Informs That Project Section II Will Not Be Able to Provide Further Assistance in Reinsp Activities of Questionable QC Inspector Certification Practices.Qa/Qc Surveillance Encl
ML20205T369
Person / Time
Site: Byron, 05000000
Issue date: 03/15/1983
From: Hayes D
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Little W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
Shared Package
ML20205S388 List:
References
FOIA-88-344 NUDOCS 8811140228
Download: ML20205T369 (3)


Text

[....,%'g UNITED STATES NUCLEAR REGULATORY COMMISSION l "

l' p.

{ .. I REGION ill e,S

,f 79s MOOSEVE LT MoAD h [/

q.....g oLEN ELLYN,lLLINOlt se137 /v March 15, 1983

/

/

MEMORANDUM FOR: William S. Little, Chief. Engineering Branch II THRU: R. C. Knop, Chief, Projects Branch 2 h( '

TROM: D. W. Hayes, Chief Projects 'Section 1B

SUBJECT:

BTRON STATION -REINSPECTION ACTIVITIES BECAUSE OF

g. QUESTIONALLE QC INSPECTOR CERTITICATION PRACTICES ,

, c The prgblem relative to the qualification / certification of QC inspectors

  • aed tWnsuing and significant Ceco reinspection program Tesulted from the ' Construction Assessment Team inspection at Byron Station. For this j reason,and the fact it involves most of the constr
  • ion,d,iacipline, we i feel.,ig is the Division of Engineering's responsibility tosconduct all

}' needed"followup to verify implementation of the reinspection program, itsefTectivenessandthevalidityofthefindings. Because of my 3

section's involvement in Pre-op testing activities and the Byron OL

hearing. Project Section IB will not be able to provide any further assistance in this area.

(

D DD. W. .

Hayes, Chief Projects Section IB cc J. G. Kappler A. B. Davis ,

) C. E. Morelius R. L. Spessard W. L. Torney /

J. M. Hinds, Jr.

i .

. fe r, A

  • t t* S V Y

, N '.Y 6811140220 001013 PDR FOIA .

MURPHYOU-344 PDR

l J.'g).-

9- BNRONSITEQ.A. SURVEILLANCE M.

. G f QP: 2790.22.2.1 Report No. 4470 Date: _Q4-01-93 Contractor / Organization : Hatfield Electric  ;

SUBJECT:

QA/QC Qualifications OBSERVATIONS: ,

! A surveillance was conducted at Hatfield on all on-site QA/QC inspectors. Each inspector surveyed was done in accordance with ANSI N45s2.6 1978. Four deficiencies were found.

All j

Hatfield'QA/QC inspectors s Procedure had no Crecord 17, Appendix Table of II.

a practical exam, All QA/QC as per inspectors 1

have taken or will take a practical, exam and be included in their l . training record.

I Al Koca, certified Level III Inspector, var, certified on 12/5/81 for a period of one year. During this year Mr. Koca was used specifically for auditing, a QA function. A question atose as to why

i Mr. Koca was certified a Level III in QC but was used primarily in j QA. Since QA must be a separate entity from QC Mr. Koca's i

ire. This was Identified and he was 1 certification immediatelywas c.1. lowed recertified onto2/24 exp/83. Mr. Koca will not do any QC i i

inspections and his primaty function is to audit.

, John Malunda, who was qualified as a Level II in Procedure #10, has no documentation of OJT training or classroom lecture as per

, Hatfield's Procedure 17 Appendix B Revision 5. Mr. Malunda s t

certification was removed and will no longer inspect to Procedure #10. I 1 I

, Tom Wells was certified as a Level II to Hatfield's Welding i

]

Procedures. As part of his certification, his experience while i working at Continental Drilling was used to comply with ANSI N45.2.6.

This is unacceptable. Hatfield was notified and his certification was i voided. His inspections have been reinspected for the first 3 months l'

he was qualified.

1 l i i  !

l I l

hIA ff,jyy

)

(05)SS)

E//s l

-- , , - - - - - , _ - - - , _ , - , ---.--.n-

\

l ' Survoillcnco Rap:rt No. 4470 '

.Pcgo 2

'Hatfield Electric Co. l l <

l The following QA/QC Inspectors were surveyed:

J. Anderson F. Keep B. Peterson H. Andrews J. Henson R. Peterson G. Barry T. Hill R. Quijes i

A. Blake D. Hoffman R. Reimer l S. Bindenagel H. Holze D. Richards J. Buchanan K. Knoebber F. Rickert ,

C. Cason S. Hubler R. Rueffer C. Cavins A. Koca E. Sarver L S. Cullen T. Maas A. Schmutt D. Demmlow J. Halunda D. Spangler.

L. Droege B. Handurano R. Sproule J. Elgin J. Handurano D. Stoner R. Ewbank D. Hay D. Swick R. Emerson F. McHenamin S. Wagner J. Fornwall D. Herritt S. Webb R. Friel D. Heyer B. Weldon H. Kainz. D. Homaly T. Wells J. Hardenbrook Hulroney J. Wilson -

S. Karr Nicholson J. Wood J. Hayes Ostrander This surveillance is closed,.

Reported by M E V. k!_0_: Date_ 4/I3 Approved by i dIIwh Date [U HVD:Jc: 0576S cc: W.J . Shewski/J.S. Bitel QA Supt./ Site Q. A. File Contractor 1 PCD Supt l

/ HVD -