Text
.
catuq
'e UNITED STATES n
I j
NUCLEAR REGULATORY COMMISSION 2
WASHINGTON, D.C. 20666 4 001 STP NUCLEAR OPERATING COMPANY DOCKET NO. 50-498 SOUTH TEXAS PROJECT. UNIT 1 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No.105 License No. NPF-76 1.
The Nuclear Regulatory Commission (the Commission) has found that:
A.
The application for amendment by STP Nuclear Operating Company
- acting on behalf of itself and for Houston Lighting & Power Company (HL&P), the City Public Service Board of San Antonio (CPS), Central Power and Light Company (CPL), and City of Austin, Texas (COA) (the licensees), dated January 20,1999, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's rules and regulations set forth in 10 CFR Chapter I; B.
The facility will operate in conformity with the application, as amended, the provisions of the Act, and the rules and regulations of the Commission; C.
There is reasonable assurance: (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; D.
The issuance of this license amendment will not be inimical to the common defense and security or to the health and safety of the public; and E.
The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.
- STP Nuclear Operating Company is authorized to act for Houston Lighting & Power Company (HL&P), the City Public Service Board of San Antonio, Central Power and Light Company and City of Austin, Texas and has exclusive responsibility and control over the physical construction, operation and maintenance of the facility.
9904220014 990416 PDR ADOCK 05000498 P
I 1
2-l 2.
Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment and Paragraph 2.C.(2) of Facility Operating License No. NPF-76 is hereby amended to read as follows:
2.
Technical Soecifications The Technical Specifications contained in Appendix A, as revised through Amendment No.105, and the Environmental Protection Plan contained in Appendix B, are hereby incorporated in the license. The licensee shall operate the facility in accordance with the Technical Specifications and the Environmental Protection l
Plan.
l 3.
The license amendment is effective as of its date of issuance and shall be implemented within 30 days from the date of issuance.
FOR THE NUCLEAR REGULATORY COMMISSION l
W i
Robert A. Gramm, Chief, Section 1 Project Directorate IV and Decommissioning Division of Licensing Project Management Office of Nuclear Reactor Regulation
Attachment:
Changes to the Technical Specifications l
Date of issuance: April 16, 1999
i i
@ CE:
j t
UNITED STATES O
j NUCLEAR REGULATORY COMMISSION o
WASHINGTON, D.C. 30666-0001 5.?...../
STP NUCLEAR OPERATING COMPANY DOCKET NO. 50-499 SOUTH TEXAS PROJECT. UNIT 2 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No. 92 License No. NPF-80 1.
The Nuclear Regulatory Commission (the Commission) has found that:
A.
The application for amendment by STP Nuclear Operating Company
- acting on behalf of itself and for Houston Lighting & Power Company (HL&P), the City Public Service Board of San Antonio (CPS), Central Power and Light Company (CPL), and City of Austin, Texas (COA) (the licensees), dated January 20,1999, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's rules and regulations set forth in 10 CFR Chapter I; B.
The facility will operate in conformity with the application, as amended, the provisions of the Act, and the rules and regulations of the Commission; C.
There is reasonable assurance: (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; D.
The issuance of this license amendment will not be inimical to the common defense and security or to the health and safety of the public; and E.
The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.
'STP Nuclear Operating Company is authorized to act for Houston Lighting & Power Company (HL&P), the City Public Service Board of San Antonio, Central Power and Light Company and City of Austin, Texas and has exclusive responsibility and control over the physical construction, operation and maintenance of the facility.
1 I
2.
Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment and Paragraph 2.C.(2) of Facility Operating License No. NPF-80 is hereby amended to read as follows:
2.
Technical Soecifications The Technical Specifications contained in Appendix A, as revised through Amendment No. 92, and the Environmental Protection Plan contained in Appendix B, are hereby incorporated in the license. The licensee shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan.
3.
The license amendment is effective as of its date of issuance and shall be implemented within 30 days from the date of issuance.
FOR THE NUCLEAR REGULATORY COMMISSION 1
A W
Robert A. Gramm, Chief, Section 1 Project Directorate IV and Decommissioning Division of Licensing Project Management J
Office of Nuclear Reactor Regulation
Attachment:
Changes to the Technical Specifications Date of Issuance: April 16, 1999 l
l
ATTACHMENT TO LICENSE AMENDMENT NOS.105 AND 92 FACILITY OPERATING LICENSE NOS. NPF-76 AND NPF-80 DOCKET NOS. 50-498 AND 50-499 Replace the following pages of the Appendix A Technical Specifications with the attached pages. The revised pages are identified by Amendment number and contain marginallines indicating the areas of change.
j Remove Insert 3/4 7-5 3/4 7-5 3/4 7-6 3/47-6*
B 3/4 7-1 B 3/4 7-1*
B 3/4 7-2 B 3/4 7-2
- Overleaf pages provided to maintain document completeness. No changes contained on these pages.
I w..
i c
PLANT SYSTEMS SURVEILLANCE REQUIREMENTS 4.7.1.2.1 Each auxiliary feedwater pun p shall be demonstrated OPERABLE:
a.
At least once per 31 days on a STAGGERED TEST BASIS by:
1)
Verifying that the developed head of each motor-driven pump at the flow test point is greater than or equal to the required developed head; 2)
Verifying that the developed head of the steam turbine-driven pump at the flow test point is greater than or equal to the required developed head when tested at a secondary steam supply pressure greater than 1000 psig within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> after entry into MODE 3; 3)
Verifying that each non automatic valve in the flow path that is not locked, sealed, or otherwise secured in position is in its correct position; and 4)
Verifying that each automatic valve in the flow path is in the correct position whenever the Auxiliary Feedwater System is placed in automatic control or when above 10% RATED THERMAL POWER.
b.
At least once per 18 months during shutdown by:
1)
Verifying that each automatic valve in the flow path actuates to its correct position upon receipt of an Auxiliary Feedwater Actuation test signal, and 2)
Verifying that each auxiliary feedwater pump starts as designed automatically upon receipt of an Auxiliary Feedwater Actuation test signal.
3)
Verifying that each auxiliary feedwater flow regulating valve limits the flow to each steam generator between 550 gpm and 675 gpm.
4.7.1.2.2 An auxiliary feedwater flow path to each steam generator shall be demonstrated OPERABLE following each COLD SHUTDOWN of greater that 30 days prior to entering MODE 2 by verifying normal flow to each steam generator.
SOUTH TEXAS - UNITS 1 & 2 3/4 7-5 Unit 1 - Amendment No. 50,6h07,105 Unit 2 - Amendment No. 50;74,92
I PLANT SYSTEMS o
AUXILIARY FEEDWATER STORAGE TANK LIMITING CONDfTION FOR OPERATION
- 3. 7.1. 3 The auxiliary feedwater storage tank (AFST) shall be OPERA 8LE with a contained water volume of at least 485,000 gallons of water.
ll APPLICABILITY: MDDES 1, 2, and 3.'
ACTION:
With the AFST inoperable, within 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> restore the AFST to OPERABLE status or be in at least HOT STAND 8Y within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in NOT SHUTDOWN within the following 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />.
SURVFfLtANEF REOUTRFWFMTS
- 4. 7.1. 3 The AFST shall be demonstrated OPERABLE at least once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> by verifying the contained water volume is within its limits.
)
SOUTH TEXAS - UNITS 1 & 2 3/4 7-6 Unit 1 - Amendment No. 33 Unit 2 - Amendment No. 24
~
3/4.7 PLANT SYSTEMS BASES l
3/4.7.1 TURBINE CYCLE 3/4.7.1.1 SAFETY VALVES
(
The OPERABILITY of the main steam line Code safety valves ensures that the Secondary System pressure will be limited to within 110% (1413.5 psig) of its design pressure s
of 1285 psig during the most severe anticipated system operational transient. The maximum relieving capacity is associated with a Turbine trip from 100% RATED THERMAL POWER coincident with an assumed loss of condenser heat sink (i.e., no steam bypass to the condenser).
Five MSSVs, each with an orifice size of 16 in', are located on each main steam header, outside containment, upstream of the main steam isolation valves. The specified valve lift settings and relieving capacities are in accordance with the requirements of Section 111 of the ASME Boller and Pressure Code,1971 Edition. The total relieving capacity for all valves on all of the steam lines is 20.65 x 10' lbs/h which is 122% of the total secondary steam flow of 16.94 x 10' lbs/h at 100% RATED THERMAL POWER. A minimum of two OPERABLE safety valves per steam generator ensures that sufficient relieving capacity is available for the allowable THERMAL POWER restriction in Table 3.7-1.
STARTUP and/or POWER OPERATION is allowable with safety valves inoperable within the limitations of the ACTION requirements on the basis of the reduction in Secondary Coolant System steam flow and THERMAL POWER required by the reduced Reactor trip settings of the Power Range Neutron Flux channels. The Reactor Trip Setpoint reductions are derived on the following bases:
Hi e = (100 g g w,h,N g Q
K
[
Where:
Hi e = Safety analysis power range high neutron flux setpoint, percent
(
O Nominal NSSS power rating of the plant (including reactor coolant pump
=
heat), MWt K
Conversion Factor,947.82 (BTU /sec)/MWt
=
Minimum total steam flow rate capability of the operable MSSVs on any one w,
=
steam generator at the highest MSSV opening pressure, including tolerance and accumulation, as appropriate,in Ibm /sec. For example, if the maximum number of inoperable MSSVs on any one steam generator is one, then w, should be a summation of the capacity of the operable MSSVs at the highest operable MSSV operating pressure, excluding the highest capacity MSSV. If the maximum number of inoperable MSSVs per steam generator is three, then w, should be a summation of the capacity of the operable MSSVs at the highest operable MSSV operating pressure, excluding the three highest capacity MSSVs.
h, =
Heat of vaporization for steam at the highest MSSV operating pressure including allowances for tolerance, drift, and accumulation, as appropriate, Btu /lbm Number of loops in the plant.
N =
l(k The calculated values are lowered an additional 9% full power to account for instrument and channel uncertainties.
SOUTH TEXAS - UNITS 1 & 2 B 3/4 7-1 Unit 1 - Amendment No. 66,103 Unit 2 - Amendment No. 65,90
..a==-
a
.. =. = = -
- -... = -. -. - - =. =.. >
PLANT SYSTEMS BASES 3/4.7.1.2 AUXILIARY FEEDWATER SYSTEM The OPERABILITY of the Auxiliary Feedwater System ensures that the Reactor Coolant System can be cooled dcwn to less than 350'F from normal operating conditions in the event of a totalloss-of-offsite power.
Each auxiliary feedwater pump is capable of delivering feedwater to the entrance of the steam generators with sufficient capacity to ensure that adequate feedwater flow is available to remove decay heat and reduce the Reactor Coolant System temperature to less than 350*F when the Residual Heat Remova! System may be placed into operation. Verifying that each APW pump's developed head at the flow test point is greater than or equal to the required developed head ensures that AFW pump performance has not degraded during the cycle (Ref.:
Calculations MC-5861 and ZC-7019). Flow and differential head are normal tests of centrifugal j
pump performance required by Section XI of the ASME Code. The AFW pumps are tested using the test line back to the AFST and the AFW isolation valves closed to prevent injection of cold water into the steam generators. This testing methodology confirms one point on the curve and is indicative of overall performance. Such inservice tests confirm component j
OPERABILITY, trend performance, and detect incipient failures by indicating abnormal performance. Performance of inservice testing, discussed in the ASME Code,Section XI, satisfies this requirement. The STPEGS isolation valves are active valves required to open on j
an AFW actuation signal. Specification 4.7.1.2.1 requires these valves to be verified in the j
correct position.
3/4.7.1.3 AUXlLIARY FEEDWATER STORAGE TANK (AFST)
The OPERABILITY of the auxiliary feedwater storage tank with the minimum water volume ensures that sufficient water is available to maintain the RCS at HOT STANDBY conditions for 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> with steam discharge to the atmosphere concurrent with total loss-of offsite power and failure of the AFW automatic recirculation control (ARC) valve followed by a cooldown to 350*F at 25'F per hour. The contained water volume limit includes an allowance for water not usable because of tank discharge line location or other physical characteristics.
3/4.7.1.4 SPECIFIC ACTIVITY The limitations on Secondary Coolant System specific activity ensure that the resultant offsite radiation dose will be limited to a smail fraction of 10 CFR Part 100 dose guideline values in the event of a steam line rupture. This dose also includes the effects of a coincident 1 gpm primary-to-secondary tube leak in the steam generator of the affected steam line. These values are consistent with the assumptions used in the safety analyses.
3/4.7.1.5 MAIN STEAM LINE ISOLATION VALVES The OPERABILITY of the main steam line isolation valves ensures that no more than one steam generator will blow down in the event of a steam line rupture. This restriction is required to: (1) minimize the positive reactivity effects of the Reactor Coolant System cooldown associated with the blowdown, and (2) limit the pressure rise within containment in the event the steam line rupture occurs within containment. The OPERABILITY of the main steam isolation valves within the closure times of the Surveillance Requirements are consistent with the assumptions used in the safety analyses.
SOUTH TEXAS - UNITS 1 & 2 B 3/4 7-2 Unit 1 - Amendment No. 00,01,100,105 Unit 2 - Amendment No. 94r6er90,92