Safety Evaluation Supporting 851203 Proposal to Modify Tech Spec 3/4.5.3 to Clarify Min Amount of Condensate Storage Tank Water Required to Ensure Operability of Core Spray Sys During Operating Conditions 4 or 5.Rev to Tech Specs EnclML20198S728 |
Person / Time |
---|
Site: |
Brunswick |
---|
Issue date: |
05/29/1986 |
---|
From: |
Office of Nuclear Reactor Regulation |
---|
To: |
|
---|
Shared Package |
---|
ML20198S721 |
List: |
---|
References |
---|
NUDOCS 8606100545 |
Download: ML20198S728 (4) |
|
|
---|
Category:SAFETY EVALUATION REPORT--LICENSING & RELATED ISSUES
MONTHYEARML20210P9181999-08-10010 August 1999 Safety Evaluation Authorizing Request for Reliefs CIP-01,02, 06,07,08,09,10 & 11 (with Certain Exceptions) & 12-18,for Second 10-year ISI Interval.Request CIP-04 & 05 Would Result in hardship,CIP-03 Not Required & CIP-11 Denied in Part ML20210P9441999-08-10010 August 1999 Safety Evaluation Accepting Licensee Assessment of Impact on Operation of Plant,Unit 1,with Crack Indications of 2.11, 6.36 & 1.74 Inches in Three Separate Jet Pump Risers ML20210N2341999-08-0505 August 1999 SER Accepting Response to NRC GL 87-02, Verification of Seismic Adequacy of Mechanical & Electrical Equipment in Operating Reactors,Unresolved Safety Issues (USI) A-46 ML20206G1871999-05-0404 May 1999 Safety Evaluation Approving Third 10-year ISI Program Requests for Relief (RR) RR-08,RR-15 & RR-17 ML20205F9031999-03-30030 March 1999 Safety Evaluation Supporting Proposed Rev to BSEP RERP to Licenses DPR-62 & DPR-71,respectively ML20203D7061999-02-0909 February 1999 SER Accepting Proposed Alternatives Contained in Relief Requests PRR-04,VRR-04,VRR-13,PRR-01,PRR-03,VRR-01.VRR-07, VRR-08 & VRR-09 Denied ML20154P8151998-10-16016 October 1998 SER Accepting Revised Safety Analysis of Operational Transient of 920117,for Plant,Unit 1 ML20154P8591998-10-16016 October 1998 SER Accepting Equivalent Margins Analysis for N-16A/B Instrument Nozzles for Plant,Units 1 & 2 ML20217K8461998-04-24024 April 1998 Safety Evaluation Approving Proposed Use of Code Case N-535 at Brunswick Unit 1 During Second 10-yr Interval,Pursuant to 10CFR50.55a(a)(3)(i).Authorizes Use of Code Case N-535 Until Code Case Included in Future Rev of RG 1.147 ML20217K3941998-04-24024 April 1998 SER Approving Relief Request for Pump Vibration Monitoring, Brunswick Steam Electric Plant,Units 1 & 2 ML20217E6841998-04-23023 April 1998 Safety Evaluation Accepting Code Case N-547, Alternative Exam Requirements for Pressure Retaining Bolting of CRD Housings ML20217E7471998-04-21021 April 1998 Safety Evaluation Accepting Alternative to Insp of Reactor Pressure Vessel Circumferential Welds ML20217B5241998-04-20020 April 1998 SE Accepting Licensee Request for Approval to Use Alternative Exam Requirement for Brunswick,Unit 1,reactor Vessel Stud & Bushing During Second 10-yr ISI Interval Per 10CFR50.55a(a)(3)(ii) ML20216B1041998-03-0404 March 1998 SER Approving Alternative to Insp of Reactor Pressure Vessel Circumferential Welds for Brunswick Steam Electric Plant, Unit 1 ML20198J0921997-09-18018 September 1997 Safety Evaluation Authorizing Licensee & Suppls & 16 Request for Approval of Alternative Reactor Vessel Weld Exam,Per 10CFR50.55a(g)(6)(ii)(A)(5) for Plant, Unit 2 for Next 2 Operating Cycles ML20198H2351997-09-0808 September 1997 Safety Evaluation Approving Licensee 970311 Request for Use of ASME Code Case N-509 & Relief from ASME Code Section IX Requirements for Exam of Hpcip Studs for Plant,Units 1 & 2 ML20137A4831997-03-18018 March 1997 SER Re CP&L Review of Power Uprate Process & Commitment Preventing Operation at Uprated Power Levels for Plant, Units 1 & 2 ML20129E0821996-09-26026 September 1996 Safety Evaluation Supporting Request to Use Certain Portions of Later Edition of ASME Code for Inservice Leakage Testing Valves for Brunswick Steam Electric Plant Units 1 & 2 ML20056D6761993-07-28028 July 1993 Safety Evaluation Concluding That Interior Masonry Walls May Be Downgraded to non-fire Related ML20128K7711993-02-11011 February 1993 Safety Evaluation Granting Relief from Certain Inservice Testing Program Requirements for Several Pumps & Valves ML20198E5081992-11-23023 November 1992 Safety Evaluation Accepting Licensee 120-day Response to Suppl 1 to GL 87-02 ML20246D6811989-08-18018 August 1989 Safety Evaluation Supporting Installation & Design of Nitrogen Pneumatic Sys,Per Generic Ltr 84-09,by Adding New Check Valves to Existing Drywell Noninterruptible Instrument Air Lines ML20246C4201989-06-27027 June 1989 SER Accepting Util Response to Generic Ltr 83-28,Item 4.5.3 Re Reactor Trip Sys Reliability for All Operating Reactors ML20247P6201989-06-0101 June 1989 Safety Evaluation Supporting Util SAFER/GESTR-LOCA Analysis ML20247M1911989-05-25025 May 1989 Safety Evaluation Re Denial of Amend Request to Licenses DPR-71 & DPR-62 ML20246P9401989-05-10010 May 1989 Safety Evaluation Accepting Plant Second 10-yr Interval Inservice Insp Program ML20246J5531989-05-0909 May 1989 Safety Evaluation Concluding That Plant Can Be Safely Operated for Another 18-month Fuel Cycle in Configuration Following Reload 5,per Improvements,Insps & Repairs to Plant IGSCC ML20245D3761989-04-25025 April 1989 Safety Evaluation Supporting Licensee IGSCC Program for Refuel 7 Outage ML20236D5481989-03-17017 March 1989 Safety Evaluation Accepting Util Response to Generic Ltr 83-28,Item 4.5.2 Re Reactor Trip Sys Reliability ML20236D5381989-03-17017 March 1989 Safety Evaluation Accepting Util 831107 Response to Generic Ltr 83-28,Item 2.2.1 Re Equipment Classification Programs for safety-related Components ML20236D4641989-03-15015 March 1989 Safety Evaluation Re Generic Ltr 83-28,Item 2.1 (Parts 1 & 2) Concerning Equipment Classification & Vendor Interface for Reactor Trip Sys Components ML20235Z2841989-03-0808 March 1989 Safety Evaluation Supporting Util Responses to Generic Ltr 83-28,Items 3.2.1 & 3.2.2 ML20235Z3451989-03-0808 March 1989 Safety Evaluation Supporting Util Compliance W/Atws Rule, 10CFR50.62 Re Power Testability Features of Alternate Rod Insertion Sys & Recirculating Pump Trip Design ML20235M5771989-02-16016 February 1989 Safety Evaluation Supporting Control Room Habitability Sys of Plant & Acceptability of Existing Tech Spec Re Control Room Pressurization Requirement ML20147G0661988-03-0202 March 1988 Safety Evaluation Supporting Proposed Functional Testing Plan for Snubbers ML20236D1311987-10-22022 October 1987 Safety Evaluation Re Util Request for Relief from Schedular Requirements for Performance of Visual Insp & Hydrostatic Test of CRD Withdrawal & Insert Lines.Granting of Request Recommended ML20235A7331987-09-18018 September 1987 Safety Evaluation Re Installation of Alternate Rod Injection (ARI) Sys & Adequacy of Plant Reactor Coolant Recirculating Pump Trip (RPT) Sys,In Compliance W/Atws Rule 10CFR50.62. ARI & RPT Acceptable NUREG-0661, Safety Evaluation Re Util 840831 Submittal of Addendum to Plant Unique Analysis Rept on Mark I Containment Mod Program.Safety/Relief Valve Load Cases C3.2 & C3.3 Adequately Addressed & Resolved1987-05-0707 May 1987 Safety Evaluation Re Util 840831 Submittal of Addendum to Plant Unique Analysis Rept on Mark I Containment Mod Program.Safety/Relief Valve Load Cases C3.2 & C3.3 Adequately Addressed & Resolved ML20212H5671987-01-16016 January 1987 Safety Evaluation Supporting Util Response to Generic Ltr 83-08 Re Restoring Safety Margins of Vacuum Breakers by Replacing Critical Parts W/Adequate Matls ML20207A8531986-11-0505 November 1986 Safety Evaluation Supporting Operation for Full Fuel Cycle W/O mid-cycle Insp for Crack Growth ML20215N3771986-10-30030 October 1986 Safety Evaluation Re Util 860320 Response to Generic Ltr 84-09, Recombiner Capability Requirements of 10CFR50.44(c)(3)(ii). Licensee Should Remove All Potential Oxygen Sources from Containments ML20203N0081986-09-17017 September 1986 Safety Evaluation Supporting Util 850919 Request for Relief from Installing Excess Flow Switch & Automatic Shutoff Valve in Diesel Fire Pump Fuel Line to Provide Protection in Event of Fuel Line Rupture ML20212N0201986-08-22022 August 1986 Safety Evaluation Denying Util 860325 Request for Relief from Inservice Insp Requirements of ASME Code Section XI, Table IWC-2500-1 for Volumetric Exam of HPCI Pump Studs ML20211G6081986-06-12012 June 1986 Safety Evaluation Supporting IGSCC Insp,Repair & Replacement Program During Dec 1985 Refueling Outage ML20205S2541986-06-0404 June 1986 Safety Evaluation Accepting Rev 2 to Nuclear Const Issues Group Spec 1, Visual Weld Acceptance Criteria for Structural Welding at Nuclear Power Plants, for non-ASME Code Welds ML20211A8281986-06-0303 June 1986 Safety Evaluation Re Rev 4 to Offsite Dose Calculation Manual.Rev Acceptable ML20198S7281986-05-29029 May 1986 Safety Evaluation Supporting 851203 Proposal to Modify Tech Spec 3/4.5.3 to Clarify Min Amount of Condensate Storage Tank Water Required to Ensure Operability of Core Spray Sys During Operating Conditions 4 or 5.Rev to Tech Specs Encl ML20133N4141985-10-23023 October 1985 Safety Evaluation Re Util 831107 & 850828 Responses to Generic Ltr 83-28,Items 3.1.2 & 3.2.1 & 850701 Request for Addl Info.Responses Re Vendor & Engineering Test Guidance & Testing Requirements After Maint Acceptable ML20134P5211985-08-28028 August 1985 Safety Evaluation Approving Use of ASME Code Case N-411 for Damping Curves ML20128M2911985-07-16016 July 1985 Safety Evaluation Supporting Licensee Response to Generic Ltr 83-28, Salem ATWS Event, Items 3.1.3 & 3.2.3 Re post-maint Testing 1999-08-05
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARML20217N3271999-10-21021 October 1999 Part 21 Rept Re non-linear Oxygen Readings with Two (2) Model 225 CMA-X Containment Monitoring Sys at Bsep.Caused by High Gain Produced by 10K Resistor Across Second Stage Amplifier.Engineering Drawings Will Be Revised BSEP-99-0168, Monthly Operating Repts for Sept 1999 for Bsep,Units 1 & 2. with1999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for Bsep,Units 1 & 2. with ML20212D0431999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Brunswick Steam Electric Plant,Units 1 & 2 ML20210P9441999-08-10010 August 1999 Safety Evaluation Accepting Licensee Assessment of Impact on Operation of Plant,Unit 1,with Crack Indications of 2.11, 6.36 & 1.74 Inches in Three Separate Jet Pump Risers ML20210P9181999-08-10010 August 1999 Safety Evaluation Authorizing Request for Reliefs CIP-01,02, 06,07,08,09,10 & 11 (with Certain Exceptions) & 12-18,for Second 10-year ISI Interval.Request CIP-04 & 05 Would Result in hardship,CIP-03 Not Required & CIP-11 Denied in Part ML20210N2341999-08-0505 August 1999 SER Accepting Response to NRC GL 87-02, Verification of Seismic Adequacy of Mechanical & Electrical Equipment in Operating Reactors,Unresolved Safety Issues (USI) A-46 ML20210R1191999-07-31031 July 1999 Monthly Operating Repts for July 1999 for Bsep,Units 1 & 2 ML20210R1311999-06-30030 June 1999 Revised Monthly Operating Rept for June 1999 for Bsep,Unit 2 BSEP-99-0118, Monthly Operating Repts for June 1999 for Bsep,Units 1 & 2. with1999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Bsep,Units 1 & 2. with BSEP-99-0095, Monthly Operating Repts for May 1999 for Brunswick Steam Electric Plant,Units 1 & 2.With1999-05-31031 May 1999 Monthly Operating Repts for May 1999 for Brunswick Steam Electric Plant,Units 1 & 2.With ML20210M8581999-05-14014 May 1999 B214R1 RPV Hydrotest Bolted Connection Corrective Action Evaluation, Rev 0 ML20211L3711999-05-10010 May 1999 Rev 0 to ESR 98-00333, Unit 2 Invessel Feedwater Sparger Evaluation ML20206G1871999-05-0404 May 1999 Safety Evaluation Approving Third 10-year ISI Program Requests for Relief (RR) RR-08,RR-15 & RR-17 BSEP-99-0075, Monthly Operating Repts for Apr 1999 for Brunswick Steam Electric Plant,Unit 1 & 2.With1999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for Brunswick Steam Electric Plant,Unit 1 & 2.With ML20206N1791999-04-23023 April 1999 Rev 0 to 2B21-0554, Brunswick Unit 2,Cycle 14 Colr BSEP-99-0059, Monthly Operating Repts for Mar 1999 for Brunswick Steam Electric Plant,Units 1 & 2.With1999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Brunswick Steam Electric Plant,Units 1 & 2.With ML20205F9031999-03-30030 March 1999 Safety Evaluation Supporting Proposed Rev to BSEP RERP to Licenses DPR-62 & DPR-71,respectively ML20206N1831999-02-28028 February 1999 Rev 0 to Suppl Reload Licensing Rept for Bsep,Unit 2 Reload 13 Cycle 14 BSEP-99-0043, Monthly Operating Repts for Feb 1999 for Brunswick Steam Electric Plant,Units 1 & 2.With1999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for Brunswick Steam Electric Plant,Units 1 & 2.With ML20203D7061999-02-0909 February 1999 SER Accepting Proposed Alternatives Contained in Relief Requests PRR-04,VRR-04,VRR-13,PRR-01,PRR-03,VRR-01.VRR-07, VRR-08 & VRR-09 Denied BSEP-99-0005, Monthly Operating Repts for Dec 1998 for Brunswick Steam Electric Plant,Units 1 & 2.With1998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for Brunswick Steam Electric Plant,Units 1 & 2.With BSEP-98-0231, Monthly Operating Repts for Nov 1998 for Brunswick Steam Electric Plant,Units 1 & 2.With1998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for Brunswick Steam Electric Plant,Units 1 & 2.With BSEP-98-0218, Monthly Operating Repts for Oct 1998 for Bsep,Units 1 & 2. with1998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for Bsep,Units 1 & 2. with BSEP-98-0210, Special Rept:On 980824,temp Element 2-CAC-TE-1258-22 Failed. Cause of Failed Temp Element Cannot Be Conclusively Determined.Temp Element Will Be Replaced & Cable Connections Repaired1998-10-30030 October 1998 Special Rept:On 980824,temp Element 2-CAC-TE-1258-22 Failed. Cause of Failed Temp Element Cannot Be Conclusively Determined.Temp Element Will Be Replaced & Cable Connections Repaired ML20154P8151998-10-16016 October 1998 SER Accepting Revised Safety Analysis of Operational Transient of 920117,for Plant,Unit 1 ML20154P8591998-10-16016 October 1998 SER Accepting Equivalent Margins Analysis for N-16A/B Instrument Nozzles for Plant,Units 1 & 2 BSEP-98-0202, Monthly Operating Repts for Sept 1998 for Brunswick Steam Electric Plant,Units 1 & 2.With1998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for Brunswick Steam Electric Plant,Units 1 & 2.With ML20151Y6211998-09-14014 September 1998 BSEP Rept Describing Changes,Tests & Experiments, for Bsep,Units 1 & 2 ML20151Y6371998-09-14014 September 1998 Changes to QA Program, for Bsep,Units 1 & 2 BSEP-98-0185, Monthly Operating Repts for Aug 1998 for Brunswick Steam Electric Plant,Units 1 & 2.With1998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for Brunswick Steam Electric Plant,Units 1 & 2.With ML20151T5021998-08-0505 August 1998 Project Implementation Plan, Ngg Yr 2000 Readiness Program, Rev 2 BSEP-98-0164, Monthly Operating Repts for July 1998 for BSEP Units 1 & 21998-07-31031 July 1998 Monthly Operating Repts for July 1998 for BSEP Units 1 & 2 ML20236T1961998-07-0101 July 1998 Rev 1 to 2B21-0088, Brunswick Unit 2,Cycle 13 Colr ML20236T1921998-07-0101 July 1998 Rev 1 to 1B21-0537, Brunswick Unit 1,Cycle 12 Colr BSEP-98-0142, Monthly Operating Repts for June 1998 for BSEP Units 1 & 21998-06-30030 June 1998 Monthly Operating Repts for June 1998 for BSEP Units 1 & 2 ML20236T1971998-06-30030 June 1998 Rev 2 to 24A5412, Supplemental Reload Licensing Rept for Brunswick Steam Electric Plant Unit 2 Reload 12 Cycle 13 ML20249B9691998-06-11011 June 1998 Rev 1 to VC44.F02, Brunswick Steam Electric Plant,Units 1 & 2,ECCS Suction Strainers Replacement Project,Nrc Bulletin 96-003 Final Rept BSEP-98-0129, Monthly Operating Repts for May 1998 for Bsep,Units 1 & 21998-05-31031 May 1998 Monthly Operating Repts for May 1998 for Bsep,Units 1 & 2 ML20151S9041998-05-31031 May 1998 Revised Pages to Monthly Operating Rept for May 1998 for Brunswick Steam Electric Plant,Unit 1 BSEP-98-0104, Monthly Operating Repts for Apr 1998 for Brunswick Steam Electric Plant,Units 1 & 21998-04-30030 April 1998 Monthly Operating Repts for Apr 1998 for Brunswick Steam Electric Plant,Units 1 & 2 ML20151S8991998-04-30030 April 1998 Revised Pages to Monthly Operating Rept for Apr 1998 for Brunswick Steam Electric Plant,Unit 1 ML20247N7501998-04-30030 April 1998 Rev 0 to BSEP Unit 1,Cycle 12 Colr ML20247N7721998-04-30030 April 1998 Rev 0 to J1103244SRLR, Supplemental Reload Licensing Rept for BSEP Unit 1,Reload 11,Cycle 12 ML20217K8461998-04-24024 April 1998 Safety Evaluation Approving Proposed Use of Code Case N-535 at Brunswick Unit 1 During Second 10-yr Interval,Pursuant to 10CFR50.55a(a)(3)(i).Authorizes Use of Code Case N-535 Until Code Case Included in Future Rev of RG 1.147 ML20217K3941998-04-24024 April 1998 SER Approving Relief Request for Pump Vibration Monitoring, Brunswick Steam Electric Plant,Units 1 & 2 ML20217E6841998-04-23023 April 1998 Safety Evaluation Accepting Code Case N-547, Alternative Exam Requirements for Pressure Retaining Bolting of CRD Housings ML20217E7471998-04-21021 April 1998 Safety Evaluation Accepting Alternative to Insp of Reactor Pressure Vessel Circumferential Welds ML20217B5241998-04-20020 April 1998 SE Accepting Licensee Request for Approval to Use Alternative Exam Requirement for Brunswick,Unit 1,reactor Vessel Stud & Bushing During Second 10-yr ISI Interval Per 10CFR50.55a(a)(3)(ii) BSEP-98-0080, Monthly Operating Repts for Mar 1998 for Bsep,Units 1 & 21998-03-31031 March 1998 Monthly Operating Repts for Mar 1998 for Bsep,Units 1 & 2 ML20216B1041998-03-0404 March 1998 SER Approving Alternative to Insp of Reactor Pressure Vessel Circumferential Welds for Brunswick Steam Electric Plant, Unit 1 1999-09-30
[Table view] |
Text
.
A %
UNITED STATES 4g
[(
5 j NUCLEAR REGULATORY COMMISSION WASHINGTON, D. C. 20555
\...../
SAFETY EVALUATION BY THE OFFICE OF NUCLEAR REACTOR REGULATION BASES TO TECHNICAL SPECIFICATION 3/4.5.3.1, " CORE SPRAY SYSTEM (CSS)"
BRUNSWICK STEAM ELECTRIC PLANT, UNITS 1 AND 2 DOCKET N05. 50-325/324
1.0 INTRODUCTION
In a letter dated December 3, 1985, the Carolina Power and Light Company requested a change in Technical Specification (TS) bases relating to the core spray system for the Brunswick Steam Electric Plant, Unit Nos. I and
- 2. The proposed change to the bases for TS 3/4.5.3.1 serves to clarify the minimum condensate storage tank (CST) volume required for the operability of the core spray and the HPCI/RCIC system.
2.0 EVALUATION During a recent review of TS 3/4.5.3.1, a question arose as to whether the 150,000 gallon core spray requirement coupled with the 100,000 gallon HPCI/RCIC requirement constituted a combined minimum requirement for the condensate storage tank of 250,000 gallons. After a review of the system's requirements, the licensee verified that 150,000 gallons was the total minimum requirement for the tank. Of this, 50,000 gallons were required for the core spray system (CSS) operability requirements and 100,000 gallons for the HPCI/RCIC requirements.
There is no ambiguity as to the 100,000 gallons for the HPCI/RCIC requirement since the CSS suction is at the 100,000 gallons level. The question is whether 50,000 gallons or 150,000 gallons is required for i core spray system operability. The core spray system can take suction either from the suppression pool or the condensate storage tank, with the latter providing the CSS with a source of demineralized water for injection path testing in conditions 4 and 5 during a reactor shutdowr..
In conditions 1, 2 and 3 when the CSS is required to be operable the valves from the CST to the CSS pumps are locked shut and the CSS takes suction form the suppression pool. Assuming each of the two CSS Pumps has a capacity of 5000 gpm, the 50,000 gallons in the CST could last for about 5 minutes if both CSS pumps operate at full capacity. This duration is deemed adequate for the injection path testing in conditions 4 and 5 were there no accidental draining of vessel water. In the event of such an accidental draining when the CSS is not available for core cooling, adequate assurance of core flooding is provided by one low pressure coolant injection (LPCI) loop. Therefore, it is concluded that the risk posed to the public health and safety as a result of the postulated event 8606100545 DR 860529 ADOCK 05000324 PDR
- ~
is very low. This change to the bases for TS 3/4.5.3.1 is deemed i
consistent witt the requirements in the current Technical Specifications that involve the Reactor Protection System and is also consistent with the requirements for the ECCS in the Standard Technical Specifications for the BWR/4's.
3.0 CONCLUSION
Based on our review, we concur with the licensee that the proposed change to the Bases for Technical Specification 3/4.5.3.1 is appropriate and necessary to clarify the operability requirements for the core spray system in operational conditions 4 and 5.
Principal Contributor: D. Yue Dated: May 29,1986 I
4 EMERGENCY CORE COOLING SYSTEMS BASES AUTOHATIC DEPRESSURIZATION SYSTEM (Continued)
ADS automatically controls 7 safety-rel~ief valves although the hazards analysis only takes credit for 6. It is therefore appropriate to permit one ,
' valve to be out-of-service indefinitely without materially reducing system reliability. Reactor operation is permitted to continue for up to 7 days with 2 safety-relief valves inoperable except that HPCI is required to be demonstrated to be OPERABLE.
The surveillance requirements provide adequate assurance that ADS will be OPERABLE when required. Although all active components are testable during reactor operation, a complete functional test results in reactor blowdown and therefore is scheduled around shutdowns.
3/4.5.3 LOW PRESSURE COOLING SYSTEMS 3/4.5.3.1 CORE SPRAY SYSTEM (CSS)
The CSS is provided to assure that the core is adequately cooled following
- a loss-of-coolant accident. Two redundant loops each provide adequate core
- cooling capacity for all break sizes from 0.2 ft2 up to and including the double-ended reactor recirculation line break, and for smaller breaks following depressurization by the ADS.
The CSS specifications are applicable during CONDITIONS 1, 2, and 3 -
because CSS is a primary source of emergency core cooling after the reactor vessel is depressurized.
When in CONDITION 1, 2, or 3 with one CSS Loop inoperable, the
-l demonstraced OPERABILITY of the redundant full capacity CSS loop and the full capacity Low Pressure Coolant Injection System provides assurance of adequate
- core cooling and justifies the specified 7-day out-of-service period.
f The CSS specifications are applicable in CONDITIOUS 4 and 5 to provide a source for flooding of the core in case of accidental draining.
The specified volume of 150,000 gallons of water in the condensate storage
. tank will assure the availability of 50,000 gallons of water for the CSS since
- - l its suction is at the 100,000 gallons level. The 100,000 gallons is the
. minimum reserved for HPCI/RCIC operation.
1 BRUNSWICK - UNIT 1 B 3 4 5-2 Revised ltr 5/29/86
~ .
EMERCENCY CORE COOLING SYSTEMS BASES AUTOMATIC DEPRESSURIZATION SYSTEM (Continued)
ADS automatically controls 7 safety-relief valves, although the hazards
, analysis only takes credit for 6. It is therefore appropriate to permit one valve to be out-of-service indefinitely without materially reducing system reliability. Reactor operation is permitted to continue for up to 7 days with 2 safety-relief valves inoperable except that HPCI is required to be demonstrated to be OPERABLE.
The surveillance requirements provide adequate assurance that ADS will be OPERABLE when required. Although all active components are testable during reactor operation, a complete functional test results in reactor blowdown and, therefore, is scheduled around shutdowns.
3/4.5.3 LOW PRESSURE COOLING SYSTEMS 3/4.5.3.1 CORE SPRAY SYSTEM (CSS)
The CSS is provided to assure that the core is adequately cooled following a loss-of-coolant accident. Two redundant loops each provide adequate core cooling capacity for all break sizes from 0.2 ft2 up to and including the double-ended reactor recirculation line break, and for smaller breaks following 4epressurisation by the ADS.
The CSS specifications are applicable during CONDITIONS 1, 2, and 3 because CSS is a primary source of emergency core cooling after the reactor vessel is depressurized.
When in CONDITIONS 1, 2, or 3 with one CSS loop inoperable, the demonstrated OPERABILITY of the redundant full capacity CSS loop and the full capacity Low Pressure Coolant Injection System provides assurance of adequate core cooling and justifies the specified 7 day out-of-service period.
i The CSS specifications are applicable in CONDITIONS 4 and 5 to provide a source for flooding of the core in case of accidental draining.
The specified volume of 150,000 gallons of water in the condensate storage tank will assure the availability of 50,000 gallons of water for the CSS since its suction is at the 100,000 gallons level. The 100,000 gallons is the minimum reserved for HPCI/RCIC operation.
BRUNSWICK - UNIT 2 B 3/4 5-2 Revised ltr 5/29/86
- - - - - - _ _ - - - - - - - - , - - , - - - _ - - - - - _ _ _ - - _ - - - - - - - - - - - . , _ - - - - - - - - - - . - - - - - - - . - _ - - - - - - - - - - - - - - - - - - - -.- --.-----,---,----u-- - ----.-1.--- -----