ML20204F439

From kanterella
Jump to navigation Jump to search
Forwards Insp Rept 50-382/88-21 on 880801-0916 & Notices of Violation & Deviation
ML20204F439
Person / Time
Site: Waterford Entergy icon.png
Issue date: 10/13/1988
From: Callan L
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Dewease J
LOUISIANA POWER & LIGHT CO.
Shared Package
ML20204F442 List:
References
NUDOCS 8810210578
Download: ML20204F439 (3)


See also: IR 05000382/1988021

Text

. ..

. ,

OCT l3 m

.In Reply Refer To:

Docket: 50-382/88-21

'

Louisiana Power & Light Company

ATTN: J. 'G. Dewease, Senior Vice President

Nuclear Operations

317 Baronne Street

P.O. Box 60340

New Orleans, Lcuisiana 70160

Gentlemen:

This refers to the inspection conducted by Messrs. W. F. Smith and T. R. Staker

of this office during the period August 1 through September 16, 1988, of

activities' authorized by NRC Operating License NPF-38. for Waterford Steam

Electric Station, Unit 3, and to the discussion of our findings with

Mr. R. P. Barkhurst and other members of your staff at the conclusion of the

inspection.

Areas examined during the inspection included plant status, onsite followup of

events, operational safety verification, mcnthly maintenance observation,

monthly surveillance observation, licensee event report followup, and engineered

safety feature (ESF) walkdown. Within these areas, the inspection consisted of

selective examination of procedures and representative records, interviews with

personnel, and observations by the NRC inspectors. The inspection findings are

documented in the enclosed inspection report.

During this inspection, it was found that certain of your activities were in

violation of NRC requirements. Consequently, you are required to respond to

this violation, in writing, in accordance with the provisions of Section 2.201

of the NRC's "Rules of Practice," Part 2, Title 10, Code of Federal

Regulations. Your response should be based on the specifics contained in the

Notice of Violation enclosed with this letter.

Also during this inspection, it was found that i.ertain of your activities

appeared to deviate from a comitment made to the NRC. This item and reference

to the commitment it identified in the enclosed Notice of Deviation. You are

requested to respond to this deviation in writing. Your response should be

based on the specifics contained in the Notice of Deviation enclosed with this

letter.

We have also examined actions you have taken with regard to previously

identified inspection findings. The status of these items is identified in

paragraph 4 of the enclosed report.

The response directed by this letter and the accompanying Notices are not

subject to the clearance procedures of the Office of Management and Budget as

required by the Paperwork Reduction Act of 1980, PL 96-511.

$2 Wh Sht

O\

RIV:fI RIV: SRI C:RPD/A

DChamberlain

D '. I'

LJua an

TStaker WSniith

10 /;2 / 88 p/2/88

1

y//t/88 L e43 /88

ggr2 m =ayig: / ii

-.

. .

.  ;

.

..

Louisiana Power & Light Company -2-

Should you have any questions concerning this inspection, we will be pleased to

discuss them with you.

Sincerely,

Original Signed By

A. D. Deach

L. J. Callan, Director

Division of Reactor Projects

Enclosures:

1. Appendix A - Notice of Violation

2. Appendix B - Notice of Deviation

2. Appendix C - NRC Inspection Report

50-382/88-21

cc w/ enclosures:

Louisiana Power & Light Company

ATTN: R. P. Barkhurst, Vice President

Nuclear Operations

P.O. Box B

Killona, Louisiana 70066

Louisiana Power & Light Company

ATTN: N. S. Carns, Plant Manager

P.O. Box B

Killona, Louisiana 70066

Louisiana Power & Light Company

ATTN: R. F. Burski, Acting Manager

Nuclear Safety & Regulatory Affairs

317 Baronne Street

P.O. Box 60340

New Orleaas. Louisiana 70160

Louisiana Power & Light Company

ATTN: L. W. Laughlin, Site

Licensing Suppnrt Supervisor

P.O. Box B

Killona, Louisiana 70066

Middle South Services

ATTN: Mr. R. T. Lally

' 0. Box 6100

.

New Orleans, Louisiana 70161

Louisiana Radiation Control Program Director

-

.

'

.. ,

Louisiana Power & Light Company -3-

bec to DMB (IE01)

bec distrib. by RIV

  • SectionChief(DRP/A) *DRP

RPSB-DRSS * MIS System

  • Project Engineer, DRP/A *RSTS Operator
  • R. Hall *D. Wigginton, NRR Project
  • TSS Manager

,.. *DRS *Lisa Shea, RM/ALF

  • RIV File
  • w/766