ML20197H398
| ML20197H398 | |
| Person / Time | |
|---|---|
| Site: | Oyster Creek |
| Issue date: | 05/12/1986 |
| From: | Kister H NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | Fiedler P GENERAL PUBLIC UTILITIES CORP. |
| Shared Package | |
| ML20197H402 | List: |
| References | |
| REF-GTECI-A-36, REF-GTECI-SF, RTR-NUREG-0612, RTR-NUREG-612, RTR-NUREG-P612 NUDOCS 8605190162 | |
| Download: ML20197H398 (2) | |
See also: IR 05000219/1986006
Text
-.
_
_
.
.
AIAY 121986
1
Docket No.
50-219
License ho. DPR-16
GPU Nuclear Corporation
ATTN:
Mr. P. B. Fiedler
Vice President and Director
Oyster Creek Nuclear Generating Station
P. O. Box 388
Forked River, New Jersey 08731
Gentlemen:
Subject:
Inspection Report No. 50-219/86-06
This refers to the routine safety inspection by Messrs. W. Bateman and
J. Wechselberger from March 3 - April 13, 1986 at the Oyster Creek Nuclear
Generating Station and the GPUN Corporate offices in Parsippany, NJ and the
Region based inspection by Mr. W. Baunack from March 24-27 and April 2-4, 1986
,
at the Oyster Creek Nuclear Generating Station. The inspections consisted of
,
document reviews, interviews and observations of activities as documented in
the enclosed inspection report.
The findings were discussed with you and other
'
members of your staff at the conclusion of the inspection and with Mr. P. Czaya
of Technical Functions Division subsequent to the inspection.
1
Apparent violations of NRC requirements are cited in Appendix A and categorized
under the NRC Enforcement Policy 10 CFR 2 Appendix C (49 FR 8583, March 8,1984).
A reply is required and should be prepared in accordance with Appendix A.
We acknowledge receipt of your April 3,1986 response to the violation cited
in inspection report 86-02. Your corrective actions will be verified in a
future inspection.
The responses directed by this letter and the accompanying Notice are not sub-
ject to the clearance procedures of the Office of Management and Budget as
required by the Paperwork Reduction Act of 1980, PL 96-511.
Your cooperation with us in these matters is appreciated.
Sincerely,
Original Signed By[
Harry B. Kister, Chief
Projects Branch No. 1
Division of Reactor Projects
Enclosure: NRC Region I Report No. 50-219/86-06
0FFICIAL RECORD COPY
IR OYC 86-06 - 0001.0.0
86051903
05/07/86 I Eoi
,
fA
050CN39
g -l
---
.
- - - - - -
- - -
- -
- - -- -
- -
-
---
- -
- -
--
_ ___
.
-. ~ ,
.
GPU Nuclear Corporation
2
.
,
cc w/ encl:
BWR Licensing Manager
Licensing Manager, Oyster Creek
Public Document Room (POR)
local Public Document Room (LPOR)
Nuclear Safety Information Center (NSIC)
NRC Resident Inspector
State of New Jersey
bcc w/ encl:
Region I Docket Room (with concurrences)
Management Assistant, ORMA (w/o encls)
ORP Section Chief
DRS Director
DRSS Director
.
RI:DRP
RI:DRP
I.
P
,fy
Blough
Kister
')
Bateman
5/[/86
.)/ 5/)[/86
5/ P/86
/
0FFICIAL RECORD COPY
IR OYC 86-06 - 0001.1.0
05/07/86
'
l
1
e