Text

,

e APPENDIXA NOTICE OF VIOLATION

.-Louisiana Power & Light Company Docket:

50-382 Waterford Steam Electric Station, Unit 3 Operating License: NPF-S8 f

During an NRC inspection conducted August 1 through September 16, 1988, one-violation of NRC requirements was identified. The violation involved operating the plant in a condition prohibited by the Technical Specifications (TS).

In accordance with the "General Statement of Policy (and Procedure for NRC1988),theviola Enforcement Actions," 10 CFR Part 2. Appendix C below:

l Operation of the Plant in a Condition Prohibited by TS i

Technical Specification 3.8.4.1 requires all containment penetration conductor overcurrent protective devices shown in Table 3.8-1 to be operable in plant operational Modes 1, 2, 3, and 4.

Contrary to the above, from initial startup in 1985 until May 22, 1988, the backup protection for pressurizer backup heater bank 4 was inoperable, and from initial startup in 1985 until September 14, 1988, the backup i

protection for pressurizer bat kup heater bank 3 was inoperable, i

This is a Severity Level IV violation (Supplement I) (382/8821-01)

Pursuant to the provisions of 10 CFR 2.201, Louisiana Power and Light is hereby required to submit to this office within 30 days of the date of the letter transniitting this Notice, a written statement er explanation in reply, including for the violation:

(1) the reason for the violation if admitted, i

(2) the corrective steps which have been taken and the results achieved.

(3) the corrective steps which will be taken to avoid further violations, and (4) the date when full compliance will be achieved. WhJre gocd cause is shown, consideration will be given to extending the ratponse time, j

l DatedatArlington,Texa[sef &

1988 L

this /g tLL day of I

i I

J l

I i

f es10210583 891013 DR ADOCK 0500 g2 i

________.____.j