1 03/11/86

SUMMARY

OF 0.R. EVENTS MEETINSS tlNCOMPLETE EVENTS DISCUSSED IN DETAIL IN SEPARATE REPORT)

MEETING PRESENTER's FACILITY /

DATE OF EVENT EVENT CODEWDRDIS)

NUMBER /

NAME AND NSSS VENDOR AND BRIEF EVENT

SUMMARY

MEETING OFFICE FOR TRACKING EVENTS DATE 86-07 SILVER H CRYSTAL RIVER 3 DN 01/01/86 -- REACTOR COOLANT PUMP REACTOR SYSTEMS 03/10/86 0F NRR NSSS VENDOR EW FAILURES -UFDATE-E AND M FAILURES 86-07 JABBOUR K CATAWBA 1 ON 03/07/86 -- LDSS OF BOTH TRAINS OF HUMAN FACTORS 03/10/86 0F NRR NSSS VENDOR W SAFETY-RELATED CONTAINMENT ISOLATIONOTHER SEAL WATER INJECTION SYSTEM 86-07 ENBLE L NORTH ANNA 2 ON 03/04/86 -- DEGRADATION OF EMERSENCY DIESEL GENERATORS 03/10/86 0F NRR NSSS VENDOR W DIESEL SENERATORS 2H & 2J E AND M FAILURES 86-07 JOHNSTON K TROJAN DN 03/03/06 -- MULTIPLE FAILURES OF HUMAN FACTORS 03/10/86 0F NRR NSSS VENDOR W '

AUIILIARY FEEDWATER FLOW CONTROL VALVES STEAM AND FEED COUPLINSS, BOTH TRAINS 86-07 MC DONALD D TURKEY POINT 3 DN 03/04/06 -- INADEQUATE COMPCNENT AU11LIARY SYSTEMS 03/10/86 0F NRR NSSS VENDOR W COOLING WATER FLOW TO EMERGENCY HUMAN FACTORS CONTAINMENT COOLERS 86-06 THOMA J TMI 1 DN 02/26/86 -- FAILURE OF REACTOR TRIP ~ELECTRICAL 03/03/86 0F NRR NSSS VENDOR EW BREAKER SHUNT TRIP FEATURE 86-06 WAMBACH T PALISADES ON // -- RECENT PLANT STARTUP OTHER 03/03/S6 0F NRR NSSS VENDOR CE EXPERIENCE (CYCLE 7) 86-06 YOUNS R PALISADES ON 02/20/86 -- REACTOR COOLANT SYSTEM REACTOR SYSTEMS 03/03/86 0FIE NSSS VENDOR CE VALVE LEAKAGE PROBLEMS 86-06 AKSTULEWICZ HADDAM NECK ON 02/26/06 -- DROPPED FUEL ELEMENT E AND M FAILURES 03/03/86 0F NRR NSSS VENDOR W 86-06 ENBLE L NORTH ANNA 2 DN 02/21/86 -- FAILURE OF MULTIPLE STEAM STEAM AND FEED 03/03/06 0F NRR NSSS VENDOR W SAFETY RELIEF VALVES E AND M FAILURES 86-06 MC DONALD D TURrEY FOINT ON 02/24/06 -- COMPONENT C00 LING WATER AUIILIARY SYSTEMS

$ 03/03/86 0F NRR NSSS VENDOR W N%'

SYSTEM VALVES MISPOSITIONED FOR THE LIFE 0F FLANT Oy 86-06 LAPINSKY 6 W PLANTS ON 02/26/86 -- SINGLE FAILURE OF NUCLEAR 1 AND C m $ 03/03/86 0F NRR NSSS VEND 0R W INSTRUMENTATION INTERLOCK P-10 05a o c tD 86-05 LYNCH D FERMI 2 ON / / -- EMER6ENCY DIESEL DIESEL GENERATORS O M 02/24/86 0F NRR NSSS VENDOR GE GENERATOR BEARING FAILURES E AND M FAILURES

$ $ 86-05 LEECH P PILBRlM ON 02/12/06 -- RHR HIGH PRESSURE ALARMS E AND M FAILURES mW 02/24/86 0F NRR NSSS VENDQR SE REACTOR SYSTEMS 86-05 WEISS E VERMONT YANFEE ON 02/28/86 -- FAILURE OF STANDBY LIQUID HUMAN FACTORS 02/24/86 0F IE NSSS VEND 0R BE CONTROL SYSTEM - UPDATE REACTOR SYSTEMS

Page No.

2 03/11/86

SUMMARY

OF 0.R. EVENTS MEETINFS (INCDMPLETE EVENTS DISCUSSED IN DETAIL IN SEPARATE REPORT)

MEETING PRESENTER's FACILITY /

DATE OF EVENT EVENT CODEWORD (S)

NUMEER/

NAME AND NSSS VENDOR AND BRIEF EVENT

SUMMARY

MEETING OFFICE FOR TRACKINS EVENTS DATE 86-05 MC DONALD D TURKEY POINT 3 ON 02/11/86 -- REACTOR TRIP DUE 10 HUMAN FACTORS 02/24/86 0F NER NSSS VENDOR W FERSONNEL ERROR ELECTRICAL 06-05 NORRIS J

!!DN 2 ON 02/19/86 -- TWO INOPERABLE EMER6ENCY DIESEL SENERATORS 02/24/26 0F NRR NSSS VENDOR W O!ESEL GENERATORS E AND M FAILURES 86-04 TARN 0FF D BWR ON / / -- SHROUD BOLT CRACK AT BWRS E AND M FAILURES 02/10/86 0F NRR NSSS VENDOR SE STEAM AND FEED 86-04 GILEERT R DRESDEN 3 ON 01/20/06 -- FIRE IN DRYWELL EIPANSION AUIILIARY SYSTEM 02/10/86 0F NRR NSSS VENDOR SE SAP 86-04 RODNEY V VERMONT YANKEE' ON 02/08/86 -- FA1L! IRE OF STANDBY LIQUID REACTOR SYSTEM 02/10/86 0F NRR NSSS VENDOR SE CONTROL SYSTEM E AND M FAILURES 86-04 SINSH R HULT!

ON / / -- RECENT SAFETY PERFORMANCE OTHER 02/10/86 0F IE NSSS VEND 0R NA 0F FARLEY, OCONEE AND ST LUCIE PLANTS 86-04 STERN S RIVER BEND ON / / -- STARTUP PROBLEMS OTHER 02/10/06 0F NRR NSSS VENDOR W 86-04 ROBINSON 2 ON 01/28/86 -- REACTOR TRIP WITH LOSS OF ELECTRICAL 02/10/86 0F REQUA 6 NSSS VENDOR W OFFSITE POWER DIESEL SENERATORS 86-03 PAULSON W ARKANSAS 1 ON 01/14/86 -- DESIGN DEFICIENCY IN DESIGN 01/27/86 0F NRR NSSS VENDOR BW EMERGENCY FEEDWATER SYSTEM REACTOR SYSTEMS 86=03 THOMA J TMI I ON 01/24/06 -- PARTIAL LOSS NNI I AND C 01/27/86 0F NRR NSSS VENDOR BW 86-03 THOMA J TMI 1 DN 01/14/86 -- REACTOR TRIP BREAVER ELECTRICAL 01/27/86 0F NRR NSSS VENDOR BW FAILURE 86-03 611TTER J MC6UIRE ON 11/03/85 -- STARTUP WITH DEBRADED REACTOR SYSTEMS 01/27/86 0F IE NSSS VENDOR W HPSI SYSTEM E AND M FAILURES 86-02 WEISS,E.

CRYSTAL RIVER 3 DN / / -- VIEWS OF ACRS MEMBERS OTHER 01/13/86 0F IE NSSS VENDOR BW DURING EVENTS BRIEFING JAN 7 & 9 1986 86-02 WEISS, E RANCHO SECO ON / / -- VIEWS OF ACRS MEMBERS OTHER 01/13/06 0F IE NSSS VENDOR BW DURING EVENTS BRIEFING JAN 7 & 9 1986 86-02 JONES, R PALISADES ON 01/09/06 -- LDSS OF 0FFSITE POWER ELECTRICAL 01/13/86 0F IE NSSS VENDOR CC E AND M FAILURES 86-02 LEE,R PALO VERDE !

ON 01/09/86 -- REACTOR TRIP DESIGN 01/13/86 0F NRR NSSS VENDOR CE SYSTEMS

Page No.

3 03/11/06

SUMMARY

OF 0.R. EVENTS MEET!NSS (INCOMPLETE EVENTS DISCUSSED IN DETAIL IN SEPARATE REPORT)

MEETINS FRESENTER's FACILITY /

DATE OF EVENT EVENT CODEWORD (S)

NUMBER /

NAME AND NSSS VENDOR AND BRIEF EVENT

SUMMARY

MEETINS OFFICE FOR TRACKINS EVENTS DATE 86-02 WEISS E ST LUCIE 1 DN / / -- VIEWS OF ACRS MEMBERS OTHER 01/13/86 0F IE NSSS VENDOR CE DURING EVENTS BRIEFING ON JAN 7 & 9 1986 B6-02 WEGNER, M.

MUNSWICK 2 ON 01/07/06 -- TARGET ROCK TWD-STAGE SRV E AND M FAILURES 01/13/86 0F IE NSSS VENDOR GE SET POINT DRIFT STEAR AND FEED B6-02 WEISS,E MCSUIRE I DN // -- VIEWS OF ACRS MEMBERS OTHER 01/13/86 0F IE NSSS VENDOR W DURING EVENTS BRIEFING JAN 7 & 9 1986 86-02 WEISS, E MC6UIRE 2 DN / / -- VIEWS OF ACRS MEMBERS OTHER 01/13/86 0F IE NSSS VENDOR W DURING EVENTS BRIEFING JAN 7 & 9 1986 86-02 Mc DONALD TURKEY POINT 3 DN 01/01/86 -- STOP CHECK VALVE FAILURES E AND M FAILURES 01/13/06 0F NRFt NSSS VENDOR W STEAM AND FEED 86-02 MC DONALD, M TURKEY POINT 4 DN 01/01/86 -- STOP-CHECK VALVE FAILURES E AND M FAILURE 01/13/86 0F NRR NSSS VENDOR W STEAM AND FEED 86-01 MOZAFARI, B.

CRYSTAL RIVER 3 DN 01/01/86 -- REACTOR TRIP CORE 01/06/86 0F NRR NSSS VENDOR SW REACTOR SYSTEMS 86-01 MINER,S.

RANCHO SECD ON 12/26/85 -- REACTOR TRIP AND I AND C 01/06/86 0F NRR NSSS VENDOR BW UNCONTROLLED C00LDOWN SYSTEMS 86-01 6 EARS, 6.

HATCH 2 ON 12/28/85 -- LOSS OF DIESELS DIESEL SENERATORS 01/06/86 0F NRR NSSS VENDOR 6E ELECTRICAL 86-01 SEARS, 6.

FEACH BOTTOM 2 ON 12/26/85 -- REACTOR TRIP AND WATERHUMAN FACTORS 01/06/86 0F NRR NSSS VENDOR EE HAMMER STEAM AND FEED 85-28 SINSH, R.

ARKANSAS 2 ON 12/18/85 -- INDPERABLE REACTOR TRIPI AND C 12/23/85 0F !E NSSS VENDOR BW BREAKERS, UNDERVOLTASE ARMATURES OF 2 HUMAN FACTORS RTBs FOUND IN MID-POSITION 85-28 LICITRA, E.A PALO VERDE 1 DN 12/16/85 -- ESFAS ACTUATION. REACTOR I AND C 12/23/85 0F NRR NSSS VENDDR CE TRIP,&COMPONENTMALFUNCTIONS ELECTRICAL 85-28 RIBENBAhr, 6 HATCH !

ON 12/21/85 -- FLOODINS OF SAFETY AUI!LIARY SYSTEMS 12/23/S5 0F NRR NSSS VENDOR GE RELATED AREAS-RHR ROOM 14 FT DEEP, UNIT HUMAN FACTORS t

DEFUELED 85-28 ISRAEL,S.

BYRON 1 DN // -- FRA SEQUENCE-LOSS OF AUllLIARY SYSTEMS 12/23/85 0F NRR NSSS VEND 0R W SERVICE WATER-BOTH TRAINS-RCP SEALREACTOR SYSTEMS LOCA CONSEQUENCES

Page No.

1

SUMMARY

OF 0.R. EVENTS MEETINSS (INCDMPLETE EVENTS DISCUSEED IN D2 TAIL IN SEPARATE REFORTl MEETINS FRESENTER's FACILITY /

DATE OF EVENT EVENT CODEWDRD(S) hDNFER/

NAFE AND NESS VENDCK AND BRIEF EVENT

SUMMARY

MEETING OFFICE FOR 1 RACKING EVENTS DATE E6-02 WEISS,E.

CRYSTAL river 3 DN // -- VIEWS OF ACRS MEMIERS OTHER 01/13/86 0F IE NSSS VENDDR EW LURINE EVENTS E6!EFINS JAN 7 & 9 1986 86-02 WEISS, E RANCHO SECO ON / / -- VIEWS OF ACRS MEMBERS

OTHEi, 01/13/56 0F IE NSSS VENDOR EW DURING EVENTS ERIEFINS JAN 7 & 9 1986 86-02 JONES, R PALISADES ON 01/09/86 -- LOSS OF 0FF51TE F0WER ELECTRICAL 01/13/06 0F IE NSSS VENDOR CE E AND M FAILURES 86-02 LEE R FALO VERDE I DN 01/09/86 -- REACTOR TRIP DESIGN 01/13/86 0F NRR NSSS VEND 0R CE SYSTEMS 86-02 WEISS E ST LUCIE !

ON / / -- VIEWS OF ACRS MEMBERS OTHER 01/13/56 0F IE NSSS VENDOR CE DURIh5 EVENTS BRIEFINS ON JAN 7 & 9 1986 86-02 WEBNER, M.

BRUNSWICK 2 QN 01/07/86 -- TARGET ROCK TWD-STASE SRV E AND M FAILUR 01/13/06 0F IE NSSSVENDOREE SET FDINT DRIFT STEAM AND FEED 86-02 WEISS, E MCGUIRE 1 DN / / -- VIEWS OF ACRS MEMBERS OTHER 01/13/86 0F IE NSSS VENDOR W DURING EVENTS ERIEFING JAN 7 & 9 1986 86-02 WEISS, E MC6UIRE 2 DN / / -- VIEWS OF ACRS MEMBERS OTHER 01/13/66 0F IE NSSS VENDCR W DURING EVENTS ERIEFING JAN 7 & 9 1986 86-02 Mc DONALD TURKEY FDINT 3 ON 01/01/86 -- STOP CHECK VALVE FAILUKES E AND H FAILURE 01/13/06 0F NRR NSSS VENUR W STEAM AND FEED 86-02 MC DONALD, M TURKEY FOINT 4 ON 01/01/86 -- STOP-CHECK VALVE FAILURES E AND M FAILURES 01/13/86 0F NRR hSSS VENDOR W STEAM AND FEED 56-01 MOIArARI, B.

CRYSTAL RIVER 3 ON 01/01/86 -- REACTOR TRIP CORE 01/06/86 0F NRR NSSS VENDOR IW REACTOR SYSTEM 5 E6-01 MINER, S.

RANCHO SECO ON 12/26/85 -- REACTOR TRIP AND I AND C 01/06/E6 0F hKR hSSS VEND 0R EW UNCONTROLLED C00LDOWN SYSTEMS 86-01 GEARS, 6.

HATCH 2 ON 12/28/85 -- LOSS 0F DIESELS DIESEL SENERATORS 01/06/86 0F NRR NSSS VENDOR GE ELECTRICAL 86-01 SEARS, S.

FEACH EDITOM 2 CN 12/26/85 -- REACTOR TRIP AND WATER HUMAN FACTORS 01/06/86 0F NRR NSSS VENDGR GE HAMMER STEAM AND FEE 0 85-28 SIN 3H,R.

ARtANSAS 2 ON 12/18/05 -- IN0FERABLE REACTOR TRIF! AND C 12/23/05 0F IE NSSS VENDOR IW EREAFERS, UNDERVOLTAGE ARMATURES OF 2 HUMAN FACTORS RTEs FOUND IN MID-POSITION 85-28 LICITRA, E.A FALO VERDE 1 DN 12/16/85 -- ESFAS ACTUATION.FEACTOR! AND C 12/23/95 0F NRR NSSS VENDOR CE TRIP, & COMPONENT MALFUNCTIONS ELECTRICAL

Page No.

2

SUMMARY

CF D.R.' EVENTS MEETINGS (INCONLETE EVENTS DIECUSEED IN DETAIL IN SEPARATE REPORT)

MEETINS FRESENTER's FACILITY /

DATE OF EVENT NUMiER/

NAME AND NSSS VENDOR AND BRIEF EVENT

SUMMARY

EVENT CODEW3RD(S)

MEETING OFFICE F0R TRACKING EVENTS DATE 85-28 RllENEARK, 6 HATCH 1 CN 12/21/B5 -- FLOODING OF SAFETY AUI!LIARY SYSTEMS 12/23/85 0F NRR NSSS VENDER GE RELATED AREAS-RHR R00M 14 FT DEEP, UNIT HUMAN FACTORS DEFUELED 85-29 ISRAEL, S.

BYRON 1 DN / / -- PRA SEQUENCE-LOSS OF AUIILIARY SYSTEMS 12/23/85 0F Nr.R NSSS VENDDR W SERVICE WATER-BOTH TRAINS-RCP SEAL REACTOR SYSTEMS LOCA CONSEQUENCES l

l 1

I l

Pye No.

I 12/12/85

SUMMARY

OF 0.R. EVENTS MEETINSS (INCOMFLETE EVENTS DISCUSSED IN LETAIL IN SEPARATE REPORT)

MEETING PRESENTER's FACILITY /

DATE OF EVENT EVENT CODEWDRD(S) h3M5ERI NAME AND NSSS VEND 05 AND BRIEF EVENT

SUMMARY

MIETINS OFFICE FOR TRACKINS EVENTS DATE 25-27 JASSOUR K CATAW3A 2 CN 11/20/S5 -- TDI EMERSENCY DIESEL DIESEL GENERATORS 12/16/E5 0F NER NSSS VEND 0R W GEhERATCR MAIN BEARINS FAILURES E AND M FAILURES 55-27 LYNCH D FERMI ON 12/16/S5 -- EMERSENCY DIESEL O!ESEL GENERATORS 12/16/25 0F NKR NSSS VENDOR SE GENERATOR BEARINS FAILURES E AND M FAILURES B5-27 EEA'iD J T NORTH ANNA 1 ON 12/12/85 -- EMERSENCY DIESEL DIESEL GENERATORS 12/16/S5 0F NRR NSSS VENDOR W GENERATOR DEFECTIVE PARTS E AND M FAILURES E5-27 SINSM R MULTl CN / / -- RECENT OFFSITE AND ONSITE ELECTRICAL 12/16/85 0F IE NSSS VEND 0R NA POWIR SYSTEM FAILURES E5-2T SEARS G FEACHEDITOMl ON !!/26/85 -- CRACKS IN STEAM SEFERATOR E AND M FAILURES 12/16/E5 0F NKR NSSS VENDOR GE HDLD-DOWN BDLTS STEAM AND FEED i

65-27 WDCDFUFF R Z10N2 ON :2/14/85 -- LOSS OF RHR C00 LINS REACTOR SYSTEMS 12/16/25 0F IE NSSS VENDOR W

! AND C B5-27 LAPINSKY B MULTI ON / / -- IMPLEMENTATION OF T.A.P.

1 AND C 12/16/B5 0F IE kSSS VENDOR NA ITEM !.D. 2, SAFETY PARAMETER DISPLAY SYSTEM, AT OFERATING REACTORS 25-26 IUDANS J PEACH BOTT05213 DN 12/09/25 -- RESIDUAL HEAT REMOVAL REACTOR SYSTEMS 12/09/S5 0F IE NSSS VENDOR EI PUMF/ WEAR RINS AND MOTOR BEARINS E AND M FAILURES FAILUKES (UPDATE) 85-26 SHEWMKER R VERMONT YANVEE ON 11/27/85 -- PIFE SUFFORT PROBLEMS E AND M FAILURES 12/09/25 CF IE NSSS VENDOR EE STEAM AND FEED E5-26 WE!SS E PIL68i!M ON 11/27/85 -- MAIN STEAMLINE 1 AND C i

12/09/85 0F IE NSSS VENDOR GE DIFFERENTIAL FRESSURE SWITCH DRIFT I

B5-26 CAMPAGNONE M SUSQUEHANNA !!2 CN 12/02/85 -- LDSS OF !!T TRANSFORMER ELECTRICAL 12/09/B5 CF NFR NSSS VENDOR SE SYSTEMS 85-26 MINER S RANCHO SECO ON 12/05/25 -- REACIOR TRIP HUMAN FACTORS 12/09/85 0F NFR NSES VENDCR EW SYSTEMS E5-25 THOMA J TM1 1 DN 12/02/85 -- REACTOR TRIP CN ELECTRICAL 12/02/95 0F NKR NSSS VENDOR EW DVERFRESSURE STEAM AND FEED 25-25 EEARD J T DIABLO CANYON 2 CN !!/28/85 -- AFPARENT REACTOR TRIP ELECTRICAL 12/02/85 0F NFR NSSS VENDOR W EEEAFER FA! LURE S5-25 SILVER H CRISTAL RIVER 3 CN 4'/22/S5 -- MFW FAILURE /AFW HUMAN FACTORS 12/02/85 CF NKR NSSS VENDOR EW ACTUAT1 3 / REACTOR TRIP STEAM AND FEED

Pa;e No.

2 12/18/25

SUMMARY

OF 0.R. EVENTS MEETINSS

(!NCC'.PLETE EVENTS DISCUSSED IN DETAll IN SEFAFATE REFCRT)

MEETING FRESENTER's FAtlLITY /

DATE OF EVENT EVENT CODEWDRD(S)

NUMSERI MAME An NSSS VENICR AND BRIEF EVENT

SUMMARY

FOR TRACKING EVENTS MEETINS 0:FICE DATE 85-25 DUDLEY R SAN 0 0FRE 1 DN !!/21/25 -- LOSS OF 0FFSITE F0WER A O ELECTRICAL 12/02/85 0F NRR NSSS VENDOR W FEEIWATER SYSTEM DAMAGE-UFDATE Na 1 STEAM AND FEED B5-24 Mc DONALD D TURYEY POINT ON !!/21/85 -- ENVIRONMENTAL E AND M FAILURES 11/25/25 CF hER NSSS VENDDR W.

-QUALIFICAil0N OF MOTOR-0PERATED VALVES 65-24 IUDANS J FEACH B0110M 3 DN !!/02/S5 -- RESIDUAL HEAT REMOVAL E AND M FAILURES 11/25/S5 0F !E NSSS VE EDR SE PUMP WEAR RING AND MOTOR BEARINS REACTOR SYSTEMS FAILURES 85-24 CARUS 0 M YANKEE R0WE ON 11/21/E5 -- RUPTURED STEAM SENERATORE AND M FAILURES 11/25/S5 0F NRR NSSS VEEDR W FEEDWATER FEEDRINS 85-24 DUDLEY R SAN DNDFFE 1 ON !!/21/85 -- LDSS OF 0FFSITE POWER AND ELECTRICAL 11/25/85 0F NRR NSSS VEE OR W FEEDWATER LEAK STEAM AND FEED 85-23 KANTOR F BROWNS FERRY ON !!/13/85 -- 0FFSliE CONTAMINAil0N HUMAN FACTORS 11/18/85 0F 1E NSSS VE C OR SE INCIDENT DURINS EMERGENCY EIERCISE I

B5-23 TARNCFF D HATCH 2 DN !!/08/55 -- FUEL ASSEMBLY LIFT!NS R16 HUMAN FACTORS

!!/18/85 0F NRR NSSS VENDCR EE FAILURE 85-23 LONS S Si LUCIE 1 CN !!/06/85 -- INTERNALS LIFi!NS RIS E A C M FAILURES

!!/15/85 0F IE NSSS VEEOR CE FAILURE HUMAN FACTORS 85-23 KININER L BRA C SULF 1 DN !!/06/85 -- TDI DIESEL GENERATOR DIESEL SENERATORS

!!/18/85 0F NRR NSSS VE00R EE OVERSFEED HUMAN FACTORS B5-23 LYNCH M FERMI 2 DN !!/13/85 -- ENGINE FAILURE OF DIESEL SENERATORS 11/10/85 0F hAR NSSS VE ODR GE EMERGENCY DIESEL E AND M FAILURES B5-22 JAS!DUR K CATAWBA 2 ON 11/04/85 -- DVERPRESSURIZATION EVENTS DIESEL SENERATORS 11/04/B5 0F NER NSSS VINDDR W FOLLOWUP REACTOR SYSTEMS 65-22 WIGGINICN D D C COOK 2 DN 10/29/85 -- REACTOR TRIP BREAKER ELECTRICAL

!!/04/85 0F NRR NSSS VEECK W FAILURE INCIDENT E AND M FAILURES 65-22 LANik 6 MC6UIRE 1,2 CN !!/02/85 -- DUAL UNIT TRIP DN LCSS OF AUI!LIARY SYSTEMS 11/04/85 0F lE NSSS VEODR W INSTRUMENTAIR DESIGN 85-22 H0FFINS J V C SUMMER ON 09/20/85 -- REACIDR TRIP EVENT HUMANFACTORS

!!/04/85 0F NRR NSSS VE 0 0R W STEAM AND FEED 25-22 KINTNER L BRA C SULF 1 DN 10/30/85 -- RECIRCULATION PIPING E AND M FAILURES

!!/04/85 0F NRR NSSS VEMOR GE CRACKS STEAM AND FEED E5-21 CAEUSS M TROJAN ON 10/17/85 -- INCORRECT SEIF0!NTS FOR I AND C 10/2S/85 0F NRR NSSS VEN:0R W TRIP OF AFW PUMFS ON LOW SUCTION FRESS.

STEAM AND FEED

Page Ns.

5 12/1S/85 SUP. MARY OF 0.R. EVENTS MEETINSS (INCCMFLETE EVENTS DISCUSSED IN DETAIL IN SEPARATE REPORT)

MEET!'i3 FRESENTER's FACILITY /

DATE 0F EVENT EVENT CODEWORD (S)

NUMPER/

NAME AND NSSS VEN 0R AND BRIEF EVENT

SUMMARY

MEETINS OFFICE FOR TRACKING EVENTS DATE B5-21 THOMA J TM1 1 ON 10/28/S5 -- STARTUP STATUS REFORT OTHER 10/28/25 0F NRR NSSS VEND 0R NA 55-21 LICITRA E A PALD VERDE ON 10/24/85 -- UNPLANNED REACTOR TRIP HUMAN FACTORS 10/28/25 0F NRR NSSS VEND 0; CE

. CURING TESTINS F.EACTOR SYSTEMS 85-21 CAMPASNONE M SUSQUEHANNA 1 DN 10/26/85 -- CONDENSATE RESIN SPILL AUI!LIARY SYSTEMS 10/28/85 0F NRR NSSSVENDOREE E5-21 ENSLE L P NDRTH ANNA 1 DN 10/24/85 -- LOSS OF CCW TO RCP MOTOR ELECTRICAL 10/28/B5 0F NRR NSSS VENDOR W MAIN BEARINGS REACTOR SYSTEMS 25-21 DUOLEYR LA CROSSE ON 10/23/85 -- APPARENT FAILURE TO SCRAM i AND C 10/22/85 0F NRR NSSS VEN!0R AC 65-21 DUDLEY R LA CROSSE ON 10/22/85 -- LOSS OF 0FFSITE FOWER ELECTRICAL 10/28/E5 0F NRR NSSS VEN30R AC I:UMAN FACTORS B5-21 EAILEY H FERRY l CN 10/23/65 -- TEST RETURN LINE PIPINE REACTOR SYSTEMS 10/28/25 CF IE NSSS VENDOR GE OVERFRESSURIZATION HUMAN FACTORS 95-20 BAILEY H RANCHO SECO ON 10/07/85 -- FOLLOWUP-Rr TRIP &

E AND M FAILURES 10/21/85 0F lE NSSS VENDDR EW E! CESS.COOLDOWN - AUI. FEED. PUMP STEAM AND FEED BEARING FAIL.

85-20 VISSINS S ARKANSAS 1 DN 10/17/85 -- FAILURE OF SERVICE WATERAul!LIARY SYSTEMS 10/21/25 0F NRR NSSS VENDDR EW FUMF DISCH. CHECK VALVE E AND M FAILURES 95-20 LICITRA E A PnLO VERDE 1 DN 10/21/E5 -- TEAM FINDINGS ON RECENTOTHER 10/21/85 0F NRR NSSS VEN:)DR CE EVENTS E5-20 ROTHMAN R L MUtil DN 10/19/85 -- MEllCAN EARTHOUAKE OTHER 10/21/85 0F NRK NESS VENDOR NA

SUMMARY

85-20 SINGH R HATCH 1 CN 12/15/85 -- CRACK IN CRYWELL INERTING E AND M FAILURES 10/21/85 0F IE NSSS VENDOR GE AND PURGE VALVE AUIlLIARY SYSTEMS B5-20 SEARS P M MAINE YANKEE ON 10/10/85 -- ROSEMONT TRANSMITTER I AND C 10/21/85 0F NRR NSSS VEN:0R CE IMPROFER INSTALLATION E5-20 ENGLE L B NORTH ANNA 2 DN 10/08/85 -- EMERS. 0!ESEL GENERATOR DIESEL 6ENERATORS 10/21/85 0F NRR NSSS VENDOR W FAILURE B5-20 CAMPAGNONE M SUSQUEHANNA I ON 10/Il/85 -- RWCU ISOLATION ON HIGH AUI!LIARY SYSTEMS 10/21/85 CF NRR NSSS VENDOR BE FLOW 25-19 EEAFC J T PALD VERDE 1 DN 10/03/95 -- LOSS OF 0FFSITE POWER ELECTRICAL 10/07/S5 0F NRR NSSS VENDER CE I AND C

Page Nc.

4 12/18/25 g

SUMMARY

OF 0.R. EVENTS MEETINSS (INCOMPLETE EVENTS DISCUSSED IN DETAIL IN SEPARATE REPORil MEETING PRESENTER's FACILITY /

DATE OF EVENT EVENT CODEWDRDIS)

NUMBER /

NAME AND NSSS VENDOR AND BRIEF EVENT

SUMMARY

MEETIN3 0FFICE FOR TRACT!NG EVENTS LATE 85-19 WEISS E DRESDEN 3 DN 09/19/85 -- SCRAM SDLENDID PROB.

I AND C 10/07/S5 0F IE NSSS VENDDR GE INDUCED LEArAGE (FDLLOWUF) 85-19 HEITNER FORT ST VRAIN ON 10/04/85 -- START-UP 0FERATIONAL 12 10/07/85 0F NRR NSSS VENDCR GA

- FROBLERS HUMAN FACTORS 85-19 LYNCH D FERMI 2 DN 10/01/85 -- RAPID C00LCOWN EVENT REACTOR SYSTEMS 10/07/85 0F NRR NSSS VENDOR EE SYSTEMS j

85-19 BROTEN4 DIS M BRUNSWICK 2 ON 09/27/85 -- MSIVS FAILURE TO CLOSE STEAM AND FEED 10/07/85 0F NRR NSSS VENDOR GE E AND M FAILURES

{

85-19 BAILEY H RANCHO SECO ON 10/02/85 -- REACTOR TRIP AND REACTOR SYSTEMS 10/07/85 0F IE NSSS VENDOR BW UNCONTROLLED C00LDOWN SYSTEMS i

85-18 HAWKINS J M' LTI J

ON 09/30/85 -- HURRICANE 6LORIA RESPONSE OTHER 09/30/E5 0F IE NSSS VENDOR NA 85-18 BEARD J T TM1 1 DN 09/23/85 -- REACTOR TRIP BREAKER I AND C 09/30/05 0F NRR NSSS VENDOR fW MALFUNCT!0N 85-13 SELLS D ST LL'CIE 2 ON 09/10/85 -- RCP SEAL FAILURE UPDATE E ANC M FA! LURES 09/30/85 0F NRR NSSS VENDOR CE STEAM AND FEED 85-17 PERSINKD D DAVIS-EESSE ON 09/20/85 -- MAINTENANCE SURVEY DTHER 09/23/85 0F NRR NSSS VENDOR EW i

HUMAN FACTORS 85-17 CARUS 0 M FERMI 2 ON 09/23/85 -- CPERATINS EIPERIENCE OTHER 09/23/85 0F NRR NSSS VENDOR GE 85-17 GEARS 6 PEACH EDTTOM 3 CN 09/19/85 -- CRACK INDICATIONS ON E AND M FAILURES 09/23/85 0F NFR NSSS VENDOR SE 316-L SAFE-ENDS 85-17 WE!SS E DRESDEN 3 ON 09/19/85 -- SCRAM SDLENDID REACTOR SYSTEMS 09/2!/85 0F IE NSSS VENDCE EE PROS. INDUCED RCS LEAKASE E AND M FAILURES 85-17 LICITRA E A FALD VERDE 1 ON 09/12/85 -- REACTOR TRIP, SAFETY REACTOR SYSTEMS 09/23/85 0F MR NSSS VENDOR CE INJECTION, LOSS OF PRESSUR. AUI. SFRAY SYSTEMS SYSTEM 85-17 EAILEY H SAN ONOFRE 1 ON 09/19/85 -- FAILURE OF AUI. FEED.

HUMAN FACTORS 09/23/85 0F IE NSSS VE OCR W PUMP TURBINE BEARINSS E AND M FAILURES 85-16 MILAND F TURKEY FDINT ON 09/12/85 -- TURBINE RUNBACK LOGIC 1 AND C 09/16/85 0F NRR NSSS VENDOR W MDD.

CORE 85-16 CALLAN J TURLEY POINT DN 09/13/05 -- OPERATIONAL READINESS HUMAN FACTORS 09/16/55 0F IE NSSS VEND 0R W INSP. OF AUI. FEEDWATER SYSTEM Bf IE STEAM AND FEED

Page Nc.

5 12/18/85

SUMMARY

OF 0.R. EVENTS MEEilNGS tlNCOMFLETE EVENTS DISCUSSED IN DETAIL IN SEFARATE REFORT)

MEETING PRESENTER's FACILITY /.

DATE OF EVENT EVENT CODEWDRDIS)

NUMIER/

NAME AND NSSS VENDOR AND ERIEF EVENT

SUMMARY

MEETIN3 OFFICE FOR TRACKING EVENTS EATE 85-16 LICITRA E A PALD VERDE 1 DN 09/12/25 -- REACTOR TRIP, SAFETY REACTOR SYSTEMS 09/16/25 0F NRR NSSS VEND 0R CE INJECTION, LOSS OF FRESSUR. AUI. SPRAY SYSTEMS SYSTEM B5-16 HOPKINS J V.C. SUMMER ON 09/08/85 -- INSTRUMENT AIR PRESSURE AUllLIARY SYSTEMS 09/16/95 0F NRR NSSS VENDOR W REDUCTION STEAM A O FEED 85-16 SWENSON W CAVIS-BESSE ON 09/06/85 -- STEAM 6ENERATOR HUMAN FACTCRS 09/16/85 0F NRR NSSS VENDOR PW DVERFRESSURIZAi!ON STEAM AND FEED B5-15 SEARS P MAINE YANKEE ON 09/03/85 -- COMMON MODE FR09. NITH I AND C 09/09/85 0F NRR NSSS VENDOR CE STEAM GENERA 10R PRESSURE INSTRUMENTATION STEAM AND F 85-15 EEARS S FEACH BOTIDM 3 CN 08/19/85 -- NEW PIFE CRACK E AND M FAILURES 09/09/85 0F NRR NSSS VENDOR GE INDICATIONS B5-15 THOMA J TMI 1 DN 08/21/85 -- PART!AL LOSS OF NNI POWER ! AND C 09/09/95 CF NRR NSSS VENDOR EW B5-15 WIGS!NTON D D C COOK 2 ON 08/24/85 -- CREVICE LEAKS IN STEAM E AND M FAILURES 09/09/85 0F NRR NSSS VENDOR W GENERATOR TUBE SHEET STEAM AND FEED B5-15 WEISS E FERMI 2 ON 08/25/85 -- RECIRCULATION PUMP HUMAN FACTORS 09/09/85 0F IE NSSS VENDOR GE OVERSFEED EVENT STEAM AND FEED 65-15 WEISS E FERPI 2 DN 09/04/65 -- VIOLATION OF CONTAINMENT STEAM AND FEED 09/(9/85 0F lE NSSS VENDOR GE INTESRITY 85-14 61LBERT R DRESDEN 2 DN 08/16/85 -- LOSS OF 0FFSITE POWER ELECTRICAL 08/26/85 0F NRR NSSS VENDOR SE DESISN 85-14 WE!SS E BROWNSFERRY123 ON 08/19/85 -- CABLE TRAYS SEISMIC 12 05/26/25 0F IE NSSS VENDOR GE CUAllFICATION E AND M FAILURES B5-14 JAEBOUR K CATAW D !

ON 08/15/85 -- BLACK 0UT SIGNAL AND HUMAN FACTORS 02/26/25 0F NER NSSS VENDOR W INTERACTION BETWEEN UNIT 1 AND UNIT 2 SYSTEMS Si-14 THA0ANI M DUANE AU DLD ON 08/22/85 -- DIESEL 6ENERATOR LOADINS O!ESEL 6ENERATORS 08/26/B5 0F NRR NSSS VENDOR GE SEQUENCER PROPLEM DESIGN E5-14 ALEXION i CALLAWAY !

ON 08/20/85 -- ELECTRICAL POWER I AND C 08/26/85 0F NRR NSSS VENT 0R W TRANSIENT ELECTRICAL 65-13 CARUSD M POINTBEACH ON 07/23/85 -- UNITS 1 AND 2 SAFETY I AND C 08/l /85 0F NRR NSES VENLCR W INJECilCN RECIRCULAi!0N LINE DESIGN E AND M FAILURES DEFICIENCY l

l

Page No.

6 12/18/93

SUMMARY

OF 0.R. EVENTS MEETINGS t!NCCMFLETE EVENTS DISCUSSED IN DETAIL IN SEPARATE REFORT)

MEETlh5 FRESENTER's FACILITY /

DATE OF EVENT EVENT CODEWDRD(S)

NUMBER /

NAME AND NSSS VENDOR AND BRIEF EVENT

SUMMARY

MEETINS OFFICE FOR TRACKING EVENTS DATE 85-13 EEA R J T CALVERT CLIFFS ON 08/13/S5 -- REACTOR TRIP BREAKER (6E I AND C 08/13/E5 0F NER NSSS VENDOR CE AK-2-25) FROBLEM 85-13 BEARD J T MAINE YANKEE ON 08/07/65 -- COMMON-M0!E PROBLEM WITH I AND C 08/13/85 0F NER NSSS VENDOR CE S/6 FRESSURE INSTRUMENTATION STEAM AND FEED 85-13 SMITH R FOREIGN ON 03/08/55 -- MutilFLE FEEDWATER I AND C 08/13/E5 0F IE NSSS VENDOR NA FAILURES DUE TO FAILURE OF A SINSLE STEAM AND FEED INVERTER 85-13 NICOLORAS H DCONEE 1 ON 07/22/85 -- NEW BE UNDERVOLTAGE TRIP 1 AND C 08/13/95 0F NRR NSSS VEND 0R BW ATTACHMENT RESPONDS SLOWLY E AND M FAILURES B5-13 BEARD J T SALEM 2 CN 08/08/85 -- REACTOR TRIP I AND C 08/13/85 0F NRR NS$$ VENDOR W STEAM AND FEED 85-13 BAILEY H TURKEY FDINT ON 07/23/85 -- MSIV DESIGN DEFICIENCY STEAM AND FEED 08/13/85 0F !E NSSS VENDOR W AUIILIARY SYSTEMS E5-13 BAILEY H TURKEY POINT ON 08/01/85 -- RECENT MULTIPLE INVERTER I AND C 03/13/85 0F IE NSSS VENDOR W FAILURES 25-13 HENDERSON J TURKEY FOINT 3 DN 08/08/85 -- PtST-TRIP LDSS OF AFW STEAM AND FEED 03/13/85 0F IE NSSS VENDOR W E AND M FAILURES 25-12 NICOLARIS, H OCONEE 2 GN 07/11/85 -- EITENDED BLOWDOWN FROM STEAM AND FEED 07/23/85 0F NRR NSSS VENDOR EW MAIN STEAM SAFETY VALVES (CROSBY VALVES) HUMAN FACTOR 85-12 RODD, H.

CE PLANTS ON 07/02/85 -- CE LOCA ANALYSIS REACTOR SYSTEMS 07/23/85 0F NRR NSSS VCNDOR CE NON-CONSERVATIVE ERROR (FCT)

CORE B5-12 HAMMER, 6.

SEAEROCK CN 12/31/84 -- CRDSBY MAIN STEAM SAFETY STEAM AND FEED 07/23/S5 0F NR NSSS VENDOR W VALVE FLOW DEFICIENCY-OTHER FWRs MAY E AND M FAILURES HAVE SIMILIAR FROILEM 85-12 W!LSDN, J.

WATERFORD 3 ON 07/04/85 -- THRU 7/07/05, FOUR 14)

STEAM AND FEED 07/2!/8!

0F NRR NSSS VENDOR CE FEACTOR TRlPS IN LESS THAN 3 DAYS-HUMAN FACTCRS 65-12 EDSNAK,R.

FOSSIL ON 06/09/05 -- MOHAVE SENERATINS STEAM AND FEED 07/23/E5 0F NFR NSSS VENDOR NA STAilDN-REHEATLINEFA! LURE-FISHMOUTH E AND M FAILURES RUPTURE 85-12 JCNES. W.

MULTI ON 06/04/85 -- BEGINNINS 10/18184, DTHER 07/23/65 0F !E NSSS VENDOR NA STARTUP EIP. COMPARISDN-WATERFORD 3, W]tF CREEK, CALLAWAY, CATAWPA, & BYRON 85-12 N!!6HBDRS,D INDIAN F0!NT 3 CN 06/27/85 -- SD WELD INDICAi!DNS STEAM AND FEED 07/23/65 0F NRR NSSS VENDOR W E AND M FAILURES b

Page No.

7 12/18/83

SUMMARY

OF 0.R. EVENTS MEETINSS (INCOMPLETE EVENTS DISCUSSED IN DETAIL IN SEPARATE REPORT)

MEETINS FRESENTER's FACILITY /

DATE OF EVENT EVENT CODEWORD (S)

NUMEER/

NAME AND NSSS VENDOR AND ERIEF EVENT

SUMMARY

j MEETINS OFFICE FOR TRACKING EVENTS DATE i

85-12 MCn!ETTE, P FORElBN ON 03/29/85 -- PALUEL I & 2 IN-CORE CORE 07/2!/25 0F NRR NSSS VENDOR NA INSTRUMENTATION TUEE VIBRATION PROBLEMS-I AND C 4

ALL 1300 MWE FRENCH REACTORS l

85-!!

DEAGAZIO, A.

DAVIS BESSE l-

'CN 06/09/85 -- LOSS OF MAIN FEEDWATER STEAM AND FEED 07/01/25 0F NER NSSS VENDOR EW AND AUXILARY FEEDWATER HUMAN FACTORS i

85-11 RIVEN 5 ARK,6.

RANCHD SECD 1 DN 06/23/85 -- RCS HIEH POINT VENT LEAK REACTOR SYSTEMS 07/01/85 0F NRR NSSS VENDOR EW E AND M FAILURES 65-11 RIVENEARK,6.

RANCHO SECO 1 ON 06/23/85 -- STARTUP PROBLEMS

SUMMARY

OTHER t

07/01/85 0F NRR NSSS VEND 09 EW (3/15/85-6/23/95)

DESIGN E5-11 EDURNIA, A.

LASALLE 2 ON 06/05/85 -- EQ MODIFICAi!CN PROBLEMSHUMAN FACTORS 07/01/95 0F NRR NSSS VENDOR BE AND LOSS OF ALL ECCS 6/5-6/10 REACTOR SYSTEMS 25-11 F0WELL, D DYSTER CREEK 1 DN 06/12/85 -- UNCONTROLLED LEAKAGE OFREACTOR SYSTEMS 07/01/85 0F IE NSSS VENDOR GE REACTOR COOLANT GUTSIDE CONIAlhMENT I AND C 1

85-10 DEASAZIO,A.

DAVIS BESSE 1 CN 06/09/85 -- LOSS OF ALL MAIN STEAM AND FEED 06/12/85 CF NRR NSSS VENDOR EW FEECWATER AND AUI!LARY FEEDWATER HUMAN FACTORS 1

85-10 SWENSON,W.

RANCHO SECO !

ON 06/05/85 -- REACTOR TRIP BREAKER TEST E AND M FAILURES 06/12/85 0F NRR NSSS VENDOR EW FAILURE I AND C 85-10 SWENSON, W.

RANCHO SECD 1 CN 06/01/85 -- EDS CONTROL CIRCUIT DIESEL GENERATORS 06/12/85 0F NKR NSSS VENDOR IW DESIGN ERROR I AND C E5-10 FCWELL,D.

HARRIS ON 02/12/85 -- POTENTIAL SEISMIC CORE 06/12/83 0F IE NSSS VENDOR W INTERACTION OF THE INCORE FLUI MAFPINS E AND M FAILURES SYSTEM B5-10 COLPURN T.

POINTBEACH!

CN 05/30/85 -- STUCK CONTROL RODS-COLD CORE 06/12/E5 0F NER NSSS VENDOR W DROF TEST & H3T DRCP TEST HUMAN FACTORS JAFFE,D.

CALVERT CLIFFS ON 05/26/85 -- ALL EMERGENCY DIESEL DIESEL SENERATORS 05/30/85 CF NRR NSSS VENDOR CE GENERATORSIN0PERAPLE E AND M FAILURES SEARD,J.T.

FITIFATRICK CN 05/06/65 -- SHUIDCNN MARGIN TESTS CORE 05/30/95 0F NRR NSSS VENDOR SE UFLATE MAY lRD AND 6TH, 1985 OTHER RIVENBARK, 6 HATCH 1 DN 05/15/85 -- STUCK OPEN SAFETY REL!EFREACTOR SYSTEMS C5/!0/25 CF NER NSSS VENDOR GE VALVE SYSTEMS INTERACT LEECH, P.

P!L6 RIM DN 05/18/85 -- WATER HAMMER IN HPCI STEAM AN3 FEED 05/ 0/85 CF NRR NSSS VEND 0F SE STEAM TUREINE EINAUST LINE OTHER

Fage No.

8 12/18/85

SUMMARY

OF 0.R. EVENTS MEETINGS (INCOMFLETE EVENTS DISCUSSED IN DETAIL IN SEFARATE REFORil MEETINS PRESENTER's FACILITY /

DATE OF EVENT EVENT CODENDRDIS)

NUMEER/

NAME AND NSSS VENDOR AND BRIEF EVENT

SUMMARY

MEETING OFFICE FOR TRACK]NS EVENTS DATE EEARC,J.T.

MCSUIRE 2 ON 05/17/65 -- CRITICAL '0SITION CORE 05/50/85 0F NRR NSSE VENDOR W ANOMALIES HUMAN FACTORS WEISS,E.

SEQUDYAH 2 ON 05/22/85 -- thPROFER USE OF TEST I AND C 05/50/85 0F IE NSSS VENDOR W-

' EQUIPMENT AND REACTOR TRIP OTHER BEARD,J.T.

SUMMER ON 05/11/85 -- PREMATURE CRITICALITIES-CORE C5/50/85 CF NRR NSSS VENDOR W 2/28/85 & 5/11/85 UFDATE. W. INVEST.FCR HUMAN FACTORS MID-JUNE 85 REFORT SEE mig 5/15/85.

VILLALVA,I.

TURKEY FOINT ON 05/17/85 -- WIDESPREAD 00TABE LEADS ELECTRICAL POWER 05/30/85 0F !E NSSS VENDDR W TO LOSS OF 0FFSITE POWER-NDTE-ALL ESF DTHER SYSTEMS WORKED AS DESIGNED EEARD, J.T.

SUMMER !

CN 05/08/95 -- LOSS OF SOTH EMER6ENCY DIESEL GENERATORS 05/15/85 CF NRR NSSS VENDOR W DIESEL SENERATORS ELECTRICAL POWER AEELSON, H.

FITZFAIRICK ON 05/03/85 -- SHUIDOWN MARGIN CORE 05/15/85 CF NRR NSSSVENICREE DEMONSTRAT10N FRCSLEMS MAY 3rd AND 6th, 1985 EEVAN,R.

QUAD CITIES ON 05/07/85 -- ELECTRICAL POWER I AND C 05/15/95 0F NRR NS$5 VENSCR GE TRANS!ENT AND PLANT ELECTRICAL SYSTEM SYSTEMS INTERACT INTERACT]DN BAILEY, H.

WNP 2 DN 05/07/95 -- REACTOR VESSEL PARilAL HUMAN FACTORS 05/15/95 0F IE NSSS VENDOR 6E DRAINDOWN REACTOR SYSTEMS SWENSCN, W.

SINNA ON 05/06/85 -- LOCA CHARC0AL FILTERS AUIILIARY SYSTEMS 05/15/25 0F NRR NSSS VENDOR W FOTENTIALLY INOPERABLE DESIGN HERMANN, R.

NINE MILE FT 1 DN 05/07/85 -- CRACKING IN CONTAINMENTE AND M FAILURES 05/15/B5 CF NRR NSSS VENDOR EE SFRAY HEAT EXCHANSER WELDS REACIDR SYSTEMS HDFKINS,J.B SUMMER 1 DN 05/11/95 -- PREMATURE CRITICAL!iY-CORE 05/15/85 0F NRR NSSS VEN00R W SEC01D OCCUPANCE (FIRST DNE 2/28/851 OSPORNE,D.

MILLSTCNE 2 DN 04/10/85 -- EDDY CURRENT TEST (ECilSTEAM AND FEED 05/0T/95 0F NRR NSSS VENDOR CE OF STEAM 6ENERATOR TUPES EPRl/5606 E AND M FAILURES GENERIC FROCESS USED DYER,J.

SENERIC ON 05/07/85 -- STATION EATTERY PROBLEMS-ELECTRICAL F0WER 05/07/85 0FlE NSSS VENDOR NA COOPER, MC6UIRE, SUSCUEHANNA HUMAN FACTORS HCDGE,V.

BYRON ON 03/14/85 -- FAILURE OF A!R CHECK STEAM AND FEED 05/07/85 0F IE NSSS VENX R W VALVES TO SEAT E AND M FAILURES

Fage No.

9 12/1E/95

SUMMARY

Lt 0.R. EVENTS MEETINGS tlNCORK ETE EVENTS DISCUSSED IN DETAIL IN SEPARATE REPORT)

MEETINS PRESENTER's rACILITY /

DATE OF EVENT EVENT CODEWDRDIS)

NUMBER /

NAME AND NSSS VENDCE AND ERIEF EVENT

SUMMARY

MEETINE OFFICE FOR TRACK!NS EVENTS CATE JAB 100R K.

CATAWEA 1 ON 04/22/25 -- RCS LEVEL CONTROL REACTOR SYSTEMS 05/07/E5 0F NRR NSES VENDOR W FRDPLEMS 1 AND C JABBDUR, K.

CATAWEA 2 ON 04/19/B5 -- RHR DVERPRESSURIZATION /

HUMAN FACTORS 05/07/85 0F NRR NSSS VENDOR N' VCT FAILUFE IVCT DN 4/20/85)

REACTOR SYSTEMS WEISS, E.

SALEM 2 ON 04/13/85 -- PRESSURE / TEMPERATURE HUMAN FACTORS 05/07/85 0F IE NSSS VENDOR W TRANSIENT -NOTE-MULTIPLE EDUIPMENT STEAM AND FEED FAILURES NEIGHECRS, D SURRY 2 DN 03/20/85 -- STEAM SENERATOR WELDSTEAM AND FEED 05/07/85 0F NRR NSSS VENDOR W INDICATION E AND M FAILURES COLLINS, W.J PALD VERDE 2 ON 03/01/85 -- WELD LEAKS IN ULTIMATE AUIILIARY SYSTEMS 04/04/85 0F IE NSSS VENDOR CE HEAT SINK FIFINS-SUSFECT E AND M FAILURES MICROE!0 LOGICAL INDUCED CORRDSION LONS, W.

BROWNS FERRY 3 ON 02/13/85 -- LEVEL INDICATOR EVENT-I AND C 04/04/85 CF NRR NSSS VENDOR GE NRC NDTIFIED 43 HOURS AFTER EVENT HUMAN FACTORS KINTNER,L.

GRAND GULF 1 ON 03/11/85 -- MALFUNCTION OF DIESLLDIESEL GENERATORS 04/04/25 0F NRR NSSS VENDOR GE GENERATOR E AND M FAILURES JONES,R.

GENERIC ON 03/19/85 -- E!!DN ECCS CODE ERRORS CORE 04/04/E5 0F DSI NSSS VENDOR NA AND Kr PROBLEMS OTHER OLSHAN L.

EYRON !

ON 03/14/85 -- MS!V FAILURE DURINS STEAM AND FEED 04/04/85 CF NRR NSSS VENDOR W RECOVERY FROM LDSS OF 0FFSITE POWER TEST E AND M FA BEARD,J.T.

NORTH ANNA 2 DN 03/15/05 -- RECENT MAJOR ENSINE DIESEL BENERATORS 04/04/E5 0F NRR NSSS VENDOR W FAILURE OF EDS E AND M FAILURES WAMPACH, T.

PALISADES ON 02/12/05 -- THRU 2/18/85 BLOCKED REACTOR SYSTEMS 03/07/S5 Dr NRR NSSS VENDCR CE FRESSURllER HEATER TRIP AND CCNCENTRATED I AND C BORIC ACID INJECTION VALVE WILSCN,J.

WATERFORD 3 CN 02/20/85 -- INADVERTANT CONTAINMENT HUMAN FACTORS 03/07/S5 0F NFR NSSS VENDOR CE SFRAY INITIATION REACTOR SYSTEMS WEENER, M.

GENERIC ON 02/28/85 -- RECENT HPC1/RCIC REACTOR SYSTEMS 03/07/85 0F IE NSSS VENDOR NA FRDBLEMS, INCLUDING NON-RANDOM HUMAN FACTORS MAINTENANCE FROBLEMS COVERS FER!0D 1/1/84-2/28/85 REEVES, E.

FARLEY2 ON 01/28/85 -- FAILURE OF CONTAINMENTOTHER 03/07/85 0F NRR NSSS VENDOR W TENDON FIELD ANCHCS SEE mig 2/14/85 E AND M FAILURES

Fage No.

10 12/18!S5

SUMMARY

OF 0.R. EVENTS MEETINSS IINCOMPLETE EVENTS DISCUSSED IN DETAIL IN SEPARATE REFORT)

MEETINS PRESENTER's FACILITY /

DATE OF EVENT EVENT CODEWORD (S)

NUMEER/

NAME AND NSSS VEMOR AND BRIEF EVENT

SUMMARY

MEETINS OFFICE FOR TRACKING EVENTS DATE VILLALVA KEWAUNEE ON 02/12/65 -- SFONTANEDUS START OF ELECTRICAL F0WER 03/07/85 0F IE NSSS VENDOR W REACTOR COOLANT PUMF REACICR SYSTEMS HDDSE, V.

R031NSON DN 01/05/85 -- MSIV CLOSURE LDSIC DESIGN STEAM AND FEED 03/07/85 0F IE NSSS VENDOR W DEFICIENCY

! AND C NOT STATED BWR ON 02/06/85 -- 5 YR HISTORY OF MS!V STEAM AND FEED 02/14/85 0F N/A NSSS VENDOR GE FAILURES-ESP. BROWNS FERRY-MFRs DF MSIVs OTHER ARE ATWOOD & MORRILL, CRANE. ROCKWELL WOODRUFF, R.

DUANE ARNOLD ON 02/06/85 -- MSIV SURVEILLANCE-4 OUT STEAM AND FEED 02/14/85 0F ESCB NSSS VENDOR GE OF 8 MSIVs FAILED LEAK RATE TEST E AND M FAILURES hEISS,E.

SRAND SULF ON 02/10/85 -- MSIVs FAIL TO CLOSE STEAM AND FEED 02/14/85 CF IE NSSS VENDOR GE (SOLENDID VALVE FRDBLEM)

E AND R FAILURES GEARS,6.

PEACH BOTTOM 2 CN 02/10/85 -- WORKER CONTAMINATION UP HUMAN FACTORS 02/14/85 0F NRR NSSS VE OGR GE TO 30% MAI. PER. BCDY BURDEN-7 REC'D OTHER INTERNAL COBALT-60 EIPOSURES WE!SS E.

WNP 2 DN 01/31/85 -- SCRAM, PARTIAL LOSS OF At ELECTRICAL POWER 02/14/E5 CF IE NSSS VENDOR 6E POWER, DIESEL 6EN. DEGRADAi!0N I AND C VILLALVA,I.

CATAWBA 1 ON 02/07/85 -- BOTH S1 PUMPS INDPERABLE HUMAN FACTORS 02/14/85 0F IE NSSS VENICR W (PLANT IN OP. MODE 2) INADEDUATE REACICR SYSTEMS OFERATOR TRAININS PROBABLE CAUSE REEVES,E.

FARLEY 2 ON 01/28/85 -- FAILURE OF CONTAINMENTOTHER 02/14/85 0F NRK NSSS VE E OR W TENDON FIELD ANCHOR-SEE mig 3/07/85 E AND M FAILURES DYER,J.

MCSUIRE ON 02/01/85 -- BATTERY FRDBLEMS POSSIBLY ELECTRICAL POWE 02/14/85 0F IE NSSS VE COR W FOR 2 YEARS-MGMT UNAWARE AND NOT HUMAN FACTORS ASSRESSIVELY CORRECilNS BEARD, J.T.

NORTH ANNA 1 ON 02/04/85 -- EDS ENSINE FAILURE DIESEL GENERATORS 02/14/85 CF NRR NSSS VENT 0R W (SIMILIAR TO UNIT 2 ED6 ENGINE FAILURE HUMAN FACTORS 12/7/84 & 6/14/831-MAINTENANCE CCNCERNS HEITNER,K.

FORT ST VRAIN ON 01/14/85 -- 01/15/85, FAILURE 10 CORE 01/31/S5 0F NRR NSSS VENDOR 6A SCRAM DURING CONTROL ROD TESilNS-E AND M FAILURES INDICATES 6/84 PROBLEMS NOT CORRECTED MURFHYE.

FERMI 1 ON 01/10/85 -- DIESEL SENERATOR FAILURE-DIESEL GENERA 01/31/85 0F NRR NSSS VENDOR GE INADEGUATE PRELUBE DURINS FAST STARTS E AND M FAILURES AFFARANT CAUSE OF MAJOR DAMAGE SINGH, R.

SUSOUEHAMA CN 01/29/B5 -- $1NCE 7/17/82-BOTH UNITS DIESEL SENERATORS 01/31/85 0F IE NSSS VE M CR GE 1 & 2-DVERVIEW 0F DIESEL 6ENERATORDESIGN FAILURES

A Po;e No.

11

!?/18/S5

SUMMARY

OF 0.R. EVENTS MEETINSS (INCOMPLETE EVEN!S DISCUSSED IN DETAIL IN SEPARATE REPORT)

MEETINS PRESENTER's FACILITY /

CATE OF EVENT EVENT CODEWORDIS)

NUMIER/

NAME AND NSSS VENDOR AND BRIEF EVENT

SUMMARY

MEET!NS OFFICE FOR TRACKIN6 EVENTS DATE i

CH0FRA, O.

GENERIC ON 01/25/S5 -- SUFFL. TO 6.L. SENT TO DIESEL GENERATORS 01/31/85 0F PSB NSSS VEh:0R NA DL-STATUS

SUMMARY

- GENERIC LETTER 84-15 OTHER i

CX DIESEL GENERATOR RELIASILITY NOT STATED FARLEY 2

'ON 01/31/85 -- VERTICAL TENDON FAILURES OTHER 01/31/85 Oc NRR NSSS VENDOR W (SEE 3/7/85 1 2/14/85 MI65)

E AND M FAILURES (0RAB)

]

ENSLE,L.

NORTH ANNA 2 ON 12/09/84 -- EMERGENCYDIESEL DIESEL GENERATORS 01/31/E5 DF hER NSSS VENDOR W GENERATORS FAILURE UFDATE VILLALVA,I.

Il0N ON 01/15/65 -- BOTH UNITS 1 & 2 RECENT DIESEL 6ENERATORS 01/31/85 0F IE NSSS VENDOR W.

DIESEL SENERATOR EVENTS (1/13-1/21)

E AND M FAILURES LEE,R.

ARYANSAS 2 DN 01/02/85 -- SFURIOUS RECIRCULATION I AND C 01/17/25 0F NRR NSSS VENDOR CE ACTUATION SIGNAL AUl!LIARY SYSTEMS LYNCH, D.

FERMI 2 DN / / -- DA5ASE TO EMERSENCY DIESEL GENERATORS 01/17/E5 0F NRR NSSS VENDCR GE DIESEL GENERATORS-2 0F 4 DESIGN FAIRPANKS-MORSE dss DAMAGED LUBE / DRY START RIVENPARK,6 HATCH 1 ON 01/16/85 -- HPCI, RCIC INOPERABLE ELECTRICAL F0WER 1/17/8, CF NRR NSSS VENDCR SE FOLLOWING LCW VESSEL CONDITION-At EUS REACTOR SYSTEMS s

LOST-4 NOT NOTED CATAWEA CN 01/09/85 -- FOTENTIAL IN0FERA51LITY OTHER 01/17/85 0F NRR NSSS VENDOR W 0F ICE CONDENSER DOORS-23 0F 24 INLETHUMAN FACTORS (CRAB)

DOORS BLOCKED CLOSED WISGINTON, D C00X 2 DN 01/03/85 -- CONTROL K00 GUIDE TUEE CORE 01/17/85 0F NRR NSSS VENDCR W SUFFORT PIN FAILURES-LOOSE FARTS END UP STEAM AND FEED IN STEAM GENERATORS NEWEERRY, S.

DIABLO CANYON !

CN 01/04/85 -- LOSS OF FEEEWATER STEAM AND FEED 01/17/S5 0F NRR NSSS VEND 0R W TRANSIENT FRCM 81 POWER-ALSD MULT!FLE HUMAN FACTORS l

14) ECulFMENT PROBLEMS N!hBER5Y,S.

DIABLO CANYON 1 04 01/02/85 -- LOAD REJECTION STARTUP STEAM AND FEED l

01/17/85 0F NRR NSSS VENDOR W TEST FROM 50% POWER-TURBINE CONTROLS'

! AND C I

PROBLEMS-SUCCESSFUL RETEST 1/5/85

.i VILLALVA, 1.

SEQUDYA4 2 DN 01/12/85 -- REACTOR PROTECTION SYSTEM ! AND C 01/17/B5 0F IE NSSS VENDOR W MALFUNCTION-W. SSPS-OTHER S!M. EVENTS E AND M FAILURES AT NORTH ANNA 2 & FOREIGN SINSH, R.

CRYSTAL RIVER 3 ON 12/28/84 -- TE".F. LOSS OF CONTROL I AND C 01/0!/E5 0F NRR NSSS VENIOR BW RCOM ANNUNCIATOR SYSTEM CAUSED BY ELEC.

GROUNDS

Py e No.

12 i

12/18/B5

SUMMARY

OF 0.R. EVENTS MIETINGS i

(INCOMFLETE EVENTS DISCUSSED IN DETAIL IN SEFARATE REPORT)

MEETING FRESENTER's FACILITY /

DATE OF EVENT EVENT CODEWDRDIS)

NUMEER/

NAME AND NSS5 VENDOR AND BRIEF EVENT

SUMMARY

MEETINS OFFICE FOR TRACK!NS EVENTS CATE HEITNER, K.

FORT ST VRAIN ON 12/18/04 -- FAILURE OF D.G. TO DIESEL GENERATORS 01/03/E5 0F NRR NSSS VENDOR SA DPEFATE DURING REQ'D TEST FOR LDSS OF

! AND C OFFSITE POWER CAMPAENONE,M SUSQUEHANNA l~

'0N 12/21/84 -- SDV VENT AND DRAIN VALVE l'AND C 01/03/E5 0F ???

NSSS VENDOR 6E PILOT AIR SDLENDID VALVE FROBLEM-POSS.

AUI!LIARY SYSTEMS CONTAMINATED CRD AIR SYSTEM 4

NE16HBCRS,D INDIAN POINT 2 DN 12/28/84 -- DE6RADATION OF SAFETY REACTOR SYSTEMS 01/03/E5 0F NRR NSSS VENDOR W INJECTION PUMPS E AND M FAILURES FAIRTILE,M.

KEWAUNEE ON 12/18/04 -- MISPOSITIONED SELECTOR REACTOR SYSTEMS 01/0!IE5 0F NRR NSSS VENDOR W-SWITH-CONTROLLING SUCTION SOURCES TOHUMAN FACTORS SAFETY INJ. PUMPS K!NTNER,L.

GRAND SULF 1 DN !!/29/84 -- SFURIOUS SWITCH OF ECCS

! AND C 12/13/84 0F NRR NSSS VENDOR BE WATER SOURCE DURINS ECCS OPERATION REACTOR SYSTEr WEISS,E.

MONilCELLO CN 12/06/84 -- EICESSIVE SCRAM TIME CORE 12/13/24 0F lE NSSS VENDOR SE FOLLOWINS RECIRCULATION PIPE REACTOR SYSTEMS REPLACEMENT-CLO6GED INNER SCREENS s

VILLALVA,I.

FOREIGN ON !!/19/04 -- FAILURE OF CONTROL RCD CORE

]

12/13/84 CF lE NSSS VENCOR NA DRIVE MECHANISM AT KO-RI 5, CHECK W.-

OTHER CATAWBA 2, WATTS BAR 1,2 & SEABROOK 1.2 T

NOT NOTED NORTH ANNA 2 ON 12/09/84 -- FAILURE OF BOTH DIESEL DIESEL BENERATORS 12/13/84 0F ORAS NSES VENDOR W GENERATORS E AND M FAILURES i

REQUA".S.

RCBINSON 2 DN 11/07/84 -- SERVICE WATER SYSTEM AullLIARY SYSTEMS 12/13/84 0F NRR NSSS VENDOR W LEAKS-CAUSE APFEAFS TO BE CORROS!0NE AND M FAILURES THADAN!, M.

CUANE ARNOLD ON !!/22/84 -- STARTUP TRANSFORMER ELECTRICAL PCWER

!!/29/94 CF MR NSSS VENICR EE FA! LURE I AND C MARTIN,R.

LIMERICK DN 11/18/84 -- PARTIAL POWER LOSS TO SRM HUMAN FAC10R$

!!/29/54 0F NM NSSS VENDOR SE 1 IRM MONITORS 1 AND C VILLALVA INDIAN POINT 3 DN !!/16/84 -- LOSS OF 0FFSITE POWER &

ELECTRICAL POWER 11/29/04 0F IE NSSS VEhDOS W TEMP LOSS OF RHR REACTOR SYSTEMS MCYENNA, E.

SAN CN0FRE 1 CN !!/16/84 -- SPURIOUS SAFETY INJECTION I AND C

!!/29/S4 0F NRR NSSS VENDOR W

/ RCP TRIP FAILURE REACTOR SYSTEMS MILLER,J.

TCRT ST VFAIN DN !!/05/84 -- RESERVE SHUIDCWN SYSTEM ! AND C 11/15/E4 0F NRR llS55 VENCOR 6A FAILURE-CR0 FROBLEMS 1 BORON REACTOR SYSTEMS i

CRYSTALIZATION

Page No.

13 12/!6/85

SUMMARY

OF 0.K. EVENTS MEETINGS

!!NCCMPLETE EVENTS DISCUSSED IN DETAIL IN SEPARATE REPORT)

MEE!!NS PRESENTER's FAtlL11Y /

DATE CT EVENT EVENT CODEWDRDIS)

NUMiER/

NAME AND NSSS VEE OR AND BRIEF EVENT

SUMMARY

PEEi!NG OFFICE FOR TRACKINS EVENTS IATE THADAN!, M.

DUANE ARNDLD ON !!/04/84 -- AUXILIARY TRANSFORMER ELECTRICAL POWER

!!/15/84 0F NRR NSSS VENDOR EE FIRE BAER,R.

MUtil

.ON 11/02/84 -- FART 21 - HEICEL PIPE OTHER

!!/15/54 0F IE NSSS VENDOR Nt, WHIP RESTRAINTS ENERGY ABSORBANT E AND M FAILURES MATERIAL HAS CRUSH STRENGTH ( THAN SPECIFIED VILLALVA,l.

MCSUIRE 1 ON 10/31/84 -- UFFER HEAD INJECil0N REACTOR SYSTEMS

!!/15/E4 0F lE NSSS VENDOR W LEVEL INSTRUMENTATION INSTALLAi!0N I AND C ERROR-EICESS N2 IN UHI EEARD,J.T.

MC6 DIRE 1 DN 10/31/84 -- UHI EVENT-6ENERIC REACTOR 3YSTEMS 11/15/84 0F NRR NSSS VENDOR W IMPLICATIONS-SEE OR EVENT PRESENTED BY

! AND C VILLALVA SAME DAY WEISS,E.

CRYSTAL RIVER 3 ON 10/27/84 -- 502 RELEASE-CRACK IN OTHER 10/30/24 0F !E NSSS VENDOR EW 4000 6AL. 502 TANK AT FOSS!L PLANT E!LBERT,R.

DRESDEN 3 ON 10/20/84 -- FAILURE OF CONTROL R00 TO CORE 10/30/84 0F hRR NSSS VENDOR GE INSERT ON SCRAM-SCRAMMED ON LOW WATER I AND C LEVEL FROB W/ MASTER FLOW CONTROLLER BEVAN,R.

QUAD CITIES 2 DN 10/24/84 -- STUCK CONTROL ROD-MANUAL CORE 10/30/84 0F NRR NSSS VENDOR BE VALVE IN SCRAM DISCHARGE LINE CLOSED-HUMAN FACTORS QUEST 10NABLE ACTIONS BY PLANT FERCH, R.

SUSQUEHANNA 1 DN 10/18/84 -- SDV VENT S DRAIN VALVESAUIILIARY SYSTEMS 10/30/94 0F NRR NSSSVENDORGE SOLEN 0!D PILDT VALVE PROBLEM i AND C DROMERICK, A VERMONT YANXEE ON 10/30/84 -- REDUNDANT FAILURES OF O!ESEL 6ENERATORS 10/30/84 0F lE NSSS VENDOR GE EMER6ENCY DIESEL GENERATORS-DATE(S) NOT ELECTRICAL POWE NOTED EEARD,J.T.

MULT1 DN 10/30/84 -- PWR SCRAM SYSTEM OTHER 10/30/84 Of NRR NSSS VENDOR NA FEFRESHER 1 AND C TRAMMELL,C.

TROJAN ON 10/11/84 -- TEMP. LOSS OF SERVICE AullLIARYSYSTEMS 10/30/24 CF NER NSSS VENDOR W WATER-900 STER PUMP FRESSURE SW ON WRONG HUMANFAtt0RS SIDE OF FILTERS-REPORTING OF EVENT?

LAN!K, 6.

FALISA!ES ON 09/16/84 -- REACTOR COOLANT PUMP REACTOR SYSTEMS 10/16/84 0F IE NSSS VENDOR CE FA! LURE E AND M FAILURES BEMD, J.T.

WATERFORD ON 10/01/84 -- ISOLAi!0N OF PROTECTION 1ANDC 10/16184 CF hKR NSSS VENDOR CE SYSTEM S!SNAL-MAY BE APPL. TO ALL CE (INDICAi!CN ONLY)

Page No.

14 12/18/85

SUMMARY

OF 0.R. EVENTS MEETINSS (INCOMFLETE EVENTS DISCUSSED IN DETAIL IN SEFARATE PEPORT)

MEETINS PRESENTER's FACILITY /

DATE OF EVENT EVENT CODEWDRDIS)

NUMBER /

NAME AND NSSS VENDER AND ERIEF EVENT

SUMMARY

MEETINS OFFICE FOR TRACKING EVENTS DATE FERCH, R.

SUS 2UEHANNA DN 10/15/84 -- UNITS 1 & 2 SCRAM VALVEE AND M FAILURES 10/16/84 0F NRR NSSS VENT 0R GE SCLENDID FR05LEM

! AND C TRAMMELL,C TROJAN ON 09/22/84 -- MAIN STEAM SAFETY VALVEI AND C 10/16/84 0F NRR NSSS VENDOR W' BLCWDOWN STEAM AND FEED FALSE MFW FUM? LOW SUCT. PRESS. ALARM FRIM - SEC POWER MISMATCH WE!SS. E.

BR"NSWICK ON 09/11/84 -- HURRICANE DIANNA-LOST OTHER 09/26/84 0F IE NSS$VENDORGE SOME TRANSMISSION LINES ELECTRICAL N3 SAFETY SYS AFFECTED HOUSTON, D.

ERAND SULF 1 DN 09/23/84 -- RECENT P! PING SYSTEM E AND R FAILURES 09/26/84 0F NRR NS55 VENDOR GE FROBLEMS 4/30/84 9/12/84 9/16/04 ALSD ROONEY, V.

VERMONT YANKEE ON 09/18/84 -- CORE FLOW ANOMALY W/

REACTOR SYSTEMS 09/26/84 0F NRR NSSS VENDCR GE LOOSE SHROUD HEAD BOLTS-FERSONNEL EftROR HUMAN FACTORS TRAMMELL, C.

TROJAN ON 09/20/84 -- REACTOR TRIP / (SPUR.1 REACTOR SYSTEMS 09/26/84 0F NRR NSSS VENDOR W SAFETY INJECTION-1 EDS FAILED, MS!Vs

! AND C NOT CLOSE, DIESEL AFW NOT START, OP. ERR VILLALVA,I.

TROJAN ON 09/13/84 -- AND 09/17/84 QTHER 09/26/84 CF IE NSSS VENDOR W RECENT SWA6ELOCr FliTINS FAILURES E AND M FAILURES LEE, R.

ARKANSAS 2 DN 08/29/64 -- LOSS OF SHUTDOWN C00 LINS, REACTOR SYSTEMS 09/11/E4 0F NRR NSSS VEND 0Ft CE N2 DVERFRESSURE I AND C COL 90RN, T.

FORT ST VRAIN ON 08/30/84 -- STUCK CONTROL R00 DRIVECCRE 09/11/84 0F NRR NSSS VENDOR 6A MECHANISM E AND M FAILURES NOT NOTED BRDWNSFERRY ON09/11/84--6ENERICFOLLOWUP OTHER 09/11/64 CF NSSS VENDOR GE CLARK,D.

BROWNS FERRY ON 08/14/84 -- DVERPRESSUR!2Ai!0N OF REACTOR SYSTEMS 09/11/84 0F NFR NSSS VENDOR 6E CORE SFRAY SYSTEM FOLLOWUP HUMANFACTORS WE!SS. E.

WNP 2 ON 08/22/84 -- THERMAL TRANSIENT DAMASE STEAM AND FEED 09/11/84 0F IE NSSS VENDOR GE TO FEEDWATER SYSTEM WEISS,E.

HADDAM NEtt DN 08/21/84 -- CAVITY SEAL FAILURE AUI!LIARY SYSTEMS 09/11/$4 0F IE NSSS VENDOR W OTHER CLARK, D.

BROWNS FERRY l DN 06/14/84 -- DVEFFRESSUR!!Ai!0N OF REACTCR SYSTEMS 08/21/84 0F NRR NSSS VENDOR GE COSE SFFAY SYSTEM HUMAN FACTORS

Pq e No.

13 12/18/E5

SUMMARY

OF 0.R. EVENTS MEEllNSS (INCCMPLETE EVENTS DISCUSSED IN DETAIL IN SEPARATE REFORT)

MEETINS PRESENTER's FACILITY /

CATE OF EVENT EVENT CODEWORD (S)

NUMBER /

NAE AhD NEES VENDOR AND BRIEF EVENT

SUMMARY

MEETINS OFFICE FOR TRACKING EVENTS DATE BIRKEL. R.

MCSUIRE 2 DN 08/06/84 -- RHR SYSTEM CROSS CONNECT REACTOR SYSTEMS 08/21/84 0F NRR NSSS VENDOR W P!FE RUPTURE E AND M FAILURES NOT NOTED PEACH BOTTOM 2 ON 07/27/84 -- CRACKS IN RECIRCULATION E AND M FAILURES CE/21/84 0F NSES VENDCR GE

' INLET NOIZLE SAFE EN!S REACTOR SYSTEMS FDLK,FHIL INDIAN POINT 2 DN 08/06/84 -- REACTOR VESSEL FLAW 2' E AND M FAILURES 08/21/24 CF NER NSSS VENDER W DEEP & 2' LOMB REACTOR SYSTEMS WEISS,E.

INDIAN POINT 2 ON 03/13/84 -- COMP. C00 LINS WATER PUMP AUI!LIARY SYSTEMS 03/21/84 0FIE NSSS VENDOR W RCCM FLOODED E AND M FAILURES WEISS,E.

MCSUIRE 2 ON 08/20/84 -- LEAK FROM UFFER HEAD REACTOR SYSTEMS 08/21/24 0F IE NSS$ VENDOR W INJECTICN VENT E AND M FAILURES 4

HDLONICH J.

CALLAWAY l ON 08/10/84 -- ISCLATION OF BOTH TRAINS REACTOR SYSTEMS 08/21/84 0F NER NSSS VENDOR W 0F CONTAINMENT SPRAY HUMAN FACTORS SILVER,H.

TMI 1 DN 08/07/84 -- LODSE DISS PLUBS STEAM AND FEED 08/07/84 CF NER NSSS VENDOR EW E AND M FAILURES 61LBERT,R.

DRESDEN ON 07/24/84 -- UNITS 2 & 3-MA!NTENANCE HUMAN FACTORS 08/07/84 0F NRR NSSS VENDOR GE ON WRONS UN!i CAUSING UNIT TRIP SINSH,R.

SUSQUEHANNA 2 CN 07/26/84 -- LOSS OF ALL AC POWER ELECTRICAL 08/07/84 0F NER NSSS VENDOR GE LOST NUMEROUS INSTRUMENIAil0NS HUMAN FACTORS FISCHER,D SALEM 2 ON 07/25/84 -- STUCK OFEN RELIEF VALVE /

REACTOR SYSTEMS 08/07/64 0F NRR NSSS VENDOR W ECCS ACTUATICN (ALSO HANDLED BY N. I AND C VILLALVA,IE)

NORRIS,J.

Il0N !

ON 07/19/84 -- PLANT SHUTDOWN TO PERFORM OTHER 08/07/54 0F NRR NSSS VEN00R W ILRT HUMAN FAC10R5 TESTS CONF!RMED LEAVAEE RATES ACCEPTABLE POWELL,D.

SEQUOYAN 1 ON 04/26/84 -- UN!SOLABLE LEAK FRCM HUMAN FACTORS 07/19/84 0FIE NSSS VENDOR W INCORE PROPE SEAL TABLE DUE TO POOR I AND C MAINTENANCE FOLLOWUP TO 4/26/84 OR 2RIEFINS MILLER,J.

FCET ST VRAIN ON 06/23/84 -- STUCK CONTROL POIS CDPF 07/19/84 0F NRR I

NSSS VENDOR SA FOLLOWUP i

LC'.5ARDO,J.

0YSTER CREEK CN 06/27/84 -- SPURICUS OFERAi!0N 0F

!ANDC 07/19/84 0F NRR NSSS VENDOR BE CCNTAINMENTISOLAi!0NVLVES REACTOR SYSTEMS i

4

.-.m.._

_.,___..____.._.-._.4

.,,.m

,ye,,,,

--.____-~,___,_m

Page No.

16 12/18/85

SUMMARY

OF 0.R. EVENTS MEETINGS t!NCOMPLETE EVENTS DISCUSSED IN DETAIL IN SEFA MEETING PRESENTER's FACILITY /

DATE OF EVENT NJMBER/

NAME AND NSSS VENDOR MEETING OFFICE AND BRIEF EVENT

SUMMARY

EVENT CODEWORDIS)

DATE FOR TRACKING EVENTS uo FISCHER D.

SALEM 2 07/19/84 0F DN 07/05/84 -- CRACK IN CHAFSING PUMP E AND M FAILURES NSSS VEND 0R W StlCTION HEADER STEAM AND FEED DUDLEY, D.

LACROSSE DN 07/16/84 -- STUCK CONTnDL EDDS (013 & CORE 07/19/84 0F NRR NSSS VENDOR AC

'0291 E AND M FAILURES WEISS,E.

MAINE YANKEE ON 06/12/84 -- LOSS OF PRESSURIZER LEVEL 06/26/84 0F IE NSSS VENDOR CE INDICAi!0N I AND C LONS,S.

SAN CN0FRE 2 ON 05/09/84 -- S/6 TUBE LEAK 06/28184 0F IE NSSS VENDOR CE STEAM AND FEED E AND M FAILURES COLSURN,T.

FORT ST VRAIN.

ON 06/22/84 -- FAILURE OF CDNTROL RODS 06/28/94 CF NRR NSSS VENDOR GA CORE TO FULLY INSERT ON TRIP HERMAN,'R.

NINE MILE FT 1 CN 06/14/84 --

06/28/94 0F NRR NSSS VENDOR GE ADS RELIEF VALVE FAILURES E AND M FAILU DURING SURVEILLANCE TESTING AUI!LIARY SYSTEMS NE!6HECES,D SURRY !

ON 06/14/84 --

06/28/84 0F NRR NSSS VENDOR W STUCK CONTROL ROD CORE x

CLARK,R.

BROWNS FERRY ON 06/12/84 -- UNITS 1,2, &3-DESIGN 06/12/84 0F NRR NSSEVENDCRGE ELECTRICAL PROELEMS IN SEV. AREAS NOT IN COMPL.

DESIGN W/FSAR-DS CONNECTIONS, HPCI ISOL VALVES CLARK,R.

FEACHBOTTOM2 DN 06/12/84 -- CRACKS IN JET PUMP 06/12/84 0F NRR NSSS VENDOR GE INSTRUMENT N0llLES REACTOR SYSTEMS E AND M FAILURES VILLALVA, I.

SALEM ON 06/12/84 -- UNITS 1 & 2, ROCrWELL 06/12/64 0F IE NSSS VENDOR W 6LDBE VALVE FAILURES E AND M FAILURES REACTOR SYSTEMS VILLALVA,I.

TROJAN ON 06/12/84 -- LODSE PARTS IN REACTOR 06/12/84 0FIE NSSS VEN:0R W VESSEL E AND M FAILURES REACTOR SYSTEMS M: DONALD, D.

TURrEY FOINT 4 CN 06/04/94 -- PRIMARYC00LDOWN 06/12/84 0F NRR NSSS VENDOR W REACTOR SYSTEMS TRANSIENT-HTR ORA!N SYS. MALFUNCil0N, STEAM AND FEED TURPINE BYFASS ISOLATION VALVES FAIL JAFFE,D.

CALVERICLIFFS ON 05/05/84 -- UN!iSS 1 L 2-tE6RADAtl0N 05/30/94 0F NSSS VENDOR CE IN THE SALT WATER SYSTEM, WHICH SUFPLIES AUI!LIARY SYS E AND M FAILURES HEAT SINK FOR CCW & SW TOUR!6NY,E.

FORT CALHOUN ON 03/16/84 -- STEAM GEN. TUSE LEAK IN STEAM AND FEED 05/:0/84 0F NSSS VENDOR CE

'B' 56 E AND M FAILURES ROOD,H.

WATERFORD 3 DN 05/07/84 --

05/30/94 0F N9R NSSS VENDOR CE REACTOR TRIF BREAKER I AND C FAILURES-2 FAILED-NOT REPORTED BUT NOT E AND M FAILURES REQUIRED 10 REPORT

3 Page No.

17 12/18/25 SUMMACY OF 0 R. EVENTS MEETINSS tlNCCM.:LETE EVENTS DISCUSSED IN LETAIL IN SEFAR MEEi!NS PFESENTER's FACILITY /

DATE OF EVENT NUMEER/

NME ANC NSSS VEND 0ft MEETINS CFFICE AND ERIEF EVENT

SUMMARY

EVENT CODEWDRDIS)

EATE FOR TRACKINS EVENTS WEISS,E.

GRA C GULF 1 05/ 0/24 0F !E DN 04/30/94 -- RHR SYSTEM FIFE CRACK-NSSS VEND 3R GE BDTH RHR LC0FS INCFERABLE-ERC)EN REACTOR SYSTEMS SUFFORTS-REtESIGN SUFFORT BRACVETS E AND M FAILURES THACANI, M.

NINE MILE FOINT 05/30/84 0F CN 05/07/84 -- CRACK-12' CORE SFRAY NSSS VENCOR BE SYSTEM PIPING E AG M FAILURES REACTOR SYSTEMS S!ESEL, B.

N!NE MILE FCINT 05/30/24 CF ON 05/14/84 -- CRACK-18' DIAMETER NSSS VENXR SE FEEDWATER HEADER E AND M FAILURES STEAM AND FEED HOLAHAN, G.

SUSOUEHANNA 2 05/30/S4 0F NRR ON 05/28/84 -- PCWER E! CURS 10N-MAIN STEAM AND FEED NSSS VE 00R GE STEAM BYFAES VALVE FRCELEMS OTHER VILLALVA, I.

METH ANNA DN 05/05/84 --

05/30/84 0F IE NSSS VE00R W FAULTY DB-50 BYPASS TRIP I AND C EREAFERS-UV DEVICE REFLACED-DTHER BREAKER HAD MISSINS FARTS-OPERAELE WEISS,E.

SEQUDYAH 1 ON 04/19/84 --

04/26/E4 0F !E NSSS VENDOR W UNISCLAELE LEAK FROM 1 AND C INCORE PROEE SEAL TABLE CCRE VEG ALL, R.

RANCH 3 SECO CN 03/19/84 --

04/26/24 0F NRR NSSS VENDCR EW LOSS OF NN! (FDLLOWUP) 1 AC C MULTIPLE FAILURES INCL. CTRL R00M 1 6,

HUMAN FACTORS LOST DC PCWER SUPPLY, SFDS N3T IE/NN!

CCLEURN, T.

FORT ST VRAIN ON 03/30/84 --

04/26/S4 0F NRR NSSS VE 20R EA DAMASED FCRV TE H CNS-OTHER APPEARS MCISTURE IS CAUSE E A C M FAILURES FICTET,t.

FCREIGN 04/26/24 0F CN 04/26/84 -- FOREIGN REACTOR NSSS VENDOR NA OTHER EXPERIENCE-EWEDEN, NETHERLANOS, FISCHER, D.

SALEM 2 04/26/S4 CF DN 04/06/84 -- FEECWATER SYSTEM WATER STEAM A C FEED NSSS VECOR W HAMMER (LEAKY CHECK VALVE)

E A C M FAILURES CARUS 0, M.

CALVERTCLIFFS 04/26/04 Cr NRR ON 04/22/24 -- FEECWATER SYSTEM 2NSSS VEC OR CE STEAM A C FEED WATERHAMMER (LEAYAGE THRU CLOSED FW REG E AND M FAILURES VALVE & BYFASS VALVE)

MINER,S.

RANCH 3 SECO 04/10/84 CF ON 03/19/84 -- MAIN SENEFATOR HVDROGEN OTHER NSSS VENDOR BW EXPLOSION-H2 LEAX1NG FRCM SEN-TUREINE BY-PASS STUCr OPEN-SOME NNI LOST SILVER, H IMI 1 04/10/84 CF DN 03/19/84 -- REACTOR COOLANT PUMP NSSS VENDOR EW REACTOR SYSTEMS DAMASE (WEST. PUMP)- CAVITATION, FATIGUE E AND M FAILURES CRACK SIM TO FRAIRIE ISL.

WEISS E.

SAN CNCFRE 3 ON 03/17/64 --

04/10/B4 0F IE NSSS VENDOR CE CCNTAINMENT 55KAY REACTOR SYSTEMS ISOLAT!0N WHILE AT F0 DER-IMFROFER USE HUMAN FACICES OF CHECrLIST

1 Page Ns.

18 12/18/S5

SUMMARY

OF 0.R. EVENTS MEETINGS (INC0hPLETE EVENTS DISCUSSED IN DETAll IN SEPARATE REFORT) i MEETIN3 FRESENTER's FACILITY /

DATE OF EVENT EVEhr CODEWORD (S)

NUMIERI NAME AND NSSS VENDOR AND BRIEF EVENT

SUMMARY

MEEilNS OFFICE FOR TRACFING EVENTS DATE i.

HERMA';N, R.

NINE MILE FT 1 ON 03/27/84 -- CONTROL ROD DRIVE HOUSINS CORE 04/10/84 0F NRR NSSS VENT 0R GE (CRD) STUB TUBE CRACKS-HAS OCCURRED AT E AND M FAILURES BIS ROCK FT FREVIOUSLY DEAGA!!0,A.

DAVIS BESSE

'0N 03/02/84 -- STUCK OPEN STEAM SIDE STEAMANDFEED 4

03/13/84 0F NRR NSSSVENO3REW COLE SAFETY VALVE-OP. MANUALLY TRIPPED HUMAN FACTORS i

ST & FW RUPTURE CONTROL SYS-SS2 DRIED J

R30D, H.

SAN ONDFRE 3 Ok 02/27/84 -- REACTOR TRIP BREAKER IANDC 03/13/84 0F NRR NSSS VENDCR CE FR01LEMS-METAL SHAVINSS, DISCONNECTED HUMAN FACTORS LEADS, PERS. ERROR EMCH,R.

BIG ROCK POINT ON 02/22/84 -- INOPERABLE REACTOR REACTOR SYSTEMS 03/13/84 0F NSSS VEN20R SE DEFRESSURIZATION SYSTEM-3 0F 4 RDSOTHER ISDLAT10N VALVES FAILED-THERMAL BINDING l

t NOT NCTED 6E FLANTS ON 03/13/84 -- SE BWR REPLACEMENT PIPE E AND M FAILURES j

03/13/84 0F CRAE NSSS VENDOR SE CRACKS 4

REEVES,E.

FARLEY !

ON 03/02/84 -- FEEDWATER LINE CRACK STEAM AND FEED 0!/13/84 0F NS$$ VINDOR W INDICAi!0NS E AND M FAILURES COLBURN,T.

POINT BEACH I ON 03/07/84 -- CRACKS DETECTED IN CORE 03/13/84 CF NRR NSSS VENDOR W CONTPOL R0D 60!DE IU2E SUPPORT P!NSE AND M FA! LURES BEARD,J.T.

TURKEYPOINT ON 02/16/84 -- UNITS 3 & 4-ELECTRICAL ELECTRICAL 03/13/84 0F NRR NSSS VENDOR W P0hER INTERACT!0N PROBLEMS-FOSS/ NUC &

SYSTEMS NUC/NUC INTERACT., TECHNICIAN ERROR LEE,R.

ARrANSAS 2 DN 01/28/84 -- INCORFECT ADDRESSABLEOTHER 02/15/84 0F NRR NSSS VEADOR CE CONSTANTS LOADED INTO CORE PROTEti!ON 1 AND C CALCULATORS P00D,H.

SAN ONOFRE 3 ON 01/01/84 -- RAD RELEASE FOLLOWUP FROM OTHER 02/15/84 0F NRR NSSS VENDOR CE 1/5/84 MI6.-(ALSO C. WILLIS BRIEFED)

SELLS,D.

ST LUCIE 2 05 02/09/84 -- LOSS OF FEECWATER-COND ETEAM AND FEED 02/15/64 0F NER NSSS VENDOR CE 200 STER PUMP SUCTION LOST-3 0F 8 SEC EANDMFAILURES CODE SAFETY VALVES LIFT, C0ffER PIN CLAPK,P.

BROWNSFERRY!

ON 02/13/84 -- RHR SY$iEM UNAVAILABLE REACTOR SYSTEMS 02/15/84 0F NRR NSSS VENDOR GE Dt: RING PLANT SHUTDOWN-A!R RELEASE VALVE DESIGN CRACKINGPROILEMS N3TNOTEI HATCH 2 ON 02/03/84 -- CRACK IN TORUS VENT E AND M FAILURES 02/15/84 0F CRAB NS$$ VENDOR 6E HEADEP i

DTHER 1

4

,e--------

,-,-..-w,4%w-r-r-,

--e

.r-

-r---n--r----

Page Nc.

19 12/18/25 SLMMARY OF 0.R. EVENTS MEETIN35 (INCOMFLETE EVENTS DISCUSSED IN DETAIL IN SEPARATE FEPORil MEEi!NS PRESENTER's FACILITY /

DATE OF EVENT EVENT CODEWDRDIS)

NUMIER/

NAME AND NSSS VENDOR AND BRIEF EVENT

SUMMARY

MEEi!NS OFFICE FOR TRACK!NS EVENTS DATE LONS,S.

TURKEY PolNT ON 02/12/24 -- UNITS 314-PLANT TRIFS ELECTRICAL 02/15/84 0F IE h5SS VENDOR W DUE 10 DN-SITE ELEC FROBLEM-INTERACT!DN SYSTEMS WITH FOSSIL UNITS AND 3 / 4

!!RFEL,R.

MCSUIRE 2 DN 01/15/84 -- RHR SYSTEM ISOLATED REACTOR SYSTEMS 01/19184 0F NSSS VENDOR W DURINS COLD SHUTDOWN-VAL"E BREAVERS HUMAN FACTORS IMFROFERLY TABBED LA!D,L.

SANONOFRE2 CN 01/10/84 -- BOTH HFSI TRAINS REACTOR SYSTEMS 01/19/24 0F N!SS VEN!0R CE UNAVAILABLE-VALVING ERFOR A5500. W/ TEST RIS, P! PIN 6 IN TEST HI6 NOT SE!SMIC.

QUAL.

CLARK,R.

EROWNSFERRY ON 01/02/84 -- DRYWELL-TORUS DELTA-PI AND C 01/19/24 CF NRR NSSS VENDOR GE INSTRUMENTS VALVED OUT OF SERVICE OTHER LAN!K,6.

BWR CN 01/19/B4 -- BWR CONTROL ROD CORE 01/19/E4 CF IE NSSS VENDOR GE MISFOSIT!0NING EVENTS-5 IN LAST YEAR-OTHER P00R COMM. BTWEEN ENSINEERS & OPERATORS WAMIACH, 1.

FAllSALES ON 01/08/24 -- LOSS OF ALL CFFSITE AND ELECTRICAL 01/19/84 0F NRR NSSS VENDOR CE 04-SITE AC POWER MINER,S.

RANCH 3 SECO ON 12/15/83 -- LOSS OF 2 0F 3 SERVICE AUI!LIARY SYSTEMS 01/05/S4 0F NSSS VENT 0R EW AIR COMFRESSDRS ROOD, H.

SAN ONOFRE 3 DN 01/01/94 -- UNPLANNED RELEASE OF OTHER 01/05/84 0F NFR NSSS VENDOR CE FASEOUS RADIDACTIVITY BUTCHIR,E.

MULT!

Ct12/13/83-- UPDATE OF BE AK-2-25 I AND C 01/05/24 0F NSSS VENDOR NA REAtTOR TRIP BREAKER REVIEW-CALV.DESIGN Cliffs 1 & OCONEE N01ED J

STAHLE,C.

SEQUDYAH 1 DN 12/16/83 -- ACCICENTAL CONTAINMENT REACTOR SYSTEMS 01/05/84 0F N!SS VEXICR W SPFAY INITIATION - VALVINS ERROR DURINS HUMAN FACTORS SW!iCH0VER OF RHR TRAINS DUDLEY, R.

LACROSSE ON 12/0!!B3 -- FPIMARY SYSTEM PIPE REACTOR SYSTEMS 12/14/S3 0F NER NSSS VENDUR AC CRACK, ON REACTOR SIDE OF RECIRC PUMP E AND M FAILURES DISCHARSE VALVE, NON-ISOLATABLE LANIX,6.

PEACH E0Tf0M 3 DN !!/17/83 -- ACCELERATED SHUIDOWN PY OTHER 12/14/23 CF IE NSSS VEN;DP EE SCRAMMING IND, CONTROL RODS FROM SCRAM TIMINS TEST PANEL WISSINTON. D C00r CN 11/23/83 -- PRIMARY SAFETY VALVE LIFT STEAM AND FEED 12/14/S3 CF NSSS VEN %R W E AND M FA! LURES

-_. _ -_=_ - -.

Pa;e N.

20 4'

12/IE/55

SUMMARY

OF 0.R. EVENTS MEEilNSS (INCOMFLETE EVENTS DISCUS!ED IN LETAIL IN SEFAFATE REFORT)

MEETINS PRESENTER's FACILITY /

CATE OF EVENT NUMBER /

NAME AND NSSS VENDDR AND BRIEF EVENT

SUMMARY

FOR TRACKING EVENTS EVEWT CODENDRDIS)

MEETINS OFFICE DATE I

FEDERSEN, R.

INDIAN POINT 2 DN !!/29/83 -- INCFERAELE CONTAINMENT REACTOR SYSTEMS 12/14/83 0F NSSS VENDOR W SFRAY SYSTEM E AND M FAILURES MCCONALD,C.

TUF. KEY FDINT 3

,ON 12/08/83 -- FARTIAL LOSS OF 0FFSITE ELECTRICAL 12/14/83 0F NFR MSSS VENDOR W' PONER HERNAN, R. ?

OCONEE ON 11/09/83 -- UNITS 1 AND 3-LDSS OF ELECTRICAL

!!/22/23 CF NSSS VENIOR BW BACKUP EMERSENCY POWER-PROELEM WITH LEE E AND M FAILURE BAS TURBIN!

HEITNER,K.

MAINE YANKEE ON !!/17/83 -- TRIP BREAKER FAILURES I AND C

!!/22/83 0F NRR NSSS VENDCE CE E AND M FAILURES LOMSARLD,J.

0YSTER CREEK CN !!/14/83 -- FIRE IN SUBSTATION ELECTRICAL I

!!/22/93 0F NSSS VENDOR EE TRANSFORMER OTHER i

SEARD, J. T.

MULT!

CN 11/22/93 -- RECENT FAILURES OF DIESEL SENERATORS j

!!/22/83 0F NRR NSSS VEND 0R NA DELAVAL DIESEL SENERATORS-SHDREHAM &

OTHER GRAND BULF CITED FAULSON,W.

SAN ONDFRE 1 ON 11/10/83 -- LOW TEMPERATURE HUMAN FACTORS 11/22/83 0F NRR NSSS VENDOR W FFESSURIZAi!ON OPMS ACTUATED, PORV STUCK ???

i OPEN NOT NOTED SAN ONOFRE ON 10/31/83 -- UNITS 2 AND 3-PROBLEMS I AND C

!!/08/83 0F NSSS VENDOR WITH REACTOR TRIP BREAKER'S UV TRIP EEVICE L A 0, L.

SAN ON0FRE 3 DN 10/31/S3 -- LOSS OF MAIN FEEDWATER STEAM AND FEED 11/09/93 0F NSES VENDOR CE EVENT

! AND C TH;DINI, M.

DUANE ARNDLD ON 10/28/83 -- REACTOR TRIP AND ECCS I AND C

!!/09/83 0F NSSS VENDOR SE ACTUATION REACTOR SYSTEMS H3USTEN, D.

SRAND BULF DN 10/28/83 -- INOFERABilliY OF DELAVAL ELECTRICAL

!!/08/93 0F NRR NSSS VENDOR EE DIESEL SENERA10RS E AND M FAILURES BEARD, J.T.

SENERIC ON !!/03/83 -- DELAVAL DIESEL SENERATORS ELECTRICAL 11/02/03 CF NRR NSSS VENDOR NA PROBRAM PLAN-SHDREHAM LEAD PLANT FAIRTILE, M.

M3Lil CN !!/07/83 -- STATUS OF BWR P!PE OTHER 11/05/53 0F NRR NSSS VENDOR NA CRACES-ORDER PLANTS BRUNSWICK 2, E AND M FAILURES QUADCITIES 2, BROWNS FEERY 3,DRESDEN 3, PIL6 RIM NOT NOTED FARLEY 2 CN 11/08/83 -- FAULT OF CIRCUIT BOARD IN I AND C 11/08/83 0F NSSS VEND 0R W REACTOR FROTECTION SYSTER

-.r

1 Page No.

21 12/lBIE5

SUMMARY

OF 0.R. EVENTS MEETINSS (INCCMFLETE EVENTS DISCUSSED IN DETAIL IN SEPARATE REFCET)

MEETINS FRESENTER's FACILITY /

CATE OF EVENT EVENT C00EWDRDIS)

NUMBER /

NAME AND NSSS VENDOR AND BRIEF EVENT

SUMMARY

MEETING OFFICE FOR TRACKING EVENTS DATE DEABA!!D, A.

DAVIS PESSE ON 10/15/83 -- LDSS OF MAIN FW AND 1 0FSTEAM AND FEED 4

10/18/83 CF NER NSSS VENDDR EW 2 AFW PUMPS-BOTH AFW FUMPS START-1 IMMED. TRIPS JAFFE,D.

CALVERT CLIFFS ON 10/12/83 -- LOSS OF SHOTDOWN COOLING REACTOR SYSTEMS 10/18/93 0F NRR INSSS VENDOR CE DUE TO SURVEILLANCE TESTING-FRIM. SYS.

I AND C TEMP. INDICATION LOST FOR 40 MIN.

JAFFE,D.

CALVERT CLIFFS ON 10/11/83 -- SAFETY INJ. SYSTEM REACTOR SYSTEMS l

10/18/83 0F NRR 2NSSS VEND 0P CE ACTUATION DUE TO OVERC00LIN6 FOLLOWINS STEAM AND FEED PLANT TRIP SS OFFSCALE/ LOW LEVELS NICOLARIS, H MONTICELLO ON 10/07/S3 -- DE6RADED VOLTA 6C RELAY OTHER 10/18/83 0F NRR NSSS VENDDR GE IRID FREVENTED-CORRECTIVE MEAS!ftES OF ELECTRICAL l

S/1/93EVENTPREVENTEDLDSSOFFSITEFW N3T NOTED PEACH BOTTOM 2 DN 10/18/83 -- PlFE CRACKS IDENTIFIED E AND M FAILURES 10/18/83 0F NSSS VEND 0R GE AFTER IHSI-20 WELDS CRACKED OF 126 INSFECTED I

BEVAN,R.

CUAD CITIES 2 DN 10/14/83 -- P!FE CRACK IN REACTOR AUI!LIARY SYSTEMS y

10/16/83 0F NSSS VENDOR EE WATER CLEANUP SYSTEM E AND M FAILURES NE!BHPCRS, D IURRY l CN 10/15/83 -- FATAL INJURY DURINS OTHER 10/18/S3 0F NISS VENDDR W ATTEMPT TO IDENTIFY LEAK AT HP FW DRAIN STEAM AND FEED PUMF-SUCTION LINE RUPTURED N3T NOTED PALD VERDE ON 09/20/83 -- 8 HPSI ISCLATION VALVES REACTOR SYSTEMS 10/06/B3 0F NSSS VENDOR CE FAIL TO CPEN DURINS TEST E AND M FAILURES R002,H.

SAN DNDFRE 2 ON 10/03/83 -- REACTOR TRIP EREAKER I AND C 10/06/B3 0F NRR NSSS VENDCR CE FAILURE-RTil4 SLOW TO OPEN, 46 FA! LED TC 0 FEN. I? FAILED TO CLOSE MCDONALD, D.

TURVEY POINT 4 ON 10/04/83 -- CONT. SPRAY SYS.

REACTOR SYSTEMS 10/06/S3 CF NRR NSSS VENDCR W INDPERABLE FOR 2 DAYS-VALVES FOR UNIT 4 HUMAN FACTORS MISTATENLY CLOSED FOR UNIT 3 NDT NOTED FOREIGN ON 09/23/83 -- FATALITY DUE TO RADIATION OTHER 10/06/83 0F IE NSSS VENDDR NA EIF05URE-UNANTICIFATED FROMPT CRIT. AT CORE RESEARCH REACTOR IN AFSENTINA NOT NDTED f0Lil DN 09/22/83 -- AND 09/19/83, PORV REACTOR SYSTEMS 10/06/S3 0F ORAS h.SS VENDOR NA PROSLEMS-RANCH 3 SECD & WATTS EAR NOTED-E AND M FAILU REQUA,E.

FARLEY 2 CN 09/17/83 -- MSIV FAILURES-3 0F 5 STEAM AhD FEED 10/06/B3 0F NSSS VENDOR W FAIL DURINS N0cMAL SHUTDOWN-DESIGN VIERATIONSS/ DESIGN CHANSES

Foge k:.

22 12/19/85

SUMMARY

OF 0.R. EVENTS MEETINSS tlNCOMPLETE EVENTS DISCL'SSED IN DETAIL IN SEFARATE REPORT)

MEETING FRESENTER's FACILITY /

CATE 0F EVENT EVENT CODEWDRDIS)

NUMIER/

NAME AND NSSS VENDOR AND EDIEF EVENT

SUMMARY

MEETING CFFICE FOR TRACKINS EVENTS DATE BIRKEL,R.

MCSUIRE 1 DN 09/29/8: -- CONTAINMENT SFRAY SYS. REACTOR SYSTEMS 10/06/83 0F NSSS VENDOR W INDFERAELE-SIMILIAR TO 10/4/83 EVENT DN HUMAN FACTORS UNIT 2-MAY INVOLVE SAME FERSONNEL h0T NDTED SENERIC CN 10/06/83 -- FEACTOR TRIP BREAKER I AND C 10/06/83 0F ORAP NSSS VE COR NA TESTS OF W. DB-50 RTBs-FOSS. CAUSE LAtr 0F 1001 LUERICAT10N HO"STCN,D.

GRA O SULF CN 08/04/83 -- WIRINS ERROR-NUMEROUS1 AND C 09/22/83 CF NSSS VE COR EE ELECTRICAL PROBLEMS IN SAFETY RELATED OTHER EGUlFMENT-PROCEDURAL FRDBLEM BOURNIA,A.

LASALLE 1 CN 09/14/83 -- INADVERTANT DRAININS OF HUMAN FACTORS 09/22/83 0F NSSS VENDDR GE REACTOR VESSEL-CHECK VALVE REFAIRED &

REACTOR SYSTEMS RETESTED-NOT NOTED MULTI DN09/22/83-- GE HFA RELAY FROSLEMS-E AND M FAILURES 09/22/83 0F IE NSSS VENDOR NA HFA IN USE IN SAFETY SYS AT ALL BWRs t

???

SOME FWRs-DUANE ARNDLD, FIL6 RIM NOTED STAMLE, C.

SEQUDYAH I DN 09/11/93 -- AUTO REACTOR TRIP I AND C 09/22/83 0F NSSS VECOR W FUNCTION UNAVAILA!LE-PROCEDURE PEINS DESIGN REVISED SD CRD MS SETS ARE DE-ENERSIZED HOFKINS,J.

SUMMER DN 09/12/83 -- LDAD REJECT EVENT FROM ELECTRICAL 09/22/83 0F NRR NSSS VEC OR W 751 F0WER-REDUNDANT 22 VDC SUFFLY TO STEAM A O FEED EHC FAILED-B!AFD,J.T.

SUMMER ON 09/01/83 -- LOW TEMF., DVERPRESSURE I AND C 09/22/S3 0F NRR NSSS VE O DR W FROTECTION SYSTEM DESIGN DEFICIENCY DES!GN SIEGEL, B EWR CN 08/29/83 -- SRV DISCHARGE LINE VACUUM REACTOR SYSTEMS 09/06/83 0F NSSS VE ODR SE BREArERS' FAILURES-BROWNS FERRY 1, E AND M FAILURES FEACH EDTTOM 2, HATCH HOUSTON, D.

ERA C SULF CN 09/04/83 -- DS R00M FIRE-COMPRESSOR DIESEL 6ENERATORS 09/08/83 0F NSSS VENDOR EE FUEL LINE RUPTURED-WATER DELUSE SYSTEM AUI!LIARY SYSTEMS FAILED TO AUTO-START-MAN. START DK CARUSD, R.

SHDREHAM CN 08/12/83 -- TRANSAMERICA DELAVAL DBDIESEL GENERATORS 09/08/B3 0F NSSS VE O GR EE CRANKSHAFT FA! LURE FICEETT, D.

FOREISN CN 08/01/83 -- FICFERINS 2-LOSS OF CORE 09/08!33 0F NSSS VECOR NA COOLANT THRU FRESSURE TUBE FAILURE-200 E AND M FAILURES GFM LEAK FROM FAILED FUEL CHANNEL HOFFINS, J.

SUMMER ON 08/19/83 -- AUTO TEST SYSTEM DES.

I AND C 09/08/83 0F NkR NSSS VECOR W DEF.- VITRO LAB SYSTEM-ALSO AT GRAC REACTOP SYSTEMS BULF, CDMANCHE FEAK, ZlMMER, MILLSTONE 3

Page No.

23 12/18/93

SUMMARY

OF 0.R. EVENTS MEETINBS (INCDMFLETE EVENTS DISCUSSED IN DETAll IN SEPAFATE REPORT) 3 MEETINS PRESENTER's FAtlLITY /

DATE OF EVENT EVENT CODEWORD (S) i N"*lER/

NAME AND NSSS VENDOR AND BRIEF EVENT

SUMMARY

FOR TRACK!hG EVENTS MEETINS OFFICE CATE SILVER, H.

TMI 1 ON 08/29/53 -- KRYPTON 85 RELEASE-OTHER 09/08/83 0F NSES VENDOR BW TRACER FOR OTSG TESilNS-SAMFLE LINE HUMAN FACTORS VENT VALVE LEFT OPEN EARLIER FARR0N, P.

EWR DN 09/08/83 -- RUDEL-SOULD EWR/6 MODE I AND C 09/08/83 0F IE NSSS VENDOR EE SWITCH MALFUNCTION-DESISN-SUSQUEHANNA E AND M FAILURES 1, DRESDEN 2, QUAD CITIES 1 NEISHBORS, D SURRY 2 DN 08/10/83 -- DEGRADATION DN J-TUEES ON STEAM AND FEED 08/16/83 0F NSSS VENDOR W STEAM EEN. SPARSER E AND M FAILURES NICOLARIS, H MDNT! CELLO ON 09/01/83 -- UV RELAY TRIF-PROPLEM IN I AND C 08/16/83 0F NRR NSSS VENDOR EE DC P0RTION OF UNINTERUPTABLE POWER ELECTRICAL SUPPLY STAHLE,C.

SEQUDYAH ON 07/29/83 -- SS TUEE INSPECTION-LEAK STEAM AND FEED 08/16/83 0F NSSS VEND 0R W IN SSl3 E AND M FAILURES ECCLESTON,K PIL6 RIM CN 08/02/83 -- LOSS OF 0FFSITE POWER-ELECTRICAL 08/16/83 0F NSSS VENDOR BE LIEHTNINS-dss STARTED L OFERATED CARUSD, M.

PALD VERDE ON 09/01/83 -- INTERNALS DAMASE, LOOSE CORE 08/16/83 0F NER NSSS VENDOR CE PARTS IN VESSEL LONSITUDINAL CRACKS IN 5 E AND M FAILURES CEA SUIDE TUPES-FRETTINS WEAR BEARD, J.T.

TURYEY POINT 4 DN 07/05/83 -- NUCLEAR INSTRUMENTATION1 AND C 07/27/83 0F NRR NSSS VENDOR W SYSTEM MALFUNCTION-LACK OF TESTINS HUMAN FACTORS DUDLEY,R.

LACROSSE ON 07/16/83 -- SEAL INJECTION FAILURE-REACTOR SYSTEMS 07/27/83 0F NRR NSSS VENDDR AC RE-CIRC PUM? SEAL INJECTION SYSTEM VALVE E AND M FAILURES MISALIGNMENT-COND & PRIM COOL LEAK NOT NOTED MILLSTONE 2 DN 06/30/E3 -- THERMAL SHIELD DAMASE CORE 07/27/83 0F NSSS VENDOR CE SIMILIAR TO ST. LUCIE PROBLE't LEECH, F.

MILLSTONE 2 CN 06/28/83 -- STEAM GENERATOR SHELL STEAM AND FEED 07/27/E3 0F NSSS VENDOR CE FLAW E AND M FAILURES NOT NCTED MILLSTONE 2 DN 07/27/83 -- FUEL FAILURES-26 TOTAL CORE 07/27/83 CF NSSS VENDOR CE FAILURES, 21 ARE W. 5 ARE CE LICITRA, M.

PALD VERDE ON 07/19/83 -- MISSINS RCP DIFFUSER REACTOR SYSTEMS 07/27/83 CF NRR NSSS VENDCR CE BOLIS E AND M FAILURES JAFFE, D CALVERT CLIFFS ON 07/19/83 -- UNITS 1 1 2-SLOW REACTOR I AND C 07/27/83 0F NSSS VENDOR CE TR!F PPEAVERS-MAINT & LUBRICATION IMPROVED

Fage Nc.

24 12/18/85

SUMMARY

OF 0.R. EVENTS MEETINGS (INCOMPLETE EVENTS DISCUSSED IN DETAll IN SEFARATE REFORT)

MEETINS FEESENTER's FACILITY /

DATE OF EVENT EVENT CODENDRDIS)-

NUMBER /

NAME AND NSSSVENDDR AND BRIEF EVENT SURMARY FOR TRACKING EVENTS MEETINS OFFICE DATE 1

EEARD,J.T.

SALEM 2 CN 07/01/S3 -- REACTOR TRIP BREAKER HUMAN FACTORS 07/27/83 0F NRR NSSS VENDOR W FAILURE TO CLOSE-OPERATOR P0KED RATHER I AND C i

THAN PUSHED HERMAN, R ERYSTAL RIVER.3

- ON 06/27/83 -- HPI VALVE DAMASE WHEN REACTOR SYSTEMS 07/27/83 0F NRR NSSS VENDOR PW THROTTLED-B&W WALWJRTH HP! VALVES E AND M FAILURES r

DN / /

/ /

OF NSSS VENDOR i

I J

1 i

i i

t b

i 4

j i

i

)

i

,,,w

+

g s-w-r----,

.-,n---

7 e--,,, -..

-y, y,-,,

..-,rr-

-,., w,

y,-