Text
__
J OH lolo-rYl- ) 81 - 004l-O(o mr-DOCUMENT NO.80A4540 REV.5 11 1
nF_106 NUCLEAR ENERGY SERVICES. INC.
PAGE C
1 PSI PROGRAM PLAN:
RESIDUAL HEAT REMOVAL SYSTEM CALLAWAY NUCLEAR POWER PLANT, UNIT 1 Prepared For THE BECHTEL POWER CORPORATION h '
l N?* ? ({Irf t
Ij
- !I.
+h w u w uLaw ij Project Application Preoare<f By --/
[ /)
g Date ((/30(/Ol 5555 gg 7 _: :
0 APPROVALS TITLE / DEPT.
S1GNATURE DATE ISI Procram Encineerina Mar.
I d.
2 3/
[
Proiect Manneer 14A 8 5
/
Quality Assuranco Mgr.
Mg I
,,/jf l
l
\\
1
(
0406180447 840613 PDR ADOCK 050004s3 l
.O PDR FORM eNES 2042 80
80A4540 DOCUMENT NO.
yg m
PAGE 2
OF _106 NUCLEAR ENERGY SERVICES. INC.
g,'
DATE "A[
DESCRIPTION APPROVAL V
g 6/28/82 See CRA #2396. Customer comments.
1
[
[. i [w 2
3/23/83 All see CRA #3233.
3 5/04/84 All Major revision.
See CRA #4214.' Revised to include Field Change FC-1 & 2 and technical correspondence.
Total number of panes changed.
k 4
6/07/84 All Major revision. See CRA #4319. Revised to incorporate customer comments. Total number of pages changed.
h 5
6/8/84 38,50 See CRA #4330. Revised to Incorporate 10 Customer Comments.
C l
b P:mu e Nas 20s 21o
80A4540 DOCUMENT NO.
AG OF
- NUCLEAR ENERGY SERVICES. INC.
(-.
i
.cr TABLE OF CONTENTS PAGE 4
1.
INTRODUCTION 2.
SYSTEM DESCRIPTION 4
4 2.1 Exemptions and Exceptions 2.2 Classifications 10 2.3 Calibration Standards 12 2.4 Program Plan and Schedule 13 b 2.5 Isometric Figures and Sketches 106 YABLES 1
Exemptions 5
2 Classifications 11 3
Referenced Calibration Standards 12 h
4 Isometric Figures and Boundary Diagram 106 C
l FORM s NES 205 2/80 l
80A4540 DOCUMENT NO.
11 OF
=
NUCLEAR ENERGY SERVICES. INC.
C RESIDUAL HEAT REMOVAL SYSTEM
- 1. INTRODUCTION This document has been prepared to (1) delineate system-specific, itemized Preservice Inspection (PSI) requirements and, (2) present appropriate diagrams locating the areas for examination. One out of four, or 25%, of the pressure retaining Class 2 welds that are structural discontinuities and 100% of the Class I have been selected for inspection from the Residual Heat Removal System piping. In addition, all components aside from piping that are required to be examined by the ASME BPV Code,Section XI, are included.
The General Reference Text, NES Document 80A4533 presents the development and required procedural information for the PSI Program Plan generic to all systems examined.
C
- 2. SYSTEM DESCRIPTION 2.1 EXEMPTIONS AND EXCEPTIONS The portions of the Residual Heat Removal System that are exempted from examination as allowed by ASME BPV Code,Section XI, and as described in the General Reference Text are presented in Table f.
Exceptions to Code required examinations may be authorized by the regulatory authority, as allowed by 10 CFR 50.55a(a)(2), provided that design, fabrication, installation, testing and inspection performed in compilance with Codes and Section XI requirements would result in hardship without a compensating increase in the level of quality and safety, or provided that the proposed alternative examination will assure an acceptable level of quality and safety.
Specific exceptions will be identified upon petition to the regulatory authority l
requesting relief from code requirements. A !! sting of such, with a tabulated description of relief requests, may be included at a later date.
FOAM s NES 205 2/80 0
TABLE 1 EXEMPTIONS ney. V passio, /O4 11 80A4540 PREPARED BY MATE O M 4 bk PROKCT CHECKED BY DATE bh 3
SYSTEM SYSTEM P 6: I BASIS FDR
$B h
TITLE DESCRsPTION DIAGRAM EXEMPTION B
E3 RHR 3/4"-ECB to V059 M-02E301 E
IWC-1220(d) 5 '73 Addenda B
E3 RHR 67-HCB-1" M-02E301
.E IWC-1220(d) S '75 Addenda B
E3 RHR 1"-BCB to V161 M-02E301 E
IWC-1220(d) S '75 Addenda B
E3 RHR 1"-BCB to V046 M-02E301 E
IWC-1220(d) S '75 Addenda B
E3 RHR 29-ECB-3" M-02E301 E
IWC-1220(d) S '75 Addenda B
E3 RHR 3/4"-ECB to V154 M-02E301 E
IWC-1220(d) S '75 Addenda B
E3 RHR 3/4"-ECB'to V048 M-02E301 E
IWC-1220(d) S '75 Addenda B
E3 RHR 69-ECB-3/4" M-02E301 E
IWC-1220(d) S '75 Addenda B
E3 RHR 21-ECB-3" M-02E301 E
IWC-1220(d) S '75 Addenda B
E3 RHR 1"-ECB to V148
' M-02E301 E
IWC-1220(d) S '75 Addenda B
E3 RHR 34-ECB-3/4" M-02E301 E
IWC-1220(d) S '75 Addenda B
E3 RHR 2"-ECB to V064 M-02E301 E
IWC-1220(d) S '75 Addenda B
E3 RHR ECB to PI601 M-02E301 E
IWC-1220(d) S '75 Addenda B
E3 RHR 65-ECB-3/4" M-02E301 E
IWC-1220(d) S '75 Addenda B
E3 RHR ECB to PT614 M-02E301 E
IWC-1220(d) S '75 Addenda B
E3 RHR 2"-ECB To V065 M-02E301 E
IWC-1220(d) S '75 Addenda B
E3 RHR Lines To FIS-610 M-02E301 E
IWC-1220(d) S '75 Addenda B
IWC-1220(d) S '75 Addenda B
E3 RHR 3/4"-ECB To V069 M-02E301 E
IWC-1220(d) S '75 Addenda B
E3 RHR 094-ECB-3/4" M-02E301 E
IWC-1220(d) S '75 Addenda B
E3 RHR 75-ECB-1" M-02E301 E
IWC-1220(d) S '75 Addenda B
E3 RHR 76-ECB-1" M-02E301 E
IWC-1220(d) S '75 Addenda B
E3 RHR 3/4"-ECB To V146 M-02E301 E
IWC-1220(d) S '75 Addenda NES 227-182
D:
O O
TABLE!
EXEMPTIONS REv.4 PAoE h / o 6 jj O9M EE 80A4540 PREPARED 8Y MATE
!O I rnOxCT CHECKEDBY nATE hg Il
~
EXEMPDON 3
SYSTEM SYSTEM P si I g
SASIS FOR g3 g
Dits DEsCn:PDON OtAGRAM B
EJ RriR 78-ECB-3/4" M-UltJUI t
IWC-144U(d) 3 V) Addenda B
E3 RHR TI608 M-02E301 E
IWC-1220(d) S '75 Addenda B
E3 RHR 3/4"-ECB To V158 M-02E301 E
IWC-1220(d) S '75 Addenda B
E3 RHR 35-ECB-2" M-02E301 E
IWC-1220(d) S '75 Addenda B
E3 RHR 3/4"-ECB to V108 M-02E301 E
IWC-1220(d) S '75 Addenda B
E3 RHR 3/4"-ECB to V106 M-02E301 E
IWC-1220(d) S '75 Addenda B
E3 RHR 57-ECIN2" M-02E301 E
IWC-1220(d) S '75 Addenda B
E3 RHR 1"-ECB To V144 M-02E301 E
IWC-1220(d) S '75 Addenda B
E3 RHR 1"-ECB To V142 M-02E301 E
IWC-1220(d) S '75 Addenda B
E3 RHR Lines To FT 618 M-02E301 E
IWC-1220(d) S '75 Addenda M-02E30'l E
IWC-1220(d) S '75 Addenda B
E3 RHR 3/4"-ECB-To V140 B
E3 RHR 1"-ECB To V133 M-02E301 E
IWC-1220(d) S '75 Addenda B
IWC-1220(d) S '75 Addenda B
E3 RHR 3/4"-ECB To V053 M-02E301 E
IWC-1220(d) S '75 Addenda B
E3 RHR 48-ECB-3/4" M-02E301 E
IWC-1220(d) S '75 Addenda B
E3 RHR 1"-BCB to V054 M-02E301 E
IWC-1220(d) S '75 Addenda B
E3 RHR 49-BCB-3/4" M-02E301 E
IWC-1220(d) S '75 Addenda B
E3 RHR 3/4"-BCB to V136 M-02E301 E
IWC-1220(d) S '75 Addenda B
E3 RHR 3/4"-BCB to V134 M-02E301 E
IWC-1220(d) S '75 Addenda B
E3 RHR Lines To V173, V174, V171, V172 M-02E301 E
IWC-1220(d) S '75 Addenda B
E3 RHR la BCB to V132 M-023301 E
IWC-1220(d) S '75 Addenda B
E3 RHR 68-HCB-1" M-023301 E
IWC-1220(d) S '75 Addenda B
E3 RHR 3/4"-ECB to V044 M-023301 E
IWC-1220(d) S '75 Addenda NES 227-782
O D
D TABLE 1 EXEMPTIONS REvbAcElc, _ 10 C W
nATE_I[_kd_
30A4540 PREPARED BY PROKCT CHECKED BY
-._DATE I
E
~
SYSTEM SYSTEM P 8: I BASIS FoR f-T:TLE DESCRWmON DIAGRAM EXEMPTION B
EJ RHR 3/4"-ECB to V052 M-023301~
Z IWC-izzG(d) d 'o Addenda B
E3 RHR 51-ECB-3" M-02E301 E
IWC-1220(d) S '75 Addenda B
EJ RHR 1"-BCB To V050 M-02EJ01 E
IWC-1220(d) S '75 Addenda B
E3 RHR 1"-ECB To V116 M-02EJ01 E
IWC-1220(d) S '75 Addenda B
E3 RHR 27-ECB-3" M-02EJ01 E
IWC-1220(d) S '75 Addenda B
E3 RHR 70-ECB-3/4" M-02EJ01 E
IWC-1220(d) S '75 Addenda B
E3 RHR 1"-ECB tb.V102 M-02E301 E
IWC-1220(d) S '75 Addenda B
E3 RHR 56-ECB-3/4" M-02EJ01 E
IWC-1220(d) S '75 Addenda B
E3 RHR 2"-ECB To V066 M-02EJ01 E
IWC-1220(d) S '75 Addenda B
E3 RHR Line To PI 602 M-02E301 E
IWC-1220(d) S '75 Addenda B
E3 RHR 66-ECB-3/4" M-02E301 E
IWC-1220(d) S '75 Addenda B
E3 RHR Line To PT 615 M-02E301 E
IWC-1220(d) S '75 Addenda B
E3 RHR 2"-ECB To V067 M-02E301 E
IWC-1220(d) S '75 Addenda B
E3 RHR Lines To FIS 611 M-02E301 E
IWC-1220(d) S '75 Addenda B
IWC-12209d) S '75 Addenda B
E3 RHR 3/h"-ECB To V068 M-02E301 E
IWC-1220(d) S '75 Addenda B
E3 RHR 3/4"-ECB To V104 M-02E301 E
IWC-1220(d) S '75 Addenda B
E3 RHR 096-ECB-3/4" M-02E301 E
IWC-1220(d) S '75 Addenda B
E3 RHR 87-ECB-3/4" M-0.2E301 E
IWC-1220(d) S '75 Addenda B
E3 RHR 84-ECB-1" M-02EJ01 E
IWC-1220(d) S '75 Addenda B
E3 RHR 85-ECB-1" M-02E301 B
IWC-1220(d) S '75 Addenda B
E3 RHR TI 609 M-02E301 E
IWC-1220(d) S '75 Addenda NES 227-h82
l C
O O
TABLEI EXEMPTIONS Rev. y p4ac S _oP 1o4 NM W
W 80A4540 PREPARED BY DATE k
PROJECT CHECKED BY OATE h*
3 SYSTEM SYSTEM P Eu !
BASIS F'OR f
h TITLE DESCRsPTioN OlAGRAM EXEMPisoN B
F.3 RHR 1"-t1D 1 o v tvu ivi-02E50i E
iiiiiC-i22G(a) 5 :75 Audenda B
EJ RHR 3/4"-ECB To V098 M-02E301 E
IWC-1220(d) S '75 Addenda B
E3 RHR 3/4"-ECB to V069 M-02E301 E
IWC-1220(d) S '75 Addenda B
E3 RHR Lines To FT 619 M-02E301 E
IWC-1220(d) S '75 Addenda
.B E3 RHR 3/4"-ECB To V094 M-02E301 E
IWC-1220(d) S '75 Addenda B
E3 RHR 1"-ECB.To V092 M-02EJ01 E
IWC-1220(d) S '75 Addenda B
IWC-1220(d) S '75 Addenda B
EJ RHR 1"-ECB To V029 M-02EJ01 E
IWC-1220(d) S '75 Addenda B
E3 RHR 62-ECB-3/4" M-02E301 E
IWC-1220(d) S '75 Addenda B
E3 RHR 1"-BCB To V058 M-02E301 E
IWC-1220(d) S '75 Addenda B
EJ RHR 64-BCB-3/4" M-02EJ01 E
IWC-1220(d) S '75 Addenda B
E3 RHR 3/4"-BCB to V166 M-02E301 E
IWC-1220(d) S '75 Addenda B
EJ RHR 1"-BCB To V086 M-02E301 E
IWC-1220(d) S '75 Addenda R
E3 RHR 3/4"-BCB to V088 M-02E301 E
IWC-1220(d) S '75 Addenda B
E3 RHR Lines To V180, V179, V181, V182 M-02E301 E
IWC-1220(d) S '75 Addenda B
E3 RHR 3/4"-BCB To V090 M-02E301 E
IWC-1220(d) S '75 Addenda B
E3 RHR Lines To FT 988 M-02E301 E
IWC-1220(d) S '75 Addenda B
E3 RHR 3/4"-ECB To V128 M-02E301 E
IWC-1220(d) S '75 Addenda B
E3 RHR 1"-ECB To V130 M-02E301 E
IWC-1220(d) S '75 Addenda B
E3 RHR 1"-ECB To V031 M-02E301 E
IWC-1220(d) S '75 Addenda B
E3 RHR 63-ECB-3/4" M-02E301 E
IWC-1220(d) S '75 Addenda B
E3 RHR 1"-BCB to V056 M-02EJ01 E
IWC-1220(d) S '75 Addenda B
E3 RHR 1"-BCB to V124 M-02E301 E
IWC-1220(d) S '75 Addenda NES 227-v82
O Y
8 Y
/c 4
O E E 0
T T
A A 1
n n
a a a a a d d d d d P
o n n n n n e
e e e dk d R N d d 9
0IO h T d d d d d t
AA AA A P
E sM o
S E 5 5 5 5 5 A
Y A X 7 7 7 7 7
p 8 y S
eE DE D 5 S S S S 4
R E
)
)
)
)
)
A K P C d d d d d
(
(
(
(
(
. ME v
H 0 0 0 0 0 ER P C 2 2 2 2 2 2 2 2 2 2 1
1 1
1 1
CC CC C WW WW W I
I I
I I
I E E E E E 1
1 1
1 1
0 0 0 0 0 MA 3 3 J 3 J R
E E E E E r.
G 2 2 2 2 2 P A 0 0 0 0 0 D
MM MMM SN TC O0 K
l I
4 E
T 5 O
P 4 R
L P
A M A 6
B O
7 0
T E 8 1
X V
E 5
e 7
1 N
V O
uI 8
T E P 7
T t sf 2
1 y C 2
V 8 0
sS 1
9 E
V 2
,1 D
1 7
1 o V 7 V 4
t 1
/
4 oV o 3 B t
t e
o e
0 B C B t B C B C s C B
4" B e B
- n -
-6 /
i "
1" L
1 4 3 uE E T LT s
I RR R R R y T s
HH H H H RR R R R 3 3 3 3 3 E E E E E 3
287 b
72 2
b B B. B B B S
EN
80A4540 DOCUMENT NO.
--.11 10 106 NUCLEAR ENERGY SERVICES. INC.
2.2 CLASSIFICATIONS This System's piping and instrumentation diagrams have been reviewed and Quality Group A, B and C (ASME Code Class 1, 2 and 3) boundaries have been established as required by ASME Code Section XI, IWA-1400. The General Reference Text discusses the basis for these determinations.
Table 2 describes the boundaries for the Residual Heat Removal System.
(
4 C
FORM s NES 205 2/80
^
l D
D D
t l
TABLE 2 mur CLASSIFICATIONS g
,,,, y,, g g,
io g g
80A4540 3 M'
(/pq mp,3,y n,7, n4Tu (NP9' enoscT cHEcxtDsv Eg ll]
3 8 ASIS FOR SYSTEM SYSTEM P Si 1 f&
TITLE DESCmPDoN DIAGRAM EXEMPfloN A
BB Reactor From Reactor Coolant System M-02BB01 Coolant hot leg (BB-06-BCA-29") to (See Note 1)
Valve PV-8702A, from Reactor Coolant System hot leg (BB-60-BCA-29") to valve PV-8702B A
EJ Residual From Reactor Coolant valves M-02EJ01 Heat PV-8702A&B to RHR valves (See Note 1 )
Removal HV-8701A&B B
From valves HV-8701A&B (14")
thru Residual Heat Removal pumps (PEJ01 A&B) thru Residual Heat Removal Heat Exchangers (EE301 A&B) thru valves HV-8809A&B to the Accumulator Injection dischargo loops 1,2,3 & 4 to valvas 8818A,B, C&D in the EP System (M-02EP01) including the crossover leg (40-F ' B-10" and 60-ECB-10") thru valve HV-8840 to valves 8841 A&B.
B All Branch Lines 4" Nominal Size E
Piping Below Minimum Size Per Sectior and less XI IWC-1220(d) S '75 Addenda C
Main Component Cooling lines to Note 1: See M-02E301-PSI for and from Residual Heat Removal identification of Boundaries.
pumps (PEJ01 A&B) and Residual Heat Removal Heat Exchangers (EE301A&B)
NES m-782
O e
80A4540 DOCUMENT NO.
PAGE OF NUCt. EAR ENERGY SERVICES, INC.
2.3 CALIBRATION STANDARDS Table 3 lists the Calibration Standards for ultrasonic examinations scheduled for the Residual Heat Removal System. All calibration standards are to be retained on site.
4 TABLE 3 Referenced Cahbration Standards Title Drawing No.
06-160-00.719-SA312-TP304-SS-17 80C4197 12-140-01.125-SA312-TP304-SS-18 80C4197 10-140-01.000-SA312-TP304-SS-21 80C4197 10- 140-01.000-S A 358-TP 304-C L 1 -SS-22 80C4197 12-140-01.125-SA376-TP304-SS-26 80D4198 12-805-00.500-5 A312-TP304-SS-28 80C4197 00.875-R H R-00.750-5 A240-T P304-SS-72 80D7606 j
(
j l
FORM sNES 205 2/80
s 80A4540 DOCUMENT NO.
{ 11 ay 13 106 PAGE OF NUCLEAR ENERGY SERVICES, INC.
2.4 PROGRAM PLAN AND SCHEDULE The specific PSI examination requirements are defined in the Program Plan and schedule tables. Each weld or other examination area is designated by a unique identification number, and then described.
Also, identified are applicable examination category, method, pr'ocedure number, any calibration standard number referenced for ultrasonic examination as described in Section 3 of the General Reference Text.
Examination items are first divided according to the Isometric figure that they appear on. Multiple examination requirements of the same component are listed together in the schedule tables. Component examinations or component bolting follow the piping weld examinations for t :h system.
The Hydro-Visual examinations required by Section III to the ASME Code are acceptable as a preservice system pres:ure tests.
For the Residual Heat Removal system 25% of the Class ?. pressure retaining welds at structural discontinuities and 100% of all Class I welds have been selected for inspection.
Extent of examination for Class 2 longitudinal welds is 2.5 times the wall thickness measured from the circumferential weld (note 2.5t in remarks column).
The direction of upstream (LU) and downstream (LD) for longitudinal seams is measured from the circumferential weld.
l FORM 8NES 205 2/80
.:.1
,.7
._7,1 v..,,..;
_:,c _
..,q.,;,. J:-=..s-.,_._ ;
b O
jf f [hj I
B ResiM Heat Removd PROGRAM PLAN AND SCHEDULE 3p9p Preservice Inspection 80A4540 Rev. 4 fage 14 of l'6 0
CAUBRATION CODE IDE TK)N DE NUMBE (tf CA GORY T
NO REMARKS RHR WELDS - Tmb A Ref. Dwg. No. 2-E3-01-1 2-E3-01-F005-LU 14" Pipe Longitudinal Seam Upstream 80A4569 N/A C-F PT 2.5t 2-E3-01-F005 14" Pipe to 14" Elbow 80A4569 N/A C-F PT 14" Elbow Longitudinak Seam Downstream 80A4569 N/A C-F PT 2.5t 2-E3-01-F005-LD 2-E3-01-S004-E-LU 14" Pipe Longitudinal Seam Upstream 80A4569 N/A C-F PT 2.5t 2-E3-01-S004-E 14" Pipe to 14" Tee 80A4569 N/A C-F PT b
2-E3-01-S004-E-LD 14" Tee Longitudinal Scam Downstream 80A4569 N/A C-F PT 2.5t 2-E3-01-5004-F-LU 14" Pipe Longitudinal Seam Upstream 80A4569 N/A C-F PT 2.5t 2-E3-01-S004-F 14" Tee to 14" Pipe 80A4569 N/A C-F PT 2-E3-01-5004-L-LU 14" Pipe Longitudinal Seam Upstream 80A4569 N/A C-F PT 2.St D
NES 239 662
Residual Heat Removal PROGRAM PLAN AND SCHEDULE By: PM
/ t/P+
App: M7
/ (/B+
navh Inspection SOA4540 Rev. 4"Page 15 of 106 CAU8 RATION CODE COMPONENT COMPONENT PROCEDURE BLOCK CODE EXAM ZONE mg DESCRIPTION NUMBER Of appleablel CATEGORY WTHOD NO.
REMARKS RHR WELDS -Train A Ret Dwg. No. 2-E3-Ol-1 2-E3-01-S004-L 14" Pipe to 14" Flange 80A4569 N/A C-F PT 2-E3-01-S006-C-LU 14" Pipe Longitudinal Seam Upstream 80A4569 N/A C-F PT 2.5t 2-E3-01-S006-C 14" Pipe to 14" Elbow 80A4569 N/A C-F PT 2-E3-01-5006-C-LD 14" Elbow Longitudinal Seam Downstream 80A4569 N/A C-F PT 2.5t
.c A
NES 239 EV82
a 3
RN Heat Reinoval B8
/ N Y
PROGRAM PLAN AND SCHEDULE
' /7# /
/(A App: /
Preservice Inspection 80A4540 Rev. 4'Page 16 of 106 OE DON DE NUMBE beel CA GORY W
RFMMES RHR SUPPORTS -Train A Ret Dwg. No. 2-E3-Ol-1 2-EJ-01-R002 Pipe Support 80A4571 N/A C-E VT-3 2-E3-01-C013 Pipe Support 80A4571 N/A C-E VT-3 8 Lugs 80A4569 N/A PT 2-EJ-01-R016 Pipe Support 80A4571 N/A C-E VT-3 VT-4 2-E3-01-H001 Pipe Support 80A4571 N/A C-E VT-3 VT-4 2-EJ-01-R019 Pipe Support 80A4571 N/A C-E VT-3 D
e 6
l NES 239 682
Residual Heat Removal PROGRAM PLAN AND SCHEDULE BW
/ @+
l App: X/P
/ 6/89 Preservice Inspection 80A4540 Rev. 4 Page 17 of 106 I
MEES D EE$
NUMBE CA ORY ME HOO No REMUn(S RHR WELDS -Train A Ref. Dwg. No. 2-E3-01-2 2-E3-01-5010-A 8" Flange to 8" Pipe 80A4569 N/A C-F PT 2-E3-01-F013 10" Pipe to Valve 8724A 80A4569 N/A C-F PT 2-E3-01-F013-LD 10" Pipe Longitudinal Seam Downstream 80A4569 N/A C-F PT 2.5t 2-E3-01-5011-E-LU 10" Pipe Longitudinal Seam Upstream 80A4569 N/A C-F PT 2.5t 2-E3-01-50ll-E 10" Pipe to 10" Elbow 80A4569 N/A C-F PT 2-E3-01-50ll-E-LD 10" Elbow Longitudinal Seam Downstream 80A4569 N/A C-F PT 2.St b
2-E3-01-F015-LU 10" Elbow Longitudinal Seam Upstream 80A4569 N/A C-F PT 2.St 2-E3-01-F015 10" Elbow to 10" Pipe 80A4569 N/A C-F PT 2-E3-01-F015-LD 10" Pipe Longitudinal Seam Downstream 80A4569 N/A C-F PT 2.5t NES 239 6/82
n G
PROGRAM PLAN AND SCHEDULE Bra M
/ M+
Residual Heat Removal App: 9///7
/ #7dv
. Preservice Inspection 80A4540 Rev. 4'P3de 18 ci l'06 o Yc o EeS YueYc CA E Y NNO REMARKS non RHR SUPPORTS -Train A Ret Dwg. No. 2-EJ-01-2 2-E3-01-H006_
Pire Support 80A4571 N/A C-E VT-3 2-E3-01-R006 Pipe Support 80A4571 N/A C-E VT-3 2-E3-01-R018 Pipe Support 80A4571 N/A C-E VT-3 e
e e
NES 239 6/82
P O
M
/
M*
B:
Residual Heat Removal PROGRAM PLAN AND SCHEDULE Y
App: 4ff/7
/ a/W Preservice Inspection 80A4540 Rev. 4 Page 19 of 106 NE DEEfKW YA40TE bW CA GORY ME E Ho REMARKS RHR WELDS -Train A Ref. Dwg. No. 2-E3-01-3 2-E3-01-5014-A 10" Pipe to 10" Orifice Flange 80A4569 N/A C-F PT 2-E3-01-5014-A-LD 10" Pipe Longitudinal Seam Downstream 80A4569 N/A C-F PT 2.51 2-E3-01-5014-H-LU 10" Tee Longitudinal Seam Upstream 80A4569 N/A C-F PT 2.5t 2-E3-01-5014-H 10" Tee to 10" Pipe 80A4569 N/A C-F PT 2-E3-01-5014-H-LD 10" Pipe Longitudinal Seam Downstream 80A4569 N/A C-F
,PT 2.5t 2-E3-01-5021-F-LU 10" Elbow Longitudinal Seam Upstream 80A4569 N/A C-F PT 2.5t 2-E3-01-5021-F 10" Elbow to 10" Pipe 80A4569 N/A C-F PT 2-E3-01-5021-F-LD 10" Pipe Longitudinal Seam ' Downstream 80A4569 N/A C-F PT 2.St 1
NES 239 IV82
D G
Residual Heat Renmal PROGRAM PLAN AND SCHEDULE Bys Y
/ (/P+
App: M277
/ (/gg Preservice l@
80A4540 Rev. 4'Page 20 of 106 CAU9RATON COM COMPOENT COMPONENT PROCEDURE BLOCK CODE EXAM ZONE OENmCATON DESCMTON N
pf N CATEGCm WDOO NO.
REMARKS RHR WELDS -Train A Ret Dwg. No. 2-E3-CI-3 2-E3-01-5021-3-LU 10" Pipe Longitudinal Seam Upstream 80A4569 N/A C-F PT 2.5t 2-E3-01-5021-3 10" Pipe to 10" x 12" Reducer 80A4569 N/A C-F PT F
b 2-E3-01-5021-3-LD 10" x 12" Reducer Longitudinal Seam 80A4569 N/A C-F PT 2.5t Downstream O
e e
NES 239 &B2
P O
. Residual Heat Removal PROGRAM PLAN AND SCHEDULE Bys 9M
/ (/P&
App: WSP
/ Wey Preservice Inspection 80A4540 Rev. 4 Page 21 of 106 causRAToN Com m
Tops DESCFDPTON NUMBE Of a l
CA ORY THOO NO REMARKS RHR SUPPORTS -Train A Ret Dwg. No. 2-EJ-01-3 g
2-EJ-01-C014 Pipe Support 80A4571 N/A C-E VT-3 8 Lugs 80A4569 PT 2-EJ-01-R025 Pipe Support 80A4571 N/A C-E VT-3 VT-4 2-EJ-01-H016
. Pipe Support 80A4571 N/A C-E VT-3 8 Lugs 80A4569 N/A VT-4 PT 2-EJ-01-R030 Pipe Support 80A4571-N/A C-E VT-3 VT-4 NES 239 6/82
O PROGRAM PLAN AND CCHEDULE Br.
/
Residual Heat Removal App: #fF
/ 6/f V I'reservice Inspection 80A4540 Rev. 4'Page 22 of IO6 COwONDU CO WONENT NOCEDURE BLOCK CODE ZOM OENDRCADON DESCRFDON NUMBEA M awaccel CATEGORY MENCO NO REMARKS RHR WELDS-Train A Ref. Dwg. No. 2-E3-01-4 2-E3-01-5014-3-LU 10" Pipe Longitudinal Seam Upstream 80A4569 N/A C-F PT 2.5t 2-E3-01-5014-3 10" Pipe to 10" x 8" Red.
80A4569 N/A C-F PT
~
2-E3-01-S014-3-LD 10" x 8" Reducer Longitudinal Seam 80A4569 N/A 2-F PT 2.5t Downstream 2-E3-01-5014-K-LU 10" x 8" Reducer Longitudinal Seam 80A4569 N/A C-F PT 2.5t Upstream 2-E3-01-5014-K 10" x 3" Reducer to 8" Pipe 80A4569 N/A C-F PT (FW66) d 2-E3-01-5014-K-LD 8" Pipe Longitudinal Seam Downstream 80A4569 N/A C-F PT 2.5t 2-E3-01-5015-H 8" Pipe to 8" Flange 80A4569 N/A C-F PT (For Valve FCV 618) 2-E3-01-5016-D 8" Pipe to 8" Elbow 80A4569 N/A C-F PT d
2-E3-01-5016-D-LD 8" Elbow Longitudinal Seam Downstream 80A4569 N/A C-F PT 2.St NES 239 6/82
P n
Residual Heat Removal PROGRAM PLAN AND SCHEDULE By: M
/ 4/PV App: #M(7/
/ (/gy na /ce Inspection 80A4540 Rev. 4 'Page 23 of 106 TBE acaNe CA GMY ME REMARKS OE DE DON RHR SUPPORTS - Train A Ref. Dwg. No. 2-E3-01-4 2-E3-01-R020 Pipe Support 80A4571 N/A C-E VT-3 VT-4 8 Lugs 80A4569 N/A PT 2-E3-01-R021 Pipe Support 80A4571 N/A C-E VT-3 VT-4 2-E3-01-C015 Pipe Support 80A4571 N/A C-E VT-3 8 Lugs 80A4569 N/A PT 2-E3-01-R031 Pipe Support 80A4571 N/A C-E VT-3 VT-4
/
e a
NES 239 6/82
B8 PN
/ (/P*
. Residual Heat Removal PROGRAM PLAN AND SCHEDULE Y
App: - 7/XA
/Wgy l
P.a-vice Inspection 80A4540 Rev. 4'Page 24 of 106 O EEE D YES NUuoE tM CA ORY HOD NO REMARKS RHR WELDS -Train A Ref. Dwg. No. 2-EJ-01-5 2-E3-01-F027 12" Pipe to Outlet of RHR Heat 80A4569 N/A C-F PT (Exchanger A) 2-E3-01-F027-LD 12" Pipe Longitudinal Seam Downstream 80A4569 N/A C-F PT 2.5t 2-EJ-01-5022-D-LU 13" Pipe Longitudinal Seam Upstream 80A4569 N/A C-F PT 2.5t 2-E3-01-5022-D 10" Pipe to 10" Elbow 80A4569 N/A C-F PT b
2-E3-01-5022-D-LD 10" Elbow Longitudinal Seam Downstream 80A4569 N/A C-F PT 2.5t 2-E3-01-F028-LU 10" Pipe Longitudinal Seam Upstream 80A4569 N/A C-F PT 2.5t 2-E3-01-F028 10" Pipe to 10" Elbow 80A4569 N/A C-F PT d
2-E3-01-F028-LD 10" Elbow Longitudinal Seam Downstream 80A4569 N/A C-F PT 2.5t NES 239 6/82
P R
PROGRAM PLAN AND SCHEDULE BF
/
- Y Residual Heat Remov^1 App: 1974 P- /
(NA Preservice Inspection 80A4540 Rev. 4 P' age 25 of 106 CAUBRATON CODE O YDG NUMBTE DON DESCRFT N M
CA GORY l
NO REMARKS RHR TELDS - Train A Ref. Dwg. No. 2-E3-01-5 2-E3-01-5023-E-LU 10" Pipe Longitudinal Seam Upstream 30A4569 N/A C-F PT 2.5t 2-E3-01-5023-E 10" Pipe to 10" Elbow 80A4569 N/A C-F PT 2-E3-01-5023-E-LD 10" Elbow Longitudinal Seam Downstream 80A4569 N/A C-F PT 2.5t b
2-E3-01-S018-C-LU 10" Pipe Longitudinal Seam Upstream 80A4569 N/A C-F PT 2.5t 2-E'3-01-5018-C 10" Pipe to 10" x 8" Reducer 80A4569 N/A C-F PT 2-E3-01-5018-C-LD 10" x 8" Reducer Longitudinal Seam 80A4569 N/A C-F PT 2.5t A
Downstream 2-E3-01-5017-B-LU 10" Pipe Longitudinal Seam Upstream 80A4569 N/A C-F PT 2.5t 2-E3-01-5017-B 10" Pipe to 10" x 10" x 8" Tee 80A4569 N/A C-F PT NES 239 &B2
D G
Residual Heat Removal PROGRAM PLAN AND SCHEDULE 4
/ @+
App: '/MP
/ g/97 Preservice Inspection 80A4540 Rev. 4"Page 26 of 106 CAuem nON Com CCa#ONENT COMPC8ENT PROCEDtKE eLOCK CCCE EXAM ZONE 10DmFICAnON DESCSFDON NUMBER (If arre*N CATEGORY hETHCC NO EMARKS RHR WELDS - Train A Ret Dwg. No. 2-E3-01-3 d
2-E3-01-5017-B-LD 10" x 10" x 8" Tee Longitudinal 80A4569 N/A C-F PT 2.5t Seam Downstream 2-E3-01-5017-F-LU 10" Pipe Longitudinal Seam Upstream 80A4569 N/A C-F PT 2.5t 2-E3-01-5017-F 10" Pipe to 10" E16ow 30A4569 N/A C-F PT d
2-E3-01-5017-F-LD 10" Elbow Longitudinal Seam Downstream 80A4569 N/A C-F PT 2.5t 9
NES 239 6112
C R
PROGRAM PLAN AND CCHEDULE 3pp;
/,ff[f Cr R=Mut Heat Rh Preservice Inspection 80A4540 Rev. 4'Page 27 of 106 CAU8 RATION COM g
n OE NUMBE Of det CA GORY NO REMARG RHR SUPPORTS - Train A Ret Dwg. No. 2-E3-01-5 2-E3-01-R024 Pipe Support 80A4571 N/A C-E VT-3 VT-4 2-E3-01-R023 Pipe Support 80A4571 N/A C-E VT-3 VT-4 2-E3-01-R022 Pipe Support 80A4571 N/A C-E VT-3 VT-4 80A4569 N/A PT 8 Lugs 2-E3-01-H013 Pipe Support 80A4571 N/A C-E VT-3 VT-4 2-E3-01-A001 Pipe Support 80A4571 N/A C-E VT-3 2-E3-01-H017 Pipe Support 80A4571 N/A C-E VT-3 e
NES 239 682
Residual Heat Removal PROGRAM PLAN AND CCHEDULE By: Y
/ G/PW App: W///%
/ /if#/
~ fa'ge 28 of 106 Preservice Inspection 80A4540 Rev.
4 CAuBRADON CODE IDENTFICATION DE NUMBE Of CA GORY NO REMARKS 1
RHR WELDS - Train A Ref. Dwg. No. 2-E3-01-6 2-E3-01-F030-LU 10" Pipe Longitudinal Seam Upstream 80A4569 N/A C-F PT 2.5t 2-E3-01-F030 10" Pipe to Valve 8730A 80A4569 N/A C-F PT 2-E3-01-5027-B-LU 10" Pipe Longitudinal' Seam Upstream 80A4569 N/A C-F PT 2.5t 2-E3-01-5027-B 10" Pipe to 10" Elbow 80A4569 N/A C-F PT 2-E3-01-5027-B-LD 10" Elbow Longitudinal Seam Downstream 80A4569 N/A C-F.
PT 2.5t 2-E3-01-5028-D-LU 10" Pipe Longitudinal Seam Upstream 80A4569 N/A C-F PT 2.5t 2-E3-01-5028-D 10" Pipe to 10" Orifice Flange (FE-618) 80A4569 N/A C-F PT NES 239 &B2
~I P
Q Residual Heat Removal PROGRAM PLAN AND SCHEDULE By:
PM.
/ (/P4 App: W//7
/ (/d P' F._ wice Inspxtion 80A4540 Rev. 4'Page 29 of 106 CAUBRATON CODE CCMPONENT COMPONENT PRONDURE BLOCK CODE EXAM ZONE CENTIFICATION DESCRIPTION NUMBER Of apphcabiel CATEGORY BETHOO NO.
REMARKS RHR SUPPORT - Train A Ret Dwg. No. 2-E3-01-6 2-E3-01-C016 Pipe Support 80A4571 N/A C-E VT-3 8 Lugs 80A4569 N/A PT e
9 0
e e
a NES 239 6/82
U-P G.
Residual Heat Renmal PROGRAM PLAN AND SCHEDULE Bys
/ (/Pt App: '7#//
/ 6/s v Preservice Inspection 80A4540 Rev. 4 Page 30 of 106' CAUBRATON CODE g
g NUMBE Of bee)
CA GORY T
NO.
REMARKS RHR WELDS -Train A Ret Dwg. No. 2-EJ-01-7 2-EJ-01-5029-B-LU 10" Pipe Longitudinal Seam Upstream 80A4569 N/A C-F PT 2.5t 2-EJ-01-5029-B 10" Pipe to 10" Elbow 80A4569 N/A C-F PT 2-EJ-01-5029-B-LD 10" Elbow Longitudinal Seam Downstream 80A4569 N/A C-F
-PT 2.5t d
2-EJ-01-5030-B-LU 10" E8 bow Longitudinal Seam Upstream 80A4569 N/A C-F PT 2.5t 2-EJ-01-5030-B 10" Elbow to 10" Pipe 80A4569 N/A C-F PT 4
2-EJ-01-5030-B-LD 10" Pipe Longitudinal Seam Downstre,
80A4569 N/A C-F PT 2.5t h
2-EJ-01-5035-B-LU 10" Pipe Longitudinal Seam Upstream 80A4569 N/A C-F Pt 2.St 2-EJ-01-5035-B 10" Pipe to 10" Tee 80A4569 N/A C-F PT NES 239 6/82
O R
^
PROGRAM PLAN AND CCHEDULE Cy2 OM
/ 4/P+
Residual Heat Removal App: Tf//
16fft Preservice Lwtion 30A4340 Rev. 4'Page 31 of 106 CAUBRArcN CODE W NT COMPONENT PROCEDURE BLOCK CODE EXAM ZONE mp DE m NUMBER Of appbcatel CATEGORY METHOO NO.
REMARKS l
RHR WELDS - Train A Ret Dwg. No. 2-E3-01-7 b
2-E3-01-5035-B-LD 10" Tee Longitudinal Seam Downstream 30A4569 N/A C-F PT 2.5t 2-E3-01-F045 Valve HV8809A to.10" Pipe 80A4567 Block 22 C-F UT 80A4569 PT k
2-E3-01-F045-LD 10" Pipe-Longitudirial Seam 80A4567 Block 22 C-F UT 2.5t Downstream 80A4569 PT O
e NES 239 662
P O
Residual Heat Remov~1 PROGRAM PLAN AND SCHEDULE BY:
N
/
M4 App: 'MA$-
/ & AV Preservice Inspection 80A4540 Rev. 4 fage 32 of'106 NE Y DON
[F BE CA CRY ME NO REMARKS RHR SUPPORTS - Train A.
Ref. Dwg. No. 2-E3-01-7 2-E3-01-C007 Pipe Support 30A4571 N/A C-E VT-3 8 Lugs 80A4569 N/A PT 2-E3-01-R014 Pipe Support 80A4571 N/A C-E VT-3 2-E3-01-H009 Pipe Support 80A4571 N/A C-E VT-3 2-EJ-01-C008 Pipe Support 80A4571 N/A C-E VT-3 2-E3-01-C009 Pipe Support 80A4571 N/A C-E VT-3 2-E3-01-C010 Pipe Support 80A4571 N/A C-E VT-3 2-EJ-01-H010 Pipe Support 80A4571 N/A C-E VT-3 NES 239 6/82
P O
B8 b
/ (/9M Residual Heat Removal PROGRAM PLAN AND SCHEDULE Y
App: 7/1/7
/ (Mgv E* "#"
SOA4540 Rev. 4 i' age 33 of 106 CAUBRATON CODE COMPONENT PROCEDURE BLOCK CODE EKAM ZONE emp DESCRPTON NUMBER Of %
CATEGORY METHOD NO.
REMARKS l
RHR SUPPORTS - Train A Ref. Dwg. No. 2-EJ-01-7 2-E3-01-H014 Pipe Support 80A4571 N/A C-E VT-3 VT-4 2-E3-01-H015 Pipe Support 80A4571 N/A C-E VT-3 VT-4 2-E3-01-R028 Pipe Support
~
VT-4 80A4571 N/A C-E VT-3 2-EJ-01-R029 Pipe Support 80A4571 N/A C-E VT-3 VT-4 4
NES 239 WB2
Residual Heat Removal PROGRAM PLAN AND SCHEDULE By:
k E
/ //P+
App: WFr /(/N W O" 80A4540 Rev. 4 'Page 34 of 106 CALIBRATION CODE COMPONENT COMPONENT PPOCEDURE BLOCK CODE EXAM ZONE IDENTIFICATION DESCRIPTION NUMBER Of appicablet CATEGORY METHOD NO.
REMARKS RHR COMPONENT SUPPORTS -Train A Ret Dwg. No. 2-E3-01-7 2-E3-01-R032 Valve (HV 8809 A) Support 80A4571 N/A C-E VT-3 VT-4 D
e e
o e
e e
e o
e M
NES 239 6/82
,w g
Residual Heat Removal PROGRAM PLAN AND SCHEDULE By8 04f
/
(/PF App: W//7-
/ c7py" Pib vice Inspection 80A4540 Rev. 4 Page 35 of 106 CAUBRATION CODE p
e DE BE Of appbcable)
CA ORY k
No REMARKS RHR WELDS -Train A Ret Dwg. No. 2-EJ-01-8 2-E3-01-5036-D-10" Pipe-Longitudinal Seam 80A4569 Block 22 C-F PT 2.5 t LU Upstream 80A4567 UT 2-E3-01-5036-D 10" Pipe to 10" Elbow 80A4567 Block 22 C-F UT 80A4569 PT h
2-E3-01-5036-D-LD 10" Elbow Longitudinal Seam Downstream 80A4567 Block 22 C-F UT 2.St 80A4569 PT 2-E3-01-5036-F-10" Pipe-Longitudinal Seam 80A4569 Block 22 C-F PT 2.5 t tU Upstream 80A4567 UT 2-E3-01-5036-F 10" Pipe to 10" Elbow 80A4567 Block 22 C-F UT 80A4569 PT b
2-E3-01-5036-F-LD 10" Elbow Longitudinal Seam Downstream 80A4567 Block 22 C-F UT 2.5t 80A4569 PT 2-E3-04-F044 6" Pipe to 10" x 10" x 6" Tee 80A4567 Block 17 C-F UT 80A4569 PT 2-E3-04-5026-C 6" Pipe to 6" Elbow 80A4567 Block 17 C-F UT 80A4569 PT NES 239 &82
-D n
Residual Heat Removal PROGetAM PLAN AND SCHEDULE By: PM
/ 4/P4 App: W/JA
/ 67M Preservice Inspection 80A4540 Rev. 4 Page 36 of 106 COMPONENT COMPONENT PROCE p.
COOE ZONE IDENTFICATION DESCRIPTION NUMOEF.
62 applecablel CATEGORY bETHOO NO.
REMARKS RHR WELDS - Train A Ref. Dwg. No. 2-E3-01-8 3y 2-E3-04-5026-F 6" Elbow to 6" Pipe 80A4567 Block 17 C-F UT 80A4569 PT 80A4567 Block 17 C-F UT 2-E3-04-S027-D 6" Elbow to 6" Pipe
- 80A4569 PT O
O b
I
- /
8 1
NES 239 WB2
p.
O B:
/ MY Residual Heat Removal Y
PROGRAM PLAN AND SCHEDULE App: &/1/ 7 / 67ef Preservice Inspection 80A4540 Rev. 4 Page 37 of 106 oonF DON rESC NUMBE CA ORY NO REMARKS RHR SUPPORTS -Train A Ref. Dwg. No. 2-E3-01-8 2-E3-04-R004 Pipe Support 80A4571 N/A C-E VT-3 Stanchion 80A4569 PT 2-E3-04-F041 Flued Head to Containment 80A4569 N/A C-E PT Penetration (P-82),
2-E3-04-C016 Pipe Support 80A4571 N/A C-E VT-3 2-E3-04-A002 Pipe Support 80A4571 N/A C-E VT-3 Plate 80A4569 PT 2-E3-04-C013 Pipe Support 80A4571 N/A C-E VT-3 2-E3-04-H003 Pipe Support 80A4571 N/A C-E VT-3 2-E3-04-C014 Pipe Support 80A4571 N/A C-E VT-3 2-E3-04-H002 Pipe Support 80A4571 N/A C-E VT-3 NES 239 6/82
P Q
Residual Heat Removal PROGRAM PLAN AND SCHEDULE Bys N
/ 6/PY App: M
/ cff V Preservice Ins ection 80A4540 Rev. 5"Page 38 of 106 m EeEm o YeTEN NuueYc cAEony E
w REMARKS RHR WELDS - Train A Ref. Dwg. No. 2-E3-01-9 2-E3-01-5024-G-LU 10" Pipe Longitudinal Seam Upstream 80A4569 N/A C-F PT 2.5t 2-E3-01-5024-G 10" Pipe to 10" Elbow 80A4569 N/A C-F PT k
2-E3-01-5024-G-LD 10" Elbow Longitudinal Seam Downstream 80A4569 N/A C-F PT 2.5t
~
2-E3-01-5025-B-LU 10" Pipe Longitudinal Seam Upstream 80A4569 N/A C-F PT 2.5t 2-E3-01-5025-B 10" Pipe to 10" Elt$ow 80A4569 N/A C-F PT 2-E3-01-5025-B-LD 10" Elbow Longitudinal Seam Downstream 80A4569 N/A C-F PT 2.5t 2-E3-01-F034-LU 10" Elbow Longitudinal Seam Upstream 80A4569 N/A C-F PT 2.5t j
2-E3-01-F034 10" Elbow to 10" Pipe 80A4569 N/A C-F PT 2 E3-01-F034-LD 10" Pipe Longitudinal Seam Downstream 80A4569 N/A C-F PT 2.5t NES 239 6/82 l
l
l' p<
q Residual Heat Removal PROGRAM PLAN AND SCHEDULE Bys fM
/ 4/?*
App: 7/XP
/ (f#f Preservice Inspection 80A4540 Rev. 4'Page 39 of 106 CAUBRATION CODE E
TION DE NUMBER pf a CA ORY T
REMARKS RHR WELDS -Train A Ref. Dwg. No. 2-E3-01-10 2-E3-01-F007 Flued Head (P-79) to 12" Pipe 80A4569 N/A C-F PT 2-E3-01-F007-LD 12" Pipe Longitudin 1 Seam Downstream 80A4569 N/A C-F PT 2.5t g
2-E3-01-FW75-LU 12" Elbow Longitudinal Seam Upstream 80A4569 N/A C-F PT 2.5t 2-E3-01-FW75 12" Elbow to 12" Pipe 80A4569 N/A C-F PT 2-E3-01-FW75-LD 12" Pipe Longitudinal Seam Downstrehm 80A4569 N/A C-F PT 2.5t I
l i
NES 239 6/82
P Q
Residual Heat Removal PROGRAM PLAN AND SCHEDULE Bya f I
/ //P4 App: '/7// t'
/ GT4Y 4 ' age 40 of 106 F.w. vice Inspection 80A4540 Rev.
P CAUBRATON CODE E
TON DE Pn NUMBE Of a CA GORY T
NO REMARKS REIR SUPPORTS -Train A Ref. Dwg. No. 2-E3-Ol-10 2-E3-01-R004 Pipe Support 80A4571 N/A C-E VT-3 2-E3-01-C002 Pipe Support 80A4571 N/A C-E VT-3 8 Lugs 80A4569 N/A PT 2-E3-01-H003
. Pipe Support 80A4571 N/A C-E VT-3 2-E3-01-R033 Pipe Support 80A4571 N/A C-E VT-3 VT-4 8 Lugs 80A4569 N/A C-E PT 2-E3-01-R003 Pipe Support 80A4571 N/A C-E VT-3 VT-4 8 Lugs 80A4569 N/A PT l
l 2-E3-01-H013 Pipe Support 80A4571 N/A C-E VT-3 VT-4 2-E3-01-R017 Pipe Support 80A4571 N/A C-E VT-3 NES 239 W82
h.
O B:
OAO
/ 6/fY Residual Heat Removal PROGRAM PLAN AND SCHEDULE Y
App: W/#
/ t'A:w Preservice Inspection 80A4540 Rev. 4 'Page 41'of 106 CAUBRATION CODE m
p DE NUMBE (if W
CA ORY I ET NO.
REMARKS RHR WELDS -Train B Ref. Dwg. No. 2-E3-02-1 h
l 2-E3-02-5008-B-LU 14" Elbow Longitudinal Seam Upstream 80A4569 N/A C-F PT 2.St 2-E3-02-5008-B 14" Elbow to 14" Pipe 80A4569 N/A C-F PT 2-E3-02-5008-B-LD ~ 14" Pipe Longitudinal Seam Downstream 80A4569 N/A C-F PT 2.5t 2-E3-02-5008-G-LU 14" Pipe Longitudinal Seam Upstream 80A4569 N/A C-F PT 2.5t 2-E3-02-5008-G 14" Tee to 14" Pip 5 80A4569 N/A C-F PT d
(FW86) 2-E3-02-F054 14" Pipe to Valve 8958B 80A4569 N/A C-F PT 2.5t 2-E3-02-F054-LD 14" Pipe Longitudinal Seam Downstream 80A4569 N/A' C-F PT 2.5 t l
l h
2-E3-02-5009-D-LU 14" Pipe Longitudinal Seam Upstream 80A4569 N/A C-F PT 2.5t 2-E3-02-S009-D 14" Pipe to 14" Flange 80A4569 N/A C-F PT
{
NES1396r89
O Residual heat Removal PROGRAM PLAN AND SCHEDULE 3y*,
I[/[j B
p f
Fra,iceInspection 80A4540 Rev. 4'Page 42 of I'06 l
cALMADON CODE CN, gTS
" eER ME CAEGORYdE NUu NO RE m S RHR WELDS - Train B l
Ret Dwg. No. 2-E3-02-1 2-E3-02-5010-D-LU 14" Elbow Longitudinal Seam Upstream 80A4569 N/A C-F PT N.St l
2-E3-02-S010-D 14" Elbow to 14" Flange 80A4569 N/A C-F PT (At RHR Pump B) l l
l l
NES 239 482
C-O PROGRAM PLAN AND SCHEDULE By Y
/ //PN Residual Heat Removal App: ?/#P
/ ( 78 7 Preservice Inspection 80A4540 Rev. E fage 43 of 106 t
CAUBRATX)N CODE O W NT COMPONENT PROCEDURE BLOCK CODE EXAM ZONE E)ENTIFCATK)N DESCRIPTION NUMBER Of apphcable)
CATEGORY METHOD NO.
REMANS RHR SUPPORTS -Train B Ref. Dwg. No. 2-E3-02-1 2-E3-02-R011 Pipe Support 80A4571 N/A C-E VT-3 2-E3-02-C002 Pipe Support 80A4571 N/A C-E VT-3 8 Lugs 80A4569 N/A PT 2-E3-02-k6 C Pip'.: Support
~
80A4571 N/A C-E VT-3 VT-4 2-E3-02-H012 Pipe Support 80A4571 N/A C-E VT-3
' VT-4 2-E3-02-R018 Pipe Support 80A4571 N/A C-E VT-3 2-E3-02-H019 Pipe Support 80A4571 N/A C-E VT-3 NES 239 8/82
r-O B3
/
N#
Residual Heat Remoc!
PROGRAM PLAN AND SCHEDULE Y
App: */M / CMG Preservice Inspection 80A4540 Rev. 4 Page 44 of 106 CAUBRATON CODE K)E DON DE NUMBE Of a CA ORY NO REMARKS RHR WELDS - Train B Ref. Dwg. No. 2-E3-02-2 2-E3-02-50ll-A 8" Flange to 8" Pipe 80A4569 N/A C-F PT (FW-107) b 2-E3-02-50l l-A-LD 8" Pipe Longitudinal Seam Downstream 80A4569 N/A C-F PT 2.5t
~
2-E3-02-F014-LU 10" Pipe Longitudinal Seam Upstream 80A4569 N/A C-F PT 2.5t 3
2-E3-02-F014 10" Pipe to Valve 8724B 80A4569 N/A C-F PT 2-E3-02-F016-LU 10" Elbow Longitudinal Seam Upstream 80A4569 N/A C-F PT 2.St b 2-E3-02-F016 10" Elbow to 10" Pipe 80A4569 N/A C-F PT 2-E3-02-F016-LD 10" Pipe Longitudinal Seam Downstream 80A4569 N/A C-F PT 2.5t 2-E3-02-5013-E-LU 10" Pipe Longitudinal Seam Ups ream 80A4569 N/A C-F PT 2.5t NES 239 W82
'7 Residual Heat Removal PROGRAM PLAN AND SCHEDULE By:
M
/ 4/P&
App: OfE P l(/fy Preservice Inspection 80A4540 Rev. 4"Page 45 of 106 CAUBRATION CODE COMPONEN-COMPONENT PROCEDURE BLOCK CODE EXAM ZONE K)ENTFICATION DESCRtPTION NUMBER pf accmcable)
CATEGORY bETHOO No.
REMARKS RHR WELDS - Train B Ret Dwg. No. 2-E3-02-2 2-E3-02-S013-E 10" Pipe to 10" Elbow 80A4569 N/A C-F PT (FW94) b 2-E3-02-5013-E-LD 10" Elbow Longitudinal Seam Downstream 80A4569 N/A C-F PT 2.5t D
e e
i O
NES 239 6/82 i
l i
P G
B2
/ 4/P4 Residual Heat Removal PROGRAM PLAN AND CCHEDULE Y
App: T)?/P
/ Gyey Frw/a Inspection 80A4540 Rev. 4 fage 46 of 106 CADORATKW CODE u
TXD4 DE NUM0c Of acabiel CA ORY T
NO REMARKS RHR SUPPORTS -Train B Ref. Dwg. No. 2-E3-02-2 2-E3-02-H016 Pipe Support 80A.4571 N/A C-E VT-3 2-E3-02-R019 Pipe Support 80A4571 N/A C-E VT-3 80A4571 N/A C-E VT-3 2-E3-02-R031 Pipe Support e
4 NES 239 6/82
B3 3k -
/W Residual Heat Removal PROGRAM PLAN AND SCHEDULE Y
App: Afe r / tzu Preservice Inspection 30A4540 Rev. 4'Page 47 of'106
~
NUMBTE CA GORY ME NO REMMES OE don DE RHR WELDS - Train B Ref. Dwg. No. 2-E3-02-3 2-E3-02-5016-A 10" Orifice Flange to 10" Pipe 80A4569 N/A-C-F PT 2-E3-02-5016-A-LD 10" Pipe Longitudinal Seam Downstream 80A4569 N/A C-F PT 2.5t
~
A
~
2-E3-02-5016-F-LU 10" Elbow Longitudinal Seam Upstream 80A4569 N/A C-F PT 2.5t 2-E3-02-5015-F 10" Elbow to 10" Pipe 80A4569 N/A C-F PT (FW90)
,2-E3-02-5016-F-LD 10" Pipe Longitudinal Seam Downstream 80A4569 N/A C-F PT 2.5t d
2-E3-02-F021 10" Tee to 10" Pipe 80A4569 N/A C-F PT 2-E3-02-F021-LD 10' Pipe Longitudinal Seam Downstream 80A4569 N/A C-F PT 2.5t d
2-E3-02-5019-D-LU 10" Elbow Longitudinal Seam Upstream 80A4569 N/A C-F PT 2.5t NES 239 982
D O
I Cesih Heat Rernovat PROGRAM PLAN AND SCHEDULE
((
7 f
Preservice Inspection 80A4540 Re e, 4 "P' age 48 of 106 CAUBRATON CODE COMPONENT COMPONENT PROCEDURE BL'OCK CODE EXAM ZONE WENTSICATON DESCRIPTION NUMBER Cf apphcatWel CATEGORY ETHOD NO.
REMARKS l
RHR YF.LDS - Train B Ref. Dwg. No. ?-E3-02-3 c.
'i 2-E3-02-5019-D 10" Elbow to 10" Pipe 80A4569 N/A C-F PT 2-E3-02-5019-D-LD 10" Pipe LongituJinal Seam Downstream 80A456?
N/A C-F PT 2.5t A
,2-E3-02-5019-H-LU,10" Elbow Longitudinal Seam Upstream 80A4569 N/A C-F PT 2.5t 2-E3-02-5019-H 10" Elbow to 10" Pipe 80A4569 N/A C-F PT 2 E3-02-S019-H-LD 10" Pipe Longidutinal Seam Downstream 80A4569 N/A C-F PT 2.5t 2-E3-02-F022 12" Pipe to RHR Heat Exchanger B Inlet 80A4569 N/A C-F PT 2-E3-02-F022-LU 12" Pipe Longitudinal Seam Upstream 80A4569 N/A C-F PT 2.5t NES 239 6/82
C O
C:
/ (/9Y Cesidual Heat Removal PROGRAM PLAN AND SCHEDULE Y
App: '/7J77 / 6/d P hh W 80A4540 Rev. 4 'Page 49 of 106 E
c EeE NUMBY CAEmy n[E E
RE N S oons RHR SUPPORTS -Train B Ret Dwg. No. 2-EJ-02-3 2-E3-02-C022 Pipe Support 30A4571 N/A C-E VT-3 8 Lugs 80A4569 N/A PT 2-E3-02-R029 Pipe Support 80A4571 N/A C-E VT-3 VT4 2-E3-02-H022 Pipe Support
~
80A4571 N/A C-E VT-3 VT-4 2-E3-02-R027 Pipe Support 80A4571 N/A C-E VT-3 2-E3-02-R033 Pipe Support 80A4571 N/A C-E VT-3
/
NES 239 6/82
Residual Heat Removal PROGRAM PLAN AND SCHEDULE BF
/ #M App: 9XP
/ #/h Preservice Inspection 80A4540 Rev. 5"Page 50 of {06 TMBE CA GORY ME NO.
REMANS OE DON DE RHR WELDS - Train B Ref. Dwg. No. 2-E3-02-4 2-E3-02-5016-M-LU 10" x 8" Reducer Longitudinal Seam 80A4569 N/A C-F PT 2.5t Upstream 2-E3-02-5016-M 10"x 8" Reducer to 8" Pipe 80A4569 N/A C-F PT 2-E3-02-5016-M-LD. 8" Pipe Longitudinhl Seam Downstream 80A4569 N/A C-F PT 2.5 t h
2-E3-02-5017-C-LU 8" Elbow Longitudinal Seam Upstream 80A4569 N/A C-F PT 2.5t 2-E3-02-5017-C 8" Elbow to 8" Pipe 80A4569 N/A C-F PT 2-E3-02-5017-C-LD 8" Pipe Longitudinal Seam Downstream 80A4569 N/A C-F PT 2.5t 2-E3-02-5017-G-LU 8" Pipe Longitudinal Seam Upstream 80A4569 N/A C-F PT 2.5t 2-E3-02-5017-G 8" Pipe to 8" Flarge (Valve FCV-619) 80A4569 N/A C-F PT NES 239 6/82
O O
B
/ UN Recidual Heat Removal PROGRAM PLAN AND SCHEDULE Y
App: #1/7
/ (/g V Preservice Inspection 80A4540 Rev. 4'Page 51 of 106 O EEb D YES NUMBYE CAEGORY ME t O NO REMATES RHR SUPPORTS. Train B Ret Dwg. No. 2-E3-02-4 2-E3-02-R020 Pipe Support 80A4571 N/A C-E VT-3 VT-4 8 Lugs 80A4569 N/A PT 2-E3-02-R021 Pipe Support 80A4571 N/A C-E VT-3 VT-4 2-E3-02-C018 Pipe Support 80A4571 N/A C-E VT-3 8 Lugs 80A4569 N/A PT e
e NES 239 6/82
A G
Residual Heat Removal PROGRAM PLAN AND SCHEDULE By: OE
/(h App: 10/ h
/&MW Preservice Inspection 80A4540 Rev. 4'Page 52 of'106 COMPONENT COMPONENT PROCEDURE BLOC CODE ZONE OENTIFICATION DESCRPTION NUMBER (if apphcabiel CATEGORY METHOD NO.
REMARKS RHR WELDS -Train B Ref. Dwg. No. 2-E3-02-5 2-E3-02-F023 RHR Heat Exchanger B Outlet 80A4569 N/A C-F PT to 12" Pipe 2-E3-02-F023-LD 12" Pipe Longitudinal Seam Downstream 80A4569 N/A C-F PT 2.5t k
2-E3-02-5020-G-LU 10" Elbow Longitudinal Seam Upstream 80A4569 N/A C-F PT 2.5t 2-E3-02-5020-G 10" Elbow to 10" Pipe 80A4569 N/A C-F PT 2-E3-02-5020-G-LD 10" Pipe Longitudinal Seam Downstream 80A4569 N/A C-F,
PT 2.5t 2-E3-02-50K-K-LU 10" Pipe Longitudinal Seam Upstream 80A4569 N/A C-F PT 2.5t 2-E3-02-5020-K 10" Pipe to 10" x 10" x 8" Tee 80A4569 N/A C-F PT 2-E3-02-5020-K-LD 10" x 10" x 8" Tee Longitudinal Seam 80A4569 N/A C-F PT 2.5t d
Downstream NES 239 6/82
P n
B3
/ N Residual Heat Removal PROGRAM PLAN AND SCHEDULE Y
App: W/S/
/ 47# V Preservice Inspection 80A4540 Rev. 4 bage 53 of 106 mmRCAE D YES NUMBE CA GORY ME No REMMES RHR WELDS - Train B Ref. Dwg. No. 2-E3-02-5 2-E3-02-F025 10" x 10" x 8" Tee to 8" Pipe 80A4569 N/A C-F PT b
2-E3-02-5021-F-LU 10" Elbow Longitudinal Seam Upstream 80A4569 N/A C-F PT 2.5t 2-E3-02-5021-F 10" Elbow to 10" Pipe SOA4569 N/A C-F PT 2-E3-02-5021-F-LD 10" Pipe Longitudinal Seam Downstream 80A4569 N/A C-F PT 2.5t 2-E3-02-5021-3-LU 10" Pipe Longitudinal Seam Upstream 80A4569 N/A C-F PT 2.5t 2-E3-02-5021-3 10" Pipe to 10" Elbow 80A4569 N/A C-F PT 2-E3-02-5021-3-LD 10" Nibow Longitudinal Seam Downstream 80A4569 N/A C-F PT 2.5t 2-E3-02-5021-K-LU 10" Elbow Longitudinal Seam Upstream 80A4569 N/A C-F PT 2.5t NES 239 6/82
O G
C3 - ON
/ (/P+
Residual Heat Removal PROGRAM PLAN AND CCHEDULE Y
~
App: 4/M / 476 V Preservice Won 80A4540 Rev. 4 f> age 54 of 106 COMPONENT COMPONENT PROCEDURE BLOCK COCE ZONE OENTFICATION CESCRIPTION NUMBER pf apphcatWel CATEGORY R4ETHOO NO
. REMARKS RHR WELDS -Train B Ret Dwg. No. 2-E3-02-5 s
2-E3-02-5021-K IC" Elbow to 10" Pipe 80A4569 N/A C-F '
PT (FW108) 2-E3-02-5021-K-LD IG" Pipe Longitudinal Seam Downstream 80A4569 N/A C-F PT 2.St 2-E3-02-SO22-B-LU IC" Pipe Longitudinal Seam Upstream 80A4569 N/A C-F PT 2.5t 2-E3-02-5022-B IC" Pipe to 10" x 10" x 8" Tee 80A4569 N/A C-F PT b
2-E3-02-S022-B-LD IC" x 10" x 8" Tee Longitudinal Seam 80A4569 N/A C-F PT 2.5t Dawnstream NES 239 &82
Residual Heat Removal PROGRAM PLAN AND SCHEDULE W:
!pN / OP4 App: 97M/
/ g/g V IMPection 80A4540 Rev. 4 Yage 55 of 106 CAU8RATON CODE p
TOP 4 DE NUMBE Of a CA GORY NO REuAAKS RHR SUPPORTS -Train B Ret Dwg. No. 2-E3-02-5 2-E3-02-R022 Pipe Support 80A4571 N/A C-E VT-3 2-E3-02-R023 Pipe Support 80A4571 N/A C-E VT-3 VT4 2-E3-02-H017 Pipe Support 80A4571 N/A C-E VT-3 VT-4
'4 Lugs 80A4569 N/A PT 2-E3-02-R025 Pipe Support 80A4571 N/A C-E VT-3 VT-4 2-E3-02-C004 Pipe Support 80A4571 N/A C-E VT-3 VT-4 4 Lugs 80A4569 N/A PT 2-E3-02-R02%
Pipe Support 80A4571 N/A C-E VT-3 VT-4 NES 239 &82
"** " "***"** "I PROGRAM PLAN AND SCHEDULE 3$'
h #[h j
h'iceIns ection 80A4540 Rev. 5 Page 56 of 106 COMPONENT COWONENT PROCEDURE CODE E AM ZOrd 10ENTFICADON DESCRIPTION MJMBER pf *=heaa CATEGORY ETHOO NO.
REMARKS R14R WELDS - Train B Ref. Dwg. No. 2-E3-02-6 2-E3-02-F027 Valve 8730B to 10" Pipe 80A4569 N/A C-F PT 2-E3-02-F027-LD 10" Pipe Longitudinal Seam Downstream 80A4569 N/A C-F
~
2-E3-02-5023-D 10" Tee to 10" Pipe-80A4569 N/A.
C-F PT 2-E3-02-5023-D-LD 10" Pipe Longitudinal Seam Downstream 80A4569 N/
C-F PT 2.5t 2-E3-02-S026-E-LU 10" Pipe Longitudinal Seam Ups: ream 80A4569 N/A C-F PT 2.5t 2-E3-02-5026-E 10" Pipe to 10" Elbow 80A4569 N/A C-F PT 2-E3-02-5026-E-LD 10" Elbow Longitudinal Seam Downstream 80A4569 N/A C-F PT 2.5t 2-E3-02-S026-G-LU 10" Pipe Longitudinal Seam Ups ream 80A4569 N/A C-F PT 2.5t 2-E3-02-5026-G 10" Pipe to 10" Orifice F4nge (FE-619) 80A4569 N/A C-F PT NES 239 642
O C:
/ U#*
Real Heat Renmal PROGRAM PLAN AND SCHEDULE Y
App: Mf7 / 678y Fr -~.TG W 80A4540 Rev. 4 Page 57 of 106 CAuBRATE)N CODE COMPONENT COMPONENT PROCEDURE BLOCK CODE EXAM ZONE E)ENTIFK;ATX)N DESCFDPTK)N NUMBER Of apphcab6el CATEGORY METHOD NO REMARKS RHR SUPPORTS -Train B Ret Dwg. No. 2-E3-02-6 2-E3-02-C020 Pipe Support 80A4571 N/A C-E VT-3 8 Lugs 80A4569 N/A PT O
+
e e
4 e
e e
e NES 239 &82
D n
B:
/
f/94 Residual Heat Renwal PROGRAM PLAN AND @CHEDULE Y
App: 7/#f-
/ IIrv Preservice Inspection 80A4540 Rev. 4'Page 58 of 106 CAUBRATE)N CODE N
COMPCNENT PROCEDURE BLOCK CODE EXAM ZONE NTX)N DESCRPTK)N NUMBER Of appbcablel CATEGORY METHOO NO.
REMARKS RHR WELDS -Train B Ret Dwg. No. 2-E3-02-7 2-E3-02-5027-C-LU 10" Pipe Longitudinal Seam Upstream 80A4569 N/A C-F PT 2.St
~
2-E3-02-S027-C 10" Pipe to 10" Elbow 80A4569 N/A C-F PT h
2-E3-02-5027-C-LD 10" Elbow Longitudinal Seam Downstream 80A4569 N/A C-F PT 2.St 2-EJ-02-5027-F-LU 10" Pipe Longitudinal Seam Upstream 80A4569 N/A C-F PT 2.5t 2-E3-02-5027-F 10" Pipe to 10" Elbow 80A4569 N/A C-F PT 2-E3-02-5027-F-LD 10" Elbow Longitudinal Seam Downstream 80A4569 N/A C.F PT 2.5t i
/A 2-E3-02-F038-LU 10" Elbow Longitudinal Seam Upstream 80A4569 N/A C-F PT 2.5t 2-E3-02-F038 10" Elbow to 10" Pipe 80A4569 N/A C-F PT NES 239 &B2 i
D'
'3 Residual Heat Renmal PROGRAM PLAN AND SCHEDULE By:
? Y
/ s/PY App: 'MX
/ 67dBy Ei"-in IMPection 80A4540 Rev. 4 'Page 59 of 106 CAUBRATON CODE CENTFICATION DESCHPTION PROCEDURE BLOCK CODE EXAW ZONE COMPONENT COMPONENT NUMBER pfapphcatWel CATEGORY METHOO NO.
REMARKS RHR WELDS -Train B Ref. Dwg. No. 2-E3-02-7 2-E3-02-F038-LD 10" Pipe Longitudinal Seam Downstream 80A4569 N/A C-F PT 2.5 t b
2-E3-02-5034-D-LU 10" Elbow Longitudinal Seam Upstream 80A4569 N/A C-F PT 2.5t
~
~
2-E3-02-5034-D 10" Elbow to 10" Pipe.
80A4569 N/A C-F PT 2-E3-02-5034-D-LD 10" Pipe Longitudinal Seam Downstream 80A4569 N/A C-F PT 2.5t 2-E3-02-F040 Valve HV8809B to 10" Pipe 80A4567 Block 22 C-F UT 30A4569 PT 2-E3-02-F040-LD 10" Pipe Longitudinal Senm Dnwnnream 80A4567 Block 22 C-F UT 80A4569 PT 2.5t 9
6 NES 239 682
P G
l Cesidual Heat Removal PROGRAM PLAN AND CCHEDULE By: M
/ 4/PN l
App: '/7//7
/ 6/d v l
Preservice Inspection 80A4540 Rev. 4'Page 60 of 106 i
CAuBRATKW CODE I
N COMPONENT PROCEDURE BLOCK CODE EXAM 2ONE MNTFK;ATKPs CESCRIPTKW NUMBER (if apphcatM CATEGORY METHOD NO REMARKS RHR' SUPPORTS - Train B Ret Dwg. No. 2-E3-02-7 g
2-E3-02-R030 Pipe Support 80A4571 N/A C-E '
VT-3 2-E3-02-C008 Pipe Support 80A4571 N/A C-E VT-3 8 Lugs 80A4569 N/A PT 2-E3-02-H003 Pipe Support 80A4571 N/A C-E VT-3 2-EJ-02-C009 Pipe Support 80A4571 N/A C-E VT-3 8 Lugs 80A4569 N/A PT 2-E3-02-H004 Pipe Support 80A4571 N/A C-E VT-3 2-EG-02-R026 Pipe Support 80A4571 N/A-C-E VT-3 2-E3-02-H005 Pipe Support 80A4571 N/A C-E VT-3 NES 239 6/82
O q
C
/ U#"
Y Residua 1 Heat Renmal PROGRAM PLAN AND SCHEDULE App: 7#I/P / di/" s y Fiwvh ' Wh 30A4540 Rev. 4 P' age 61 of 106 CAlt9 RATION CODE IDE TION DE Of CA GORY T
NO REMARKS RHR SUPPORTS -Train B Ret Dw3. No. 2-E3-02-7 2-E3-02-R032 Pipe Support 80A4571 N/A C-E VT-3 VT4 8 Lugs 80A4569 N/A PT 2-E3-02-R035 Pipe Support 80A4571 N/A C-E VT-3 h
VT4 80A4569 N/A PT 8 Lugs 2-E3-02-R036 Pipe Support 80A4571 N/A C-E VT-3 VT4 2-E3-02-H021 Pipe Support 80A4571 N/A C-E VT-3 VT4 2-E3-02-R034 Pipe Support 80A4571 N/A C-E VT-3 VT4 2-E3-02-H023 Pipe Support 80A4571 N/A C-E VT-3 VT4 e
NES 239 IV82
q Residual Heat Removal PROGRAM PLAN AND SCHEDULE By: N
/ (/ft App: Wp
/(;/gF Preservice Inspection 80A4540 Rev. 4 fage 62 of 106 causnaron ecoE OENTinCATION DE NUMsE Of tM CA GORY No REMARKS RHR WELDS - Train B Ref. Dwg. No. 2-EJ-02-8 2-E3-02-5035-D-LU 10" Pipe Longitudinal Seam Upstream 80A4567 Block 22 C-F UT 2.5t 80A4569 PT 2-EJ-02-5035-D 10" Pipe to 10" Elbow 80A4567 Block 22 C-F UT 80A4569 PT
~
2-E3-02-5035-D-LD 10" Elbow Longitudinal Seam Downstream 80A4560 Block 21 C-F UT 2.5 t 80A4569 PT 2-E3-02-F041-LU 10" Elbow Longitudinal Seam Upstream 80A4560 Block 21 C-F UT 2.5 t 80A4569 PT 2-E3-02-F041 10" Elbow to Flued Head (P-27) 80A4567 Block 22 C-F UT 80A4569 PT 2-E3-04-5001-B-LU 10" Elbow Longitudinal Seam 80A4560 Block 21 C-F UT 2.5 t Upstream 80A4569 PT 2-E3-04-5001-B 10" Elbow to 10" Pipe 80A4567 Block 22 C-F UT 20A4569 PT NES 239 6412
B3
/ b Residual Heat R2moval PROGRAM PLAN AND SCHEDULE Y
App: --/fl#7
/g/PY Preservice Inspection 80A4540 Rev. -5 Page 63 of 106 ocsNcRE EY cAEconr d E
ioc tu REMARKS RHR WELDS - Train B Ref. Dwg. No. 2-E3-02-8 2-E3-04-5001-B-LD 10" Pipe Longitudinal Seam Downstream 80A4567 Block 22 C-F UT 2.5t 80A4569 PT 2-E3-04-5001-3 10" x 10" x 6" Tee to 6" Pipe 80A4567 Block 17 C-F UT 80A4569 PT 2-E3-04-5001-L 6" Elbow to 6" Pipe, -
80A4567 Block 17 C-F UT 80A4569 PT 2-E3-04-S002-D-10" Elbow Longitudinal Seam 80A4560 Block 21 C-F UT 2.5 t LU Upstream 80A4569 PT
.j 2-E3-04-5002-D 10" Elbow to 10" Pipe 80A4567 Block 22 C-F UT 80A4569 PT j
b 2-E3-04-5002-D-LD 10" Pipe Longitudinal Seam Downstream 80A4567 Block 22 C-F UT 2.5 t 80A4569 PT 2-E3-04-5002-E-LU 10" Pipe Longitudinal Seam Upstream 80A4567 Block 22 C-F UT 2.5 t 80A4569 PT 2-E3-04-S002-E 10" Pipe to 10" x 6" Reducer 80A4567 Block 22 C-F UT 80A4569 pr NES 239 6/82
p O
PROGRAM PLdN AND SCHEDULE
- ffh B*
Y 3pp. 3 f
Preservice Inspection 80A4540 Rev. 4'Page 64 of 106 CAUBRADON COCE u
m DE M ON pf appl 6 cable)
CA ORY THOO NO REM W RHR WELDS - Train B Ref. Dwg. No. 2-E3-02-8
.2-E3-04-5002-E-10" x 6" Reducer Longitudinal Seam 80A4560 Blocks 21 C-F UT 2.5 t LD Downstream 80A4569 PT 2-E3-04-5003-E 6" Pipe to 6" Elbow 80A4567 Block 17 C-F UT 80A4569 PT 2-E3 44-S004-C 6" Pipe to 6" Elbow - '
80A4567 Block 17 C-F UT 80A4569 PT 2-E3-04-5004-G 6" Pipe to 6" Elbow 30A4567 Block 17 C-F UT 80A4569 PT 1
4 NES 239 6/82
D G
Residual Heat Removal PROGRAM PLAN AND SCHEDULE BF
/
N App: 7M
/ ( /A F Preservice Won 80A4540 Rev. 4I) age 65 of 106 CE DE NUMBE W
CA Omf ME REMARKS RHR SUPPORTS -Train B Ref. Dwg. No. 2-E3-02-3 2-E3-04-R003 Pipe Support 80A4571 N/A C-E VT-3 j
2-E3-04-0004 Pipe Support 80A4571 N/A C-E VT-3 2-E3-04-H001 Pipe Support 80A4571 N/A C-E VT-3 2-EJ-04-R002 Pipe Support 80A4571 N/A C-E VT-3 VT-4 d
2-EJ-04-F001 Flued Head to Containment 80A4569 N/A C-E PT Penetration (P-27) 2-E3-04-R010 Pipe Support 80A4571 N/A C-E VT-3 2-E3-04-C015 Pipe Support 80A4571 N/A C-E VT-3 2-E3-04-R0ll Pipe Support 80A4571 N/A C-E VT-3 NES 239 6/82
1 B2 bA'
/ 4/PV Residual Heat Renmal PROGRAM PLAN AND SCHEDULE Y
App: //A 7
/c/u Pres twice inspection 80A4540 Rev. 4"Page 66 of '106
~
CALIBRATION CODE COMPONENT COMPONENT PROCEDURE BLOCK CODE EXAM ZONE IDENTIFICATION DESCRIPTION NUMBER (If applicable)
CATEGORY LETHOO NO.
REMARKr RHR SUPPORTS -Train B Ref. Dwg. No. 2-E3-02-8 2-E3-04-H004 Pipe Support 80A4571 N/A C-E VT-3 2-E3-04-H005 Pipe Support 80A4571 N/A C-E VT-3 2-E3-04-A003 Pipe Support 80A4571 N/A C-E VT-3
' Plate 80A4569 N/A PT 4
e NES 239 6/82
i P
7 O
W
/ - s /89 Residual Heat R:mov 1 PROERAM PLAN AND SCHEDULE B2 Y
App: 7/f#-
/ C/sr l
Preservice Inspection 80A4540 Rev. 4 'Page 67 of 106*
f COMPONENT COMPONENT PROCEDURE CODE ZONE IDENTIFICATION DESCRIPTION NUMBER Uf apphcable)
CATEGORY METHOO NO.
REMAPKS RHR WELDS - Train B Ref. Dwg. No. 2-E3-02-9 2-E3-02-5023-F-LU 10" Elbow Longitudinal Seam Upstream 80A4569 N/A C-F PT 2.5 t b
2-E3-02-S023-F 10" Elbow to 10" Pipe 80A4569 N/A C-F PT 2-E3-02-S023-F-LD 10" Pipe Longitudin51 Seam Downstream 80A4569 N/A C-F PT 2.St 2-E3-02-F029 Valve HV8716B to 10" Pipe 80A4569 N/A C-F PT 2-E3-02-F029-LD 10" Pipe Longitudinal Seam Downstream 80A4569 N/A C-F PT 2.St 2-E3-02-F030-LU 10" Pipe Longitudinal Seam Upstream 80A4569 N/A C-F PT 2.5t 2-E3-02-F030 10" Pipe to 10" Elbow 80A4569 N/A C-F PT b
2-E3-02-F030-LD 10" Elbow Longitudinal Seam Downstream 80A4569 N/A C-F PT 2.5 t 2-E3-02-F042 10" Tee to 10" Pipe 80A4569 N/A C-F PT NES 239 6/82
O
." **I" "** * * ** **I PROGRAM PLAN AND SCHEDULE 3y,
fg((
B I
Preservice Inspection 80A4540 Rev. 4'Page 68 of 106 COMPONENT COMPONENT PROCEDURE CODE ZONE IDENTIFICATION DESCRIPTION NUMBER (If apphcabel CATEGORY METHOO NO.
REMARKS RHR WELDS - Train B Ref. Dwg. No. 2-EJ-02-9
~
2-E3-02-F042-LD 10" Pipe Longitudinal Seam Downstream 80A4569 N/A C-F PT 2.St b
2-E3-02-5036-D-LU 10" Elbow Longitudinal Seam Upstream 80A4569 N/A C-F PT 2.5 t 2-E3-02-5036-D 10" Elbow to 10" Pipe,
80A4569 N/A C-F PT 2-E3-02-5036-D-LD 10" Pipe Longitudinal Seam Downstream 80A4569 N/A C-F PT 2.5t 2-E3-02-S037-A' 10" Fiange to 10" Pipe 80A4569 N/A C-F PT 2-E3-02-S037-A-LD 10" Pipe Longitudinal Seam Downstream 80A4569 N/A C-F PT 2.St b
2-E3-02-5037-D-LU 10" Elbow Longitudinal Seam Upstream 80A4569 N/A C-F PT 2.5 t 2-E3-02-S037-D 10" Elbow to 10" Pipe 80A4569 N/A C-F PT NES 239 8/A2
O O
B k
/,C/M PROGRAM PLAN AND SCHEDULE 3
Preservice Inspection 80A4540 Rev. 4 Page 69 of 106 CAUBRATION CODE IDE T10N DESCR BE Of appi ble)
CA ORY NO REMARKS RHR WELDS -Train B Ref. Dwg. No. 2-E3-02-9 k
2-E3-02-5037-D-LD 10" Pipe Longitudinal Seam Downstream 80A4569 N/A C-F PT 2.St 2-E3-02-F043-LU 10" Elbow Longitudinal Seam Upstream 80A4569 N/A C-F PT 2.5 t b
2-E3-02-F043 10" Elbow to 10" Pipe, 80A4569 N/A C-F PT k
2-E3-02-F043-LD 10" Pipe Longitudinal Seam Downstream 80A4569 N/A C-F PT 2.5 t l
NES 239 6/82
O Residual Heat Removal PROGRAM PLAN AND SCHEDULE Bys fM
/ (/Pt App: 7//f?
/ f/sv Preservice Inspection 80A4540 Rev. 4"Page 70 of 106 CALIBRATION CODE g
n DESCR ON BE lif a icable)
CA ORY T
REMARKS RHR SUPPORTS - Train B Ref. Dwg. No. 2-EJ-02-9 2-EJ-02-H018 Pipe Support 80A4571 N/A C-E VT-3 VT-4 4 Lugs 80A4569 N/A PT 2-EJ-02-A001 Pipe Support 80A4571 N/A C-E VT-3 2-EJ-02-R006 Pipe Support 80A4571 N/A C-E VT-3 2-EJ-02-C019 Pipe Support 80A4571 N/A C-E VT-3 Stanchlon 80A4569 N/A PT 2-E3-02-R007 Pipe Support 80A4571 N/A C-E VT-3 2-EJ-02-C012 Pipe Support 80A4571 N/A C-E VT-3 8 Lugs 80A4569 N/A PT 3
L NES 239 6/82
Residual Heat Remal PROGRAM PLAN AND SCHEDULE Bys e [AE
/ UPV I
f.pp: 97Ff
/ CJ8 V b
Preservice Inspection 80A4540 Rev. 4'Page 11 of 106 e
CAUBRATION CODE COMPONENT COMPONENT PROCEDURE BLOCK CODE EXAM ZONE IDENTIFICATION DESCRIPTION NUMBER (If applicable)
CATEGORY METHOD NO.
REMARKS RHR COMPONENT SUPPORTS - Train B Ref. Dwg. No. 2-E3-02-9 2-E3-02-R039 Valve (HV 8716B) Support 80A4571 N/A C-E VT-3 VT-4 e
O O
ea O
e 4
1
- I i
i
.i
.i NES 239 6/82 E
b p,
O Pf
/ 4/P4 Residual Heat Remov21 A
B PROGRAM PLAN AND SCHEDULE 3p]p -jgg fgy Preservice Inspection 80A4540 Rev. 4"Page 72 of'106 CALIBRATION CODE COMPONENT COMPONENT PROCEDURE BLOCK CODE EXAM ZONE IDENTIFICATION DESCRIPTION NUMBER Of apphcable)
CATEGORY METHOO NO.
REMARKS RHR WELDS - Train B Ref. Dwg. No. 2-E3-02-10 2-E3-02-F049-LU 10" Pipe 1.ongitudinal Seam Upstream 80A4569 N/A C-F PT 2.5t 2-E3-02-F049 10" Pipe to 10" Elbow 80A4569 N/A C-F PT b
2-E3-02-F049-LD 10" Elbow Longitudinal Seam Downstream 80A4569 N/A C-F PT 2.5 t 2-E3-02-SO44-C-LU 10" Pipe Longitudinal Seam Upstream 80A4569 N/A C-F PT 2.5t 2-E3-02-SO44-C 10" Pipe to 10" Elbow 80A4569 N/A C-F PT h
2-EJ-02-SO44-C-LD 10" Elbow Longitudinal Seam Downstream 80A4569 N/A C-F PT 2.5 t 2-E3-02-F050-LU 10" Pipe Longitudinal Seam Upstream 80A4569 N/A C-F PT 2.5t 2-E3-02-F050 10" Pipe to 10" Elbow 30A4569 N/A C-F PT NES 239 6/82
p 1
O
-(
/ N*
PROGRAM PLAN AND SCHEDULE Y
App: /M7
/ 678V i
Preservice Inspection 30A4540 Rev. 4 Page 73 of 106 1
CAU3 RATION CODE COMPONENT COMPONENT PROCEDURE BLOCK CODE EXAM ZONE IDENTIFICATION DESCRIPTION NUMBER (If applicable)
CATEGORY METHOD NO.
REMARKS I
RHR WELDS - Train B Ref. Dwg. No. 2-E3-02-10 b
2-E3-02-F050-LD 10" Pipe Longitudinal Seam Downstream 80A4569 N/A C-F PT 2.5 t 2-E3-02-F051-LU 10" Pipe Longitudinal Seam Upstream 80A4567 Block 22 C-F UT 80A4569 PT 2.5t 2-E3-02-F051 10" Pipe to Valve HV8840 80A4567 Block 22 C-F UT 80A4569 PT O
e 9
NES 239 6/82
p O
B:
M
/ #/P+
Residual Heat Removal PROGRAM PLAN AND SCHEDULE Y
App: T///7 / (78r Preservice Inspection 80A4540 Rev. 4 Page 74 of 106 O EE TBE don DE CA ORY ME REMARKS RHR SUPPORTS - Train B Ref. Dwg. No. 2-E3-02-10 2-E3-02-R008 Pipe Support 80A4571 N/A C-E VT-3 Stanchion 80A4569 N/A PT 2-E3-02-C013 Pipe Support 80A4571 N/A C-E VT-3 2-E3-02-H008 Pipe Support 80A4571 N/A C-E VT-3 2-E3-02-C015 Pipe Support 80A4571 N/A C-E VT-3 2-E3-02-C016 Pipe Support 80A4571 N/A C-E VT-3 8 Lugs 80A4569 N/A P."
2-E3-02-H009 Pipe Support 80A4571 N/A C-E VT-3 NES 239 6/82
p 4
q Residual Heat Removal PROGRAM PLAN AND SCHEDULE By: _ f48
/#M App: 72FF
/c-3 v Preservice Inspection 80A4540 Rev. 4 Page 75 of 106 CAUBRATION CODE COMPONENT COMPONENT PROCEDURE BLOCK CODE EXAM ZONE IDENTIFICATION DESCRIPTION NUMBER (if appicable)
CATEGORY METHOD NO.
REMARKS RHR SUPPORTS -Train B Ref. Dwg. No. 2-EJ-02-10 2-EJ-02-R038 Pipe Support 80A4571 N/A C-E VT-3 VT-4 2-EJ-02-R037 Pipe Support 80A4571 N/A C-E VT-3 VT-4 2-E3-02-C014 Pipe Support 80A4571 N/A C-E VT-3 B
1 i
NES 239 6/82
O q
Residual Heat Rcmoval PROGRAM PLAN AND SCHEDULE App: 7 -
/l/9I B:
Y
/ 6)fv I
Preservice Inspection 80A4540 Rev. 4 Yage 76 of 106 CALIBRATION CODE COMPONENT COMPONENT PROCEDURE BLOCK CODE EXAM ZONE IDENTIFICATION DE3CR!PTION NUMBER (if applicable)
CATEGORY METHOD NO.
REMARKS RHR WELDS - Train B Ref. Dwg. No. 2-E3-03-1 2-E3-03-S003-C 8" Pipe to 8" Elbow 80A4569 N/A C-F PT (FW41)
I s
[
2-E3-03-5003-C-LD 8" Elbow Longitudinal Saam Downstream 80A4569 N/A C-F PT 2.5 t i
l 2-E3-03-5003-F-LU,8" Elbow Longitudin'al Seam Upstream 80A4569 N/A C-F PT 2.5 t b
I 2-E3-03-S00. F 8" Elbow to 8" Pipe 80A4569 N/A C-F PT 2-E3-03-S003-G 8" Pipe to 8" Elbow 80A4569 N/A C-F PT 2-EJ-03-5003-G-LD 8" Elbow Longitudinal Seam Downstream 80A4569 N/A C-F PT 2.5 t b
NES 239 6/82..
P O
Residual Heat Removal PROGRAM PLAN AND SCHEDULE By3 Y
/ ' /P'/
App: '/)WP ff/bf
~
Preservice Inspection 80A4540 Rev. 4 Page 77 of 106 cAUBRADON CODE DON DESCR NU B Of app ble)
CA ORY HOO NO REMARKS RHR SUPPORTS - Train B Ref. Dwg. No. 2-E3-03-1 2-E3-03-R006 Pipe Support 80A4571 N/A C-E VT-3 VT-4 8 Lugs 80A4569 N/A PT 2-E3-03-R005 Pipe Support 80A4571 N/A C-E VT-3 2-E3-03-H002 Pipe Support 80A4571 N/A C-E VT-3 2-E3-03-R015 Pipe Support 80A4571 N/A C-E VT-3 VT-4 2-E3-03-A003 Pipe Support 80A4571 N/A C-E VT-3 g
Plate 80A4569 PT 2-E3-03-C007 Pipe Support 80A4571 N/A C-E VT-3 VT-4 NES 239 6/82
d C
G fM
/ 4/P4
~ Residual Heat Removal PROGRAM PLAN AND SCHEDULE By: _TI#7
/ 6/87 App:
Preservice Inspection 80A4540 Rev. 4'Page 78 of 106 10 EEDON DESC ON NU B p
CA Y
E NO REMARKS RHR WELDS - Train B Ref. Dwg. No. 2-E3-04-1 2-EJ-04-F026 12" Pipe to 12" Nozzle 80A4567 Block 26 B-3 UT 80A4569 PT 2-E3-04-5016-B 12" Pipe to 12" Elbow 80A4567 Block 26 B-3 UT 80A4569 PT 2-E3-04-S016-C 12" Elbow to 12" Pip.e --
80A4567 Block 26 B-3 UT 80A4569 PT 2-E3-04-5016-D 12" Pipe to 12" Elbow 80A4567 Block 26 B-3 UT 30A4569 PT 2-E3-04-5016-E 12" Elbow to 12" Pipe 80A4567 Block 26 B-3 UT 80A4569 PT 2-E3-04-S016-F 12" x 6" Sweepolet to 12" Pipe 80A4567 Block 26 B-3 UT 80A4569 PT 2-E3-04-S016-G 12" Pipe to 12" Elbow 80A4567 Block 26 B-3 UT 80A4569 PT 4
2-E3-04-5016-H 12" Elbow to 12" Pipe 80A4567 Block 18 B-3 UT 80A4569 PT NES 239 &82
C Resi&ial Heat Rmwal PROGRAM PLAN AND SCHEDULE 3y
- ((
B f
Preservice Inspection 80A4540 Rev. 4'Page 79 of 106 I
COMPONENT COMPONENT PROCEDURE L K CODE ZONE IDENTIFICATION DESCRIPTION NUMBER (if apphcable)
CATEGORY METHOD NO.
REMARKS I
RHR WELDS - Train B Ref. Dwg. No. 2-E3-04-1 2-E3-04-F025 12" Pipe to Valve PV8702B 80A4567 Block 18 B-3 UT 80A4569 PT 2-E3-04-F024 Valve PV8702B to 12" Pipe 80A4567 Block 26 B-3 UT 80A4569 PT 2-E3-04-5015-E 12" Pipe to 12" Pipe" 80A4569 PT 80A4567 Block 26 B-3 UT 2-E3-04-S015-C 12" Pipe to 12" Elbow 80A4567 Block 26 B-3 UT 80A4569 PT 2-E3-04-F023 12" Elbow to 12" Pipe 80A4567 Block 26 B-3 UT 80A4569 PT 2-E3-04-S014C 12" Pipe to 12" Elbow 80A4567 Block 26 B-3 UT 80A4569 PT 2-E3-04-S014-D 12" Elbow to 12" Pipe 80A4567 Block 26 B-3 UT 80A4569 PT 2-E3-04-F022 12" Pipe to 12" Elbow 80A4567 Block 26 B-3 UT 80A4569 PT NES 239 6/82
p i
O Residual Heat Removat PROGRAM PLAN AND SCHEDULE By:
/ t/Pr Apr: M/7
/ ('#v Preservice Inspection 80A4540 Rev.
4 ' age 80 of 106 P
CAUBRATION CODE COMPONENT COMPONENT PROCEDURE BLOCK CODE EXAM ZONE IDENTinCATION DESCRIPTION NUMBER Cf appicable)
CATEGORY METHOO NO.
REMARKS RHR WELDS -Train B Ref. Dwg. No. 2-E3-04-1 2-E3-04-5013-B 12" Pipe to 12" Elbow 80A4567 Block 26 B-3 UT 30A4569 PT O
e 9
O l
NES 239 6/82
'I A
N Q
B3
/ #
PROGRAM PLAN AND SCHEDULE App: f>M7
/ GTRY Preservice Inspection 80A4540 Rev. 4'Page 31 of 106 COMPONENT COMPONENT PROCEDURE B
CODE ZONE IDENTIFICATION DESCRIPTION NUMBER (If apphcable)
CATEGORY METHOO NO.
REMARKS RHR "B" TRAIN COMPONENTS Ref. Dwg. No. 2-E3-04-1 2-E3 Valve PV-8702B Bolting 80A4571 N/A B-G-2 ' VT-1 PV-8702B-b 2-E3 Valve PV-8702B Internal Pressure 80A4571 N/A B-M-2 VT-1 PV-8702B-SURF Surface e
i O
e NES 239 6/82
P N
O Residual Heat Removal PROGRAM PLAN AND SCHEDULE BF
/ M App: 744 7
/6T8T Preservice Inspection 80A4540 Rev. 4"Page 32 of 106 CAUBRATION CODE COMPONENT COuPONENT PROCEDURE OLOCK CODE ExAu ZorE IDENTFICATION DESCRIPTION NUMBER Of acohcabiel CATEGORY LET@
NO.
REMARKS RHR SUPPORTS -Train B Ref. Dwg. No. 2-E3-04-1 2-E3-04-H010 Pipe Support 80A4571 N/A B-K-2 VT-3 2-E3-04-R012 Pipe Support 80A4571 N/A B-K-2 VT-3 VT-4 2-E3-04-C018 Pipe Support 80A4571 N/A B-K-2 VT-3 VT-4 2-E3-04-C019 Pipe Support 80A4571 N/A B-K-2 VT-3 VT-4 2-E3-04-R013 Pipe Support 80A4571 N/A B-K-2 VT-3 VT-4 2-E3-04-H006 Pipe Support 80A4571 N/A B-K-2 VT-3 2-E3-04-R014 Pipe Support 80A4571 N/A B-K-2 VT-3 VT-4 l
NES 239 6S2
n 7
q t
l Residual Heat RGmoval PROGRAM PLAN AND SCHEDULE By:
Y
/ (/Ph
\\
App: 2Nar
/ CYGY Preservice Irupection 80A4540 Rev. 4"Page 83 of 106 l
CALIBRATION CODE COMPONENT COMPONENT PROCEDURC BLOCK CODE EXAM ZONE IDENTIFICATION DESCRIPTION NUMBER Of appucable)
CATEGORY LETHOO NO.
REMARKS RHR COMPONENT SUPPORTS - Train B Ref. Dwg. No. 2-E3-04-1 2-E3-04-R019 Valve PV 8702-B Support 80A4571 N/A B-K-2 VT-3 VT-4 8
O 8
O O
e NES 239 6/82
m n
e Y
/ UPh B:
Residual Heat Removal PROGRAM PLAN AND SCHEDULE Y
App: 6 77/ 7
/ 4/s<
Preservice Inspection 80A4540 Rev. 4"Page 84 of 106 e EtnE o EcS E *Y cAEv d m
no REMARKS RHR WELDS - Train B Ret Dwg. No. 2-E3-04-2 2-E3-04-F021 12" Pipe to Valve HV8701B 80A4567 Block 26 B-3 UT 80A4569 PT b
2-E3-04-F019-LU 12" Pipe Longitudinal Seam Upstream 80A4569 N/A C-F PT 2.5 t 2-E3-04-F019 12" Pipe to Flued H ad (P-52) 80A4569 N/A C-F PT 2-E3-02-F001 12" Pipe to Flued Head (P-52) 80A4569 N/A C-F PT l
2-E3-02-F001-LD 12" Pipe Longitudinal Seam Downstream 80A4569 N/A C-F PT 2.5c b
2-E3-02-5001-E-LU 12" Elbow Longitudinal Seam Upstream 80A4569 N/A C-F PT 2.5 t
.l 2-E3-02-5001-E 12" Elbow to 12" Pipe 80A4569 N/A C-F PT 2-E3-02-5001-E-LD 12" Elbow Longitudinal Seam Downstream 80A4569 N/A C-F PT 2.5t NES 239 662
v r
n B:
EN
/ OP4 R=Wal Heat Removal PROGRAM PLAN AND SCHEDULE Y
App: 7/1/7
/ 6/8 V Preservice Inspection 80A4540 Rev. 4 Page 85 of 106 CAUBRATION CODE COMPONENT COMPOSENT PROCEDURE BLOCK CODE EXAM ZONE g)ENTFICATION DESCRIPTION NUMBER (If apphcable)
CATEGORY METHOD NO.
REMARKS RHR WELDS - Train B Ref. Dwg. No. 2-E3-04-2 2-E3-02-5001-G-LU 12" Elbow Longitudinal Seam Upstream 80A4569 N/A C-F PT 2.5 t A
2-E3-02-5001-G 12" Elbow to 12" Pipe 80A4569 N/A C-F PT (FW98) 2-E3-02-5001-G-LD 12" Elbow Longitudinal Seam Downstream 80A4569 N/A C-F P
2.5t 0
e i
t 4
NES 239 6/82
Residual Heat Removal PROGRAM PLAN AND' SCHEDULE Bys FM
/ s/P4 App: 1//7 / 4 '/p r Preservice Inspect 7an 80A4540 Rev. 4 'Page 86 of 106 CAUBRATKW CODE IDE TK)N DE (if appicabiel CA ORY REMARKS RHR "B" TRAIN COMPONENTS Ref. Dwg. No. 2-E3-04-2 2-E3 Valve HV-8701B Bolting 80A4571 N/A B-G-2 VT-1 HV-8701B-b 2-E3 04-Valve HV-8701B Internal Pressure Surfaces 80A4571 N/A B-M-2 VT-1 HV-8701B-SURF O
e e
e e
O 9
NES 239 IV82
O m
B:
P M
/ (/PV Residual Heat Renmal PROGRAM PLAN AND SCHEDULE Y
App: W/T /g&T Ei""E WC" 80A4540 Rev. 4 I) age 87 of 106 TMBE OE TO4 DESC No CA GMY ME NO REMARKS RHR SUPPORTS - Train B Ref. Dwg. No. 2-E3-04-2
^
2-E3-02-R016 Pipe Support 80A4571 N/A C-E VT-3 VT-4 8 Lugs 80A4569 N/A PT 2-E3-02-H014 Pipe Support 80A4571 N/A C-E VT-3 2-E3-02-C006 Piie Support l
80A4571 N/A C-E VT-3 5 Lugs 80A4569 N/A PT 2-E3-02-R012 Pipe Support 80A4571 N/A C-E VT-3 VT-4 2-E3-02-H020 Pipe Support 80A4571 N/A C-E VT-3 VT-4 2-EJ-02-R017 Pipe Support 80A4571 N/A C-E VT-3 2-E3-04-F018 Flued Head to Containment 80A4569 N/A C-E PT Penetration (P-52) 2-E3-04-C017 Pipe Support 80A4571 N/A C-E VT-3 NES 239 6/82
P O
PROGRAM PLAN AND SCHEDULE By:. Ed.
/ th+
App: 1E/7
/ 6#/
Preservice Inspection 80A4540 Rev. ~ 'Page SS of 106 4
CALIBRATION COOE COMPONENT COMPONENT PROCEDURE BLOCK CODE EXAM ZONE IDENTIFICATION DESCRIPTION NUMBER (If apphcate)
CATEGORY METHOD NO.
REMARKS RHR SUPPORTS - Train B Ref. Dwg. No. 2-E3-04-2 2-E3-04-C020 Pipe Support 80A4571 N/A C-E VT-3 VT-4 e
e e
e e
l l
[
I NES 239 8/82
P Q
Residual Heat Removal PROGRAM PLAN AND SCHEDULE By:
?
/ 644 App:
4F /67BF Ei
=Ce In8Pection 80A4540 Rev. 4 'P' age 89 of 106 O EEE DE ON NU BE app CA MY K2 NO REMARKS RHR WELDS -Train A Ref. Dwg. No. 2-E3-04-3 2-E3-04-F030 12" Pipe to 12" Nozzle 80A4567 Block 26 B-3 UT 80A4569 PT 2-E3-04-5018-B 12" Pipe to 12" Elbow 80A4567 Block 26 B-3 UT h
(FW9) 80A4569 PT 2-E3-04-S018-C 12" Elbow to 12" Pipe -
80A4567 Block 26 6-3 UT 80A4569 PT 2-EJ-04-5018-D 12" Pipe to 12" Elbow 80A4567 Block 26 B-3 UT A
(FW8) 80A4569 PT 4M 2-E3-04-5018-E 12" Elbow to 12" Pipe 80A4567 Block 26 B-3 UT 80A4569 PT 2-E3-04-5018-F 12" x 6" Sweepolet to 12" Pipe 80A4567 Block 26 B-3 UT 80A4569 PT 2-E3-04-F031 12" Pipe to Valve PV8702A 80A4567 Block 26 B-3 UT 80A4569 PT 2-E3-04-F032 Valve PV8702A to 12" Pipe 80A4567 Block 26 B-3 UT 80A4569 PT NES 239 8/82
l P
n Residaal Heat Removal PROGRAM PLAN AND SCHEDULE By:
/ #P4 UIW "
~
/c/df App:
80A4540 Rev. 4 Page 90 of 106 O EEEON DE NU BE W b CA GORY ME NO.
REMARKS l
RHR WELDS -Train A Ref. Dwg. No. 2-E3-04-3 2-!!3-04-5019-D 12" Pipe to 12" Elbow 80A4567 Block 26 B-3 UT 80A4569 PT 2-E3-04-5019-E 12" Elbow to 12" Pipe 8044567 Block 26 B-3 UT 4
(FW7) 80A4569 PT 2-E3-04-5019-F 12" Pipe to 12" Elbow -
80A4567 Block 26 B-3 UT 80A4569 PT 2-E3-04-F033 12" Elbow to 12" Pipe 80A4567 Block 26 B-3 UT 80A4569 PT 2-E3-04-F034 12" Pipe to 12" Elbow 80A4567 Block 26 B-3 UT 80A4569 PT 2-E3-04-5037-B 12" Elbow to 12" Pipe 80A4567 Block 18 B-3 UT (5037-A) 80A4569 PT 2-E3-04-5037-C 12" Pipe to 12" Elbow 80A4567 Block 18 B-3 UT (5037-B) 80A4569 PT 2-E3-04-5037-D 12" Elbow to 12" Pipe 80A4567 Block 18 B-3 UT (5037-C) 80A4569 PT NES 239 6/82
~
p
^
s W
/ 08Y Reeldual Heat Rernoval PROGRAM PLAN AND SCHEDULE B:
Y App: W/P
/ (,W Preservice Inspection 80A4540 Rev. 4'Page 91 of 106 Co woNENT COMPONENT PROCEDURE BLOCK CODE ZONE IDENTFICADON DESCRIPTION NUMBER Of apphcablel CATEGORY METHOD NO.
AEMARKS RHR WELDS - Train A Ref. Dwg. No. 2-EJ-04-3 2-EJ-04-F048 12" Pipe to Valve HV-8701 A 80A4567 Block 18 B-J UT 80A4569 PT 2-E3-04-F047 Valve HV-8701 A to 12" Pipe 80A4567 Block 18 C-F UT 80A4569 PT 2-E3-04-F047-LD 12" Pipe Longitudinal Seam Downstream 80A4567 Block 18 C-F UT 2.5t 80A4569 PT D
e G
e NE'S 239 W82
D n
Residual Heat Removal PROGRAM PLAN AND CCHEDULE 3y:
04f
/ (/ft App: 77 M /c7sr Preservice Inspection 30A4540 Rev. 4 Eage 92 of 106 CAttBRATION CODE COMPONENT COMPONENT PROCEDURE BLOCK CODE dxAM ZONE K)EPmACATX)Pi DESCftPTION NUMBER (if apphcablel CATEGCRY METHOO NO.
REMARKS RHR "A" TRAIN COMPONENTS Ref. Dwg. No. 2-E3-04-3 2-E3 Valve HV-8701 A Bolting 80A4571 N/A B-G-2 VT-1 HV-8701A-b 2-E3-04 Valve PV-8702A Bolting 80A4571 N/A B-G-2 VT-1 PV-8702A-b
~
s 9
e h
G 6
NES 239 6/82
r-3 B3
/ N4
Residual Heat Removal PROGRAM PLAN AND SCHEDULE Y
App: C///H-
/,e 7 G T Ei"'E W 80A4540 Rev. 4 fage 93 of 106 CAUBRATION CODE E)OmFIC T10N DE T10H NUMBER pf CA GORY TK)O to AEMARKS RHR SUPPORTS -Train A Ret Dwg. No. 2-E3-04-3 s
2-E3-04-F038 Flut Head to Containment 80A4569 N/A C-E PT Penetration (P-79) 2-E3-04-H009 Pipe Support 80A4571 N/A C-E VT-3 2-EJ-04-R018 Pipe Support 80A4571 N/A B-K-2 VT-3 VT-4 2-EJ-04-H008 Pipe Support 80A4571 N/A B-K-2 VT-3 2-E3-04-C021 Pipe Support 80A4571 N/A B-K-2 VT-3 VT-4 2-E3-04-C023 Pipe Support 80A4571 N/A B-K-2 VT-3 VT-4 2-EJ-04-H007 Pipe Support 80A4571 N/A B-K-2 VT-3 2-E3-04-R017 Pipe Support 80A4571 N/A B-K-2 VT-3 VT-4 NES 239 632
(~i n
M
/ MN PROGRAM PLAN AND SCHEDULE BN Residual Heat Removal App:'//f/F
/6/Fr F.a.vice Inspection 80A4540 Rev.
4'P' age 94 of 106 COMPONENT COMPONENT PROCEDURE O
CODE E
ZONE IDENTIFICATION DESCRIPTION NUMBER (ft aWacable)
CATEGORY METHOD NO.
REMARKS RHR SUPPORTS -Train A Ref. Dwg. No. 2-EJ-04-3 2-E3-04-R016 Pipe Support 80A4571 N/A B-K-2 VT-3 VT-4 2-E3-04-C022 Pipe Support 80A4571 N/A B-K-2 VT-3 VT-4 O
e 9
O NES 239 (V82
k n
Residual Heat Removal PROGRAM PLAN AND SCHEDULE By: fM.
/ // N App: W/*
/ 67# v" E' "' *h 8"
80A4540 Rev. 4 'Page 95 of 106 CAuBRATION CODE COMPONENT COMPONENT PROCEDURE BLOCK CODE EXAM ZONE IDENTIFICATION DESCRIPTION NUMBER (if appleable)
CATEGORY hETHOO NO.
REMARKS RHR COMPONENT SUPPORTS -Train A Ret Dwg. No. 2-E3-04-3 2-E3-04-R019 Valve (PV8702A) Support 80A4571 N/A B-K-2 VT-3 VT-4 e
0 0
0 9
s NES 239 &S2
['
O O
Residual Heat Removal PROGRAM PLAN AND SCHEDULE By: f M
/ (/PV App: 'M1 P
/ eV#Y Preservice Inspection 80A4540 Rev. 4 'Page 96 of 106 IDE Tion DESCRI NUMBE CA ORY ME REMARKS RHR WELDS - Train B Ret Dwg. No. 2-E3-04-4 2-E3-02-SO46-A-LU 10" Pipe Longitudinal Seam Upstream 80A4567 Block 21 C-F PT 2.5t 80A4569 2-E3-02-SO46-A 10" Pipe to 10" Elbow 80A4567 Block 21 C-F UT (SO46-D) 80A4569 PT 2-E3-02-5046-A-LD 10" Elbow Longitudinal Seam Downstream 80A4567 Block 21 C-F PT 2.5t 80A4569 1
2-E3-02-F053-LU 10" Elbow Longitudinal Seam Upstream 80A4567 Block 22 C-F UT 80A4569 PT 2.5t i
2-E3-02-F053 10" Elbow to 10" Pipe 80A4567 Block 21 C-F UT 80A4569 PT 2-E302-F053-LD 10" Pipe Longitudinal Seam Downstream 80A4567 Block 21 C-F UT 80A4569 PT 2.5t 2-E3-04-F008-LU 10" Pipe Longitudinal Seam Upstream 80A4567 Block 22 C-F UT 80A4569 PT 2.5t NES 239 6/82
p Q
^
Bye N
/ M4 Residisal Heat Removal PROGRAM PLAN AND SCHEDULE App: 47Mf~
/ ifTSY Preservice Inspection 80A4540 Rev. 4'Page 97 of 106 IDENT DON DE NUMBE M b CA ORY bE NO REMARKS RHR WELDS -Train B Ref. Dwg. No. 2-E3-04-4 2-E3-04-F008 10" Pipe to 10" Elbow 80A4567 Block 22 C-F UT 80A4569 PT 2-E3-04-F008-LD 10" Elbow Longitudinal Seam Downstream 80A4567 Block 22 C-F UT 80A4569 PT 2.5t 2-E3-04-5006-B-LU 10" Elbow Longitudinal Seam Upstream 80A4567 Block 22 C-F UT 80A4569 PT
,2.5t 2-E3-04-5006-B 10" Elbow to 10" Pipe 80A4567 Block 22 C-F UT 80A4569 PT 2-E3-04-5006-B-LD 10" Pipe Longitudinal Seam Downstream 80A4567 Block 22 C-F UT 80A4569 PT 2.5t 2-E3-04-5006-D-L U 10" Elbow Longitudinal Seam Upstream 80A4567 Block 22 C-F UT 80A4569 PT 2.5t 2-E3-04-5006-D 10" Elbow to 10" Pipe 80A4567 Block 22 C-F UT 80A4569 PT 2-E3-04-S006-D-LD 10" Pipe Longitudinal Seam Downstream 80A4567 Block 22 C-F UT 80A4569 PT 2.5t NES 239 6/82
B:
bdd
/ UN Residual Heat Removal PROGRAM PLAN AND SCHEDULE Y
App: '//#7
/ (//r U"#=ce In5Pection 80A4540 Rev. 4 Page 98 of 106 CAuBRAnON CODE COMPONENT COMPONENT PROCEDURE BLOCK COOE EXAM ZONE g)ENTFICADON DESCftPTION NUMBER Of apphcabael CATEGORY nETHOO NO.
REMARKS RHR SUPPORTS - Train B Ret Dwg. No. 2-E3-04-4 2-E3 d2-H010 Pipe Support 80A4571 N/A C-E VT-3 VT4 2-EJ-04-R001 Pipe Support 80A4571 N/A C-E VT-3 80A4571 N/A C-E VT-3 2-E3-04-R020 Pipe Support VT4 2-EJ-04-C002 Pipe Support 80A4571 N/A C-E VT-3 2-EJ-04-H012 Pipe Support 80A4571 N/A C-E VT-3 VT4 2-E3-04-H0ll Pipe Support 80A4571 N/A C-E VT-3 VT4 NES 239 &B2
O A
Residual Heat Removal PRECRAM PLAN AND SCHEDULE By:
fM_
/ (I/P%
App: T///r
/ gr4f Preservice Inspection 30A4540 Rev. 4 Page 99 of 106.
mmHCA ION DE NUMB b
CA Y
l REMARKS RHR WELDS -Train B Ref. Dwg. No. 2-E3-04-5 2-E3-04-5009-D-LU 10" Pipe Longitudinal Seam Upstream 80A4567 Block 22 C-F UT 80A4569 PT 2.*t 2-E3-04-5009-D 10" Pipe to 10"x10"x6" Tee 80A4567 Block 22 C-F UT (S009-A) 80A4569 PT 2-E3-04-S009-D-LD 10" x 10" x 6" Tee L gitudinal Seam 80A4567 Block 22 C-F UT 80A4569 PT
.2.5t 2-E3-04-50ll-C 6" Pipe to 6" Elbow 80A4567 Block 17 C-F UT (50ll-A) 80A4569 PT 2-E3-04-F016 6" Pipe to Valve 8841B 80A4567 Block 17 C-F UT 80A4569 PT 2-E3-04-5009-F-LU 10" Pipe Longitudinal Seam Upstream 80A4567 Block 22 C-F UT 80A4569 PT 2.St 2-E3-04-5009-F 10" Pipe to 10dx6" Reducer 80A4567 Block 22 C-F UT (S009-C) 80A4569 PT 2-E3-04-S009-F-LD 10" x 6" Reducer Longitudinal Seam 80A4567 Block 22 C-F UT Downstream 80A4569 PT 2.5t NES 239 6/82
r n
Residisal Heat Removal PROGRAM PLAN AND SCHEDULE ty:
JA'
/ r/py App: 7/74/ # / # /6 4 Ei"'h Inspection 80A4540 Rev. 4 fage 100 of 106 CALIBRATION CODE COMPONENT COMPONENT PROCEDURE BLOCK CODE EXAM ZONE 10ENTFICATION DESCR6PTION NUMBER Of apphcablel CATEGORY METHOO NO.
eV MARKS 1
l
\\
~ -
- Ref. Dwg. No. 2-E3-04-5 2-E344-F012 6" Pipe to 6" Elbow 80A4567 Block 17 C-F UT 80A4569 PT 2-E3-04-5010-E 6" Elbow to 6" Pipe 80A4567 Block 17 C-F UT (S010-C) 89A4569 PT e
9 e
/
e 9
e NES 239 6/82
P O
Residual Heat Renwal PROGRAM PLAN AND SCHEDULE By:
fM
/ </P4 App: ?fMP
/ Cf6 Y Preservice Inspection SOA4540 Fev. 4 [' age 101 of 106 o ErS YueYE cAEGmY a[E Om Y REMARKS um now RHR SUPPORTS -Train B Ret Dwg. No. 2-EJ-04-5 2-E3-04-C001 Pipe Support 80A4571 N/A C-E VT-3 2-E3-04-A001 Pipe Support 30A4571 N/A C-E VT-3 Plate 80A4569 PT 2-E3-04-C008 Pipe Support.
80A4571 N/A C-E VT-3 2-E3-04-C007 Pipe Support 80A4571 N/A C-E VT-3 2-E3-04-C006 Pipe Support 80A4571 N/A C-E VT-3 2-E3-04-R005 Pipe Support 80A4571 N/A C-E VT-3 2-E3-04-C010 Pipe Support 80A4571 N/A C-E VT-3 2-E3-04-R009 Pipe Support 80A4571 N/A C-E VT-3 VT-4 8 L.ugs 80A4569 PT NES 239 EV82
I O
/ U
/ gM['-
B:
Residual Heat Removal PROGRAM PLAN AND SCHEDULE Y
App: 7 7/S P Preservice Inspection 80A4540 Rev. 4 Page 102 of 106 oEuTw nON DE NUMBE CA GMY ME D NO REW RKS RHR SUPPORTS - Train B Ref. Dwg. No. 2-EJ-04-5 2-EJ-44-C012 Pipe Support 80A4571 N/A C-E VT-3 2-E3-04-R007 Pipe Support 80A4571 N/A C-E VT-3 VT-4 d
80A4571 N/A C-E VT-3 2-E3-04-R006 Pipe Support 2-EJ-04-C009 Pipe Support 80A4571 N/A C-E VT-3 2-E3-04-R008 Pipe Support 80A4571 N/A C-E VT-3 VT-4 8 Lugs 80A4569 PT 2-EJ-04-C0ll Pipe Support 80A4571 N/A C-E VT-3 NES 239 (WB2
B: -
/ O Ra=M=1 Heat Remal PROGRAM PLAN AND SCHEDUi.5 Y
App: ##F/F
/ (7 97 Piwvice Inspection 80A4540 Rev. 4 Page 103 of 106 cTomF DON DE PT N NUMBE D
CA Y
ET C NO REMMMS RHR HEAT EXCHANGER A Ret Dws. No. 2-E3-01-Il 2-EE301A Support Skirt Weld 30A4569 N/A C-C PT SKIRT-W Support (Skirt) 80A4571 N/A C-C VT-3 2-EE301 A-Nozzle A to Shell Weld (inlet) 80A4588 Block 28 C-B UT NA-1 80A4569 PT 2-EE301 A-Nozzle B to Shell Weld (outlet) 80A4588 Block 28 C-B UT NB-1
~
80A4569 PT 2-EE301-A Bonnet Flange to Channel 80A4588 Block 72 C-A UT SEAM-1-W Weld 2-EE301A Channel to Head Weld 80A4588 Block 72 C-A UT SEAM-2-W S
NES 239 662
f
- .' s. a i j J.J ' r,, " ',...., '..
..g : s y
' f v *,~.;.'
y.
4,'.<;-'.
._;,;.. : 9.~%,
J.,',,
..'.;. s
.. :,/J,
.f
...g?'...
r
^
q B:
/ 4/Ph Residual Heat Reinoval PROGRAM PLAN AND SCHEDULE Y
App: g/-
/ 4 74(
Fw-#a Inspection 80A4540 Rev. 4 Page 104 of 106 CAUBRATON CODE COMPONENT CCNPONENT i
PROCEDURE BLOCK CODE EXAM ZONE 10ENTFICATION DESCRIPTON MN81ER Of appec%
CATEGORY METHOO NO.
REMARKS RHR PUMP A Ret Dwg. No. 2-E3-01-Il 2-PE301 A-F-2 Pump Body to Discharge Flange Weld-80A4569 N/A C-G PT 2-PE301 A-SUP-1 Pump Support 80A4571 N/A C-E VT-3
~
Support Foot Weld,
80A4569 N/A PT 80A4571 N/A C-E VT-3 2-PE301A-SUP-2 Pump Support Support Foot Weld.
80A4569 N/A PT 2-PE301A-SUP-3 Pump Support 80A4571 N/A C-E VT-3 Support Foot Weld -
80A4569 N/A PT 9
NES 239 &82
O q
Residual Heat Removal PROGRAM PLAN AND SCHEDULE BE
/ - @4' App: %V
/ GYAW Preservice hispection 80A4540 Rev. VPage 105 of 106 COMPONENT COMPONENT PROCEDURE CODE ZONE IDENTIFICATION DESCR!PTION NUMBER (If appocabiel CATEGORY METHOD No. g REMARKS Pressure Tests: Descriptions below describe test areas.
h 1,
RHR HEAT REMOVAL PRESSURE TESTS Ret Dwg.10466-M-02E301 (See Note 1) 2-E3-HYDRO-1 From Reactor Coolant System hot leg 80A4751 N/A B-P VT-2 Nominal (BB-06-BCA-29") to Valve PV-8702A, Operating from Reactor Coolant System hot leg Pressure (BB-60-BCA-29") to valve PV-8702B From Reactor Coolant Valves PV8702A&B
.to RHR valves HV8701 A&B 2-E3-HYDRO-2 From Valves HV8701 A&B (14") thru 80A4751 N/A C-H VT-2 Nominal Residual ileat Removal Pumps (PE301 Operating A&B) thru Residual Heat Removal Heat Pressure Exchangers (EE301, A&B) thru valves HV-8809 A&B to the Accumulator Injection discharge loops 1,2,3 & 4 to valves 8818A, B, C&D in the EP System (M-02EP01) including the crossover leg (40-ECB-10 60-ECB-10") thru valve HV-8840 to valves 8841A&B 2-E3-HYDRO-3 All Branch Lines 4" Nominal Size 80A4751 N/A C-H VT-2 Nominal and less Operating Pressure 2-E3-HYDRO-4 Main Component Cooling lines to and from 80A4571 N/A D-A VT-2 Nominal Residual Heat Removal pumps (PE301 A&B)
Operating and Residual Heat Removal Heat Exchangers Pressure (EE301A&B)
Note 1:
M-02E301-PSI delineates these boundaries NES 239 662
l l
80A4540 l
DOCUMENT NO.
PAGE OF
{
NUCLEAR ENERGY SERVICES, INC.
l l
2.5 ISOMETRIC FIGURES AND SKETCHES The piping isometric figures listed in Table 4 show the identification and location of areas for the Residual Heat Removal System requiring examination. Sketches may also be included that illustrate or locate areas of components requiring identification for examination.
TABLE 4 Isometric Figures 2-E3-01-1 Rev.I 2-E3-01-2 Rev.I 2-E3-01-3 Rev.1 2-E3-01-4 Rev.2 2-E3-01-5 Rev.1 2-E3-01-6 Rev.1
(
2-E3-01-7 Rev.I 2-E3-01-8 Rev.I 2-EJ-01-9 Rev.I 2-E3-01-10 Rev.1 2-E3-01-il Rev.0 2-E3-02-1 Rev.2 2-E3-02-2 Rev.2 2-E3-02-3 Rev.2 2-E3-02-4 Rev.I 2-E3-02-5 Rev.2 2-E3-02-6 Rev.I 2-E3-02-7
- Rev.3 2-E3-02-8 Rev.1 4
2-E3-02-9 Rev.1 2-E3-02-10 Rev.2 Rev.4 d 2-E3-03-1 2-E3-04-1 Rev.2 2-E3-04-2 Rev.3 2-E3-04-3 Rev.3 2-E3-04-4 Rev.2 2-E3-04-5 Rev.2 i
Boundary Diagrams M-02E301-PSI Rev.0 FORM 8 NES 205 2/80
~
O O
/
f I 2 - E J-On-5039 -D 1 2 -E J-Ot-Roo? I
< i
- 3.c 3. ci., o o iCONT. FIG.
I 2 -t >- ca - t 0041 EJ-Ol-lO I
I 2 -EJ-Ot-FCSO I f
e 30* % SLV 44 TC(V LIN E j*
I 2 - E J-on - Sostej PUMP PEJOI A 07-EC B -14*
(SUCTIO N)
HV OII
[ 2.t.'-os-roc 3 }
12 E J-O I - 503 7 - 81 N
s f
2 -EJ-os-s006-0 1 12 EJ-Ol-5037-A I l2.EJ-OI-FOO2 l NO CONT.
i 06-H C B-14" I 2 -EJ44-SOO6-C I
,\\
g CONT 2-EJ-On-5006-A I l 2 -EJ-Oe - F0 4LI N OT ES:
) 2 -EJ-Oe-5005-01
l 2 -EJ SOOS~-A i 12 EJ-ot-F048 l
- 2. ALL LI NES PREFIXE D 3
- PI-601 y
a WITH SYSTEM NUMBER Cs' UN LESS OTHERWISE I 2 -EJ-Oe-soo4-t i S,0 SHOWN.
O I I
- 3. D R EPR ESE NTS 2 - E J - O -5003 - D I HANGERS.
- 2. FLUSH CONH{PR J 2 -EJ-O-Sco4 - r i 4
I 12 -EJ 5004-E I I 2 -EJ-OI-5004-J l p
gm l 2 -EJ-Os -rot 9 !
21-E C B - 3 2 rJ-On-Rosi EE 7 "*""*""
4*
svinn mte 1 i RHR SYSTEM e
Y4 DRAIN LINE-EJ
'A* TRAIN 2 -EJ-OI-F OO5 l mav. I esa eso-2-EJ-Ol-1 l 2 -EJ-O-HOOF I F. U2.1 04T. g-/78E I 2 -EJ-Ot-5004-B "C'-
10466 M-23EJOI REv.3 CALLAWAY 5555 10466 M-05EJOI REV.8 ser vo n.
O O
f)
CONT.
F1 g
2 -EJ-OI-3 N
,4 ? -E 3-Os -s a<g n 2EJ-Gek'*j N/?N O u24' SLV.
ll l 2 -EJ-Ot-FOIS l
/ 2 EJ-Ol-Sol 2-C l 15-ECO-8'
~
D,s0 I 2 EJ-Ol-FOl4 l qC NOT ES:
PUM P O
PEJ01A ISCHARGE)
- 2. AL L LINES PREFlXED WITH l 2 -EJ-OI-SCel-r I SYSTEM NUMBER UNLE SS 2 -EJ-OI-SOst -F 1 OTH ERWIS E SHOWN.
I 2 -EJ-Os-sOiO-C I
- 3. O REPRESENTS H ANGERS.
I 2 EJ-On-SOIO-A I k
l 2 -EJ-OI-50lO-El i 2 -E J-OI-SOll-E 1 sf,"- P T-6i4
' '~ ' '
2 -EJ-OI-RC O61 systru intt 8724 l l RHR SYSTEM 2 - E J -CI-Soil -01 EJ
'A* TRAIN
/
au i
..a. no 2-EJ-O!- 2 2" FLUSH ING CONN.
n 2,
am e n-de I 2-EJ-Oe-roisI 10466 M-23EJOI REV 3 I 2-EJ-Os -sOtt-C I
.10466 M-05EJOl REv e CALLAWAY 5555 nor va scm.
P.
D D
C ON T.
LEFT l #--"'- * '-C I
I 2-Ea-ci-sm-g i N
4 e -ta-ce-saa-o _j d
Y4 2 -E J-os-sont-o l A
\\Y N
1 2 -EJ-On-5064-F 1 E-612
,,,,,, c,,,,,,, g h EC8-h' IS-EC 8-10*
P -ra-os-une-e i 2-EJ-oe-Foas j p
CONT.
FIG.
CONT.
E6 2-EJ-Og-4 RIGHT
' W t -EJ-OI-SOIS-C l NOTES:
1
- 1..=== OENOT ES EX EMP1l E -EJ-06-Su2E PIPING LINES. '
1
' 2-EJ""G-@l41
- 2. ALL LIFES PREFIXED' WITH SYb7EM NUMBER N
/
I a -EJ-Ot-5021-F l UNLESS OTa'ERWISE e
SHOWN.
f s
L Q REPRESENTk gu HANGERS.
24'%5LV ~ '
I A-EJ-Ohio 28-H I 8 -E J-04-5028-G l I2-EJ-08-mors
- - ra-a-se2,- ai l
- 12*AIO* RED.
- ~ * '5
'*l i
gg.g;-o,,o,,
~ ' " ' " "
RHR HEAT
=
R SETEM EXC HANGE R EJ
- TRAIN EEJOlA INLET
=1
=a 2 EJ-Ol-3 "S
o.m ssow REF.ORWGS.
'~
10466 M-23EJOB REV.3 CALLAWAY 5555-cog 7.
M~
REv 8 2-EJ-Oh-2
.cr m.c.ar
P-0 0
C O NT. F IC.
2,-E J-OI-3
[
[
Y' VENT LINE I 2 -r3-oe -50:4-H ltREFI 4
N
'-a-5"*-
IC."= 8 R E D-i I a -E,t-os-sors-c 1 (l e-ra-oe-sa4-mFvge 1 I
I I ?-EJ-OI-RO3R e
j,g4 g
I e -r. -rw-ms-m I M a-EJ-o-no2ol 12-EJ-0F Fw50005 I a -EJ-a-noes y,N 1 E-EJ-a-soeS-E I 1 5 -EJ-a-Fo66 I NO T ES:
- l.==== DENOTES EXEMPT PIPING LI N E S.
- 2. ALL LINES PRE FIXED WITH SYSTEM
- n-EJ-06-FS 571 HUMBER UN LESS OTH ER WISE SHOWN
- 3. 0 R EPRESENTS HANGERS.
et SEE FIELD CHANGE FC-1 FOR WELD NUMBERS I s-u-a-W-F I i
i a-rJ-os-sas-s I a -EJ-a-soes-c 1 REF. E S.
10466 M-23EJOI Ev.s
-sa-a-sas-H I 8 -EJ-a-sO6-0 i NM M-MEM REV.8
% g -g-a-SO6-E I i 3-EJ-G-5016-A 1 Q
i TIEL%, ---
i a EJ-os-sO6-8 l t-EJ O -COSI l
s,was virts E7 R$N f
=2 e = 2-EJ-OI-4 O-- S ~.~0
$h [bhy CONT FIG.
""" CALL AWAY 5555 2-EJOI-5
T ON NO
.N C
5 5
5 H
E 1
5 I
E T 8
TN 5
0 c B
0 0
OI i,
NSS s v c
Y.
v Sl tf E
Y 4F c.
Y ER S*R nH Y
I o
L L SE D
l t
O 2
2 2 ^
I S
0 o D
i h
A w
o 0
f
'8 l
G HI S
I I ge,o,.
1 0
4 5
s S
A O
W a.
N eme A J
H NTW JE 8
E6
. mm L
2 2
I I o
P S
3 8
J
+
J o
o e
. 4-F 0
n E
E E
s E
E S
n N
E P
P s
s c
DH G W MM C
o T
}
ET R
\\
J s
7J P
O N i
D 66 E
o E
M X A
9-
(('
66 2
E E
3
.1 S
E SH 7
6A e
E I
44 8
n*
4, F
9 O0 e
- E X
S 1
1 i
T EEE S I1 8
T 2
0 O S P N
0 I
RL
~
2
~
o N E N I
E s
- (
T SU S f-O m
O E E
y N NRR J
E 8
J
.D E IE P 8
E 1
E D LB E 2
~
D a
R LM R I
I S *B
=. LU M x
= AN O "O
1 G l1 2.3 0
l l
"8 7
2 2
~E J
o 2
c r
O a
s a
e c
I i
o s
H o
a D
o 7-i R
a s
J E
P
.R 3
E o
E o
TG 1
r RAN a
l 2
H i
a I
r EA a
s o
R HH s
m s
C 2
s o
X 2o E
a f
a l
y o
3 i,
a l
a c
p I
s J
E 2
E B
o a
s 2
I a
0 C
a j
I i
a E
3 5
s I
u e
QEHb a
o 1
s J
o 2
J g
s
,[
o R
2 r
J o
o E.
a 3
n z
2 2
4' I
E
~
z 2
o i
o o
s l
a n
f s
I o
o-r a
s I
J 1
H u
E o
J a
E 2
r s
a n
i I
a I
t a
a o
/
B s
I i
C m
l E
a A
E u
J
?
N 5
I s
t r
e L
o 3I s
s i
-r m
s 8
T a
1 o
N 7
E a
J a E
E V
s
- N J
4 a
4 O
s I
Y o
7 L
l I
a I
8 e
J r
E 5 N I
B s-I C
a s
a
- A E
o z
- R 1
8 s
i m
'D J
r 7 0 E
a 4
'l t
1 6
a 8
s GI iT o
J u.
O. jI7 a-I E
s T
J a
E 1
a s
J I
r N
u 1
7 i
s
[
o F
l G
a 7
'O J
6
.~
o E
l S
6 B
a a
.l TGO C
I NI E
J OFJ E
C E 7
-2
-2 1
~
I O
CONT.
F I G.
I EJ-Ol-7 2 -EJ-04-SO27-C 1 l 3 -EJ-oe-5027-8 I-I 3 -fJ-Oe-502s-D N s'
O'
,[ g -EJ-G -FD37 1 g.fJ Oe-50ie-5 I L
NOTES:
- 1. - DENOTES EXEMPT PIPING LINES.
- 2. ALL LINES PRE FIXED WI H SYSTEM NUMBER UNLESS OTHERWISE SHOWN.
- 3. O R EPRESENTS HANGERS.
3 -EJ-Os-COs6 I CONT.
2-EJ-O 9 n -EJ-os - F0361 nns 7
p EJ TRAIN REF.ORWS.
I a -EJ-os-5024-F i
-EJ-os-m i 10466 M-03EJOI REV 5
== l as== 2-EJ-Ol-6 10466 M-OSEJOI REVS
,j,g i
EJ-m-p*-DI
.mwyr 3
- DR AIN 8-EJ-O'-
3
"' CALLAWAT 5555 LINE CONT.
~
8730 FIG.
,3 m A
2-EJ-01-5
f (R
T
)
P E
M.E E
B X S IMI 5
E 7
5 X FUW S 5
ENR T
E.R 5
g E
N N
E g
EE ET A
E S
T T TNSTO EL N
W
-]*
O ES O
A RR g
I g
HL NYgPF L
N I
IS g
a L
EG 0
3 D L EG 4
A H H RN 0
1 C
i
.P LT y,
l f
t
.B t
g
- ' E RIy OH A
~
.I G
y P
W S
C O
J L
3 f
.E F
E w
J
~
g 5
j E
E a
g 7
6 T
e o.
y 1
E D ng*0
)
o,
/_
I 1
y o
/
j G
1 T
4 0
D c
6 2
o
-s s
t I
3 d
g D
o
(
M s
5 V
O
/4 2
3 H
C
~ V e f,
a o
f o
s 0
o s-J J
E o
N' i.
E z
2 J
E I
o t E
H 1
n l
e m
L
)7 s
6 o
T.
4 2
r
.l i
3 NGO m
Y' i
o s
0
(
c O -
I 6
C R
e FJ a
T B
J o
C E so E
C r
n r
o 4
T Y
E 2
a a
J m
y
'l 8
E g
C u
i u
4 2
g 3
1 g
3 a
5 0
9 2
5 i
I 0
G 1
5 1
I i
0 W
J g
4 4
I 4
E 0
l r
s 0
J I
e o
F E
E c
0 a
a EI e
0 n.
3 s
u e
0 3
o.
J l
5 0
E 5
a a
8 e
e g
3 O
o 3
0 g
F J
1 J
t t.
O 2
3i E
J t
/
l l
E 2
S*
N I
1 I
s 4
L 1
o s
n T
8 a
l N
1 a
3 E
0 u
V n
a 1
5 9 ".
4 3
O 7
0 I
F J
t V-a c,
g L
S t
I m
o g
3
'8 I
j',
1 1
a s
. g
, g I
saes E
S
~
o W [
J' F
s E
E t
f F-e 2
E G
1 R
i IF T. M NJ OE C 2 1l1I l
r.
!^
3/4* VENT UNE 4 a-EJ.04-so26-E I N
a -EJ-04 -f 026-r _ ]
I 2 EJ-08-Fo*6 F
,,9
,, y g.BCB-6 l p-82 h LEFT NOT ES:
CONT. FIG-jf a 4J-04-so26-6 I 3.
DENOT ES Ex EMPT PlPING LIN ES.
2-EJ-Ol-7 i 2 EJ-04-roes
- 2. ALL Li NES PREfixE D g.g3-o4 - so26-H i WITH SYSTEM NUMBEfs l 2-EJ-04-f o43 l UNLESS OTHERWISE
}
3 -o-o4-s oas-u I SHOWN.
ta-EJ* o4-Hoo 3 ;
- 5. O R EPR ESE NTS f j a.gJ-c4-sose Al HANGERS.
I 2 -EJ-m-so24-c.
I 34J-os-so364 f '
FO-2 g 3-EJ-o4-ro45I Ia-EJ-04-Co83 I S 4J-m-sens-o fTC(DUNE l a 4J-o4-noo2 I 8-EJ+-so2dc I 18-EJ-04-co 6 3 -EJ-o4-so27-D I d
N (49-BCB-Y4 a-EJ-04-so27-E I l 3 -EJ-04-90041 '
y CONT.
A W UNE RIGHT Ie.t> ou-ron F inge.:
a EJ-o4-so27-F I Ia4J-04-Hoo2 I a -EJ-04-6026-C I
(
i 2 EJ-04-so24-el
,-,,--....i g a_o-o4-so24-F CgTg, A/
It EJ-04-coe4 !
5 N a -rJ-o4-rn44 I i
-tJ- 04-F043 s
r m uNE T
'"RHR SYSTEM i e 4J-os-6 -s 1 EJ W~ TRAIN I s-EJ-o4-sca6-0 I g g-gJ-04-$0tS-C 3 -EJ-o4-so25-F I
,,, g
,,,,a 2 -EJ-Ol-8 16x 6 RED.J g
mg.jy.g 19-ECB-if MM
-23EJ01 Ev4
""* U #I A R_4J-on-so32-A M-Et
}*"
CALL AWAY 5555
-um-a-rous lagF3 g.
mv,3 FO-l
., - Q C'O N T. F IG.
10466 M-JO4 m m l
7-F P-Ol-l
a l
g e
o m y,
H 3A W
8 M y p
4 ow $
i 2 x i
1 w z 2 wa. ;
(
g O
V) w xzz N
b
~U3 4
w 5%w esi z 5y % :nes 2
a s
i
- o. m m
-o Hz O
I 33 J
h zgs*swwpe m
a
.' z 9
mO z am 2 tr Q.
5 Oz a gum www I, W l a.
> I2 pas
- _a -
r tg 6
o s tL < OC 0
ed A
4 O
?
k 0
=
-2
- Q y$gi Y
i R
e=
8
+
4
>s
- s. -\\
&g~
n o
O J
b T
0 b
, WOO r
, 8, 2, 8, A
2 0
I 2222 0
-\\
- m. ees, Wece
\\
g $888 r
- d w
y a.
,l e
h "O
e
~
0.)
!]
3 N*
?
I [4 !
?
6 3
a s, u
- a. ud-C6
~
/
8==p u
s.
u N
Ow N
/
3 5
~
g t
]
4 3
4 N
T. f.
m' Y
+
a 0
(-
~
c e
O N
n 5
=
s N
H e
s e
6 6
s 4
'4 %
Q
?
a 6
?
s
~
s 4
S 4
O.
?~
9,'
i 4
o t
i 2
Y I
l
~
Ei m
I a
e, c.
NO 5'
L u7 N
?
I f'
c 3
u 1
DR-P E
E M
BE x S E
iMI M
O 5
~
x FUW l
5 S
E 5
A E E H F.
T T
I 5
a R E N
~
W3N O
=
E EE
- #s c
S; J
ET E Y
e R
E T TNSTO S.
A
=
- W n
I 1
H 2
- m A
u.
N NL N YS. RF i
I R *N 9
a EGISSNPE M
- e. *' n L
L 7-L N HEWEG w
F A
I LTLO RN I
P C
.P LINH A
C
%f f
I
= P AWUS 0H 5A "*
5-EJ J
c E-T 4
- E 1
2 5
=
2 NG0 OIF-J C
i E
I 2
E N
IL V
{
l C
7 T
0 V.
0 l
- h[
s o
o.
L r
a S
c 5
r g
J
'4 t.
a S
G {
2 a
W r;
D 3
F. h 7
, i
[
s<
E &
0
, i -
i 0
0 p
a 5
e o
ac o
s O
i J
g f
a n
2 a
I r
w O
m r
a J
~
a E
4 a
2 o
i o
g p
1 J
i 3
T r
a i
o I
o
^
1 0
c E
e a
e o
d l
o a
s t
a
. a c
T J
4 e
I I
3ooH I
o 4
J T
o a
os i
i t
a so o
o J
o n.
r E
e a
3 o
e 1
J E-a g
1 N
O l
T.
NOC r -2
'f(lIll(
1
1 1I I
R E
G N
3.
A l
HP l
5 CM l
5 X
O 5
EU 5
P J
T E
w_
AR Y
A EH 2
W HR
{%
\\
A RD a.
L
$N L
RA A
g YE S_**C s
0 J
pu s
I
-a I.
s n
M r
+
p heg.
g
/.
gg I
p fg p
S g
G p
WD
~
6I l.
g L
3 p
E 0 T
~
p H
2I N,
g g~
C p
F R MM
=
6E F
6 E
p R 4M D
I
- a-
't e
u P
s U
S a
t n
A o
y 2
j t
F p
i A
e g
e n
I g
a w
s i
na e
r I
n s
I r
9 i
m m
a a
r u
F z
n z
A j
=
I 2
O J
EE 3A'E R
[II D
2 j GN AH CX
[
(
E
~
T A
)
2 E
tr H
p
=
t s
R n
d ar e-A B
0_
n s
EF r
F 2
1 7
1
,i l
III
P p
G 4
f
- e rJ-or-roosi i e.o 0,-
N 2-EJ-02-sc46-s 1 l
'l 2 EJ-of-mos ]
a M blV-g TCl V LINE 4
' ' ' " * ! [
CONTEIG.
t CONT. FIG.EJ-04-2 '
2-EJ-02-2 RHR Pump i 2 -EJ-or-row
~ PEJOla a - tJ -o2-roo, i i
W I E EJ-02-q q NO CX)NT.
i M R-D-02-5000-D l g
I3-HC B-14*s u-or-m a-p-or-cocel 3 -ga-02-90eO-C I l [
NOTES:
IO-EC8-14 ofurlCE IO -ECB-84*
I
""as DENOTES EXEMPT PIPING LINES.
2 ALL LINES PRE FIXED WITH SYSTEM 2 FLUSHCO>N.hP.P. LNE NUMea UNLESS OTHERWISE SHOW.
I E fJ-G-SoIO-A:
Y P
- 3. O R EPRESENTS HAN GERS.
I I - E.s- 02-5.orm- 0 OfMFICE I E -u-or-sooo-a a REE DRWS.
1 3-EJ-ct-soce-t 8 -EJ-02-$ cot-J l 10466 M-23EJO2 REY.3 10466 M-OSEJO2 REVfD I 2-EJ-et-scos-m a-EJ-02-soce-r1 a-EJ-oe-moisi
- 1 El-E J-ee-scs7-Ai g+
Mbh ---.
Ia O -oe-mois A
- e -o-02-roso 1
/
,,n, 4
RHR SYSTEM EJ
'D' TRAIN 70-EC8-M
=s 2. ** =* 2-EJ-02-1
- a-EJ-ce-ros4 I I t-EJ-02-Host l 2 -D-02-$008-9 I
.y
~
"'I f~
el 'SiE FIELD CHANGE FC-1 FOR "W
- U
{
g WELD MUM 8ERs
-CALLAWAY. 5555
+
b 2 CONT. FIG.
EJ-02-3 e
I f tJ-02-5013-D ;
2 (J 50:3-C l N
% 2 EJ-02-RO3C I
~
"g SLV.
I 2-E J-C2-FD & i
,f i t-O-02-sont-W gb;t,d R
IB i a rJ-ca-sai-a:Fwmee t d (J-w-ra? I CONT. FIG.
n-sJ-02-so n-e n 2-EJ 3 a-t4-02-sai-c i
)4! PT-615 l a ra-o2-nos) 2-EJ-ce-sa 3-EtFw94 J s1 a <J-ar-roi41 I
I hFLUSH CONN.
5
< q
~ '
i n-a-or-rossh I t-EJ-02-Hos61 2ee so2-e i WELD MUMBERS H EE --
T
""'RFtR SYSTEM NOT ES:
EJ
'B TRAIN 1 - DENOTES EXEMPT PIPING LINES.
REF. m
- 2. ALL LINES PRt! FIXED WITH SYSTEM
== 2
=== 2 - EJ 2 HUMBER UNLE SS OTHERWISE SHOWN.
N66 M-2 I==='4BTf N66 M-2m
- 3. O R EPRESENTS HANGERS.
= hm
=
CALLAWAY 5555 set fg Stat
.m
B t
/
CON T. FIG.
2-EJ 4 N
I 2-rJ-02-5046-It l 2 -rJ-On-SCB6-H '
g.gj.ot-F o2 t l
/g
'/g CONT. FIG.
%.VENTLIN)E 2-EJ-02-5 i a -stt-sous-rtresoddl 17x 10' RED.
k"[
EXCHANGER a.ra-ne-sas-r I EEJ018 I t-EJ-C2-SCO-C!
I 2 -EJ-02-SOr9-J '
l'-TE-613
! a-EJ-ca-sois-A l
,,,g e a-02-mo2sl 1 e-rJ-oz-rc22 1
's s FE ORIFICE I s-EJ-o2-SO9-E "
la-o-or-nos31 EG-M
[
,.g,.o,_5o,3 c i I a-rJ-or-sos-r!
- a -rJ-c2-m i
I e -rJ-02-SOS-G !
p
,,.g,,,,,,
! 2 -rJ-02-509*H ]
/
e N
A C l8'RSLV.'
REF.ORWS
Q{%_L_
< u a -ta-02-rosa l
EJ g TRAIN
'Y
- 2. ALL LI NES PREriXED WITH SYSTEM NUMBER
"* 2
'* aa 2-EJ-02-3
'~'
UNLESS OTHERWISE M,A.m4n.gf SHOWN.
,,937
- 3. O R EPR ESE NTS
. FIG.
HANGERS.
" CALLAWAY 5555 02-2
== ww.,
0 0
0 N
l 2 -EJ-02-SO7-O'
' 2.EJ-02-5017-C l
! t EJ-02-Sps2-EJ
' a -rJ-o2-sa 7-r l a-EJ-02-500-GI I B -EJ R02tl H 2 f J-02-50se-A l F
. I 3 -EJ-02-F089 l 3.EJ-02-5088-0 I f
I I t -EJ-OR-5006-N u P
I 2 -E J-o2 -5016-C l NOT ES:
f
- 2. ALL LI NES PREFIXED
@ gcp, WITH SYSTEM HUMBEli UNLESS OTHERWISE SHOWN.
Kfx F U.:D,
- 3. D R EPR ESE NTS m a rJ-02-soss-oI HANGERS.
2.EJ-02-504 8 -E l 2 -EJ-02-5016-M ]
H ELui ----
I -E J-OR-5G6 -L l ewes mte
,8
- g p u a EJ-oe-cosI
.RHR SYSTEM
(
EJ B* TRAIN 1
1 CONT. FIG. 9
- =. 1
- == 2 EJ-02-4 l
2-EJ-02-3
's gg Y
h[66 ~
at b-II'
'8 '
-O5 CALLAWAY' 5555
~
'.y~
. FIG.
2-J-02-5
5 5
[
T DR M
55 P
E E E E
2 5
M B
X S E
IMI 0
X FUW Y
E.RENR D
A S
W T
E N
S SS 2
A PMH E h E EE L
ET C L
N TNSTO S.
s T
n A
a a
C I
N NL N YS. RR f
EGISSNPE H yg D
L
=
N HEWEG 2
=
I LTLO RN P
=
=
LINH A
a IP AWUS OH g
2-3 ic
- 3. D.
I 0
2 1
H I
1 3
3 o
r VY 0'
a s
EE a
o RR 0
2 2
m 2
r 22 0
o 0
c OO 5
s 2
s a
1 o
u JJ 5
r 2
2 EE o
0 o
S 35 o
I t
W z
J G 20 o
J J
a t
W s
r E
e o-R MM I
s 2
a a
a O
F. 66 r
i o
E 66 2
t I
e a
I 5
R 44 O0 a
a m
r.
g M
=
I1 E
t a
2 E
l 1
o T
D C
u E
i F
c S
'g-s ER e
1 o
GE i
z l
G-I5 t
o e
NB AM F0 a
s f
0 HU I-C 2
2 CN
/
NJ 4
o I
s
)E
~
s DD t
7 o.
l o
X-e 2
a LL r
(t z
EE a
o o
FW I
n r
o o
i 2
ER J
o EO g
a r SF a
t-g 1
a E
N I
U
=
i 5
s r
N s
a 2
MR E
8 7
t 2
0 o
o GB s
s O
5 RTNl f
D HAAO r
r f
o o
REWE o
E J
R J
u J
l E
1
'd XE r
E 4
a a
i t
t m
I on 4
t I
r r
3 o
G2 I0 G2 i
l i
F T.
41 a-u E
r I 0 F-J a
8 1
NE t
a 2
2 o
J o
o O-i s
E s
s C1
,1 t
0 a
2 a
a c n 0
o 0
e o
F I
J s
J J
E D
t E
r 2
r e
E 0
o a o I
a J
s I
J E W 2
C m
a a d 4
7 l
J 3
l u
3 d
r.
0 i
s f
,l l
i e
s 70 i
8 N
s m
e f
r o
o i
n J
s-4 e
Y o
c1 i
r 6
o o
r G-C e
a B
s
'8 I
u 2
F. 0 C
2 T-2 E
0 C
e a
E c
i J
J NJ i
O 7
E g
E 7
C-1 2
5 l
2 l
1 P.
O O
l l
- 2 EJ-02-sO26-Ol N
I 2 -EJ-oa-scts-c :
CONT. FIG.
a EJ M Co2ol Q
2-EJ-02-9 k
< r--I s -EJ-o2-rom I g
l t-EJ-02-so23-0 '
I 2 EJ-o2-So23-e :
3 -EJ-02-F027 l l p (J-o2-Fo261
! 3.EJ so26-r I N CONT. FIG.
I 2-EJ-02-5
. J a-EJ-of-sors-rI
_ NOTES:
- 1. - DENOTES EXEMPT PIPING LINES.
z-EJ-or-rwem
- 2. ALL LINES PREFIXED WITH SYSTEM NUMBER UNLE SS OTH ERWIS E SHOWN.
10 REPRESENTS H ANGERS.
~a-EJ-of-sots-sI I a -Es-o2-soe7 -a HELai ---
ccNT.Fis. -
m-mu 2-EJ-02-7 FE-689 RHR SYSTEM
'n EJ
- B' TRAIN EF.ORWGS
- I
= '* 2 -EJ-02 -6 10466 M-23EJO2 mv2.
== ro.aa 10466 M-05EJO2 Ev.so w.
=
un ex sp 1
CALLAWAy 5555
.or m =
l
- w*
I i
m s
. s 8
I Wz 8
s f
3
',8, m-g i g _a i
ad v,,
m t
z-U $2 5 8
0% ~6e t
6 f.
f f.P
" I e
1 ga m
?
Q 3
! 'g y
a
.i Z
+
a-W P" je, n.s g mw a
i st !
g]i Q
e
~
2
.9. ]
? I
?
0 6 W k k
8 g
A 6
2 6
8.T 5
8 s e
y as u
-1
' 7 g
3, rr
~
y
/
s
~
I 4
3'.
,/ ~
g x
h h
$2
~
9 y
a gg u
6 g E,Q 6
=
-t g
2 a
'S 2
4 6 b
U
?
W hJ y-s
?
9
\\
f s
z
- i i l i
,i th.!
c-e! !
~
1 8 g.. L a
=w
.z 4
4 55 7 !E I
I
? ? s I. f j'@,$
5:
5 E5 E g
e. =sz e
=
=.
4 E
S E
B m
- w amm z
y A
4 o u o r sww d8 h
h E
i S
b e
goEJg$
N
=
y 7
A
-?
y
=
=
4 Esww w 3
E
.-Q lEYMoD s anz a t
v.
8 4
U"*
b I
h" h
'e a
~
a b.
%,./
o 4
y as 4
8 i.
=
x r
t C
u 3
\\
k A
S I
5 s
i 9
?
b.
s 2 3
)
g 4
3
{
w 2
~
U k
g h,
no da y
EE n
l M
=g 3.
E mmm
i N
I0 2
G-1 I
P I
5 E
NE 0-G t
M 8
5 i 02 5
L
[
hN 6
SI E
2 5
T TN 0
t O
m uW YA s
Y E
.u J
4 A
SR V
l E
o W
T 4
2 t
A.
o
)3 io i
a
% '"MF 2
J m=
L T
(
s a *
=
L e*
=
A 4
I 2
N o
F
~
l 7
C m
T e
J 1
f AM"*
WE 5
i
~
t
~
J d
e I
a c
s
~
40 05-e 40 1
4 1
J o
6 E
o I
a c
g 5
M
- 3. c e. -
I I
I I
4 1
5 o
3 D
Ree*
V 0
2 c
o J
E J
0 3
2 E
m
@5 m
W o
E R
O0mM F
e 22 2
4 o
4 1
o JJ 4
s 0
202N EE 4
o J
I S
i o
4 D
(
35 c
J o
t F
G a
E D
W g
I s
)r o[J,oI o
O t
R I
i a
R MMMM a
2 c
y 666 g
s 444N ml l
s 1
F.
666 i
I T
4 4
s g, W
4 E
0 E
F o
N i
R o
OOO O
5 H
a s
0 III 4
a C
r 0
0 i
r 4
n g s
o a
I 5
2 J
s s
0 4
i g
o e
o
- o 4
F l
3 3
3 o
g e
E 0
J s
e E
4 o
I I
0 E
J 2
o N
N o
R F
E p
5 o. ".
MW a
a I
o L
o 0
I g
2 4
I O
S E 4
s 4
D 0
c 0
T 0
H i
E T 5
J o
E 7'
3 J
NSS Uk t
f o
I E
o E
E 4
u
- f o
Y s
V o
L SE I
l t
t 6
gg s
,a o
e a
x p
J g
4 I
4 G
S I
I g
f 3
0 HI s
NTW.
o.
4 s
I 4
3 o
o c
K I
c 3
I S
S c
i g
P WR R l
s 4
I E
E 4
P E
g 0
4 a
l 0
DH G g
o 3
o G
T o
C o J
g_
,N l
O s
o P ET XO N J
o 4
s s
F o
s I
A M
s 4
4 4
s o
s S
a 4
0 0 0 "6 I
I 30 S
E SH F
E X
S o
0 J
4 0
I u
o 4
i T EEE S A
0 p
E 4 8
s I
RL T c
4 O S P N
F a
a n a
4 J
a O 0 I
N E N o
E n
iI e
E c
o I
J s
A 5
E T SU S 0
u e
5 e
o l
O E E
I 2
t I
4 N
c NRR I
4 0
4 D
n a
0 0
m E IE P J
a J
E a
D LB E s
i o
4 J
s s
6 4
E
. LM R e
2 4
= LU I
a o.
4 a
1_
=ANO
=
o I
J J
r 2 3 1
E a
U I
I i
[
e I
d c
E 1
i c
o F
1 5
o 0
3 S
e 4
0 o
,4o 0
F I
S 4
e -
F a
4 o w u e
0 n
c g
r J
1 3
J o
D o
E s s
E E
o.
r I
e s
N 3
-s c
t-3 I
w I
'L o
L I
J s
4 D
g a
e g
l o
H C
T p
g g
4 J
f o
r
- ]7 20 M
u F-
.2 2
T0 A.-
l eE J
4 2
N,;\\
~
2 l
Sw l
8 G e e
3 b $
o W
1 Di g o ar-
-t O
? [.$
C 4 i n
l i l
r 8:
i ag ~sag a
a f
U pu gga (a) l~
~
i t
,I a
He g
4 m
v e
6 Y
h 5
5 5
z a
a.
k.
b e
sw>
4 2.,
m y
a ma. g
=
om s
Y W
X2%z W
m x
-mg
- 3m$.
,e,
>- 2 ( s.. >
m 2Ww o
03 em z
2E0
$.gg
- s=ame a
ozs 4
a zz
.Y Y
. -J 3
- 4<
OD S
a si e6 Y
M6 7
s a
w.
~
(
i:
$9 s
~
d.
a?!
,4,# "
4 bz
~
7
/
8 o
e h
h.h
- h. h. @.,8 n-a
~
~
4 3
8 5
h h M g
l T
5 h
.~I W
Q I
al 8.
E 8
6 i:
h r
s s'
g
's n
- Y f
?
r
)
j a
6 4
1
?
6
?
- 0-I h
s 3
3 t,
ee
?,
~T t
o
(
z
(
)
M I
8 4
A
+'*e f F4
=
m
. M1 eE d'
$2?
- +*P
'N N M
I
- W sfh 5
l ji' i s aca m
! I5 h!
C
^
i.
=e l
m T
i a.
a I
." b f
o' s W d
6W y
g w
D p
b 4
P g3 N
el.l.
g j
m i a l
e I
Q e
t
/
A, z
h k
S D
g 99 g
4 S
8
?
- so w SS m' $
Y 2
3 y QW
=
. h
,5 4
~~
w x
~33 2 kk
? h
?
?
Y Y
I
- wd be
.WW 2
m
?
Q B.
- m. o
.i w m zw w m
e w
8
- e p
w e.m 2
=
l-N 3
0 M2 22 03 *2W W o
4
,\\
4 z
pm m e$
e Y
Z w
l
=
wc 2z _k g g y8 z33"S W
/
\\
o 9_
s s
b T
o i
5 J.
3 9'
a 3
4 S
a.
=
g w
(
i 5
$~
h j
~
u e
.tp d'cs 8
Y
--o-B y---:*a-V W
,d
]
g q
g un s
.h U..
k k
E,
. a.
S 8
?,
T
=
4 4
3
?
o w
t
.9 t
g
'N 4
4
=
8 7'
4 f'
"g u
o o
w 6
?
t 1
8 8
~
n5 h,
0 I
Y
~
4 8
+
T
. ?
h 2,
- -6l I
k m.
- ' T T
3 o
5 s
b h
a 8
=
4 4
y E.
D V
l e3E j E
C.
sg I p= u n 1
z
.=
v it t a
i
$$4 7 11 j '
f gg ba l
$ 55 e
I ei f
i b
a a
g s
i
.S 9
_I I OU,. g gg 1,
e i
spik \\
- l
?
5 E~ds!$
niiz
- gr 83*
p
- a. i e
s -s mgs_ :
9 8
M
.a w ff a
~
w a
9 wo 2 0
Y 13 za3ww o
a
'e, b
e l5 3E
~
sit <j.U D i
s, Di s
=e 2
a g
C i
! )
i 9
L r
T g
l 3
8 a
1 s
4 a
g ]
6 3 9 4 "r 2 I
4 1
3 6
4 g
g M
4 g
i.
s p
A k
k z
's 1
gr.
(
k_
(-
J g
h
g
~
i
'S c
I E
x 5
6 1
5 3w 0
s 5
M 4
5 4
5 0
?
0 s
l8 E
4 i
4 a
T a,#
3 0
-A SN J
Y c
r e
E A
1 c
SAI E
Y a
E e
R 2
4* W m
r i
R
=
- l e
I
)
o
~
2 0
a s H" a ="
l a
A m R *B =
c q
7 l
P
~-
G
\\
c 6
u "c
H =s"'
E
=
e
=
J 2-J o
6 s
F s
s 2
o
'5
=
0 e
s s
4 s
5 i
4 o
o e
S o
J s
E s
J o
e 2
I E
-J i
H 2
E a
I G
3 l
a i
0 s0 5
I 4
l 4
e T
0 a
M
/
n P
J 8
s J
E I
o E
g~
8 t
N D
- h I
l 4
t 2
I 0
g F
B B
O 4
~
0 R
t s
J I
a u
- }O E
o J
e 8
a O
t E
H I
+l '
o 4
l o
V H
S N
t u
e L
o J
S
.MV R
0 E
c E
S E B
E a
"E H
E T M
E s
t s
4 NSS U
I a
o m
0 Y
N I
s s
JE 2
L SE D
n o
4 f
G S
L s
o e
i HI E
1
.s a
1 4
C NTW W
4 E
I 0
0' 3
I S
PWR R R
2 5
4 n
0 0
P I
E J
I 0
E O
F E.
4 5
DH G F
0 4
T 0
P ET E
^ fl 4
O N 1
J 0
X A
C E
J M
2 E
J IFSH F
G-8' E X S E
S E
I 2
F4 E
T. 0 T EEES G
2 i
RL T O S P N
A g/ h*I 1
N NJ L
N E N XE O
E H
E S
T SU S
( e C
2 r
O E E
M e
I N NRR D
o F
E IE P L
g N
D LB E E
e l
I
= LM R F
o ro E
= LU E
e C
= AH O E
e 4
-s S
=
r s
0 2 3 1
1
- v. g.
ts s
2 al oon s
e 2
m o.
A o.
o c
4 0
e e
t a
o u
J s
E s
e t
o e
o I
J J
s E
a i
I
~
-/
_%. c&
S&
"g e ig 59
[
4 s
4
~
4 O Ch N
2 Q
b b A
- Uz b hl 8 3' 4
l
- a Y 99 h, e,
(
mm
~
Z rd
? $
I II f : ","
z 1
~
aw e sg o
/
z e
Es,
E g
4
?
$ 1 p= ig -
n 8
~0 E w, l it t
=
s==
laW T
memR I
EsEE 5
i.
1 1%%B4 3
o a
E
~,
f Y
$EPd$
2 8
y e
g isii
?
g
$333 T
.sl E c5 w
WT g
g 8
5 m.w s
w t
x' ws3 m~
z s
a w wze
~!
C?
Gmm.Esg -
a 4
4 5
z
(-
I w ww v
w y
ws W v
g Y
g 52 0t,;o $a w..n
.r B.
3 gzJzG..mm
=
4 we-.zaw
'73....
g s
k 6
o sz zwwww sozz
?
6 6
6 L M
/-
IE s,_E5 a ts hh f
^
s e
d 3
,a
.q.
g M
E
.9
't e
ll3 a
s 6
s I
y gaI H
3 y
E 3
.t
O O
n CONT. FIG CONT.
2-EJ-OI-LgFi P-79 j' VENT 12 - fJ A0's a g z EJ-o4-noi71 12-EJ-04-F03e [
- 1 12 EJ 04 5DI9 E t Fw ?)f7
, g,. g,.o4., g 3 3,
I r-EJ- 04 -F037 C 29-ECB-3" f
12-EJ-04-50f9 D I' I2
- EJ-04-5069-F i 5,.g.g,,
f 02-ECO-12*
B r.;
6 I2-u-o4-Fo471 (ORAIN LlHE la-u-o4-coar 8 Of re-EJ-04-H01s 2-EJ-04-F0451 42-N Gi-F osa i
- 112 EJ-04-5037-0 g
' '503R'
-BB-PT-405 e.EJ-04-co2 I
- 1 II-EJ-04-5037-c Q'
8702 l tSO3) bl 3-EJ-04-CO25I Z-EJ F03O I A
It-EJ-04-DOO5 F-J 2 - EJ-04 -5037-9 12 u F031l d 11:5037 m 4
?
r u -o4 sois-ri
,,7,.,,
It EJ-04-F034
'd 112 -EJ -o4-S ole -8 It -EJ-04-50ie-C W g pgg
.et nr4-scie-o 2-EM-05-1 lt F W-Si
,20's SLV.
me u sois-t _i
~
NOTES:
<f' I.
DENOTES EXEMP1 PIPING LINES.
- 2. ALL LINES PREFIXED REF.ORm;S t1 WITH SYSTEM HUMBER N66 M-23EJO4 nEv.R
= = -.
UggS OTHERWISE g TC ( V LINE Of-BCA-t2 10466 M-05EJ04 AEV.10 S
'??'
'"'8 RHR SYSTEM 3 D REPRESENTS EJ A* TR A IN HANGERS.
'*
- 3 2-EJ-04-3
- tt, ears 6 6 84 et SEE FELD CHANGE FC-3 CONT "N
- 4 '8 '
FOR HANGER DELETION RIGH
" CALLAWAY 5555
.or se seu
o I
uD o
N P-28 EL. 2 Ole'- O" 9g,g,
~
Ig-EJ 04-5005 - C E8-rJ-on-F063_1 EJ- 04-5 0801
,ap A04-4003 I-EJ-09 -NUlli f8
- 5*n g
L o EJ-o *-F084 ur-u-os-aaaa-
' H MJ-02-SO4G-C l
- /o, g-12-EJ-04-F o oM ygg u-rJ-os-huus 2 EJ-04 5 12-EJ-04-6ao7-Cl IFEpo4 Coo 2]
j &ttso 4 -s006-N In-Efo4-foot d E L. 2005'- 6' sa-r2-on-em
/
yEL 2002'-6 1
-EJ-ca-so46-Al F
J-on-H ous REF. DWGS-2-E J-02-10 g {%" _,,, -
IO 466-M-new.s IO4 66-M-REv. 2 4
ew=
nne RHR SYSTEM TO 104 66-M-05 EJO2 REV O SAFETY INJECTlON IO4 66-M- 05EJO4 nEv.m EJ SYSTEM LOOP NO 24 3
.n 2 ne.= 2-EJ 4
- 2 SEE FIELD CHANGE FC-2
,, u.
.,447.r4 FOft !!A80GER DELETION
- w$
sam we#f
" 5555 -CALLAWAY
.or m sc=a 1
r n
a 8841 IE E J-04 R0071 g
C lt-EJ-04 40iSl s.
lE-EJ 04-CO
/ u s;-o4-c oc ci 10% 6' RED T EE (2 EJ-o44 osat NJ # 00 Lt EJ-o4-soossi//
/
d EL.a m
's cg1..
,4i aggp/
a m o*-n-N, x
H104-s A
3
,,....r M#04-50M
'n N
leEJO4 SO'O O IO' G"R E D-paq,-cosa s EtJ-04-50 34-A 6g
. Se <#04-rois F0
, g y,,o
,,gc, 6
hE#C4-50l!II mg g
i detJ-04 goe0-(
l&lPO4-5009 91 Ista.04-acosH I y
o
, 12-E J-04-50l o-E tS010'C ( + 1 '
NJ-04-SOll-CISOss All# 1 1E-E#04-50110 EfJ-04-C00A 4
e eO MJ-04-C005 MJ-04 -Accam-
-a CONT-FIG
--H 2-EJ-04-4 H EL*i ---
REE OwGS-T w RHR SYSTEM TO SAFETY INJECTION 104G6 M 23EJO4 REv a EJ SYSTEM LOOP NO. 24 3 104 GG M O5 EJ 04 REV e -
.2
.a 2 EJ 5 nam 4 W1M se enns/HV
~
CALLAWAY - 5555
.or so c=s i
.