Text
'
cgdcu fut
,
o-
7
APR 181986
Q:
Georgia Power Company
ATTN: Mr. R. J. Kelly
Executive Vice President
P. O. Box 4545
Atlanta, GA 30302
Gentlemen:
SUBJECT: REPORT N05. 50-424/86-09 AND 50-425/86-04
On February 1 - March 31, 1986, NRC inspected activities authorized by NRC
Construction Permit Nos. CPPR-108 and CPPR-109 for your Vogtle facility. At the
conclusion of the inspection, the findings were discussed with those members of
your staff identified in the enclosed inspection report.
Areas examined during the inspection are identified in the report. Within these
areas, the inspection consisted of selective examinations of procedures and
representative records, interviews with personnel, and observation of activities
in progress.
The inspection findings indicate that certain activities violated NRC require-
ments.
The violations, references to pertinent requirements, and elements to be
included in your response are presented in the enclosed Notice of Violation.
The responses directed by this letter and the enclosures are not subject to the
clearance procedures of the Office of Management and Budget issued under the -
Paperwork Reduction Act of 1980, PL 96-511.
Should you have any questions concerning this letter, please contact us.
Sincerely,
Original Signed by
Luis A. Reyes /for
Roger D. Walker, Director
Division of Reactor Projects
Enclosures:
1.
2.
Inspection Report Nos. 50-424/86-09
and 50-425/86-04
'
cc w/encls:
(See page 2)
8605210019 860418
ADOCK 05000424
O
{
,
i
!
,-
l
1
s
r
.
.
'
APR 18 366
,
'
Georgia Power Company
2
-
cc w/encls:
GR.E.Conway,SeniorVicePresident&
Project Director
V . 0. Foster, Vice President, Project Support
. D. Rice, Vice President, Project Engineering
g.H.Pinson,VicePresident,ProjectConstruction
pM T. Beckham, Vice President &
General Manager - Operations
/,R. A. Thomas, Vice President, Licensing
9 . W. Hayes, Vogtle Quality Assurance Manager
0
- W'. C. Ramsey, Manager - Readiness Review
J k B. Bockhold, General Manager,
Nuclear Operations
yt. Gucwa, Manager, Nuclear Safety
and Licensing
p-M. H. Googe, Project
Construction Manager
dE.D. Groover, Quality
Assurance Site Manager -
Construction
J. A. Bailey, Project Licensing Manager
yGi F. Trowbridge, Esq. , Shaw,
Pittman, Potts and Trowbridge
8. W. Churchill, Esq., Shaw,
9
Pittman, Potts and Trowbridge
g . L. Blake, Jr., E:q., Shaw,
E
Pittman, Potts and Trowbridge
vd. E. Joiner, Troutman, Sanders,
Lockerman and Ashmore
uf. G. Ledbetter, Commissioner,
Department of Human Resources
J . H. Badger, Office of Planning
and Budget
p0. Kirkland, III, Counsel,
Office of the Consumer's Utility
Council
p . C. Teper, Georgians Against
D
Nuclear Energy
pM. B. Margulies, Esq., Chairman,
Atomic Safety and Licensing Board
Panel
VDr. O. H. Paris, Administrative Judge
Atomic Safety and Licensing Board
Panel
I A. Linenberger, Jr., Administrative Judge
Atomic Safety and Licensing Board
Panel
kB. P. Garde, Citizens Clinic, Director
Government Accountability Project
bcc w/encis:
(See page 3)
r_
.
.
APR 18 ns
-
. Georgia Power Company
3
w
, Acc w/encls:
Y E. Reis, ELD
. M. Hill, IE-
N. Miller, NRR
g.Brach,EDO
, M. Sinkule, RII
'
E. Christnot, RII
vdRC Resident Inspector
Document Control Desk
State of Georgia
.
-
RII
RII
RII
EChristnot:ht
MSinkule
VLBrownlee
4/ l(,/86
4/gy/86
4/p/86
.
A
. .
.
.
.
.
.
.
-
.
.