ML20198J411

From kanterella
Jump to navigation Jump to search
Forwards As-Built Team Insp Rept 50-443/86-14 on 860310-21 & Notice of Violation
ML20198J411
Person / Time
Site: Seabrook NextEra Energy icon.png
Issue date: 05/28/1986
From: Ebneter S
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Harrison R
PUBLIC SERVICE CO. OF NEW HAMPSHIRE
Shared Package
ML20198J413 List:
References
NUDOCS 8606030107
Download: ML20198J411 (2)


See also: IR 05000443/1986014

Text

.f

>

'

(

NAY 281MB

Docket No. 50-443

Public Service of New Hampshire

ATTH:

Mr. Robert J. Harrison

President and Chief Executive Of ficer

P. O. Box 330

Manchester, New Hampshire 03105

Gentlemen:

Subject:

Inspection Report No. 50-443/86-14

This refers to the special As-Built Team Inspection conducted by Mr. J. Johnson

of this office on March 10-21, 1986 at the Seabrook Station, Unit 1, Seabrook,

New Hampshire, of activities authorized by NRC Permit No. CPPR-135 and to the

discussions of our findings held by Mr. Johnson with Mr. J. DeVincentis and

other members of your staff at the conclusion of the inspection.

Areas examined during this inspection are described in the NRC Region I

Inspection Report which is enclosed with this letter. Within these areas, the

inspection consisted of selective examinations of procedures and representative

records, interviews with personnel, measurements made by the inspector, and

observations by the inspector.

Based on the results of this inspection, it appears that certain of your

activities were not conducted in full compliance with NRC requirements, as set

forth in the Notice of Violation, enclosed herewith as Appendix A.

These vio-

lations have been categorized by severity level in accordance with the revised

NRC Enforcement Policy (10 CFR 2, Appendix C) published in the Federal Register

Notice (49 FR 8583) dated March 8, 1984. You are required to respond to this

letter and in preparing your response, you should follow the instructions in

Appendix A.

The responses directed by this letter and the accompanying Notice are not

subject to the clearance procedures of the Office of Management and Budget

as required by the Paperwork Reduction Act of 1980, PL 96-511.

Your cooperation with us in this matter is appreciated.

Sincerely,

Original Signed By

0606030107 06

v3

Stewart D. Ebneter, Director

PDH

ADOCK Ot>

Division of Reactor Safety

PDR

G

Ol

\\\\

OFFICIAL RECORD COPY

IR SEA 1 86-14 - 0001.0.0

05/16/86

.

,

____

_

_

_ _ _ _ _ _ _ . _ _ _ _ . - - - - -

h

(

Public Service of New Hampshire

2

.

Enclosures:

1.

Appendix A, Notice of Violation

2.

NRC Region I Inspection Report Number 50-443/86-14

cc w/encis:

John DeVincentis, Director, Engineering and Licensing

William B. Derrickson, Senior Vice President

Warren Hall, Operational Services Supervisor

Donald E. Moody, Station Manager - Seabrook Station

Gerald F. Mcdonald, Construction QA Manager

Pubitc Document Room (PDR)

local Public Document Room (LPDR)

Nuclear Safety Information Center (NSIC)

NRC Resident Inspector

State of New Hampshire

bcc w/encis:

Region I Docket Room (with concurrences)

Management Assistant, DRMA (w/o enc 1)

DRP Section Chief

RI:DRS

RI:DRS

RI:DRS

[\\Chaudhary/geb

Johnson

ttenhausen

4)t't

h4

3

"

/86

2adf6

g

0FFICIAL RECORD COPY

IR SEA 1 86-14 - 0001.1.0

04/23/86