville,Md to Discuss Overall Response & Present Addl Details Re Performance Indicators Used to Monitor Performance Stations ML20138J7671997-02-0505 February 1997 Informs That NRC Plans to Administer Generic Fundamentals Exam Section of Written Operator Licenseing Exam on 970409. Ltr W/Copy to Chief,Operator Licensing Branch Must Be Submitted to Listed Address in Order to Register Personnel ML20149M6901997-01-19019 January 1997 Notification of 970128 Meeting W/Commonwealth Edison Co to Discuss Licensee Proposed Program for Use of Mixed Oxide Fuel ML20133J4821997-01-15015 January 1997 Notification of 970123 Meeting W/Licensees in Rockville,Md to Discuss Contents of Plants TS Conversion Submittal, Provide Staff Comments Based on Initial Screening Review & Discuss Review Schedule ML20133J5811997-01-15015 January 1997 Notification of 970122 Meeting W/Util in Rockville,Md to Discuss Licensee Status of Program for Replacement & Operation of New SG at Byron 1 & Braidwood 1 ML20135C4761996-12-0505 December 1996 Forwards Request for Addl Info Re Application to Amend Licenses Extending Steam Generator Replacement for Byron Unit 1 and Braidwood Unit 1 ML20135D8861996-12-0505 December 1996 Notification of 961219 Meeting W/Util in Rockville,Md to Discuss Licensee Proposal of 961018 & to Delete Plant,Unit 1 mid-cycle SG Insp ML20135D1241996-12-0404 December 1996 Forwards NRC Approved Operator Licensing Exam (Facility Outline & Initial Exam Submittal & as-given Operating Exam) for Tests Administered on 960930-1014 ML20135B4811996-12-0303 December 1996 Forwards Info Re Eddy Current Indications Located on cold-leg Side of Plant SG Tubes ML20210N4271996-12-0202 December 1996 Informs About Drop in Meeting on 961203 for Update on Industry Restructuring & Deregulation,Unicom Strategic Planning & Mixed Oxide Fuel ML20217D5421996-11-27027 November 1996 Forwards Partially Withheld Background Briefing Package in Preparation for 961203 Meeting Between Comed,Nuclear Strategic Services & Chairman Jackson ML20136E6221996-11-19019 November 1996 Informs That Draft in on Operator Activities Affecting Reactivity Being Distributed ML20149L7721996-11-14014 November 1996 Notification of 961114 Meeting W/Util in Rockville,Md to Discuss Methodology & Database Proposed by Comed to Determine Length of Operating Cycle Between SG Tube Eddy Current Insps for Plants,Unit 1 ML20210N3761996-08-12012 August 1996 Informs About Meeting on 960513 to Brief Chairman Jackson on Comed Response to Deregulation ML20217D4761996-07-31031 July 1996 Forwards Background Briefing Package in Prepartion of 960813 Meeting Between Commonwealth Edison Co & Chairman Jackson. Purpose of Visit to Discuss Recent Organizational Changes at Comed & Company Mgt Focus for Immediate Future ML20210N3381996-05-14014 May 1996 Discusses Courtesy Visit to Ceco on 960513 Re Listed Plants ML20210N2681995-11-13013 November 1995 Discusses Paritially Withheld Chairman Briefing by Ceco on 951116 ML20217D5321995-11-0909 November 1995 Forwards Partially Withheld Background Briefing Package in Preparation for 951116 Meeting Between Commission & Senior Comed Mgt.Purpose of Visit to Discuss Performance at Each of Sites & Challenges & Issues Needed to Be Addressed 1999-09-01
[Table view] |
Text
_- . _ _ _ . .
! i 8 ,[p.es Uts4TEo STATES NUCLE A3 REGULATORY COMMIS$10N i
, / [*,,
f, AEGIOes les i '
t ?.. poo.svtLT aoao
~,
g* **j eu~.uvo..u. .. .. n JAN 20 Bd4 1
r NEMOBJutDUM P0tt S. K. East. Office of Congressional Affairs l FRON: C. E. Morelius. Director. Division of Project and Resident Programs. Region III ;
i SUkJECT: BTRON REltSPACTION FROGRAM l 5 In response to the request you received from Dr. Neary Myers. I en attaching a chronology of events relating to the development of the reinspection progran ,
at Byron. Some documents which may not be part of the record in the PDR are ,
included in the attachment for your information and use. I understand that i you will obtain the documents which are in the PDR. The licensee's summary report dated January 12. 1984, has been tranesitted to you under separate cover.
l
> Please let me know if you need additional information.
i ,
i.
j -6.4' YleE !
C. E. Morelius. Director l
Division of Project and i Resident Programs u
j
Attachment:
As Stated
)
) cc w/ attachments j J. C. Keppler. 1111
. A. 5. Davis, RIII ;
3 R. L. Spessard. R111
! W. Dircks. EDO -
I M. Denton NRR
] R. DeYoung. IE G. Cunningham. ELD
- l C. Kammerer. CA /
SRI. Byron Site V l .
l 1 i i
I e.
! / !
l
! I i 8811140277 001013 i l
l PDR FOIA 4 MURPHYO8-344 PDR l
> l
~
l I
I
. - - - . .n __
(
CHROWOLOGY OF REINSPECTION p10CIAN i
/ NEC Inspection Report 454/82-051 455/82-04 (March 29 - l 4
06/24/82 May 11. 1982) .
I 1 I l Special safety inspection - special team inspection to i
assess the adequacy of certain. aspects of the quality I
assurance / construction activities at the Byron Station.
1 ,
) / Noncompliance 82-05-19 identified as Ites #2 of the [
( Appendix to IR 82-05 identified certain contractor QA/QC ,
supervisors and inspectors were not adequately qualified and/or trained to perform safety-related inspectica i functions.
r a
j The forwarding letter requested that Ceco describe the [
) action taken or being taken to assure thatt (1) other s
! quality control inspectors are properly trained and certified. (2) quality control inspectors working for !
contractors that have completed safety-related work and l l
no longer have persernel onsite were properly trained i
and qualified to perfo.it the inspection functions assigned and (3) inspections performed by quality coatrEl inspectors r l ( r that were improperly trained and qualified were valid.
l l
U 1
^
e i
?
l
- CBCo letter Stiede to Keppler dated 7/30/82. Provided
( #07/30/82 i the initial response to NRC retarding corrective actions to the itosa of noncompliance identified in
( . i In 82-05. .
i
,i '
L Vh9/02/82 Ceco letter Traan to Kappler dated 9/02/82. Provided b
i a schedule for issuing procedures and perforetag retraining in support of actions outlined in the l Ceco letter of 7/30/82.
i NRC letter Norelius to Esed dated 9/22/82. Provided I
/09/22/82 i j NRC consente rejecting the CBCo sospense letter dated J
j 7/30/82. The EtC requested addittomal information. .
I i 10/19/82 Ntc Latter Spessard to Reed dated 10/19/82. Confirming ;
' (
! ocheduled meeting to be held on 10/26/82 to discuss Ceco response to 82-05.
l
} 10/26/82 Meetian Region 111/CICo 10/26/82. To discuss the {
CBCo response to 82-05 for veld procedures. cable 1
i i pulling and inspector qualifications. ,
l 5
'(1/05/82 Ceco letter Stiede to Kappler dated 11/05/82. Provided l 3 (
additional information regarding corrective actione .
l I I takaa in response to moscompliance 82-05-19. !
Ps i
f I
i
) i
! 2 !
i r
e
/11/30/82 NRC letter Forney to Daniulson. NRC. Documented Byron
(
Rasident Inspector Office concerns with the corrective actione proposed in the Ceco letter of 8/1'//82. Cop}
r/ attached. .
12/13/82 Meetina Ceco /NRC at lyton Site. Held to discuss the 1
inadequacies of previous Ceco submittals and to discuss a proposed resolution to 82-05-19.
/12/21/82 NRC letter Worelius tu Reed dated 12/21/82. Provided rejection of the 11/05/82 Ceco submittal. Documented the 12/13/82 seating at Byron. Documented understanding :
that additional information would be provided by Ceco in 1 I 20 days.
4
]
i 01/26/83 Meetina Region 111 Staff /1&E. See 2/15/83 trip report l
for details.
q r#02/15/83 Trip Report Morelius to Kappler dated 2/15/83. Documented t
the results of a 1/26/83 meeting in Bethesda between ,
l L Region III Staff and Director.1&E Division of Quality i
, Assurance. Safeguards and Inspection Programa and members )
, of his staff. The meeting was held to discuss the guestion of corrective actions to be required of Ceco regarding a finding of uncertified QC inspectors of various contractors i
p/ at the Byron Site (52-05-19). Copy attached.
I
(
l 1
3 i
9 Meetina at NRC Region III Offices with CECO on 2/15/83 to
( 02/15/83 discuss CECO's pr0 posed Byron reinspection program. The meeting wee not documented but led to the Ceco letter p
l Stiede to Keppler dated 2/23/83 (see below). A copy of.
I [the Ceco handout at the meeting is attached.
l I
l
/02/23/83 Ceco letter Stiede to'Esppler dated 2/23/83. Provided revised response to 82-05-19 which detailed a revised plan to satisfy NRC concerns identified in the NRC ;
letters of 6/24/82 and 9/22/82.
l l 03/11/83 Resident Inspection Office submitted names to Ceco of l 4
j additional inspectors to be reviewed under the reinspection '
I program. Documented in a handwritten note in the Byron I resident inspector's file at the Byron Site. ;
r I 06/28/83 (l'de,) WRC Inspection Report 50-454/8 b26 (June 7-10, 1983).
Documented the results of a special inspection to review I the overall status of the reinsp<ction program and the i
! specific status of the program for certain key contractors l i
I resulting free findings identified in NRC Inspection I
Report 82-05.
1
. 1 1
1 -
]
1
\
_NRC Inspection Report No. 50-454/J3-34 50-455/83-28.
09/01/83 h lt) '
Documents discussions with Ceco site personnel conceratag problems Eatfield was having in retrieving cri41aal weld inspection records for QC visual weld inspectors whose .
work was selected for reinepection, i
- 09/22/83 _ Meetina at the Byron Site between NRC Region 111 and Ceco to discuss status of the reinspection program. Copy of handouts at the meeting are attached.
I i
09/29/83 ($lt) Inspection Report No. 50-454/83-37. Documents WRC Region 111 inspector review of reinspection program ,
ongoing work.
L I
4 v'10/28/83 CECO letter De1 George to Kappler dated 10/28/83 provided ;
the preliminary report of reinspection program dated <
10/28/83. ,
i 11/10/83 Meetism NRC Region and Resident laspectors. Discussed f t
4 results of Region and Resident taspection personnel i l
review of the Ceco preliminary report of 10/28/83.
I 1
l t
i l
I i s
\ Diecueeed N 11/10/83 /D' L%tir>)CenterenceCallWRC/De1GeorgeandTrmm.
Region III review of the CBCo preliminary report of 10/28/83. Specific conceras discussed were
- 1. Use of Ceco Level 111 overview of reinspection 1
program findings.
I 2. Need for tabulattom of reinspection results by weld attribute / area.
I 3. Need for evaluation by inepection activity.
)
, /18/83 NRC letter spessard to need dated 11/18/A3. Provided .
written cosenente to CBCo on the preliminary report of i.
) the reinspection program attached to the 10/28/83 l ! CICo letter. Also addressed items discussed during 1
l the 11/10/83 conference call.
4 i
i 12/28/81 (Fde.) WRC !asoection Resort 50-454/8h39. Documente NRC j Region III inspector renewe and verification i inspections of tha ongoing Ceco reinspection program.
l 01/12/84 Ceco letter De1 George to Keppler dated 1/12/84 Provided a summary report of the actions taken to verify the adequacy of Qr: inspections performed during l construction at Byrea in response to b2-05-19.
l
(
1 i
6