Amend 96 to License DPR-35,changing Tech Specs by Deleting Discontinued ASTM Std Refs for Diesel Fuel Oil & Replacing Refs W/Current ASTM Std Refs
ML20199L242
Person / Time
Site: Pilgrim
Issue date: 07/01/1986
From: Zwolinski J
Office of Nuclear Reactor Regulation
To:
Shared Package
ML20199L226 List:
References
NUDOCS 8607090347
Download: ML20199L242 (5)


Text

/ ,  %, UNITED STATES

[ g NUCLEAR REGULATORY COMMISSION

\ L rj W ASHINGTON, D. C. 20555

\...../

BOSTON EDISON COMPANY DOCKET NO. 50-293 PILGRIM NUCLEAR POWER STATION AMENDMENT TO FACILITY OPERATING LICENSE Amendment No. 96 License No. DPR-35

1. The Nuclear Regulatory Comission (the Commission) has found that:
A. The application for amendment by Boston Edison Company (the licensee) dated February 25, 1986, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act) and the Comission's rules and regulations set forth in 10 CFR Chapter I; B. The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C. There is reasonable assurance (i) that the activities authorized

, by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Comission's regulations; 1 D. The issuance of this amendment will not be inimical to the

> comon defense and security or to the health and safety of the public; and E. The issuance of this amendment is in accordance with 10 CFR Part 51 of the Comission's regulations and all applicable requirements have been satisfied.

2. Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment, and paragraph 3.8 of Facility Operating License No. DPR-35 is hereby amended to read as follows:

I i

B607090347 860701 PDR P ADOCK 05000293 PDR

4 B. Technical Specifications The Technical Specifications contained in Appendix A, as revised through Amendment No. 96 , are hereby incorporated in the license.

The licensee shall operate the facility in accordance with the i Technical Specifications.

3. This license amendment is effective 30 days after date of issuance.

i FORTHENUCLEARREGULATpRYC ISSION s

John . Zwolinski, Director BWR P o,iect Directorate #1

> Divisi n of BWR Licensing

Attachment:

Chanaes to the Technical Specifications

]

Date of Issuance: July 1,1986 i

i I

i i

l 1

k i

_ -. _ _ . . _ _ - - . . _ . _ _ _ . - _ . - - _ . , . , _ - _ _ . . ~ . _ _ , - - - _ _ _ _ _ , - - . _ _ . _ _ _ - . _ _ . _ _ _ _ _ . -

ATTACHMENT TO LICENSE AMENDMENT N0. 96 FACILITY OPERATING LICENSE NO. DPR-35 DOCKET NO. 50-293 Revise the Appendix A Technical Specifications by removing the pages identified below and inserting the attached pages. The revised pages are identified by the captioned amendment number and contain marginal lines indicating the area of change.

REMOVE INSERT 195 195 206b 206b I

I l

m

, LIMITING CONDITIONS FOR OPERATION SURVEILLANCE REQUIREMENTS , 3.9.A AUXILIARY ELECTRICAL EQUIPMENT - 4.9.A AUXILIARY ELECTRICAL EQUIPMENT g .

SURVEILLANCE

4. 4160 volt buses A5 and A6 are d. Once a month the quantity of energized and the associated 480 diesel fuel available shall be volt buses are energized. logged.
5. The station and switchyard 125 e. Once a month a sample of diesel and 250 volt batteries are fuel shall be checked for quality operable. Each battery shall in accordance with ASTM D4057-81 have an operable battery charger. or D4177-82. The quality shall be within the acceptable limits
6. Emergency Bus Degraded Voltage specified in Table 1 of ASTM Annunciation System as specified D975-81 and logged.

In Table 3.2.B.1 is operable.

2. Station and Switchyard Batteries
a. Every week the specific gravity, the voltage and temperature of the pilot cell and overall battery voltage shall be measured and logged.
b. Every three months the measurements shall be made of m

voltage of each cell to nearest 0.1 volt, specific gravity of each cell, and temperature of every fifth cell. These measurements shall be logged.

c. Once each operating cycle, the i stated batteries shall be subjected to a rated load discharge test. The specific gravity and voltage of each cell shall be determined after the discharge and logged.

B. Operation with Inoperable 3. Emergency 4160V Buses A5-A6 Equipment Degraded Voltage Annunciation System Whenever the reactor is in Run Mode or startup Mode with the a. Once each operating cycle, reactor not in a Cold Condition, calibrate the alarm sensor.

the availability of electric power shall be as specified in b. Once each 31 days perform a

3. 9. B.1, 3. 9. B.2, 3. 9.B. 3, channel functional test on the 3.9.B.4, and 3.9.B.5. alarm system.
1. From and after the date that c. In the event the alarm system is incoming power is not available determined inoperable under 3.b from the startup or shutdown above, commence logging safety transformer, continued related bus voltage every 30 minutes until such time as the  !

alarm is restored to operable status. .-

Amendment No. 42, 61, 96 195

~

. _ _ . . . . . . . . . _ . . . _m. _ _ _ . _ . . . _ _ . _ _ . . _ - . . . . .

'. SURVEILLANCE REQUIREMENT 5 LIMITING CONDITION FOR OPERATION ,

. e. At least once per 3 years by performing a flow test I of the system in accordance with Chapter 5, Section 11. " Test of Water Supplies" of the Fire Protection Handbook, 14th edition, published by the National Fire Protection Association.

2. The fire pump diesel shall be demonstrated OPERABLE:
a. at least once per month by verifying that the fuel storage tank contains at least 175 gallons of fuel.
b. at least once per 3 months by verifying that a sample of diesel fuel from the fuel storage

' tank, obtained in accordance with ASTM D4057-81 or 04177-82, is within the acceptable limits specified in Table 1 of ASTM 0975-81 with respect to viscosity, water content, and sediment.

c. at least once per operating cycle by I

subjecting the diesel to an inspection in accordance with ,

procedures prepared in conjunction with the manufacturer's recommendations for the class of service,

d. by demonstrating that the diesel starting 24-volt battery bank and charger are OPERABLE as follows:
1) at least once per week by verifying _

j that the electrolyte .

j level"of each battery is above the plates -

and battery voltage is at least 24 volts.

Amendment No. 29, 96 206b I