May 1, 1986 Docket No. 50-344 DISTRIBUTION ocket File NRC PDR L PDR Gray File PAD-3 Rdg.

H. Thompson C. Vogan Mr. Bart D. Withers T. Chan K. Johnston S. Scott Vice President Nuclear OELD E. Jordan B. Grimes Portland General Electric Company J. Partlow ACRS(10)

H. Smith 121 S.W. Salmon Street Portland, Oregon 97204

Dear Mr. Withers:

The Comptroller General in a Report to the Congress dated September 19, 1984, stated "NRC needs better management controls to ensure implementation of generic issue solutions." To correct this situation, the Nuclear Regulatory Commission is working on a long-term program which will improve its documentation on the status of power reactor licensees' implementation of approved regulatory improvements.

To assist in developing this information for the Trojan Nuclear Plant, please review the enclosed plant-specific list (Enclosure 1), add omitted significant actions to the list, and provide the date that all aspects of each identified requirement were completed / implemented or are expected to be completed.

Enclosure.2 provides a more detailed title description of certain tasks identified in Enclosure 1, and is provided for your information. For each requirement that has been completed, enter " completed" under the Status column and the date the item was completed.

For requirements that have not been completed / implemented, provide the projected date and enter " projected" under the Status coltmn.

A major effort to obtain precise dates is not desired or expected. Rather, readily-known or best-estimate dates for actions that have been completely implemented is acceptable.

For example, the year only would be acceptable for completions prior to 1984; the month as well as year is needed for requirements completed after that time.

For projected completions / implementations in 1986, use month and year. Use year only for projections thereafter.

Please provide a response in the form of a marked up listing by May 31, 1986.

In the future, NRR will need estimated dates prior to issuance of the safety evaluation so that the estimated schedule may be included in the evaluation.

8605190003 860301 PDR ADOCK 05000344 P

PDR l

1 This request.is covered by OMB Clearance Number 3150-0011, which expires September. 30, 1986.

Sincerely, Terence L. Chan, Project Manager PWR Project Directorate #3 i-Division of PWR Licensing-A,'NRR

Enclosure:

As stated i

I 4

1 J

s 1

N b

i d

U =l PAD-3,1# ~

D/ PAD-3

, PAD-3 Vogan'.T. Ch n;bs-S. Varga i/86 y /g6 04/ /86 4

i r

R-1298731-901 R E O U L A T.4 R Y INF0RMATION TRACKINO 3YSTEN PAGE NO.8 49; FACILITY IMPLEMENTATION 03/31/8i 1

FACILITY: TROJAN 4

PLCNT LOCATION: 32 MI N OF PORTLAND, ORE LICENSED PONER: 3411 194T PROJECT MANAGER: K. JONNSTON DOCKET NUMBER 8 959-99344 DESIGN PONER:

1130 NME BRANCN CHIEF:

S. VARGA l

ARCN/ ENGINEER BECM NSSS VENDORS MEST LIC. ASSISTANT:

L. PARRISN IE INSPECTOR:

G. JONNSTON l

LIC ACT LICENSEE TAC NO. MPA.0 TITLE COMPLETE STATUS MH N08321 A-01 10 CFR 59.55 A(0) - ISI 05/98/81C M07721 A-02 APPENDIX I - ALARA 12/20/84C MO7269 A-93 SEctNtITY REVIENS-MODIFIES AMENSMENT PLANS 92/27/79C i

i MD6930 A-03 SEC1NtITY REVIENS-MODIFIES AMENDMENT PLANS Q

02/27/79C i

M97714 A-09 PRESSURE VESSEL BELTLINE MATERIAL SURVEILLANCE

  • 95/19/80C l

M19558 A-10 CONTINGENCY PLAINIING 10/96/80C M19555 A-11 OUARD TRAIIIING PLANS 11/13/81C M19541 A-12 VITAL AREA AllALYSIS 82/27/79C lM11245 A-14 19CFR 59.55 A(0) - INSERVICE TESTIlle

~04/10/82C N

M12793 A-15 90ALITY ASStNtANCE REQUEST REGARDING BIESEL OENARAT 84/30/80C M47097 A-16 00ALIFICATIONS OF EXAMINATIOII, INSPECTIOll, TESTING 11/03/81C

!M5i342 A-17 INSTRUMENTATION TO FOLLO14 THE C1PJRSE OF AN 'ACCIDEN 87/30/84 i

jM55751 A-18 TECN SPECS AFFECTE3 SY 59.72 AND 59.73 (OL 83-43) 19/30/84C lM59152 A-29 10 CFR 59.62 OPERATIlle REACTOR REVIEllS II//S /

M59991 A-21 19 CFR 59.41, PRESSURIZED THEltMAL SNOCK RULE 03/30/84 lM06325 S-92 FIRE PROTECT 10ll 93/09/78C fMe7715 5-93 PNit MODERATOR DILUTI0lt 02/27/79C s

{M07199 S-94 REACT 00t VESSEL OVERPRESSINtE PROTECTIOtt 12/04/82C

'M07390 3-97 STEAN GENERATOR FEEDNATER FLON INSTASILITY 10/18/79C lM10144 3-14 CEA GUIDE TUDE HEAR 07/01/89C i

1 1

R-1208731-901 R E O O L A T,O R Y INF0RMATION 7RACKINO SY$ TEM PA!E NO.

FACILITY IMPLEMENTATION 03/j TROJAN (CONTINUATION)

LIC ACT

,1 ENSEE IAC NO.

WA 0 TITLE COMPLETE STATUS RAIE M12144 3-16 EMER0ENCY PLANNING AND REVISIONS S4/01/41C M11298 B-17 TECM SPEC SURVEILLANCE FOR NYDRAULIC SNUBSERS 92/06/85C M1927S B-20 CONTAINMENT LEAKAGE DUE TO SEAL DETERIORATION 01/01/70C M10339 B-21 LOSS OF 125-V DC SUS VOLTAGE NITN LOSS OF ANNUNCIA 95/13/81C M19141 3-22 TECM SPEC SURVEILLANCE REGUIREMENTS FOR MECMANICAL 02/06/85C N07328 B-23 DEGRADED ORID VOLTAGE 04/16/01C N08291 3-24 VENTING AND PtNt0ING CONTAINMENTS NMILE AT FULL, PON 09/26/80C M42594 3-24 VENTING AND PtNtOING CONTAINMENTS NNILE AT FUI.C.PON 06/01/84C M19234 3-26 INADVERTANT SAFETY INJECTION DURING fitl0LDONN 12/29/79C N08685 3-39 PNR PRESSURE - TEMPERATURE LIMIT TECH SPECS 11/13/80C M46735 3-41 FIRE PROTECTION - FINAL TECM SPECS (INCLUDES SER S 12/14/82C M11073 5-41 FIRE PROTECTION - FINAL TECM SPECS (INCLUDES SER S 10/06/80C M11715 3-42 TMI FOLLON UP - ALL PLANTS 66/03/81C M43155 B-43 PNR FEESNATER LINE CRACRS 95/25/82C M30680 3-44 LESSONS LEARNED I WLEMENTATION 04/23/80C M30681 3-44 LESSONS LEARNED IWLEMENTATIDW 04/23/80C p - *

  • M30682 3-44 LESSONS LEARNED IMPLEMENTATION 04/23/80C M30683 3-44 LESSONS LEARNED IMPLEMENTATION 84/23/80C 1

i M30684 3-44 LESSONS LEARNED I NLEMENTATION 04/23/80C l

'M30685 3-44 LESSONS LEARNED IMPLEMENTATION 84/23/80C e

M30686 3-44 LESSONS LEARNED IMPLEMENTATION 04/23/80C M30687 B-44 LESSONS LEARNED IMPLEMENTATION 04/23/80C l

M30688 B-44 LESSONS LEARNED IMPLEMENTATION 04/23/80C l

l t

R-1298731-991 R E 6 U L A't 0 R Y tNF0RNAtiON TRACKINO SYSTEN PAGE NO.t.

FACILITY IMPLEMENTATION 03/314 TROJAN (CONTINUATION)

LIC ACT LICENSEE TAC.NO. MPA 3 TITLE COMPLETE STATUS DATI M38689 B-44 LESSONS LEARNED IfrLEMENTATION 84/23/80C

]

M39699 B-44 LESSONS LEARNED IMPLEMENTATION 04/23/80C M39691 3-44 LESSONS LEARNED IMPLEMENTATION 84/23/80C M39492 3-44 LESSONS LEARNED IfrLEMENTATION 84/23/89C M39493 3-44 LESSONS LEARNED IfrLEMENTATION 84/23/89C M12939 B-45 MASM 1499 EVENT V, " PRIMARY COOLANT SYSTEM PRESSUR 94/29/81C M42984 B-46 ANALYSIS OF TURSINE DISC CRACKS

'5, 05/15/89C M42119 B-44 ANALYSIS OF TURBINE DISC CRACKS 12/11/80C M12689 B-47 ECCS; CLAB SHELLING AND RUPTURE 99/10/80C M48370 B-48 ADE90ACY OF STATION ELECTRIC DISTRIBUTION VOLTAGE 92/24/81C M11885 B-52 REVIEN OF SAFETY ASPECT OF INADVERTENT SAFETY ACTI 10/21/89C l

M12349 B-59 MASONRY NALL DESIGN 03/31/86 I

[

M42502 3-60 ENVIRONMENTAL QUALIFICATION 12/04/84C 9042711 3-61 LOSS OF ff0F CLASS IE ISC PONER 97/28/82C M42783 3-62 ESF RESET CONTROL DESION DEFICIENCY 06/12/81C M43933 B-43 INTERIM PROCEDURES FOR SHORT TEMM BLACKOUT 99.'17/81C

- ' M47179 S-46 NATtNtAL CIRCULATION C00L30NN 84/92/83C i

M46445 3-69 IES 89-4 MAINSTEAM LINE BREAK HITH CONTINUED FEEDN 10/97/82C 1

j M46639 S-70 FATIOUE TRANSIENT LIMIT TS 05/25/82C

{

"M49765 3-72 NURE0'9737 TECM SPECS (GENERIC LETTER 82-16) 04/24/85C e

M52899 B-76 ITEM 1.1 - POST TRIP REVIENs PROGRAM DESCRIPIION 4 99/95/85C l

M52896 3-77 ITEM 2.1 - E9UIPMENT CLASSIFICATION 8 VENDOR INTER 09/30/86 l

M52971 3-78 ITEMS 3.1.1 8 3.1.2 -POST MAINTENANCE TEST PROCEDU 10/11/85C l

l i

I

F R-1298731-est R E O U L A T. O R Y I O F0R MATI'ON TRACEINO SYSTEM PAGE NO.s FACILITY IMPL"EMENTATION 03/,8 TROJAN (CONTINUATTON)

LIC ACT LICENSEE

.IbC NO.

MPA 9 TITLE COMPLETE STATUS MIZ I

MS3052 3-79 ITEM 3.1.3 - POST MAINTENANCE TESTING - CHANOES TO S4/30/86 MS3196 3-88 ITEM 4.1 - REACTOR TRIP SYSTEM RELIABILITY - VENDO 19/10/85C MS3159 B-81 ITEMS 4.2.1 8 4.2 2 -PREVENTATIVE MAINT PR00 FOR R 84/27/85C M53291 3-82 ITEM 4.3 - AUTOMATIC ACTUATION OF SHUNT TRIP ATTAC 97/26/84C M!.4575 3-83 TECM SPECIFICATIONS COVERED BY OENERIC LETTERS 83-09/05/44C i

MS6710 3-83 TECM SPECIFICATIONS COVERES SY GENERIC LETTERS 83-04/04/85C'

-MS3642 3-85 SALEM ATNS 1.2 DATA CAPABILITY

' 'e.

04/15/86 M53725 5-86 SALEM ATNS 2.2 S-R COMPONENTS 81/01/87 M53498 3-87 SALEM ATMS 3.2.1 4 3.2.2 S-R COMPOWEltT's s2/12/86C I

M53891 3-88 SALEM ATNS 3.2.3 T.S. S-R COMPONENTS 94/39/86 M53946 B-89 SALEM ATHS 4.2.3 4 4.2.4 LIFE COMPONENTS 11/30/86 f

M55583 3-9e SALEM ATMS 4.3 N AND BSN T.S.

97/30/86 l

M54118 B-92 SALEM ATNS 4.5.1 DIVERSE TRIP FEATURES 97/11/85C

]

M54035 B-93 SALEM ATHS 4.5.2 8 4.5.3 TEST ALTERNATIVES 84/30/87 M96678 C-91 PNR SECONDARY MATER CHEMISTRY MONITORIld0'REGUIREME 10/28/80C M07358 C-94 PUMP SUPPORT-LAMELLAR TEARIIIG 04/17/81C

' M87717 C-97 FUEL MAN 9 TING ACCIDENT INSIDE CONTAllW4ENT 12/11/Sec

)

M97716 C-te CONTROL OF MEAVY LOADS OVER SPENT FUEL POOL (PHASE 07/18/83C M43669 C-14 AUXILIARY FEEDNATER SEISMIC SUALIFICATION 98/04/81C

'M52280 C-15 CONTROL OF MEAVY LOADS - PHASE II (FOLLONUP OF MPA 06/28/85C e

]

M54097 C-16 UTILITY RESPONSES TO STAFF REcopWIENDATIONS C0f0CERN 12/11/85C l

M01718 D-82 ECCS ZIRC CLAD MODEL ERROR-COMPLIANCE WITH 18 CFR-09/10/80C M9T729 D-04 PNR REACTOR VESSEL CAVITY SEAL RING MISSILE PDTENT 84/29/78C 1

=

l 4

R-1298731-901 R E O U L A 1'.6 R Y INF0RMATION TRACKINO SYSTEM PAGE NO.

F FAC1LITY IMPLEMENTATION 03/31/;

' TROJAN (CONTINUATION)

LIC ACT LICENSEE TAC NO.

IFA 9 YITLE COMPLETE STATUS PAlg M86594 D-i t ASYNMETRIC LOCA LOADS 94/20/86 i M07722 D-11 FISSION OAS RELEASE 02/22/80C M12279 D-15 NION ENEROY LINE BREAR S CONSE40ENTIAL SYSTEM FAIL 01/31/84C M43035 D-17 DEFINITION OF OPERABLE 12/11/89C

' M56812 D-19 DIESEL OENERATOR RELIABILITY TECM SPECS (OL 84-15) 10/94/85C i M55914 D-19 DIESEL DENERATOR RELIABILITY TECH SPECS (OL 84-15) 18/04/85C i M96503 E-81 SPENT FUEL POOL EXPANSIONS

9. '-

10/23/78C M47444 E-05 N N-1 LOOP OPERATION 11/14/84C M0061 F-91 I.A.1.1 SHIFT TECHNICAL ADVISOR 51/98/82C l

M44132 F-92 1.A.1.3 SNIFT MANNING 96/30/83C 1

! M44293 F-03 1.A.2.1 UPORADING OF RO AND SRO TRAINING 11/12/82C M44274 F-94 1.C.1.2/3.A EMERGENCY OPERATIIIS PROCEDURES GENERIC 06/07/84C i'

M44344 F-95 I.C.1.2/3.3 PROCEDURES GENERATION PACKAGES (NUREO 63/30/84 5

lM47258 F-94 I.C.S FEEDSACK OF OPERATING EXPERIENCE 11/95/81C lM47330 F-97 I.C.6 CORRECT PERFORMANCE OF OPERATING'ACTIVITI 11/95/81C M51212 F-98 1.D.1.1 DETAILED CONTROL ROOM DESION REVIEN PROGRA 10/iO/84C

!M51292 F-99 1.D.2 SAFETY PARAMETER DISPLAY SYSTEM i M44412 F-10 II.B.1 RCS NION, POINT VENTS 99/08/83C

'M47981 F-11 II.S.2 PLANT SHIELDING 03/30/83C

[N44482 F-12 II. B. 3' POST ACCIDENT SAMPLING 01/26/84C s

jM44533 F-13 II.B.4 TRAINING FOR MITIGATING CORE DAMAGE 11/12/82C

(!M44625 F-14 II.D.1 RV AND SV TRAININO 11/15/86 lM44654 F-15 II.E.1.1 AFM SYSTEM EVALUATION 02/14/81C II t

1298751-901 R E (D U L A T. 0 R Y INF0RMATION TRACKINO SYSTEM PAGE NO.

5, FACILITY IMPLEMENTATION 03/31/.

TROJA0 (CONTINUATION)

LIC ACT LICENSEE TAC NO.

WA 8 TITLE COMPLETE STATUS MIE 96 F-16 II.E.1.2.1 AFM SYSTEM INITIATION 94/98/82C l

N44735 F-17 II.E.1.2.2 AFM SYSTEM FLON INDICATION 84/98/82C l

M4821 F-18 II.E.4.1 DEDICATED.NYDROSEN PENETRATION 84/23/89C M4892 F-19 II.E.4.2 CONTAINMENT ISOLATION DEPENDA9tLITY 11/10/82C 4963 F-29 II.F.1.1 NO9LE OAS MONITOR 95/01/82C M5934 F-21 II.F.1.2 IODINE / PARTICULATE SAMPLING 95/91/82C l

5195 F-22 II.F.1. 3 CONTAINMENT MION RAN0E MONITOR 01/97/82C M7642 F-23 II.F.1.4 CONTAllN1ENT PRESSURE INSTRUMENT 55/24/83C H7713 F-24 II. F.1. 5 CONTAINMENT MATER LEVEL INSTRUNINT 95/24/83C 7784 F-25 II.F.1.6 CONTAINMENT NYDR00EN MONITOR 95/24/83C M5175 F-26 II.F.2 INSTRUMENTS FOR DETECTION ON INADEQUATE 95/10/86C l

M4999 F-39 II.K.2.13 THERMAL-MECMANICAL REPORT 96/95/84C 7823 F-33 II.K.2.17 POTENTIAL FOR VOIDING IN RCS 91/95/84C 5253 F-36 II.K.3.1 AUTO PORV ISOLATION 99/16/83C 5299 F-37 II.K.3.2 REPORT ON PORV FAILURES 99/16/83C 5385 F-38 II.K.3.3 REPORTING SV AND RV FAILURES AND CHALLE 03/94/82C 5416 F-39 II.K.3.5 AUTO TRIP OF RCPS 92/22/83C 5445 F-40 II.K.3.9 PIB COIITROLLER 98/14/81C 5495 F-41 II.K.3.10 ANTICIPATORY TRIP MODIFICATIONS 98/14/81C i

5525 F-42 II.K.3.12 ANTICIPATORY TRIP ON TUR9tNE TRIP 98/14/81C a

5672 F-47 II.K.3.17 ECCS OUTAGES 98/94/83C i

436 F-53 II.K.3.25 PONER ON PUMP SEALS 96/15/82C

~5868 F-57 II.K.3.39 39 LOCA METHODS 86/29/85C

s,"

R-1298731-901 R E O U L A 7'O R Y INF0RMAtION 7RACKINO 5YSTEM PAGE NO.8.5 FACILITY IMPLEMENTATION 03/.3t/

TROJAN (CONTINUATION)

LIC ACT LICENSEE h MPA 9 TITLE COMPLETE STATUS RAIE M48299 F-58 II.K.3.31 COMPLIANCE MITH it CFR 56.44 91/31/87 M43091 F-43 III.A.1.2 TECHNICAL SUPPORT CENTER 12/31/84 M46939 F-64 III.A.1.2 OPERATIONAL SUPPORT CENTER 12/31/86 M46151 F-65 III.A.f.2 EMER0ENCY OPERATIONS FACILITY 12/31/86

' M46283 F-66 III.A.1.2 NUCLEAR BATA LINK 97/30/82C M46275 F-67 III.A.2.1 EMER0ENCY PLAN WPORADE TO MEET RULE 95/12/83C M46344 F-68 III.A.2.2 METEOROLOGICAL DATA UPORADE

  1. i' 12/31/86 o'

M46017 F-69 III.B.3.3 IMPLANT RA91ATION MONITORING 02/18/82C M46486 F-79 111.9.3.4 CONTROL ROOM MASITABILITY 02/17/82C i M56176 F-71 1.9.1.7 DETAILED CONTROL ROOM REVIEN (FOLLOMUP TO 94/30/87

M49697 O-91 REACTOR COOLANT PUNP TRIP (9660 - II.K.3.5) 07/30/86 t'

4 i

4 4

]

l*

1 1

1 1

l 5

se enc 1csure 2 R-1208731-901 R E O U L A*T.O R Y INF0RMATION TRACKINO SY$ TEM PAGE NO.8 FACILITY IMPLEMENTATION 84/tc FACILITY 8 TROJAN PLANT LOCATION: 32 MI N OF PORTLAND, ORE LICENSES PONER8 3411 10ff PROJECT MANAGER: K. JONNSTON DOCKET NUMBER: 950-80344 DESIGN POWER:

1130 MNE BRANCN CHIEF:

S. VARGA ARCN/ENGINEERe BECH NS$5 VENDORS NEST LIC. ASSISTANT:

L. PARRISH IE INSPECTOR:

O. JOHNSTON YAC IND. WA 0 7171E N08321 A-01 TROJAN - 10 CFR 59.55A(0) - INSERVICE IMSPECTION OENERIC MD6503 E-01 TROJAN-SPENT FUEL MOS NEARINO MD6678 C-Of TROJ.AN - SECONDARY MATER CNEMISTRY CONTROL (PNR OENERIC)

M44041 F-01 TROJAN - NUREO-0737 I.A.1.1 STA LONG TERM

'9 RE9UIREMENTS

~ '

  • M49697 O-01 TROJAN - REACTOR COOLANT PUW TRIP M06325 9-92 TROJAN - FIRE PROTECTION M07718 9-02 TROJAN - ECCS ZIRC CLAND MODEL ERROR M07721 A-02 TROJAN - APPENDIX I TECM SPECS IMPLEMENTATION REVIEN REVIEN 9944132
  • F-02 TROJAN - NUREO-0737 I. A.1.3.1, SHIFT MAINIING DVERTIME LIMITS M44203 F-03 TROJAN - NUREG-0737 I. A.2.1.4, UPoltABIII0 0F R0 AND SRO TRAINING N07715 3-03 TROJAN-GENERIC-FMR MODERATOR DILUTION N06930 A-03 TROJAN - REVISED SECURITY PLAN PER 10 CFR73.55 M07260 A-03 TROJAN--REVIEM CNANGES TO SECURITY PLAN M07720 3-04 POINT BEACH 1-PHR REACTOR VESSEL CAVITY SEAL RIII0 MISSILE POTENTIAL N071?9 B-04 TROJAN - DVERPRESSURE PROTECTIOld REVIEN TOENERIC)

M44274 F-84 TROJAN - NUREG-0737 I.C.1.2.A, INADEQUATE CORE COOLING OUIDELINES l

"M44344 F-OS TROJAN '- PROCEDURES OfftERATION PACKAGE REVIEN (IOUREO 0737 SUPP/1) e l

M47448 E-05 TROJAN - 3 LOOP OPERATION (N-1)

M07358 C-06 TROJAN - PUMP SUPPORT-LAMELLAR TEARIII0 M47258 F-86 TROJAN - FEEDBACK OF OPERATING EXPERIENCE (AP I.C.5)

se R-1298731-est REOULAT0RY INF0RMATION TRACEINO

$YSTEN PAGE NO.. 4 !

FACILITY IMPLEMENTATION 34/14/ l TROJAN (CONTINUATION)

TAC MO.

IFA. 8 TITIE M47330 F-87 TROJAN - CORRECT PERFORMANCE OF OPERATING ACTIVITIES CAPI.'C 6)

M07379 B-97 TROJAN-STEAM OENERATOR FEED NATER FLON INSTABILITY i

M07717 C-97 TROJAN'- GENERIC @ INSIDE CONTAINNENT l

MSitt 2 F-98 TROJAN - I.B.1.1 - DETAILES CONTROL ROOM DESI0ll REVIEN Pit 00 RAM PLAN F-08

) MS12t2 F-89 TROJAN - I.D.2. SAFETY PARAMETER DISPLAY SYSTEM M87714 A-89 TROJAN PRESSURE VESSEL BELTLINE MATERIAL SURVEILLANCE I N06594 3-10 TROJAN - ANALYSIS OF ASYtelETRIC LOCA LOADS AN9/EFFECT ON REACTOR VESSEL SUPPORTS MO7716 C-10 TROJAN -CONTROL OF MEAVY LOADS OVER SPENT FUEL POOL (NUREO 9412)

M44412 F-10 TROJAN - NUREO-0737 11.3.1, RCSMIONP0YNT VENTS M19554 A-10 TROJAN - CONTINGENCY PLAN REVIEN M19555 A-11 TROJAN - OUARD TRAINIIIS PLAN REVIEN

{ M87722 D-11 TROJAN-GENERIC-FISSION OAS 1 M47981 F-11 TROJAN - PLANT SMIELSING MODIFICATIfMIS (11.3.2.2)

M44482 F-12 TROJAN - INNtEO-8737 II.B.3.2, POST ACCIDENT SANPLING MODIFICATI0llS M19561 A-12 TROJAN--VITAL AREA ANALYSIS t M44553 F-13 TROJAN - IIUREO-0737 11.B.4.1, TRAINING FOR MITIGATillo CORE i

f, M44623 F-14 TROJAN - RV AND SV TESTIIIS l M11245 A-14 TROJAN - 18 CFR 59.55A(0)-INSERVICE TESTIIIO(IST)

$ M19144 3-14 TROJAN - CollTROL ROS OUIDE TUSE MEAR i"M43468 l

C-14 TROJAN'- SEISMIC QUALIFICATI0ll 0F THE AUXILIARY FEEDNATER SYSTEM s

f M12793 A-15 TROJAN - DIESEL FUEL GA M44654 F-15 TROJAN - NUREG-0737 II.E.1.1, AFM SYSTEM EVALUATION M12279 D-15 TROJAN - Elfv. QUAL. OF CONTROL SYSTEMS TROJAN TROJAN

s1

. y, R-1204731-901 REOULAT0RY IilF0RMATION TRACKINO SYSTEM PAGE NO.s.

FACILITY IMPLEMENTATION 04(14e.

TROJAN (C0llTINUATIDII)

Jjg,& lEA_t TITLE M52280 C-15 TROJAN - CONTROL OF NEAVY LOADS - PNASE II (FOLLONUP OF MPASC-10)

M58097 C-16 TROJAN - STEAM OENERATOR DENERIC REVIEN CONCERNING STEAM OENERATORS COL 85-02) l M12144 3-14 TROJAN - EMER0EN(4 PLAN REVIEN 1944496 F-14 TROJAN - NUREO-0737 II.E.1.2.1, AFM SAFETY ORADE AUTO INITIATION

%7897 A-16 TROJAN - SUALIFICATION IF IllSP., EXAMINATION, TESTING AND AUDIT PER509tNEL (GL81-01)

M44735 F-17 TROJAN - IOUREG-0737 II.E.1.2.2, AFM SAFETY ORADE FLON IllDICATION l

1943035 D-17 TROJAN - YECNilICAL SPECIFICATI0llS DEFINING OPERABILITY FOR SAFETY SYSTEMS j

M11298 B-17 TROJAN - NYDRAULIC SNUBSERS 19PORADE TECW SPEC 5; i

M51552 A-17 TROJAN - IllSTRUMENTATIOlt TO FOLLON THE ' COURSE OF AN ACCIDENT (R0 1.97) 1 l

1055731 A-18 TROJAN - TECN. SPECS. AFFECTED BY 50.72 AND 50.73 (OL 83-43)

M44821 F-18 TROJAN - NUREG-0737 II.E.4.1.2, DEDICATED HYDR 00EN PENETRATIO985 M55914 D-19 TROJAll - DIESEL GENERATOR RELIABILITY TECN. SPECS.

COL 84-15)

{

M56812 3-19 TROJAN - LCA 114 DATED 1-29 't5.

RESPONSE TO OL 84-15 DO RELIABILITY j

1944892 F-19 TROJAN - IIUREG-0737 II.E.4.2, CONTAINMEllT ISOLATION DEPENDABILITY f

M59152 A-20 TROJAN - 10CFR50.62 OPERATING REACTOR RE/IENS M19275 3-20 TROJAN-CONTAlletENT LEAKAGE DUE TO SEAL DETERIORATION

{ M44963 F-20 TROJAN - IOUREG-0737 II.F.1.1, Il0BLE GAS MellITOR i

M45034 F-21 TROJAll - HUREO-0737 II.F.1.2, IODINE /

PARTICULATE SAMPLING M10339 B-21 TROJAll - LOSS OF 125V DC SUS VOLTAGE llITN LOSS OF AINIUllCIATOR SYSTEM l"M59991

~

A-21 TROJAN - 10CFR50.41 PRESSURIZED THERMAL SNOCK RULE REGUIREMENTS, PNASE 1 8

M10141 3-22 TROJAN - TECW SPEC SURVEILLAllCE PER FOR MECMANICAL SNUBBERS j

M4Si ti5 F-22 TROJAN - IOUREG-0737 II.F.1.3, C0llTAlllMEllT HION RANGE MONITOR j

M07328 B-23 TROJAN - DIESEL OENERATOR SURVEILLANCE. GENERIC ISSUE (DEGREATED GRID VOLTAGE) i :

i I

l i,

N R-1298731-Del R E O U L A T*6 R Y INF0RMATION TRACKINO 5YSTEM PAGE NO.

.5' FACILITY IMPLEMENTATION 04/14/:

TROJAN (CONTINUATION)

TAC NO.

WA e TITLE M47642 F-23 TROJAN - NUREO 0737 ITEM II F1.4 CONTAINMENT PRESSURE INSTRUMENT M47713 F-24 TROJAN 1 - NUREO 0737 ITEM II F1.5 CONTAINMENT NATER LEVEL MONITOR MSS 291 3-24 TROJAN-CONTAINMENT PURGE AT PONER AN9 EFFECT ON LOCA M2594 3-24 TROJAN - LONG TERM REVIEN CONTAINMENT PURGE AND VENT (B-24)

M7784 F-25 TROJAN - NUREO 0737 ITEM II F1.4 CONTAINMENT NTBR00EN MONITOR M5175 F-26 TROJAN - NUREG-0737 II.F.2.3, INADEGUATE CORE COOLING INSTROMENTATION M19236 D-26 TROJAN 4 INADVERTENT SAFETY INJECTION DURING COOLDONN (PMR'S)

M46989 F-39 TROJAN - II K2.13 THERMAL MECMANICAL REPOET M7823 F-33 TROJAN-NUREO8737ITEMIIK2.17POTENYkAL FOR VOIDING IN RCS M45253 F-36 TROJAN - NUREG-8737 II.K.3.1, AUTO PORV ISOLATION M45299 F-37 TROJAN - NUREG-9737 II.K.3.2, REPORT ON PORV FAILURES M5385 F-38 TROJAN - NUREG-0737 II.K.3.3, REPORT ON RY/SV FAILURES M45416 F-39 TROJAN - NUREG-0737 II.K.3.5, AUTO TRIP OF RCPS N08685 3-39 TROJAN - PNR PRESSURE TEM ERATURE LIMIT TECM SPECS M5445 F-40

. TROJAN - NUREG-9737 II.K.3.9, PID CONTROLLER M45495 F-41 TROJAN - NUREG-9737 II.K.3.19, ANTICIPATORT TRIP MODIFICATIONS M11973 3-41 TROJAN - FIRE PROTECTION SER SUPPLEMEFT M46735 3-41 TROJAN - FIRE PROTECTION APPENDIX R EXEMP7 ION REGUESTS (2). POE 5-5-81 LETTER M11715 3-42 TROJAN - TNREE MILE ISLAND FOLLON UP MORK 3945525 F-42 TROJAN'- NUREG-0737 II.K.3.12, ANTICIPATORY TRIP DN TURBINE TRIP M43155 3-43 TROJAN - PNR FEEBMATER LINE CRACKS LONG TERM CORRECTIVE ACTION M38680 3-44 TROJAN-2.1.7.5 CONTROL ORADE AUX FEED FLON INDICATION M39681 3-44 TROJAN-2.1.5 A,C DEDICATED N2 CONTROL PENETRATIONS S RECOMBINER PROCEDURE S

H R-1298731-999 REOULAT5RY INF0AMATION TRACKINO

$YSTEM PAGE NO.

5 FACILITY IMPLEMENTATION e4/14/

TROJAN (CONTINUATION)

TAC NO. HEA_j TITLE M39682 3-44 TROJAN-2.1.1. EMER. PONER SUPPLY PORV/

BLOCK VALVE, PER NEATER S LEVEL M39683 3-44 TROJAN-2.2.2 A,3,C CONTROL ROOM ACCESS, TSC, OPERATIONAL SUPPORT CENTER M30684 3-44 TROJAN-2.2.1 A,3,C,SMIFT SUPER. RESP.,

STA, TURNOVER PROCEDURES N39485 3-44 TROJAN-2.1.8.C IMPROVED IODINE INST.

M30636 3-44 TROJAN-2.1.8.3 MION RANGE RADIATION MONITORS M39687 B-44 TROJAN-2.1.8.A POST ACCIDENT SAMPLING M39688 3-44 TROJAN-2.1.6.3 SHIELDINO REVIEN M39489 3-44 TROJAN-2.1.6.A SYSTEMS INTEORITY FOR HION RABI0 ACTIVITY M39690 3-44 TROJAN-2.1.4' DIVERSE CONTAINMENT ISOLATIDM M30691 3-44 TROJAN-2.1.3.3 INST. FOR CORE COOLING M39492 3-44 TROJAN-2.1.3.A DIRECT INDICATION OF VALVE POSITION M30693 3-44 TROJAN-2.1.2 RELIEF S SAFETY VALVE TESTING M12939 B-45 TROJAN - PRIMARY COOLANT SYSTEN PRESSURE ISOLATION VALVES VALVES M42119 B-46 TROJAN - DECAY MEAT REMOVAL CAPABILITY TECM SPECS M42984 3-46 TROJAN - AMALYSIS OF TURBINE DISCS IN 0.E. TURRIMES M12689 B-47 TROJAN-ECCS CLAD SNELLING AND RUPTURE M45672 F-47 TROJAN - NUREO-0737 II.K.3.17, ECC SYSTEM OUTAGES M48370 3-48 TROJAN - ADESUACY OF STATION ELECTRIC DISTRIBUTION VOLTAGES M11889 3-52 TROJAN - REVIEN OF SAFETY ASPECTS OF INADVERTENT SAFETY SYSTEM ACTUATIONS DURING SURVEILLANCE TESTING

'PM8436 F-53 TROJAN - NUREO 9737, II.K.3.25 PONER ON PUMP SEALS M45868 F-57 TROJAN - NUREO-0737 II.K.3.30, 53 LOCA OUTLINE M48209 F-58 TROJAN -NUREO 0737 II.K.3.31 COMPLIANCE NITH 10 CFR 50.46 M12369 B-59 TROJAN - SEISMIC RESTRAINTS / MALL PROBLEM

~

x R-1208731-901 R E O U L A t*0 R Y INFCRMATION 7 RACK 1-NO S Y S T E M '-

PAGE MO.8. 5 FACILITY I M P L E M E'N T A T I O N e4414f TROJAN (CONTINUATION)

TAC 110. MPA 9

_ TITLE M42502 3-60 TROJAN - ENVIRONMENTAL RUALIFICATION OF SAFETY RELATED ELECTRICAL E9UIPMENT (80-CLI-21)1 M2711 3-41 TROJAll - IE BULLETIN 79-27, LOSS OF NON CLASS IE INST S CONTR. PolEP. REY. 8 EVAL. RESPONSES 9042783 3-62 TROJAN - ESF RESET. CONTROL DESIGN BEFICIENCY - ISE BULLETIN 89-94 M43933 B-43 TROJAN - STATION BLACKOUT PROCEDURES S TRAINING i

M43091 F-63 TRCJAN - NUREG-0737, III.A.1.2, TEttNIICAL SUPPORT CENTER M46059 F-64 TROJAN - NUREO-9737 III.A.1.2, OPERATIONAL SUPPolt? CENTER I

M46131 F-65 TROJAN - NUREG-0737 III.A.1.2, EMER0ENCY

" L.

OPERATIOfl3 FACILITY M47179 B-66 TRrJJANNATURALCIRCULATIONCOOLDONN(GENERICLhk 81-21)

M44293 F-66 TROJAN *.III.A.2 NUCLEAR BATA LINE DATA M46275 F-47 TROJAN - III.A.2.1 EMERGENCY PLAN UPORADE TO MEET RULE TO MEET RULE M44344 F-68 TROJAN - NUREO-0737 III.A.2.2, METEORet00ICAL DATA UPORADE I

M46865 3-49 TROJAN 1 - PNR MSLB NITM CONTINUED FEEDNATER ADDITION M46417 F-49 TROJAN - NUREO-9737 III.D.3.3, INPLANT RADIATION MONITORING M44486 F-78 1ROJAN - NUREG-0737 III.D.3.4, CONTROL ROOM NABITABILITY M46639 B-70 TROJAN-MONITORINGOFFATIOUETRANSIENT' LIMITS FOR THE REACTOR COOLANT SYST96 M56176 F-71 TROJAN - 1.D.1.2 DETAILED CONTROL ROOM DESION REVIEN SUIWIARY REPORT - F-71 0

M49765 3-72 TROJAN

'fIUREO 0737 TECM SPECS (GENERIC TETTER 82-16 82-16 OR 83-02)*

M52809 B-76 TROJAN - ITEM 1.1 - POST TRIP REVIEN PR00RAlt DESCRIPT1000 AND PROCEDURES l

M52899 B-77 TROJAN - ITEM 2.1 - ERUIPMENT CLASSIFICATI0l1 AND VENDOR IlffERFACE - RTS COMPONENTS "M52971 5-78 TROJAN - ITEMS 3.1.1 4 3.1.2 - POST MAINTEMMICE TESTING PROCEDURES / VENDOR RECOMMENDATIOftS'- RTS COMPONENTS M53052 3-79 TROJAN-ITEM 3.1.3 -POST-MAINTENAIICE TESTIlle CNANGES TO TECM SPECS-RTS COMPONENTS l

M53184 3-80 TROJAN - REACTOR TRIP SYSTEM RELIABILITY - ifEN00R RELATED MODIFICATI09ts (ITEM 4.1)

M53159 B-81 TROJAN - ITEMS 4.2.1 8 4.2.2 - PREVENTATIVE MAINTENA10CE PROGRAM FOR REACTOR TRIP BREAKERS - MAINTENAIGCE 8 TREI

~

i

el R-1298731-Set R E O U L A T.0 R Y

!NF0RMATION TRACEINO 5YSTEM PAGE NO.* (

F A C I L I T if IMPLENENTATION e4/14)

TROJAN (CONTINUATION)

TAC NO.

IEA_.1 TITte M53291 3-82 TROJAN - ITEM 4.3 - AUTOAMTIC ACTUATION Off SHUNT TRIP ATTACNNENT FOR H AND 3 8 N PLANTS M54575 3-83 TROJAN - TECHilICAL SPECIFICATIONS COVERED BY DENERIC LETTERS 83-36, 83-37 FOR NUREG-8737 M56710 3-83 TROJAN - LCA 115.. p 1-14-85.

MORE TECM SPECS FOR TMI IIFROVEMENTS PER OL 83-37 M53642 3-85 TROJAN 1 - ITEM 1.2 - POST TRIP kCf!EN-DATA AND IlfFORMATION CAPADILITY M53725 3-86 TROJAN - ITEM 2.2 - ESUIPMElff CLASSIFICA710ll All9 VENDOR VENDOR INTERFACE - ALL SR COPTONENTS M53898 B-87 TROJAN-ITEMS 3.2.1 8 3.2.2 - POST-MAINT TESTIlle PROCEDURES AND VENDOR REcolelEllDATI0lfS - ALL SR COMPON 0855891 3-88 TROJAN - ITEM 3.2.3 - POST-MAINTEllANCE Tl!STIIIOi

-CHAIIGES TO TECH. SPEC. - ALL SR COMP 0llENTS M53946 3-89 TROJAN - ITEMS 4.2.384.2.4-PREVElffATIVl!MAINEMAIICE PROGRAM FOR RX TRIP BREAKERS - LIFE TESTIlfo 8 REPLACE M55383 3-98 TROJAN - ITEM 4.3(TS) - AUTOMATIC ACTUATISM OF SNUNT TRIP FOR H AND BSN PLANTS - TECM SPECS M54118 B-92 TROJAN 1 - ITEM 4.5.1 - REACTOR SYSTEM FUllCTI0llAL TESTING - DIVERSE TRIP FEATURES M54035 3-93 TROJAN - ITEMS 4.5.2 4 4.5.3 - REACTOR Tl!!P SYSTEM FtNICTIOIIAL TESTING - ALTERNATTYES S TEST INTERhALS 4