MONTHYEARML20247G4001998-05-12012 May 1998 Interview Rept of Ej Massey ML20248L9771997-03-12012 March 1997 Partially Deleted Allegation Receipt Report Re Allegations That Safety Bus 9 Either Overloaded or There Are Problems W/Swithgear & That Vernon Tie (for Station Blackout) Undependable IA-97-365, Partially Deleted Allegation Receipt Report Re Allegations That Safety Bus 9 Either Overloaded or There Are Problems W/Swithgear & That Vernon Tie (for Station Blackout) Undependable1997-03-12012 March 1997 Partially Deleted Allegation Receipt Report Re Allegations That Safety Bus 9 Either Overloaded or There Are Problems W/Swithgear & That Vernon Tie (for Station Blackout) Undependable ML20199D0691997-01-29029 January 1997 Partially Deleted Interview Rept of G Hengerle, on 970129 Re Allegation That Former Plant Employee J Massey Was Discriminated Against Because of Raised Concerns W/Design Change for Plant Advanced Off Gas Sys ML20199D0421997-01-29029 January 1997 Partially Deleted Interview Rept of R Vibert, on 970129 Re Allegation That Former Plant Employee J Massey Was Discriminated Against Because of Raised Concerns W/Design Change for Plant Advanced Off Gas Sys ML20197J3101997-01-28028 January 1997 Partially Deleted, Interview Rept of R Clark, on 970128 Re Allegation That Former Plant Employee J Masset Was Discriminated Against Because He Had Raised Concerns W/Design Change for Plant Advanced Off Gas Sys ML20199C9781997-01-28028 January 1997 Interview Rept of R Rothier, on 970128 Re Allegation That Former Vermont Yankee Employee J Massey Was Discriminated Against Because of Raised Concerns W/Design Change for Plant Advanced Off Gas Sys ML20198K7591997-01-27027 January 1997 Interview Rept of L Casey ML20197J3761997-01-23023 January 1997 Partially Deleted, Interview Rept of J Calchera, on 970123 Re Allegation That Former Plant Employee J Massey Was Discriminated Against Because He Had Raised Concerns W/Design Change for Plant Advanced Off Gas Sys ML20197J3691997-01-22022 January 1997 Partially Deleted, Interview Rept of M Tessier, on 970122 Re Allegations That Former Plant Employee J Massey Was Discriminated Against Because He Raised Concerns About Design Change for Plant Advanced Off Gas Sys ML20199D0261997-01-22022 January 1997 Partially Deleted Interview Rept of J Osmond, on 970122 Re Allegation That Former Plant Employee J Massey Was Discriminated Against Because of Raised Concerns W/Design Change for Plant Advanced Off Gas Sys ML20199D0541997-01-22022 January 1997 Partially Deleted, Interview Rept for J Dayton, on 970122 Re Allegation That Former Plant Employee J Massey Was Discriminated Against Because of Raised Concerns W/Design Change for Plant Advanced Off Gas Sys ML20197J2951997-01-21021 January 1997 Partially Deleted, Interview Rept of M Gosekamp, on 970121 Re Allegation That Former Plant Employee J Massey Was Discriminated Against Because He Had Raised Concerns W/Design Change for Plant Advanced Off Gas Sys ML20199C8331997-01-21021 January 1997 Interview Rept of P Mckenney on 970121 Re Allegation That Former Vermont Yankee Employee J Massey Was Discriminated Against Re Concerns Raised W/Design Change for Plant Advanced Off Gas Sys ML20199D0481997-01-21021 January 1997 Partially Deleted Interview Rept of G Wright, on 970121 Re Allegation That Former Plant Employee J Massey Was Discriminated Against Because of Raised Concerns W/Design Change for Plant Advanced Off Gas Sys ML20199D1011997-01-21021 January 1997 Partially Deleted Interview Rept of D Houde, on 970121 Re Allegation That Former Plant Employee J Massey Was Discriminated Against Because of Raised Concerns W/Design Change for Plant Advanced Off Gas Sys ML20199C9801996-12-19019 December 1996 Partially Deleted, Interview Rept of P Cornett, on 961219 Re Allegations That Former Plant Employee J Massey Was Discriminated Against Because of Raised Concerns W/Design Change for Plant Advanced Off Gas Sys ML20199D0621996-12-18018 December 1996 Partially Deleted Interview Rept of P Mckenney, on 961218 Re Allegation That Former Plant Employee J Massey Was Discriminated Against Because of Raised Concerns W/Design Change for Plant Advanced Off Gas Sys ML20199D0771996-12-18018 December 1996 Partially Deleted Interview Rept of R Routhier, on 961218 Re Allegation That Former Plant Employee J Massey Was Discriminated Against Because of Raised Concerns W/Plant Advanced Off Gas Sys ML20199C9951996-12-18018 December 1996 Partially Deleted Interview Rept of B Buteau, on 961218 Re Allegations That Former Plant Employee J Massey Was Discriminated Against Because of Raised Concerns W/Design Change for Plant Advanced Off Gas Sys ML20197J3611996-12-17017 December 1996 Partially Deleted, Interview Rept of B Wittmer, on 961217 Re Allegation That Former Plant Employee J Massey Was Discriminated Against Because He Raised Concerns About Design Change for Plant Advanced Off Gas Sys ML20197J3511996-12-17017 December 1996 Partially Deleted, Interview Rept of D Phillips, on 961217 Re Allegation That Former Plant Employee J Massey Was Discriminated Against Because He Had Raised Concerns About Design Change for Plant Advanced Off Gas Sys ML20197J2761996-12-17017 December 1996 Partially Deleted, Interview Rept of D Mcelwee, on 961217 Re Allegation That Former Plant Employee J Massey Was Discriminated Against Because He Had Raised Concerns W/Design Change for Plant Advanced Off Gas Sys ML20199D0851996-12-17017 December 1996 Partially Deleted Interview Rept of J Orris, on 961217 Re Allegation That Former Plant Employee J Massey Was Discriminated Against Because of Raised Concerns W/Design Change for Plant Advanced Off Gas Sys ML20199D0141996-12-16016 December 1996 Partially Deleted Interview Rept of L Casey, on 961216 Re Allegations That Former Plant Employee J Massey Was Discriminated Against Because of Raised Concerns W/Design Change for Plant Advanced Off Gas Sys ML20149G8711988-02-18018 February 1988 Request for Addl Info Re Second 10-yr Interval Inservice Insp Program Plan ML20204G4651987-03-19019 March 1987 Engineering Evaluation Rept Re motor-operated Valve Failure Due to Hydraulic Lockup from Excessive Grease in Spring Pack ML20214W6961986-07-24024 July 1986 Request for Addl Info Re High Density Rack Spent Fuel Pool Expansion,Including Discussion of Existing Variations Among Three Load Combinations.Variation Used for Rack Design Should Be Identified IA-86-803, Request for Addl Info Re High Density Rack Spent Fuel Pool Expansion,Including Discussion of Existing Variations Among Three Load Combinations.Variation Used for Rack Design Should Be Identified1986-07-24024 July 1986 Request for Addl Info Re High Density Rack Spent Fuel Pool Expansion,Including Discussion of Existing Variations Among Three Load Combinations.Variation Used for Rack Design Should Be Identified 1998-05-12
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARML20217L8831999-10-21021 October 1999 Safety Evaluation Supporting Proposed Alternatives to Code Requirements Described in RR-V17 & RR-V18 ML20217G2041999-10-13013 October 1999 Safety Evaluation Supporting Amend 179 to License DPR-28 BVY-99-127, Monthly Operating Rept for Sept 1999 for Vermont Yankee Nuclear Power Station.With1999-09-30030 September 1999 Monthly Operating Rept for Sept 1999 for Vermont Yankee Nuclear Power Station.With ML20212C2551999-09-17017 September 1999 Safety Evaluation Supporting Amend 175 to License DPR-28 BVY-99-112, Monthly Operating Rept for Aug 1999 for Vermont Yankee.With1999-08-31031 August 1999 Monthly Operating Rept for Aug 1999 for Vermont Yankee.With BVY-99-109, Ro:On 990812,stack Ng Effluent Instrumentation for PAM Was Declared Oos.Caused by Instrument Drift Due to Electronic Components Based on Insps by Instrumentation & Controls Dept.Detector & Preamplifier Will Be Replaced on 9908311999-08-19019 August 1999 Ro:On 990812,stack Ng Effluent Instrumentation for PAM Was Declared Oos.Caused by Instrument Drift Due to Electronic Components Based on Insps by Instrumentation & Controls Dept.Detector & Preamplifier Will Be Replaced on 990831 BVY-99-102, Monthly Operating Rept for July 1999 for Vermont Yankee. with1999-07-31031 July 1999 Monthly Operating Rept for July 1999 for Vermont Yankee. with ML20209J0081999-07-14014 July 1999 Special Rept:On 990615,diesel Driven Fire Pump Failed to Achieve Rated Flow of 2500 Gallons Per Minute.Pump Was Inoperable for Greater than 7 Days.Corrective Maint Was Performed to Reset Pump Lift Setting BVY-99-090, Monthly Operating Rept for June 1999 for Vermont Yankee Nuclear Power Station.With1999-06-30030 June 1999 Monthly Operating Rept for June 1999 for Vermont Yankee Nuclear Power Station.With ML20196G5071999-06-23023 June 1999 Vynp Assessment of On-Site Disposal of Contaminated Soil by Land Spreading BVY-99-077, Monthly Operating Rept for May 1999 for Vermont Yankee Nuclear Power Station.With1999-05-31031 May 1999 Monthly Operating Rept for May 1999 for Vermont Yankee Nuclear Power Station.With BVY-99-068, Monthly Operating Rept for Apr 1999 for Vynp.With1999-04-30030 April 1999 Monthly Operating Rept for Apr 1999 for Vynp.With ML20206E8741999-04-29029 April 1999 SER Determined That Flaw Evaluation Meets Rules of ASME Code & Assumed Crack Growth Rate Adequate for Application ML20206D9301999-04-27027 April 1999 1999 Emergency Preparedness Exercise 990427 Exercise Manual (Plume Portion) ML20205S4211999-04-16016 April 1999 Non-proprietary Version of Revised Page 4-3 of HI-981932 Technical Rept for Vermont Yankee Spent Fuel Pool Storage Expansion ML20205K7581999-04-0707 April 1999 Safety Evaluation Supporting Alternative Proposal for Reexamination of Circumferential Welds with Detected Flaw Indications in Plant RPV BVY-99-046, Monthly Operating Rept for Mar 1999 for Vermont Yankee Nuclear Power Station.With1999-03-31031 March 1999 Monthly Operating Rept for Mar 1999 for Vermont Yankee Nuclear Power Station.With ML20205F6631999-03-0404 March 1999 Jet Pump Riser Weld Leakage Evaluation BVY-99-035, Monthly Operating Rept for Feb 1999 for Vermont Yankee Nuclear Station.With1999-02-28028 February 1999 Monthly Operating Rept for Feb 1999 for Vermont Yankee Nuclear Station.With ML20205P8241999-02-28028 February 1999 Rev 2 to Vermont Yankee Cycle 20 Colr ML20203H9881999-02-18018 February 1999 SER Accepting Alternative to 10CFR50.55a(g)(6)(ii)(A) Augmented Reactor Vessel Exam at Vermont Yankee Nuclear Power Station.Technical Ltr Rept Encl ML20203A6951999-02-0404 February 1999 Revised Rev 2,App B to Vermont Yankee Operational QA Manual (Voqam) ML20199K7151999-01-21021 January 1999 Corrected Safety Evaluation Supporting Amend 163 Issued to FOL DPR-28.Pages 2 & 3 Required Correction & Clarification ML20199K6991999-01-20020 January 1999 Safety Evaluation Concluding That Request to Use YAEC-1339, Yankee Atomic Electric Co Application of FIBWR2 Core Hydraulics Code to BWR Reload Analysis, at Vermont Yankee Acceptable ML20199L5951999-01-14014 January 1999 Safety Evaluation Accepting Licensee Proposed Alternative to Code Requirement,Described in Rev 2 to Pump Relief Request RR-P10 Pursuant to 10CFR50.55a(a)(3)(i) BVY-99-071, Corp 1998 Annual Rept. with1998-12-31031 December 1998 Corp 1998 Annual Rept. with BVY-99-001, Monthly Operating Rept for Dec 1998 for Vermont Yankee Nuclear Power Station1998-12-31031 December 1998 Monthly Operating Rept for Dec 1998 for Vermont Yankee Nuclear Power Station ML20198H5481998-12-23023 December 1998 Rev 2 to Vermont Operational QA Manual,Voqam ML20196H8641998-12-0101 December 1998 Cycle 19 Operating Rept BVY-98-163, Monthly Operating Rept for Nov 1998 for Vermont Yankee Nuclear Power Station.With1998-11-30030 November 1998 Monthly Operating Rept for Nov 1998 for Vermont Yankee Nuclear Power Station.With ML20195C4161998-11-0909 November 1998 SER Accepting Request That NRC Approve ASME Code Case N-560, Alternative Exam Requirement for Class 1,Category B-J Piping Welds BVY-98-154, Monthly Operating Rept for Oct 1998 for Vermont Yankee Nuclear Power Station.With1998-10-31031 October 1998 Monthly Operating Rept for Oct 1998 for Vermont Yankee Nuclear Power Station.With ML20155B6471998-10-26026 October 1998 Safety Evaluation Accepting Jet Pump Riser Insp Results & Flaw Evaluation,Conducted During 1998 Refueling Outage ML20154N0891998-10-16016 October 1998 Rev 1 to Vermont Operational QA Program Manual (Voqam) ML20154B6951998-10-0101 October 1998 SER Re Licensee Response to GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Power-Operated Gate Valves, for Vermont Yankee Nuclear Power Station BVY-98-149, Monthly Operating Rept for Sept 1998 for Vermont Yankee Nuclear Power Station.With1998-09-30030 September 1998 Monthly Operating Rept for Sept 1998 for Vermont Yankee Nuclear Power Station.With ML20239A1361998-09-0202 September 1998 SER Re License Request for NRC Review & Concurrence W/Changes to NRC-approved Fire Protection Program BVY-98-135, Monthly Operating Rept for Aug 1998 for Vermont Yankee Nuclear Power Station.With1998-08-31031 August 1998 Monthly Operating Rept for Aug 1998 for Vermont Yankee Nuclear Power Station.With ML20151U0361998-08-28028 August 1998 Non-proprietary Rev 1 to Holtec Rept HI-981932, Vermont Yankee Nuclear Power Station Spent Storage Expansion Project ML20237E9221998-08-20020 August 1998 Vynp 1998 Form NIS-1 Owners Summary Rept for ISI, 961103-980603 BVY-98-122, Monthly Operating Rept for July 1998 for Vermont Yankee Nuclear Power Station1998-07-31031 July 1998 Monthly Operating Rept for July 1998 for Vermont Yankee Nuclear Power Station ML20205F6491998-07-31031 July 1998 Rev 1 to GE-NE-B13-01935-02, Jet Pump Assembly Welds Flaw Evaluation Handbook for Vermont Yankee ML20236G0011998-06-30030 June 1998 Individual Plant Exam External Events BVY-98-098, Monthly Operating Rept for June 1998 for Vermont Yankee Nuclear Power Station1998-06-30030 June 1998 Monthly Operating Rept for June 1998 for Vermont Yankee Nuclear Power Station ML20248C5081998-05-31031 May 1998 Rev 2 to 24A5416, Supplemental Reload Licensing Rept for Vermont Yankee Nuclear Power Station Reload 19 Cycle 20 ML20248C4951998-05-31031 May 1998 Rev 1 to Vermont Yankee Nuclear Power Station Cycle 20 Colr BVY-98-081, Monthly Operating Rept for May 1998 for Vermont Yankee Nuclear Power Station1998-05-31031 May 1998 Monthly Operating Rept for May 1998 for Vermont Yankee Nuclear Power Station ML20247J8341998-05-31031 May 1998 Peak Suppression Pool Temp Analyses for Large Break LOCA Scenarios, for May 1998 ML20247G4001998-05-12012 May 1998 Interview Rept of Ej Massey ML20247E6351998-04-30030 April 1998 Rev 1 to GE-NE-B13-01935-LTR, Jet Pump Riser Welds Allowable Flaw Sizes Ltr Rept for Vermont Yankee 1999-09-30
[Table view] |
Text
.
c c EXHIBIT 35 l
$g130 1 980128
)
HICKEY 97-365
(
PDR
, .4 ,
, , t .,. , 3 , ,
H r . .' : . . . .: . :he i.ew; a g :n;ctm3 Son Act, exe.rl! ss . _
f.01A _ Y7-NJ Case No. 1 96 005 Exhibit 35 c, p I c, o'N 7) )
t INTERVIEW REPORT OF C PATRICK McKENNEY On December 18, 1996, McKENNEY was interviewed by the reporting agent. The interview was conducted under oath at the Vermont Yankee Nuclear Power Plant (VY), Energy Information Center, Governor Hunt House, Vernon, VT. McKENNEY was represented during the interview by J. Patrick HICKEi, Esquire, Shaw, Pitman, Potts & Trowbridge, 2300 N Street, N.W., Washington, D.C. 20037 1128.
HICKEY's office telephone ne ber is (202) 663 8103, HICKEY stated that he represented McKENNEY and VY during the interview. McKENNEY stated that it was his choice to have HICKEY represent him, and he understood that HICKEY might shcre with VY management infomation discussed during the interview. McKENNEY stated that he was not under any pressure from VY management to have HICKEY represent himr McKENNEY provided the following infomation regarding an allegation that former VY employee James HASSEY was discriminated against because he had raised concerns with a design change for th: VY Advanced Off Gas System (A0GS).
y s His home te ephone n r ra rom he es a nster Institute of Technology, oston, ,
ith a Bachelor of Science in Electrical Engineering. He was hired by January 1985. He is currently a Lead Electrici.! Engineer in the Performance Engineering Department. Dennis LEGERE has been his supervisor s/nce OctWr 1996. From January 1994 until January 1996, his supervisor was Pat CORBETT, which includes the time neriod that he worked on the A0GS.
McKENNEY stated that, on or about May 25, 1994, CORBETT assigned him and George HENGERLE to perform an independent review of the status of the design change, focusing on whether it should proceed in light of concerns that KSSSEY had raised with the project. He recalls that CORBETT asked him if he w:mid have a >roblem performing the assignment because he and NASSEY were peers. He- - ,
told CORBETT, "no." McKENNEY stated that he was not given any instructions on _
how to perform the review, other than those described in the May 25, 1994, memorandum (attached) from CORBETT. After completing that review, he did not have any further technical involvement in the ADGS design change.
McKENNEY stated that, as documented in the June 3, 1994, memorand a (attached), the review concluded that the A0GS Modification Project could be completed and safely implemented during the 1995 refuel outage if their _
recommendations were addressed. McKENNEY said that the review was perfomed because MASSEY was implying that the problems with the control wire drawings (CWDs) were so severe that the design change couldn't be easily im
- during the outage, without possibly extending the outage's length.plemented - ~ He added that NASSEY felt that a complete walk down of the A0GS was required before the design could proceed, but he -is not aware of anyone else having that concern or belief, and as concluded in his and HENGERLE's review, the project could continue.
McKENNEY said that NASSEY had a " hands off" attitude regarding the design C change, which left Vi contractor Rick R0lfTHIER to perform most of the EXHlBIT b a3tE. 1-96-005' y;; PAGE / OF /k PAGE(S)
fieldwork, however. P.0! miler felt that the project could be completed during the outage.
McKENNEY said that the design change focused on the A0GS instrumentation, which is a less significant part of the system than the control side, although a few of the modifications were on the 9 50 control room panel. McKENNEY said '
that the 75 discrepancies that MASSEY found on the 9 50 control room panel were being addressed and inspected by ROUTHIER in June 1994, but that certain
)ortions could not be inspected-during plant operations. McKENNEY said that t00THIER reported to him during the March 1995 outage, and during the outage ROUTHIER rformed: 1) an "as built" re/iew of the panel and the corres ing Clos: 2) a walk down of the panel: and 3) closed out the 9 50 contro room panel discrepancies which had not been addressed. McKENNEY said that ROUTHIER found only two wiring errors while completing all of that work, and that ROUTHIER completed it in about 2 days, as opposed to the massive effort that SSSEY felt was needed.
McKENNEY said that through his review he found that MASSEY: 1) was not being very cooperative in working with Yankee Atomic Energy Company (YAEC) Engineer Lou CASEY: 2) had little respect for CASEY: and 3) and did not have a very I
working relationship with CASEY. Md(ENNEY said that hu recommended that l
Y spend more time at VY working with MASSEY, who he feit was not being a team player by virtue of putting ROUTHIER (a contractor) in a position where ROUTHIER was dealing directly with CASEY, instead of MASSEY dealing with l
CASEY. McKENNEY believes that MASSEY " shirked" his responsibility on the l
i project and did not give it his best effort because MASSEY did not involve himself in the day to day review of CWDs. He said that MASSEY saw that-(. ROUTHIER found 74 discrepancies in the CWDs, and MASSEY used that as a validation of his concerns with the CWDs of the whole A0GS system. McKENNEY said that finding those types of probles.s is not uncommon in 3 *non. safety" system. He added that NASSEY saw the drawing discrepancies as a chance to act in an overview position for a complete review of the A0GS. instead of
" buckling down" and working to get the design change campleted. McKENNEY believes that NASSEY's removal from the project was justified because NASSEY's eversight of the project caused VY to waste money and resources. McKENNEY still believes that the design change could have been implemented as scheduled during the March 1995 outage.
Regarding NASSEY's relationshi) with VY Vice President of Engineering Jim PELLETIER, he opined that 4ASSEY didn't like PELLETIER, because ne heard MASSEY say negative things about PELLETIER over the years, although he never saw a verbal exchange between them. He is not aware of any infonnation which leads him to believe that PELLETIER and the Engineering Director, Bernie BUTEAU, were out to get rid of MASSEY. McKENNEY opined that, based on what he knew, MASSEY was not discriminated against because of his position on the A0GS design change. He believes that the actions that VY management took against MASSEY were based on NASSEY's poor job performance.
MdCENNEY stated that, during his discussions with MASSEY. MASSEY did not state that he had a safety concern with the A0GS. - He said that MASSEY did have a concern with the design change tively impactin' g the length of the outage.
He said that the culmination of 'SEY's fears would have been that the
(
Case No. 1 96 005 2 EXHIBIT M PAGE_Q2 OFM PAGE(S)
/
problems with the CWDs would hold up the plant and extend the outage.
Regarding his January 11, 1996, memorandum (attached) to David McELWEE and i
Michael GO5EKAMP, McKENNEY stated that during VY's investigation of the
- allegations that speared in the Brattleboro Reformer newspaper, he was asked
' by McELWEE if MASSEY's concerns with the ADGS had been addressed. McKENNEY stated that NASSEY's concerns were addressed and corrected by R0lmilER during the 1995 outage, as documented in ROUTHIER's May 3, 1995, memorandum (attached).
McKENNEY reviewed the notes of his interview by the VY independent investigation team (attached). He stated that the notes (yes and no answers) are an accurate representation of what he told the interviewers, but that he may have provided them with more information than what is indicated on the notes. He said that his response of, 'Yes was not ready to 90 " to question No. 4, "Do you believe the design change should have been canceled? If so, why?" was made because, at that time, the design was not ready to go and should have been canceled.
Regarding the VY gate house issue, McKENNEY stated that he did not hear any VY manager state anything negative about MASSEY regarding the information that MASSEY provided to the plaintiff's attorney. He added that he is not aware of the results of the litigation between VY and the contractor hired to build the gate house, other than he knew that VY had reached a settlement with the contractor.
AGINT'S NOTE: MASSEY, alleged that the information that he provided to
(- the contractor caused VY to lose the suit-filed by the contractor, and that his involvement in that issue caused the beginning of his problems-with VY management.
f [ ,
y b)-
Jeffred A;.ITeatcr, Special Agent Office of Investigations Field Of*1co, Region I Attachments:
-As stated
' $l
. (- Case No.- 1 96 005 3 EXHBIT N PAGE $ OFd$ PAGE(S)