Forwards Insp Repts 50-424/86-09 & 50-425/86-04 on 860201-0331 & Notice of Violation
ML20205N944
Person / Time
Site: Vogtle  Southern Nuclear icon.png
Issue date: 04/18/1986
From: Walker R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Kelly R
GEORGIA POWER CO.
Shared Package
ML20205N947 List:
References
NUDOCS 8605210019
Download: ML20205N944 (3)


See also: IR 05000424/1986009

Text

'

cgdcu fut

,

o-

7

APR 181986

Q:

Georgia Power Company

ATTN: Mr. R. J. Kelly

Executive Vice President

P. O. Box 4545

Atlanta, GA 30302

Gentlemen:

SUBJECT: REPORT N05. 50-424/86-09 AND 50-425/86-04

On February 1 - March 31, 1986, NRC inspected activities authorized by NRC

Construction Permit Nos. CPPR-108 and CPPR-109 for your Vogtle facility. At the

conclusion of the inspection, the findings were discussed with those members of

your staff identified in the enclosed inspection report.

Areas examined during the inspection are identified in the report. Within these

areas, the inspection consisted of selective examinations of procedures and

representative records, interviews with personnel, and observation of activities

in progress.

The inspection findings indicate that certain activities violated NRC require-

ments.

The violations, references to pertinent requirements, and elements to be

included in your response are presented in the enclosed Notice of Violation.

The responses directed by this letter and the enclosures are not subject to the

clearance procedures of the Office of Management and Budget issued under the -

Paperwork Reduction Act of 1980, PL 96-511.

Should you have any questions concerning this letter, please contact us.

Sincerely,

Original Signed by

Luis A. Reyes /for

Roger D. Walker, Director

Division of Reactor Projects

Enclosures:

1.

Notice of Violation

2.

Inspection Report Nos. 50-424/86-09

and 50-425/86-04

'

cc w/encls:

(See page 2)

8605210019 860418

PDR

ADOCK 05000424

PDR

O

{

,

i

!

,-

l

1

s

r

.

.

'

APR 18 366

,

'

Georgia Power Company

2

-

cc w/encls:

GR.E.Conway,SeniorVicePresident&

Project Director

V . 0. Foster, Vice President, Project Support

. D. Rice, Vice President, Project Engineering

g.H.Pinson,VicePresident,ProjectConstruction

pM T. Beckham, Vice President &

General Manager - Operations

/,R. A. Thomas, Vice President, Licensing

9 . W. Hayes, Vogtle Quality Assurance Manager

0

W'. C. Ramsey, Manager - Readiness Review

J k B. Bockhold, General Manager,

Nuclear Operations

yt. Gucwa, Manager, Nuclear Safety

and Licensing

p-M. H. Googe, Project

Construction Manager

dE.D. Groover, Quality

Assurance Site Manager -

Construction

J. A. Bailey, Project Licensing Manager

yGi F. Trowbridge, Esq. , Shaw,

Pittman, Potts and Trowbridge

8. W. Churchill, Esq., Shaw,

9

Pittman, Potts and Trowbridge

g . L. Blake, Jr., E:q., Shaw,

E

Pittman, Potts and Trowbridge

vd. E. Joiner, Troutman, Sanders,

Lockerman and Ashmore

uf. G. Ledbetter, Commissioner,

Department of Human Resources

J . H. Badger, Office of Planning

and Budget

p0. Kirkland, III, Counsel,

Office of the Consumer's Utility

Council

p . C. Teper, Georgians Against

D

Nuclear Energy

pM. B. Margulies, Esq., Chairman,

Atomic Safety and Licensing Board

Panel

VDr. O. H. Paris, Administrative Judge

Atomic Safety and Licensing Board

Panel

I A. Linenberger, Jr., Administrative Judge

Atomic Safety and Licensing Board

Panel

kB. P. Garde, Citizens Clinic, Director

Government Accountability Project

bcc w/encis:

(See page 3)

r_

.

.

APR 18 ns

-

. Georgia Power Company

3

w

, Acc w/encls:

Y E. Reis, ELD

. M. Hill, IE-

N. Miller, NRR

g.Brach,EDO

, M. Sinkule, RII

'

E. Christnot, RII

vdRC Resident Inspector

Document Control Desk

State of Georgia

.

-

RII

RII

RII

EChristnot:ht

MSinkule

VLBrownlee

4/ l(,/86

4/gy/86

4/p/86

.

A

. .

.

.

.

.

.

.

-

.

.