0 - '

POINT BEACH NUCLEAR PLANT PRESSURE TEST PROGRAM ASME SECTION XI PERIODIC Revision 1 PRESSURE TEST PROGRAM December 14, 1993 TIURD IN""RVAL INDEX PROCEDUR3 kt v'ISION EFFECTIVE NUMBER PROCEDURE 'T1TLE NUMBER DATE THIRD INTERVAL . . . . . . . .............. ......... ..........I 12/14/93

1.0 INTRODUCTION

2.0 SCOPE 3.0 DEFINITIONS 3.1 System Leakage Test 3.2 System Functional Pressure Test 3.3 System inservice Pressure Test 3.4 System Hydrostatic Pressure Test 3.5 System Pneumatic Pressure Test 4.0 APPLICABLE RULES 4.1 Schs..aling 4.2 Requirements 4.3 Boundaries 4.4 Documentation 5.0 PRE-TEST REVIEW A:'D TEST PREPARATION 6.0 SLHEDULE 7.0 RELIEF REQUESTS 8.0 ACCEPTANCE CRITERIA ,

9.0 REFERENCES

APPENDICES A. . Unit I and Common Program Scheduls . . . . . ... ..... . ......I 12/14/93 B. Unit 2 Program Schedule . . . ..... .. . .. . .. . .....I 12/14/93 C. Relief Requests ......... ............ ... . .... ..1 12/14/93

^

9712240093 971216 PDR ADOCK 05000266 p PM

o .,

POINT BEACH NUCLEAR PLANT PRESSURE TEST PROGRAM ASME SECTION XI PERIODIC Revision 1 PRESSURE TEST PROGRAM December 14, 1993 THIRD INTERVAL PROGRAM DISCUSSION

1.0 INTRODUCTION

THs document summarizes the applicable rules and requirements for periodic system pressure testing at Point Beach N-: clear Plant (PBNP)in accordance with the American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel Code,Section XI,

) " Rules for Inservice Inspection of Nuclear Power Plant Components," 1986 Edition. This document also outlines the poposed schedule for the implementation of the program, and lists the technical basis for each individual pressure test.

2.0 ,1COEE This document is limited to periodic system pressure testing performed to satisfy the requirements of ASME Section XI, Tables IWB-2500-1 (Class 1 Piping / Components), IWC-2500-1 (Class 2 Fiping/ Components), and IWD-25001 (Class 3 Piping / Components). It is not the intent of this document to include or cover the requirements for post-maintenance l / post-modification pressure testing. Requirements for post-maintenance / post-modification pressure testing are covered in Administrative Procedure PBNP 3.2.5, " Pressure Test

}

Procedure."

1.

Maintenance of this document is the responsibility of the Plant Performance Engineering (PPE) Group - Inservice Engineering (ISE). An individual currently assigned to this group shall serve as the Pressure Testing Program Coordinator / Engineer. The PPE Group Senior Project Engineer shall be the approval authority for revision of the program document.

3.0 DEFINITIONS

  • following periodic pressure tests are covered by this program document:
1) System leakage tests.
2) System functional pressure tests.
3) System inservice pressure tests.
4) System hydrostatic pressure tests.
5) System pneumatic pressure tests.

al System Leakane Test

Purpose:

Ensure primary system pressure retaining integrity.

Frequency: Following opening and closing of a component within the ISI class 1 I pressure retaining boundary. Typically this is at the end of each teruu...; outage.

r Page 1 of 15

i .-e i POINT BEACH NUCLEAR PLANT PRESSURE TEST PROGRAhi A3ME SECTION XI PERIODIC Revision 1 PRESSURE TEST PROGRAM December 14, 1993 THIRD INTERVAL PROGRAM DISCUSSION Boundaries: Extend to the pressure retaining components within the system boundary containing pressurized reactor coolant under normal startup conditions.

Rules: Test pressure is 2085 psig. The test pressure is dictated by the operation pressure of 2000 psia as stated in Technical Specification 15.4.3.a.2.

No hold time required after attaining test pressure and temperature.

3.2 System Functional Pressure Test

Purpose:

Verify pressure retaining integrity of a system or component that is not required to operate during normal plant operation.

Frequency: Once each period (periods defined by IWB-2412, IWC-2412, and IWD-2412).

Boundaries: Include only those pressure retaining components within the system boundary pressurized under the test mode defined by the valve alignment checklist and procedures assxiated with system tests.

Rules: Test pressure shall be the test mode pressure or other parameters defined by the test procedure.

A ten ninute hold time is required after attaining test pressure.

< 3.3 System Inservice Pressure Test

Purpose:

Verify the pressure retaining integrity of a system while the system is in service and at normal operating pressure.

Frequency: Once each period (periods defined by IWB-2412, IWC-2412, and IWD-2412).

Boundaries: Extend to these pressure retaining components under operating pressures during normal system service defined by valve alignment checklists associated with normal heatup, power, or cooldown activities.

Page 2 of 15

POINT BEACH NUCLEAR PLANT PRESSURE TEST PROGRAM ASME SECTION XI PERIODIC Revision 1 PRESSURE TEST PROGRAM December 14, 1993 THIRD INTERVAL PROGRAM DISCUSSION Rules: Test pressure shall be the normal operating pressure.

Normal operating pressures are defined by:

1) Operating Instructions (Ols)
2) Other written operating pro.edures
3) 1sometric Drawings such as the "P" drawings
4) NRC IE Bulletm 79-14 Final Report No holding time is required, provided the system has been in operation for at least four hours. The test procedure will document that the system has been in operation for four hours prior to examination.

3.4 System Hydrostatic Pressure Test

Purpose:

Verify pressure retaining boundary integrity. This test is typically conducted during a plant shutdown at a pressure above nominal operating pressure or above the system pressure for which overpressure protection is provided.

Frequency: Once each interval, near the end of the interval (intervals defined by IWB-2412, IWC-2412, nd IWD-2412).

Boundaries: Defined by the ISI classification boundary. ,

Rules: Hydrostatic testing shall be performed in accordance with the following:

1) ISI Class 1 pressure retaining components will be tested at system leakage test pressures as allowed by ASME Code Case N-498,
2) ISI Class 2 pressure retaining components will be tested at system functional or inservic< test pressures as allowed by ASME Code Case N-498.
3) ISI Class 3 pressure retaining components will be tested at 110 percent of the design pressure for those components having a design temperature :s;200*F, and 125 percent of the design pressure for those components having a design temperature

> 200'F.

x Page 3 of 15

POINT BEACH NUCLEAR PLANT PRESSURE TEST PROGRAM ASME SECTION XI PERIODIC Revision 1 PRESSURE TEST PROGRAM December 14, 1993 THIRD INTERVAL PROGRAM DISCUSSION After attaining the test pressure, the hold time is four hours for insulated systems or ten minutes for non-insulated systems, 3.5 Systemfneumatic Pressure Test

Purpose:

Verify pressure retaining boundary integrity. This test is typically conducted during a plant shutdown at a pressure above nominal operating pressure or above the system pressure for which overpressure protection is provided.

Frequency: Once each interval in lieu of a hydrostatic test. (intervals defined by IWB-2412, IWC-2412, and IWD-2412).

Boundaries: Defined by the ISI classification boundary.

Rules: This test shall be performed at 110 percent of the design pressure for those components having a design temperature s:200'F, and 125 percent of the design pressure for those components having a design temperatures >200'F.

After attaining the test pressure, Sold time is ten minutes.

A pneumatic piessure test may be conducted in lieu of a system hydrostatic pressure test for those componcats wit'D the scope of Articles IWC and IWD.

4.0 APPLICABLE RULES ,

The applicable rules governing periodic system pressure testing as applicable to this program can be found in ASME Section XI, Articles IWA,B,C,D-5000, Tables IWB,C,D-2500-1; ASME Section III, Articles Nx-2300, Appendix R; and ASME Code Case N-498.

4.1 SCHEDULING The proposed schedule for the completion of the Code requirements is showa in the Appendices to this program, as discussed in Section 6.0.

Page 4 of 15

POINT BEACH NUCLEAR PLANT PRESSURE TEST PROGRAM ASME SECTION XI PERIODIC Revision 1 PRESSURE TEST PROGRAM December 14, 1993 THIRD INTERVAL PROGRAM DISCUSSION 4.1.1 ISI Class 1 Table IWB-2500-1, Examination Category B-P, requires that a system leakage test be performed on ASME Code Class 1 pressure retaining components following each refueling outage. A system hydrostatic pressure test must be performed at or near the end of the 10-year inspection interval. The hydrostatic pressure test may be performed in lieu of the system leakage test.

4.1.2 ISI Class 2 Table IWC-2500-1, Examination Category C-H, requires that a system functional pressure test or a system inservice pressure test be performed on ASME Code Class 2 pressure retaining components each 40 month inspection period. A system hydrostatic \ pneumatic pressure test must be perrormed at or near the end of the inspection interval. The hydrostatic \ pneumatic pressure test may be performed in lieu of the system functional pressure test or an inservice pressure test.

4.1.3 ISI Class 3 Table IWD-2500-1, Examination Categories D A, D-B, and D-C require that a system functional pressure test or a system inservice pressure test be performed on ASME Code Class 3 pressure retaining components each 40 month inspection period. A system hydrostatic \pecumatic pressure test must be performed at or near the end of the inspecdon interval. The hydrostatic \ pneumatic pressure test may be perforn ed in lieu of the system functional or inservice pressure test.

4.2 REOUIREMENTS ASME Section XI, Articles IWA-2000 and IWA-5000 identify the general requirements for pressure testing. ASME Section XI, Articles IWB-5000, 1WC-5000, and IWD-5000 define the requirements that are specific to ISI Class 1,- 2, and 3 respectively.

Page 5 of 15

POINT BEACH NUCLEAR PLANT PRESSURE TEST PROGRAM ASME SECTION XI TERIODIC Revision 1 PRESSURE TEST PROGRAM December 14, 1993 THIRD INTERVAL PROGRAM DISCUSSION 4.2.1 Examination Item Number The Pressure Testing Program does not reference the examination item number detcrmination as described by ASME Section XI, Table IWx-2500-1 for the purpose of tracking pressure tests. However, examination categories have been assigned in the Unit 1 and 2 Program Schedules

(.'.ppendices A and B) that link the pressure test procedures to the applicable paragraphs of Section XI. All of the pressure test procedures that comprise the pressure test program meet all of the requirements of ASME Section XI, including the requirements of individual item numbers.

4.2.2 ASME Code Case N-498 ASME Code Case N-498, "Altemative Rules for 10-Year Hydrostatic Pressure Testing for Class 1 and 2 Systems" allows ISI Class 1 and 2 hydrostatic pressure tests to be conducted at the normal system operating pressure.

4.2.3 Authorized Inspection Agency PBNP has retained the services of an authorized inspection agency to provide inspection services in accordance with IWA-1400(f). The Authorized Nuclear Inservice Inspector (ANII) shall witness or otherwise verify the performance of system pressure tests within the scope of this program. In addition, the ANII shall review every completed pressure test / test document package. The ANII review shall be documented and

. retained with the pressure test / test document package.

The ANII shall be notified in advance of all upcoming pressure tests in accordance with IWA-2130. Such notification should be not less than 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> prior to the performance of any test.

4.2.4 Qualified Personnel All system pressure tests referred to in this document will have a VT-2 visual examination, as discussed in IWA-5240, performed by qualified personnel having a certification of Level II or Level III. The Quality Technical Services (QTS) Group of Wisconsin Electric's Nuclear Power Department maintains qualified personnel on staff and/or arranges for the services of qualified personnel under contract.

Page 6 of 15

POINT BEACH NUCLEAR PLANT PRESSURE TEST PROGRAM ASME SECTION XI PERIODIC Revision 1 PRESSURE TEST PROGRAM December 14, 1993 THIRD INTERVAL PROGRAM DISCUSSION 4.2.5 Test Equipment Calibration All pressure gauges used for system hydrostatic pressure tests and system pneumatic pressure tests, shall:

a, Be accurate to within 0.5 percent of full scale,

b. Be calibrated within 14 days of the test,
c. Have an indicating range of at least one and one half (1.5) times, but not more than four times the maximum test pressure,
d. Be recalibrated upon completion of the hydrostatic test to verify data obtained is accurate.

System leakage tests, system functional pressure tests, and system inservice pressure tests do not have test gauge calibration requirements.

Normally installed system instrumentation may be used in the performance of these tests.

4.2.6 Test Pressures ,

The maximum test pressure at any point within the system or portion of a system being tested during a hydrostatic pressure test (i.e., the low point pressure due to hydrostatic head) shall not exceed 106 percent of the test pressure unles; the appropriate engineering evaluation has been completed

. prior to the performance of the test. Overpressurization may be prevented by subdividing the system. If it is impractical to subdivide the system to prevent overpressurization, the piping and components at the lowest part of the area being tested will be reviewed by the Pressure Testing Program Coordinator / Engineer to determine if the test pressure is acceptable.

Page 7 of 15

POINT BEACil NUCLEAR PLANT PRESSURE TEST FROGRAM ASME SECTION XI PERIODIC Revision 1 PRESSURE TEST PROGRAM Decemoer 14, 1993 TillRD INTERVAL PROGRAM DISCUSSION 4.2.7 Test Temperature The hydrostatic pressure test temperature for systems constructed of ferritic steel shall satisfy the requirements of fractitre prevention criteria.

Components constructed entirely of austenitic iter.1 or ferritic steel and have a nominal wall thickness s 0.625" are not required to satisfy fracture prevention criteria. The temperature pressure criteria for the reactor coolant system and the steam generators are addressed in the PBNP Technical Specifications and vendor literature. For carbon steel piping with a nominal wall thickness 2 0.625", (piping classification DB h 10" nominal pipe size, EB h 16" nominal pipe alze, and 2503 h 5" nominal pipe size), the test temperature shall be d 70'F. For other components such as tanks, heat exchangers, and pump casings, refer to the applicable vendor manuals for the minimum hydrostatic pressure test temperatures.

Additinnalinformation on the lowest service metal temperature may be found in ASME Section !!I, Nx 2300 arid Appendix R.

The test fluid s! al be warm enough to prevent the component from sweating so that leakage can be ident.ified. If no guidance is available, the mir.imum test fluid temperature shall be 70'F.

4.2.8 Buried Components In nonredundant systems where the buried con.ponents are isolable by means of valves, the vi:ual examination shall consist of a leakage test that determines the rate of pressure lost. Alternatively, the test may determine the changc in flow between the ends of the buried components. In both cases, the acceptable rate of pressure loss or flow shall be established by the Prestu:e Testing Program Coordinator / Engineer, or a designated alternate, and 6cumented in the pressure test basis prior to the performance of the test. In nonredundant systems where the buried components are nonisolable, such as return lines to the heat sink, the visual examination shall consist only of a verification that the flow during operation is not impaired. In redurJant systems where the buried components nic nonisolable, the visual examination shall consist of a test that determines the change in flow between the ends of buried components.

In cases where an annults surrounds the components, the areas at each end of the annulus shall be visually examined for evidence of leakage.

Examples of annull at PBNP are the North and Soitth Service Water Supply and Return Headers through the Switchgear Room located on the 8' elevation of the turbine hall.

Page 8 of 15

POINT BEACl{ NUCLEAR PLANT PRESSURE TEST PROGRAM ASME SECTION XI PERIODIC Revision 1 PRESSURE TEST PROGRAM December 14, 1993 l TillRD INTERVAI. '

PROGRAM DISCUSSION  !

4.2.9 'anks I

Piping from a tank to the first isolation valve is considered to be an cxtension of the tanh In cases where a chxk valve in series with the first isolation valve prevents pressurization of that portion of piping between the valves, the tank boundary will be extended to the first valve that will allow prqssurization of the connecting system classified for ISI without overpressurizing the tank. Open-ended portions of suction or drain lines from a storage tank are corisidered to be an extension of the tank.

When performing a hydrostatic pressure test of an atmospheric storage tank, the pressure developed due to the static head when the tank is filled to its design capacity will be acceptable as the test pressure. For a 0-15 psi storage tank (i.e., a tank that is not vented to atmosphere), the test pressure will be 1.10 times the design pressure of the vapo.'or gas space above the liquid level for which overpressure protection is provided by the relief valve. Tanks with a design pressure greater than 15 pd will be tested using the applicable system hydrostatic pressure test rules.

4.2.10 Open ended piping flydrostatic pressure tests on open ended portions of discharge lines beyond the last shutoff valve in non closed systems (eg, containment spray header) shall demonstrate an open flow path. Demonstration of an open flow path is not required during system functiont.1 pressure tests. ASME Section XI, Article IWA-5222 requires the pressurization at:d examination of only those pressure retaining components that are pressurized in the test mode. Therefore, these portions of ISI class systems will be tested only once, near the end of the inspecdon interval.

4.2.11 Insulated Components Pressure retaining bolted connections in systems borated for the purpose of controlling reactivity shall have insulation removed for VT-2 examination.

Other componen's may be examined without removal of insulation by examining access Ac and exposed surfaces and joints, as discussed in IWA 5242.

Page 9 of 15

POINT BEACl! NUCLEAR PLANT PRESSURE TEST PROGRAM ASME SECTION XI PERIODIC Revision 1 PRESSURE TEST PROGRAM December 14, 1993 TilIRD INTERVAL PROGRAM DISCUSSION 4.2.12 Pumps aad Valves For the purposes of hydrostatic pressure testing of centrifugal pumps, the '

low pressure piping boundary shall terminate at the first isolation alve on the discharge side of the pump. Likewise, the high pressure piping boundary shall begin at the first dir,harge isolation valve.

Where leakages from components are normally expected and collected (such as valve stems and pump seals), the visual examination shall be '

conducted by verifying that the leakage collection system is operable.

4.2.13 Containment Penetrations While all containment penetrations are included within the Pressure Test Program, not all are actually tested under the program. Containment penetrations wl.ich are not part of larger ISI classed systems are tested under the 10 CFR 50, Appendix J, testing program, as discussed in relief request irrP 3 02.

4.3 BOUNDARIES The ISI classification boundaries used to develop and implement this program are defined in the " Basis for ASME Section XI Classification Boundaries" for the Third Inspection Interval (Units 1 and 2). There are two types of boundaries that are used when describing a pressure test. These are the pressure retaining boundary" and the

" examination boundary." The pressure retaining boundary is generally defined by the location of the 151 Class boundary valves within the system. These valves are '

then shut if needed to provide a pressure retaining barrier. The extent of the examination boundaries vary due to the ISI Classification and type of pr.:ssure test being performed.

Establishing appropriate pressure boundaries which conform exactly to examination boundaries cannot always be done while adhering to the principles of ALARA and maintaining safety. Fut these instances a request for relief will be prepared and submitted in accordance with 10 CFR 50.55a(g)(5).

Page 10 of 15

POINT BEACH NUCLEAR PLANT PRESSURE TFST PROGRAM ASME SECTION XI PERIODIC Revisicn 1 PRESSURE TEST PROGRAM December 14, 1993 TillRD INTERVAL PROGRAM DISCUSSION 4.3.1 ISI Class 1

a. System Leakage Test The boundary will extend to the pressure retaining components within the system boundary containing pressutized reactor coolant under the plaat mode of normal reactor startup. (l.c., No special valve line up is required.)
b. liydrostatic Pressure Test The boundary will extend to the ISI classificatic, boundary within the system. This means that when two valves are in series, the inner valve must be opened to pressurize piping and components to the extent of the IS! class boundary. (l.c., A special valve line up is required.)

4.3.2 ISI Class 2

a. Functional Pressure Test The boundary will inch.de only those pressure retaining components within the system bounc'ary pressurized under the test mode required during the performance of a periodic system (or component) functional test. (i.e., No special valve line-up is required.)
b. Inservice Pressure Test The boundary will include those pressure retaining components within the system bouadary that are pressurized under operating pressures during normal system service. (i.e., No special valve line up is required.)
c. Hydrostatic Pressure Test The boundary will extend to the ISI classification boundary valves within the sy> tem or each portion of the system within which the components have the same minimum classification and design pressure.

This means that all systems or portions of systems that are classified for ISI will be appropriately pressurized and examined. Therefore, valve positions may need to be altered in order to perform this pressure test.

Systems that are designed to operate at different pressures under several modes of plant operation or post accident conditions shall be Page 11 of 15

POINT BEACl{ NUCLEAR Pl. ANT PRESSURE TEST PROGRAM ASME SECTION XI PERIODIC Revision 1 PRESSURE TEST PROGRAM December 14, 1993 TIIIRD INTERVAI-PROGRAM DISCUSSI af1 x .

subject to a system pressure 2st within the test boundary defined by the operating mode with the higher pressure.

4.3.3 ISI Class 3

a. Inservice Pressure Test The boundary will include those pressure retaining components within the system boundary that are pressurized under operating pressures during normal system service. (i.e., No special vaive line up is required.)
b. Hydrostatic Pressure Test The boundary will extend to the ISI classification boundary valves within the system or each portion of the system within which the components have the same minimum classification and design pressure.

This means that all systems or portions of systems that are classified for ISI will be appropriately pressurized and examined. Therefore, valve positions may need to be altered in order to accomplish this pressure test.

4.4 DOCUMENTATION Inservice Test procedures (ITs), Operating Refueling Tests (ORTS), and Tech Spec Tests (TS) are used to implement the system pressure test program at PBNP. Taey <

are also used to document the performance of the test. Other working documents, such as Maintenance Work Requests (MWRs), may be utilized to document test performance at the discretion of the Pressure Testing Program Coordinator / Engineer.

A VT-2 visual examination data sheet must also accompany the completed implementing procedure as part of the permanent record, Copics of completed periodic pressure tests, including the inspection results and dispositions, are retained by the Pressure Testing Program Coordinator / Engineer.

Page 12 of 15

POINT BEACil NUCLEAR PLANT PRESSURE TEST PROGRAh!

ASME SECTION XI PERIODIC Revision 1 PRESSURE TEST PROGRAh! December 14, 1993 TillRD INTERVAL PROGRAM DISCUSSION 5.0 PRE-TEST REVIEW AND TEST PREPARATION Prior to conducting an AShlE Section XI periodic pressure test, the test procedure shall be reviewed by the Pressure Testing Program Coordinator / Engineer, or a designated alternate, to ensure compliance with AShtE Section XI requirements. The Pressure Testing Program ,

Coordinator / Engineer, or a designated alternate, shall review the test valve line-up to ensure that all portions required to be examined by the procedure will be pressurized as required.

Development of actual testing procedures should be accomplished by Operations personnel ,

knowledgeable in the operation of the subject system, with technical support provided by the Pressure Testing Program Coordinator /Engineel, or a designated alternate. The Pressure Testing Program Coordinator / Engineer, or a designated alternate, will forward a test package containing the reviewed tes'. procedure with marked drawings indicating the piping / components to be inspected to the QTS Supervimr for use in the field. The QTS Supervisor shall have the responsibility of arranging for any necessary radiological support required for their inspections.

6.0 SCIIEDULE System pressure tests at PBNP will follow Inspection Program B as defined by AShfE Section XI, Article IWA-2432. The system pressure tests to be performed at PBNP shall meet the planned schedule listed in Table 1. The dates shown in this table may be adjusted within the limits allowed by ASME Section XI, Article IWA 2430.

Iabje 1 - Third Insoection Interval UWt ! UWt2 Ten Year laterval December 1,1990 November 30,2000 December 1,1992 September 30,2002 First 40 month Period December 1,1990 March 31,1994 December 1,1992 - January 31,1996 Second 40 month Period April 1,1994 July 31,1997 February 1,1996 May 31,1999 Thi rd 40 month Period August 1,1997 November 30,2000 June 1,1999 Sep' ember 30,2002 7.0 RFLIEF REOUESIS Appendix C contains relief requests related to both Unit I and Unit 2 pressure tests.

Additional requests for relief may be added as necessary and shall be submitted to the NRC for review and approval as required by Federal Regulations. All Relief Requests are identified by the prefix, ITP-3 , which indicates Pressure Testing Program - Third Interval Page 13 of 15

POINT BEACH NUCLEAR PLANT PRESSURE TEST PROGRAM ASME SECTION XI PERIODIC Revision 1 PRESSURE TEST PROGRAM December 14, 1993 Tlf!RD INTERVAL s PROGRAM DISCUSSION 8.0 ACCFPfANCE CRrrERIA Acceptance criteria for each pressure test shall be specified within the test procedure or test working document. The Pressure Testing Program Coordinator / Engineer, or a designated alternate, shall ensure that appropriate acceptance criteria is set forth for each test during his pre test review. In general, acceptance criteria for each pressure test shall specify that the test is to be considered acceptable as long as the pressure retaining piping and components within the test bounday are able to withstand test pressure with no loss of structural integrity. Additionally, acceptance criteria will also generally specify that the test is to be considered acceptable as long as there is no leakage from the system other than controlled leakage or leakage through boundary valves.

The term " leakage" has been defined by the Point Beach Manager's Supervisory Staff (MSS) to be " wet, spraying, or steaming." The term " residue" is used to describe dry material deposits, such as boric acid, and may not have the same acceptance criteria that is specified ,

for leakage.

Since the pressure tests accomplished under this program do not measure or record any numerical data, no numerical acceptance criteria need be specified.

The Pres-re Testing Program Coordinator / engineer, or a designated alternate, shall review the results of each pressure test within 96 hours0.00111 days <br />0.0267 hours <br />1.587302e-4 weeks <br />3.6528e-5 months <br /> of completion. This review shall compare the test results obtained to the specified acceptance criteria, and note any corrective actions which may be required.

Page 14 of 15

POINT BEACli NUCLEAR PLANT PRESSURE TEST PROGRAM ASME SECTION XI PERIODIC Revision 1 PRESSURE TEST PROGRAM December 14, 1993 TIIIRD INTERVAL PROGRAM DISCUSSION

9.0 REFERENCES

9.1 American Society C afechanical Enginects (ASME) Boiler and Pressure Vessel '

Code, Section 5 Rules for Inservice Inspection of Nuclear Power Plant Components," . 6 Edition, with no Addenda.

9.2 " Basis for ASME Section XI Classification Boundaries" for the Third Inspection Interval, Unit 1.

9.3 " Basis for ASME Section XI Classification Boundaries" for the Third Inspection Interval, Unit ?..

9.4 Americar Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel Code,Section III, " Rules for Construedon of Nuclear Power Plant Components,"

1986 Edition, with no Addenda.

9.5 ASME Code Case N-498, " Alternative Rules for 10-Year Hydrostatic Pressure testing for Class 1 and 2 Systems."

9.6 Inservice Inspection Long Term Plan for the Third Inspection Interval, Unit 1.

9.7 Inservice Inspection lAng Term Plan for the Third Inspection Interval, Unit 2.

9.8 PBNP 3.2.5, " Pressure Test Procedure".

Page 15 of 15

r l POINT BEACII NUCLEAR PLANT PRESSURE TEST PROGRAM ASME SECTION XI PERIODIC APPENDIX A PRESSURE TEST PROGRAM Revision 1 THIRD INTERVAL December 14, 1993 PROGRAM SCHEDULE UNIT 1 AND COMMON The database shown is a schedule for the implementation of the Pressure Testing Program for PBNP Unit I and common systems. Preceding the table is a brief description of the information that is provided in the Unit I and common program.

FIELD NAME DESCRIPTION TEST Description of the type of test to be performed and an explanation of what DESCRIIFTION system / component the test pertains to.

SYSTEM A portion of the plant that performs a particular function and is usually identified by an acronym of the function performed.

AF - Auxiliary Feedwater RC - Reactor Coolant CC - Component Cooling Water RIIR - Residual Heat Removal CYC - Chemical & Volume Control SC - Sampling DA Diesel Air Start SIS -

Safety Injection FO - Fuel Oil SF -

Spent Fuel II2V - Hydrogen Venting SW -

Service Water MS - Main Steam WG - Waste Gas PEN - Containment Penetrations PROCEDURE Pressure test procedure number. Several test procedures may be required to examine a single system. Likewise, a single test procedure may encompass multiple systems.

An indication cf "TBD" denotes that the procedure number has not yet been assigned. An indication of "MWR" denotes that the test is accomplished under a maintenance work request and associated work plan. " APP J" denotes that testing is accomplished under the 10 CFR 50, Appendix J, testing program.

TEST TYPE Indication of the type of test to be performed.

F = Functional H = Hydrostatic 1 = Inservice P = Pneumatic Page 1 of 19

~ -- . - _ - - - - _ - . . - _ - . _ . . .-.--_-..- - . . . . -

POINT BEACH NUCLEAR PLANT PRESSURE TEST PROGRAM ASME SECTION XI PERIODIC APPENDIX A PRESSURE TEST PROGRAM Revision 1 l THIRD INTERVAL December 14, 1993 PROGRAM SCHEDULE  !

UNIT 1 AND COMMON The classification of a component for ISI as outlined in the " Basis for ASME  !

CLASS Section XI Classification Boundaries" for the Third Inspection Interval (Units 1 and 2).

1 = ASME CLASS 1 2 = ASME CLASS 2 3 = ASME CLASS 3 2/3 = ASME CLASS 2 and 3 PRESSURE TESTS ASME Section XI Pressure Test Requirements.

4-TEST ASME Section XI Pressure Test Conditions.

CONDITIONS i

CATEGORY ASME Section XI Category. A category of "MULT1" is used for a test that encompasses more than one examination category.

FREQUENCY Indication of the frequency (la months) at which the system and/or component ,

is required to be tested under the respective ten year interval. ,

40 = 40 month interval 120 = 120 month interval (once during ten year interval)

PLANT Special plant conditions required to complete the test procedure.

CONDITIONS A = No Special Con,ditions Required B = Refueling Outage C = Defueled DRAWINGS The Primary P&ID drawings of the system / component to be tested.

OUTAGE Relates to the ,iesignated outages within the inspection interval. Note that test SCHEDULE procedures which due not require an outage condition to accomplish may be performed at any time during the calendar year of the outage specified.

X = Exam Due Y = Exam Satisfactorily Completed

- = No Exam Scheduled REMARKS Notes relating to the test. This field may include such references as relief request numbers, MWR numbers, IDR numbers, indication of ASME Code Case N-498 Reference, exam notes, and procedure notes.

Page 2 of 19

DOINT BEACH NUCLEAR PLANT

  • PRESSURE TEST PROGRAM '

ASME SECTION XI PERIODIC PRESSURE APPENDIX A TESTING PROGRAM THIRD INTERVAL Revision 1 .

December 14, 1993 PROGRAM SCHEDULE UNIT 1 AND COMMON Sye Pms Ten Class M amme Ten Cas Plam Doge UI UI Fnal Ut Ut Ut Ut ut Ut UI Ut Reemrte Type Tees Can&taans Cand RIS R19 R20 R21 R22 R23 R24 R25 R26 R27 TEST DESCRIPTION Functional Namne Tem d the TWhne Dmen Auxiliary Feedwater Peep IP-29 AF IT-290 F 3 IWA-5211(b) IWA-5212 D-A 40 B M-2175hi - -

Y - -

X - - - -

) IWA-5211(c) IWA-5213 IWA-5211(d) IWD-5220

  • IWD-5210 IWD-5230 s

TEST DESCRIPTKW: Functional Preasure Twa of P-38A Amuliary Feedweser Pwnp AF Tr-290 F 3 IWA-52t l(S) IWA-5212 D-A 40 B M-217 5h l - -

Y - -

X - . - -

IW A-5211(c) IWA-5213 IWA-5211(d) rw D-5220 IW D 5210 IWD-5230

]

TEST DESCRIPTKJN Functicant Pressure Ted of P-385 Auxilicy Feed =eser Pue,p AF IT-290 F 3 IWA-5211(b) r#A 5212 D-A 40 B M 217 sh 3 - -

Y - -

X - - - -

IWA-5211(c) IWA-5213 IWA-52tI(d) Iw h 5220 I IWD'5210 IW D-5230 a ua DESCRIPTION: Hydruesatic Pressure Tem of the Class 2 Peruce of Main and Aemiliary Feedwater AF TBD H 2 IWA-5211(b) IWA-5212 C-H 120 B M-217Sh 1 - - - -

x IWA-5213 Nee 1 M-202 sh 2 IWA-5211(d) IWC-5220 IWC-5210 IWC-5230 l

sua DESCRIFr10N: Hydressatic Pressure Tem of the Auxiliary Feedweier Section P5 ping AF IT-1090-1 H 3 IWA-52Iltb) PNA-5212 D-A 120 B M-217 5h 1 - - - - - - - -

X -

IWA-5211(c) IWA-5213 IWA-5211(d) IWD-5220

} IWD 5210 IW D 5230 mua DESCRIPTION: Hydrosutic ? - 2 Tem of she Auxiliary Feedwanes Discharge PipHg AF Tr-8090-3 H 3 IW A-52tttb) r#A-521 ' D-A 120 B M-217 5h l - - - - - - - -

X -

IWA-52tl(c) IWA 3213 IWA-5211(d) IWD-5220 Iw h 521e ,

rND-5230

{

Page 3 af 19

MINT BEACH NUCLEAR PLANT ~

ASME SECTION XI PERIODIC PRESSURE PREFSURE TEST PROGRAM APPENDIX A TESTING PROGRAM THIRD INTERVAL Revision 1 .

December 14, 1993 PROGRAM SCHEDULE

_ UNIT 1 AND COMMON Sys Proc Ted Class n- - Ten Cm Freq Type mna Dog. Ut UI i Teme ' ' " - Ut UI Ut Ut Ut Coed RIS 219 R20 Ut Ut Ut Ramarke R21 R22 R23 R24 TE.Tt DESCRIFTION R25 R26 R27 L. ice Pre-. Tem of the Claen 2 Partian erMean saa Aemii.ery M_m AF TT-290 I 2 IWA-5211(b) IWA-3212 C-H 90 B 4 M -IIT Sh 1 - -

Y I IWA-5213 M-202Sh 2 X - - - -

TMA-52II(d) TWC-5220 IWC 5210 IWC-5230 s t.st- DESCRIPTION H,2- --+ Nesme Tem of the C ,-

se - ' ; Symem Inside C--

CC IT-1120-1 H 2 IWA-52tl(b) IWA-5212 C-H 120 8 11000lt sh 2 - - -

IWA-5213 - - - -

X - -

Nas 1 IWA-5211(d) IWC-5220 IWC-5210 IWC-5230 TEST DESCRIPT10N: Hydre Preeuwe Tem e(C,.--,-  : Cooling Synem W '- "-

sa

+> CC TT-s t20-2 H 2 IWA-5211(b)IWA-5212I C-H 120 a llOEDtB - - -

IWA-523 I(c) IW *A-5213 - -

X IWA-52II(d) sh 1,2,3 -

wie 1

!WC D 5220 -

3 IWC.D-5210 IWC.D-5230 it.sr DESC3tlPTION:

Hydrosur.is Preemere Tem et the IP-1 A RCP Convened Ceuting Weser Symem CC fr-1190-4 H 2 IWA-3211(b) IWA-5212 C-H 120 C 110 Eats - -

IWA-528 t(c) IWA-5213 - - -

X Sh.1, 2, 3 - -

Nase !

IWA-52 TIM) IWD-5220 IWD-5210 IWD-5230 TEST DESCRIPTION: Inservue Prenewe Tem of the C-. .

m CMing Symem Inside C" -_

CC fr-1120-1 1 2 IWA-521)(b) IWA-5212 C-H 40 B 110EDIESh 2 -

Y IWA-5213 - -

X - - - - -

IWA-32tI(d) IWC-5220 IWC-5210 IWC-5230 TEST DESCRIPT10N: 1 Imervice Pressere Tem cf the Cw ra C =&ng Symem Omaide C~ ' _-- m CC IT-il20-2 3 2 a IWA-52tl(b) IWA-5212 C-H 40 A tt0Ents IWA-5211(c) IWA-5213 X - -

X sh.1, 2, 3 - - -

IWA-5211(d) IWC.D-5220 IWC.D-521e IWC.D-5230 Page 4 of 19

yINT BEACH NUCLEAP PLANT PRESSURE TEST PROGRAM -

ASME SECTION XI PERIODIC PRESSURE APPENDIX A "ESTING PROGRAM TillRD INTERVAL Revision 1 ~

DecCmbCr 14, 1993 PROGRAM SCHEDULE UNIT 1 AND COMMON _

w Sys Proc Test Claes Freemre Test Cat Frog Fism Dogs Ut Ut UI UI UI Ut UI UI Ut Ut kamarks Type Ten, s'a- Ceed RIS R19 R20 R21 R22 R23 R24 R25 i R16 R27 TEST DESCRIPTION Imemce Presem e Test of t.e Cheamcal and Vaanme Cesarol Symes Ins Se Cosmainmes CVC TBD I 2 IWA-5211(b) IWA-5212 C-H 40 B 6841741 Sh 2 - -

Y - - X - - - - Fene3 IWA-521 f(c) IWA-5213 IWA-Sall(d) 2WC-5220 IWC-5210 IWC 5230 TEST DESCRIPTION Wece Pressure Tem of she (hmical and Vehmere Casarul syenema ousa.de Commaammens

' q t i CVC TBD I 2 IWA-52t l(bl i IWA-5112 C-H 40 A 684U41 - - Y - -

X - - - - Mae 3 IWA-5211tc) IWA-5213 Sh I. 2 IWA-5211(d) IWC 5220 541FW2 Sh I IWC-5210 IWC-5230 684J961 Sh 2 4441972 Sh 3

] PBM-226 l TEST DESCRIPTION: Hydron.atse Pressure Test of die Bone Acid Tanks and Transfer Pompe CVC TBD H 2 IWA-5211(bl IWA-5212 C-H 120 A 684J471 Sh ? - - - - - - -

X - - Nee 1

!WA-5211(c) IWA-5213 IWA-5211(d) IWC-5220 IWC-5210 IWC-5230 TEST DESCRIPTION: Hydrostatae Pressere Tem of she Chemical emi Volume Cosevel Sye m Im de Carsommees CVC TBD H 2 IWA-5211(b) IWA-5212 C41 120 B 684D415h 2 - - - - - - - - - X Nee l IWA-52tl(c) IWA-521, IW A-5211(d) IWC-5220 IWC-5210 IWC-5230 l 1 TEST DESCRIPTION: Hydrostatic Pressure Test of the Chesucal and Volume Cesaret Symem Outade CC_

CVC TBD H 2 IWA 5211(b) IWA-5212 C-H 120 8 6t U741 - - - - - - - - X - Naes 1 IWA-5211(c) IWA-521, Sh I. 2 IWA-52t l(d) IWC-5220 54tFU92Sh! j IWC 5210 IWC-5230 6841961 Se 2 684J972 Sh 3 PBM-226 Page 5 ef It

  • OINT BEACH NUCLEAR PLANT PRESSURE TEST PROGRAM

~

ASME SECTION XI PERIODIC PRESSURE APPENDIX A TESTING PROGRAM THIRD INTERVAL Revision 1 .

December 14, 1993 PROGRAM SCHEDULE UNIT 1 AND COMMON Sys Pros Tea Class Pree.amre Tea Cat Freq Plass D*2' UI UI UI UI UI UI UI UI UI UI Remarks Type Tes's fwe= Cand R18 R19 R20 R21 R22 R23 R24 R27 R25 ]R26 TEST DESCR1FidON: Funct anal Preamre Tess of she Boric Acid Tasks ami Treamfer Puence CVC TBD F 2 IWA-52116) !WA-5212 C-H 40 A 684U415h 1 - - -

X - - X - - -

IWA-5211(c) IWA-5213 IWA-52t l(d) IWC-522w IWC-5210 IWC-5230 TEST DESCRIFT10N: Fuartional Pressure Ted of she emergency Diesel Generneur (G41) h Stad Syeze I

DA TED F l3 IWA-5211(b) IWA 5212 DA 40 A M-2U9 Sh 12 - - -

X - -

X - - -

IWA-5211(c) IW &5213 IWA-5211(d) IWC-5220 IWC-5210 IWC-5230 TEST DESCRIPTRW Fuectmnal Pressure Tem of the Emergency Dicael Generator (G42) & Start Symem DA TBD F 3 IWA-5211(b) IWA-5212 D-A 40 A M-2W Sh 12 - - -

X - - X - - -

IWA-5211(c) IWA-5213 IWA-5211(d) IWC-5220 TWC-5210 IWC-5230 , (

TEST DESCRIPTION Pneumatic Pressure Test of the .%r Start System for 042 DA TT-Il80-2 P 3 IWA-5211(b) IWA-5212 D-A 120 A M-209 5h 12 - - - - - - - - X -

IWA-5211(c) IWA-5213 IWA-5211(d) IWC-5220 l IWC-5210 IWC-5230 TEST DESCRIPTION: Pneumstic Pneemure Tem of the A;r Swt System for G41 DA TT-Il80-1 P 3 IWA-5211(b) IWA-5212 D-A 120 A M-209 5h 12 - - - - - - - . X -

TNA-5211(c) IWA-5213 IWA-5211(d) IWC-5220 IWC-5210 NC-5230 TEST DESCRIFTK)N: TMeal Pressure Tem of the E.nergency Diesel Gentrusar (G42) F. net Transfer Syssem FO TBD F 3 IWA-5211(b) IWA-3212 D-A 40 A M-219 - - -

X - -

X - - -

IWA-5211(c) IWA-5213 IWA-5211(d) IWC-5220 TNC-5210 IWC-5230 Page 6 of 19

NINT BEACH NUCLEAR PLANT PRESSURE TEST PROGRAM -

ASME SECTION XI PERIODIC PRESSURE APPENDIX A TESTING PROGRAM THIRD INTERVAL Revision 1 .

Decstver 14, 1993 PROGRAM SCHEDULE UNIT 1 AND COMMON Sys Proc Tem Clean Preemme Tea Cat Freeg Piam Dege Ut Ut 01 t*1 Ut UI Ut Ut UI Ut Reesc4s Type g Teme h4a- Cand kl8 R19 R20 R21 R24 R25 R26 R22 l R23 R27 TEST DESCRIPTION: Functaanni Presswe Tem 'Jih Emerrency Dwent Gear-eser (G41) Fe:I Tromsfer Symese i

FO TSO F 3 IWA-5211@) IWA-5212 D-A 40 A M-219 - - -

X - - X - - -

IWA-5211(c) IWA-5213 IWA-5211(d) IWC-5220 IWO-5210 IWC-5230 TEST DESCRIPTION: Hydrostasac Pressure Test of the Esregency Dunel Generenor Fuel Od Symem (Day Tank T 31 A W FO IT-Il 81-3 H 3 IWA-5211@) IWA-5212 DA 120 A M 219 - - - - - -

X - -

IWA-5211(c) IWA-5213 IWA-5211(d) IWC-5220 MC-5210 IWC-5230 TEST DESCRIPTION: Hydrosassac Pressure Tem of Emerrency Dweel Generator Fuel Od Symesa (Day Tank T-318 Po inom)

FO TT-il81-4 H 3 IWA-5211@) IWA-5212 D-A 120 A M-219 - - - - - - -

X - -

IWA-52tl(c) IWA-5213 IWA-52il(d) IWC-5220 IWC-5210 IWC-5230 ,

TEST DESCRIPTION: Hydroessaic Pevesure Tem of EDG Fuel Od Symem' Emergency FuelTank Portion)

FO IT-il51-1 H 3 IWA-5211@) IWA-5212 DA 120 A M-II9 - - - - - - -

X - -

IWA-5211(c) IWA-5213 IWA 52il(d) IWC-5220 IWC-5210 IWC-5230 [

Terr DESCRIPT10N: Hydew-==r Prew Tess of Emergency Dweel Generator Fuel Od Jymem 01B-22 % Portsun)

FO IT-Itti-2 H 3 IWA-52t l@) IWA-5212 D-A 120 A M-219 - - - - - - -

X - -

IWA-5211(-) IWA-5213 IWA 52il(d) IWC-5220 IWC-5210 !WC-5230 TEST DESCRIPTION: Pneumatic Preamre Tem e,%, Post Accidern Corsainmens Verming and Messeormg Syssem l[ l l

H2V TBD P 2 IWA-5211@) IWA-5212 C-H 120 B M-224 - - - - - - - - X - Now 1 IWA-5213 IWA-5211(d) IWC-5220

, IWC-5210 IWC-5230 Page 7 e(19

MihT BEACH NUCLEAR PLANT PRESSURE TEST PROGRAM ~

ASME SECTION XI PERIODIC PRESSURE APPENDIX A TESTING PROGRAM THIRD INTERVAI. Revkion 1 .

Deumber 14,1993 PROGRAM SCHEDULE UNIT I AND COMMON Sys Pree Tea Class Pressere les Can Freq Plam Dwgs Ut UI UI UI UI UI UI UI UI UI Remmete Type Tease Cenetaans Cand R18 R19 R20 R21 R22 R23 R24 R25 R26 R27 TEST DESCRIPTION: Functional Pmasure Tem of C.s Main Steam to em Terry heene Outsmie Ceenaanmes M3 TT-290 F 2 IWA-5211(b) IWA-5212 C-H 40 B M-201Sh1 - -

Y - -

X - - - -

( IWA-5213 IWA-5211(d) IWC-5220 IWC-5210 TWC-5230 l TEST DESCRIPTION: Fametsonal Preeevne Tem of abe Main seeman symem ao she Terry Tusine lameder -' -

M5 TT-290 F 2 IWA-5211(b) IWA-5212 C-H 40 B M-201 Sh 1 - - Y - -

X - - - -

IWA-5213 IWA-5211(d) IWC-5220 IWC-5210 IWC-5230 TEST DESCRIPTION: Hydreamaic ymesuve Tem of sbe Heim Sesam Syssem to ibe Tony Tusine Outside C- '  :

E TBD H 2 IWA-5211(b) IWA-5212 C-H 120 B M-201 Sh 1 - - - - - - - X - - nne !

IWA-3213 IWA-5211(d) IWC-5220 IWC-5210 IWC-5230 W DESCR!FTION: Hydr isestic Pressues Tea 4.f the Main Sesam Symem to the Terry Turbine Inside Cneminmers MS TBD H 2 IWA-5211(b) IWA-3212 C-H 120 B M-201 Sh 1 - - - - - - . -

A . See 1 IWA-5213 IWA-5211(d) IWC-5220 IWC-5210 IWC-5230 l

TEST DESCRIPTION: Funcisunal Pressure Tem of Panetratson P-33A (Inarumes Air)

PEN APPJ F 2 IWA-3211(b) IWA-5212 C-H 40 B M-209 - - - - - - - - - - N.me 2 IWA-5'!!3 Sh 7.11 IWA-5211(d) IWC-5220 IWC-5210 IWC4230 TEST DESCRIPTION: Functsonal Pressure Tem of Penetratsen P-71 fr- -'

-Saw Discharge) l PEN AFPJ F 2 IWA-5211(b) IWA-5212 C-H 40 B 684J971 - - - - - - - - - - Kas 2 IWA-5213 sh I A IWA-5211(d) IWC-5220 IWC-5210 IWC-5230 Page 8 of 19

MIhT BEACH NUCLEAR PLAhT PRESSURE TEST PROGRAM -

ASME SECTION XI PERIODIC PRESSURE APPENDIX A TESTING PROGRAM THIRD INTERVAL Revision 1 .

December 14, 1993 PROGRAM SCHEDULE UNIT 1 AND COMMON e

Sys Proc Test Cines Pressure Test Cat Freq Plaza Dogs UI Ut UI UI UI Ut Ut Ut UI Ut Romerta Type Teams Condemons C,ed Rtt R19 R20 R21 R22 R23 R24 R25 R26 R27 TEST DESCRIPTION: Functimal Preemers Test of P a P-33B (Instramwas Air)

PEN APP 3 F 2 IWA-52t f(b) IWA-5212 C-H 40 B M-209 - - - - - - - - - - Nees 2 IWA-5213 sh. 7,Il IWA-5211(d) IWC-5220 1 IWC-5210 IWC-5230 TEST DESCRIPTION: Funct nal Pree ere Test of Penetrance P-33C (Service Air)

PEN APP J F 2 IWA-5211(b) IWA-5212 C-H 40 B M-209 - - - - - - - I - - - N ,e2 IWA-5213 sk.1,2 IWA-5211(d) IWC-5723 IWC-5210 IWC-5230 TEST DESCRIPTION: Functional Piveaure Test of P L- ,_ P-30CIPreemaruer Relief Tank)

PEN WPJ F 2 IWA-52t l(b) IWA-5232 ('-H 40 B 541f9915h 2 - - - - - - - - - - Nese l s'WA-5213 TMA-5211(d; IWC-5220 l IWC-5210 IWC-5230 ,

l TEST DESCRIPTION: Functsuna* Preemere Test of Penetratice P-52 (Ammiimry Steam Snapply)

PEN APPJ F 2 IWA-5211(b) IWA-5212 C-H 40 B M-214 Sh 1 - - - - - - - - . -

Name 2 IWA-5213 IWA-5211(d) IWC-5220 IWC-5210 IWC-5230 TEST DESCRIPTE)N: Functamal Presauve Test of Pa-a 6 P49 (Reactor Ceoland Dreie Tank)

PEN APP J F 2 IWA-5211(b) IWA-5212 C-H 40 8 684IV71 - - - - - - - - - - Nase 2 IWA-5213 sh. I A

. Page 9 of 19

nameradCTTOR21 PERIODIC PRESSURE PRESSURE TEST PROGRAM TESTING PROGRAM THIRD INTERVAL APPENDIX A  ;

~

Revision 1 December 14,1993 .

PROGRAM SCHEDULE UNIT 1 AND COMMON Sys Pme -

Ted Class Pressure Tem Type Cat Freg

! Tees M*--- Ptase Doge Coed Ut Ut UI TEST DESCRIPTION: T-~ R18 Ut Ut U3 R19 R20 Ug Jg Ug e Test d Pes.h P-12C (h ---e Vens 13W R21 R22 R23 Ut n= =- -q, PEN APPJ R24 R25 R26 F 2 RI7 IWA-5211@) IWtc5212 C-H 40 B IWA-5213 6441971 .

IWA-5211(d) IWC-5220 sk. IA . .

IWC-5210 TWC-5230 me 2 TEST DESCRIPTION F-H Pressmee Ted at Pe .h P-X2 PEN APPJ F 2 IWA-5211@) fW A-5212 C-H 40 B fWA-5213 M-215 5h 2 .

IWA-52t l(d) NC-5220 TWC-5210 . .

IWC-5230 .

me. 2 TEST DESCRIPTION: F=

ed Pressure Tem of P;._;

P-V2 PEN APPJ F 2 IWA-5211@) IWA-5212 C-H 40 B IWA-5213 M-215 sh i . .

IWA-5211(d) IWC-5220 .

rWC-5210 IWC-5230

__ TEST DESCRIPTION; F=

Nie l i '

PEN APPJ

--! Pressure Tom of Penetrataan P-2tD (DW e Weight Teaser Lin )

F 2 IWA-5211@) IWA-5212 C-H 40 B IWA-5213 M-215 Sh ! . .

IWA-52t f(d) IWC-5220 IWC-5210 IWC-5230 m,, 2

_1EST DESCRIPTION:

PEN TM- : Pveasure Tem elPn- a P-34A (P::whw Rm! f T ,

APPI F 1 onk Ges) i e

IWA-52XI@) IWA-5212 e

C41 40 5 IWA-5213 MIFV9156 2 .

tWA-5211(d) IWC-5220 IWC-52io IWC-5230 me. 2 i TEST DESCClPTION: Fahetaunal P n_.. Test of 7;.- ion P-X1 {

PEN APPI F 2 IWA-5211@) IWA-5212 C-H 40 B TWA-3213 M-215 sh 2 . .

IWA-5211(/) IWC-5220 j IWC-5210 IwC-5230 man 2 P.ge 10 419 E

NINT BEACH NUCLEAR PIANT PRESSURE TEST PROGRAM

  • ASME SECTION XI PERIODIC PRESSURE APPENDIX A TESTING ' PROGRAM THIRD INTERVAL Revision 1 .

Decemi>er 14, 1993 PROGRAM SCHEDULE UNIT I AND COMMON Sys Pme Test Class Pressere Ted Cat Frog Phut Dwge UI UI U1 UI Ut UI UI UI UI UI Resnarte Type l Teme Condaions t'end R15 R19 R20 R21 R22 R23 R24 R25 R26 R27 TEST DESCRIPTION: Fencescent Pressure Tem of Penetreason F-14D (Reac1er Ceulant Dreis Teek)

PEN APPJ F 2 IWA-5211@) IWA-3212 C-H 40 B 6541971 . - - - - . . - - - Name 2 TWA-5213 m1A IWA-5211(d) IWC-5220 IWC-5210 IWC-5230 TEST DESCRIPTION: Fenceomal Preamwre Test of Penetrauma P-53 F ' Renarn!

PEN APPJ F 2 IWA-521l@) IWA-5212 C41 40 B M-214 sin 1 - - - - . . - - - me. 2 IWA-5213 IWA-52t l(d) IWC-5220 IWC-5210 IWC-4230 ]

TEST DESCRIPT*)N: Functional Preamsre Test of Pah P-12A (De4oenard Water)  ;

PEN APP J F 2 IWA-5211@) IWA-5212 C4{ 40 B FEM-131 - - - - - - - - -

. k Nene 2 TWA-5213 IWA-521l(d) IWC-5220 IWC-5210 TWC-5230 TEST DESCRIFTK)N: Fence oeal Preanne Test of Penetration P-14 A (Presaartner Relief Tenit)

PEN APPJ F 2 IWA-5211(b) IWA-3212 C-H 40 8 541FW4 Sh 2 - - - - - - - - . . me. 2 IWA-5213 .

IWA-52tl(d) IWC-5220 IWC-5219 IWC-5230 h

TEST DESCRIFiY)N: Hydecessus Pressure Tem of Pe.c a P-X1 PEN APPJ H 2 [WA-5211(b) IWA-52!1 C41 120 B M-215 sh 2 . - - . . . . . - . Mm2 IWA-5213 IWA-521I(d) IWC-5220 IWC-5210 IWC-5230 ,

TEST DESC1t!PTION Hydre.tatic Pressure Tess of Penetretson P-2SD (Dead Weight Tester line)

PEN APP J '.1 2 IWA-521l@) IWA-5212 C-H 120 3 M-215 Sh 1 - - . - - . . . . . Nee 2 IWA-5213 IWA-5211(d) IWC-5220 IWC-5210 IWC-5230

(

Page il of 19

'OINT BEACH NUCLEAR PLANT PRESSURE TEST PROGRAM -

ASME SECTION XI PERIODIC PRESSURE APPENDIX A TESTING PROGRAM THIRD INTERVAL Revision 1 .

December 14,1993 PROGRAM SCHEDULE UNIT I AND COMMON m

Sys Prus Tea Cines Pressure Tesa Cat Frog FM D=ge UI UI UI UI UI Ut Ut Ut Ut U1 Raamarts e- "

Type Tesas Camd RIS R19 R20 R21 R22 R23 R24 R25 R26 R27 TEST DESCRIFTR)N: Hydmassic Presome Tem of Peneerstaan P-53 (e-

  • Resurnt i

PEN APPJ H 2 IWA-5211@) IWA-5212 C-H 120 5 M-214 5bt - - - - - - - - - - lees 2 IWA-5213 IWA-52tl(d) IWC-5220 IWC-5210 IWC-5230 TEST DESCRIrrR)N: Hydrossaue Pressere Tesa of Fenetrusson P-12A (De-lamazed Water)

PEN APPJ H 2 IWA-32tl@) IWA-5212 C-H 120 B PBM 231 - - - - - - - - - - Nees 2 IWA-5213 IWA-52tl(d) IWC-5220 IWC-5210 IWC-5230 __

TEST DESCRIPTION: Hydrosianc Pressure Test of Pw. P-V1 PEN As'P J H 2 IWA-52t t@) IWA-5212 C-H 120 B M-215 5h 1 - - - - - - - - - - Nm2 IWA-5213 IWA-5211(d) IWC-5220 IWC-5210 IWC-5230  ;

TEST DESCRIPTR)N: Hydrostehe Pressure Tesa of Penetratium P-V2 PEN APP 3 H 2 IWA-52t l@) IWA-5212 C-H 120 B 4 2155h1 - - - - - - - - . - Nese 2 IWA-5213 IWA-521 t(d) IWC-5220 IWC-5210 IWC-523C TEST ISESCRIPTR)N: Hydrostatac Pressure Test of Peaeeratine P-X2 PEN APP 3 H 2 IWA-521l@) IWA-5212 C-H 120 B M-215 sh 2 - - - - - - - . - - None 2 IWA-5213 IWA-52II(d) IWC-5220 IWC-5210 tWC-5230 ,

TEST DESCRIPTION: Hydrosiatic Premonee Tesa of M - P-30C (Pressurizee Relief Tant)

PEN APP 3 H 2 IWA-5211@) IWA-5212 C-H 120 B 54tFU91$h 2 - - - - - - - . - - Nose 2 IWA-5213 IWA-5211(4) IWC-5220 ,

IWC-5210 IWC-5230 l Page 12 of 19

'OINT BEACH NUCLEAR PLANT PRESSURE TEST PROGRAM -

ASME SECTION XI PERIODIC PRESSURE APPENDLX A TESTING PROGRAM THIRD INTERVAL Revi.eion 1 .

December 14, 1993 PROGRAM SCHEDULE UNIT I AND COMMON Sys Pre; Tea Class Pveemme Tea Cat  % Pks D*r* UI UI UI UI UI UI UI UI UI UI Remesets l

t Ty:=e Team C e === Camd RIS R19 R20 R21 R22 R23 R24 R25 R26 R27 TEST DESCRIF1DN: Hydrostatse Pressere Tess of Penetratme P-71 (C ^ -- Suay Duchesge)

PEN APPJ H 2 IWA-5211(b) IW A5212 C-H 120 8 684F971 - - - - - - - - - - Noe l IWA-5213  %.IA IWA-5211(e IWC-5220 l IWC-5210 IWC-5230 ,

l TEST DESCRIPTK)N: Hydreassac Pressure Tem of L_; - P-12C 8Cemasivament Vcar Hee @

PEN APPJ H 2 fWA-5211$) IWA-Su 2 C-H 120 8 68479/1 - - - - - - - - - -

. Nee 2 IWA-5213 h IA I IWA-5211(4, TWC-5220 ,

l IWC-5210 rWC-5230 l j g TEST DESCRIPTKPd Hyhw Pressure Tem of Panarataan P49 (Rescaer Cooient Drsen Tank)

PEN APP J H 2 IWA-5211@) IWA-5212 C-H 120 B 654J971 - - - - - - - - - - mes 2 IWA-5213 sh I A IWA-521I(d) IWC-5220 IWC-5210 IWC-5230 TEST DESCRIPTM)N: Hydrnesatic Pressure Tem of Peneerstaos P-34D (Reactor Coolnes E ~~nk)

PEN APPJ H 2 IWA-5211@) IWA-5212 IWA 5213 C-H t^0 B 6841971 sh I A

- l -- - - - - - - - - Nee 2 IWA-5211(4) IWC-5220 IWC-5210 IWC-5230 g g TEST DESCRIPTN)N: Hydresamtsc Pre-asure Tess of Penetrataos F-14A (Pressurirer Rel.cf Tam &)

PEN ATPJ II 2 IWA-5211@) IWA-5212 C-It 120 B 541tV915h 2 - - - - - - - - - - mes 2 1 RWA-5211(d)

IWA-5213 IWC-5220 IWC-5210 IWC-5230 TEST DESCRIPTK)N: Hydrenesse Presasse Test of Pencarnisce P-34A (Pressuruer Relief Tank Gee)

PEN APP J H 2 IWA-5211@) IWA-5212 C-H 120 B 541fm915h 2 - - - - - - - - - - mm. 2 IWA-5213 IWA-52tl(d) IWC-5220 -

IWC-5210 IWC-5230 ,

tsge 13 of 19

a OINT BEACH NUCLEAR PLANT PRESSURE TEST PROGRAM

- ASME SECi10N XI PERIODIC PRESSURE APPENDIX A TESTING PROGRAM THIRD !NTERVAL Revision 1 _

December 14, 1993 l

PROGRAM SCHEDULE I UNIT 1 AND COMMON F.eq Dwge UI UI UI UI UI Ut UI UI UI Ut Remesis Sys Pros Tem Cleas Pressure Tea Cat Plans twa== Cand Rlt R19 R20 R21 R22 R23 R.24 R25 RN R27 Type Team TEST DESCRFTION: Ptseisenstas Pressure Tem of Peeraratsue P-33C(Servue Aar)

IWA-5212 C-H 120 B M-2L9 - - - - See 2 PEN APPJ P 2 IWA-52114)

IWA-5213 Sk. I. 2 r#A-5218(d) IWC-5220 IWC-5210 rrC-5230 l TEST DESCRIPTION Pumams6c Preemove Test of Praetratman P-33A (Instrenness Amr)

APPJ P 2 IWA *211@) IWA-5212 C-H 120 B M-209 - - - - - - - - - - Mes 2 PEN IWA-5213 sh 7,!!

IWA-5215(d) IWC-5220 IWC-5210 IWC-5230 l TEST DESCRFTION: Pnemmstac Preasure Test of Peaseremos P-33B (1msafunness Air)

PEN APPJ P 2 IWA-5211(b) IWA-5212 C-H 120 B M-209 - - - - - - - - - - Nees2 IWA-5213 sh.7,11 IWA-52 t I(d) IWC-5220 l IWC-5210 IWC-5230 TEST DESCRIPDON: Hydrustatic Premse Tem of the R- Coulard esmi Safety Impecisae Symeme RC TT-10lO H I TWA-5211(a) IWA-5212 B-P 120 8 5415091 - - - - - - - - . X Nees !

IWA-5213 Sh. I,2. 3 IWA-52II(d) IWC-5220 .

!WB-52to IWC-5230 ,

TEST DESCRIPMON: Symese leakage Test of Cleas 1 Canyone as Following e Refueling Outage RC  !.*4 230 L I IWA-5211(a) IWA-5212 IN' REF B 5411092 Y Y Y X X X X X X -

IWA-5213 sh.1, 2, 3 IWA-52tl(d) IWC-5220 IWB-5210 IWC-5230 TEST DESCRIPTION: Functional Pressere Test of the Residue: Heat Removal Symem D3tR fr-530 P 2 IWA-5211(b) IWA-5212 C-H 40 B 110E018 51t I - - Y - - X - . . -

IWA-5213 541F092 5h 1 3

IWA-5213 rd) IWC-5220 IWC-5210 IWC4230 Page 14 ef 19

'OINT BEACH NUCLEAR PLANT PRESSURE TEST PROGRAM -

- ASME SECTION XI PERIODIC PRESSURE APPENDIX A TESTING PROGRAM THIRD INTERVAL Resision 1 ,

December 14. 1993 PROGRAM SCHEDULE UNIT I AND COMMON sy. Proc Ten Claes Pressure Ted Cet Freal Piem Derge UI UI UI UI UI UI UI UI Ut UI Remarks Type Tems Condames Cond RIS R19 R20 R21 R22 R23 R24 R25 R26 R27 TEST DESCRIPTION: H-dremstic Pressure Tem af ste Spem Feel Cooinag Symem SP TT-!!92 H 3 IWA-52t l(b) IWA-5212 SC 120 A Il0EDIB 5h 4 . . . . . - . . . X IWA-5211(c) TMA-5213 IWA-5211(d) IWC-5220 IWC-5210 IWC-5 30 TEST DESCRIPTION: Inserwks Pressure Tem of the Spem Fwel Cooling Symem 5F TBD I 3 IW A-52t l(b) IWA-5212 DC 40 A Il0ED18 5h 4 - . .

X . . X . . .

IWA-5211(6) IWA-5213 TWA-52tl(d) IWC-5220 P.VC-5210 TWC-5230 l l TEST DESCRIPTION: Functional Pressure Tem et the Speny Addstave Tank P6puw SIS TT-ill0 2 F 2 IWA-5211(b) FWA-5212 C-H TO A Il0E017 5h 1 . . .

X . . X . . .

9 IWA-5213 IWA-5211(d) FWC-5220 IWC-5210 IWC-5230 l TEST DESCRIPTION: Fusseianal Pressere Tem of Refueling Wate- Secesse Tank Pipeg j SIS TT-1070 F 2 IWA-5211(b) IWA-5212 C-H 40 A Il0EDI7 5h 1 . . .

X . .

X . . .

j j IWA-5213 IWA-5211(d) IWC-5220 f IWC-5210 IWC-5230 TEST DESCRDTION: Functional Pnesure Tem of Conseimmem Sary B Section line (Refueling Shradare) 515 TT-531 F 2 IWA-5211(b) IWA-5212 C-H 40 B IICE017 -

Y - -

X . . . . .

IWA-5213 Sh 1,2 IWA-521l(d) IWC-5220 IWC-5210 IWC-5230 l

TEST DE5tMN; Funceaanal Pressure Tem of the Safety Injection Symem SIS TT-520A F 2 PNA-5211(ol IWA-5212 C-It 40 B ll0E017 . -

Y . . X - . . .

!WA-5213 sh I 2 IWA-52tI(d) r#C-5220 r#C-5210 IWC-5230 Page 15 of 19

OINT BEACH NUCLEAR PIANT PRESSURE TEST PROGRAM '

ASME SECTION XI PERIODIC PRESSURE APPENDIX A TESTING PROGRAM THIRD INTERVAL Revision 1 4 December 14, 1993 PROGRAM SCHEDULE UNIT 1 AND COMMON Sys Proc Test Cless Preesmes Ted Cm Frog Plam Dc gs Type Ut UI Ut Ut Ut Ut UI UI

, Tema condsons Ceed R15 UI UI Remarks R19 R20 R21 R22 R23 R24 R25 R26 R27 Te3T DESCRIPTION: F-l Preeuwe Tem of thee .___m sprey Portion of the sefety y 4 Symeen SIS TT-540A F 2 IWA-32tI(b) IWA-5232 C-II 40 B 110fE17 sh 3 - -

Y - -

X IWA-5213 - - - -

IWA-5211(d) IWC-5220 rwC-5210 twC-5230 TEST DESCRIFT10N: Hyde- i- Pressure Test of RcEselmg Weeer 5sorage Tank .W sls tr-leM H 2 IWA-32tl(b) IWA-5212 C-H 120 A Il0EOl75b t - - -

IWA 3213 X - -

Nee 1 IWA-5211(d) IWC-5220 IWC-5210 IWC-5230 TEST DESCRWr10N: Hydenotatic Preasure Tew of the Spray Addisve Tank .%

5t$ TT-Ill0-2 H 2 IWA-5211tb) IWA-5212 C-H 120 A t t0E017 541 - - - -

IWA-5213 X - -

Nene !

IWA-52I1(d) IWC-5220 IWC-5210 IWC-5230 TEST DESCRWTION: Hyd;-=__- Pressess Test of she C-~-_- a sprey .%

e(she sefety 'Mm synesa 5ts IT-1040 H 2 IWA-5211(b) IWA-5212 C-H 120 B fl0E017 $h 3 - - - - -

IWA-5213 - - -

X -

Nene l IWA-521I(d) IWC-5220 TWC-5210 IWC-5230 TEST DESCRIPTION: Hydreatatic Pressure Tcw of she SI Symem (51 Purnp Diedurre) sts IT-1143 H 2 IWA-52t I(b) IWA-5212 C-H 120 B 110ED17 - - - - -

IWA-5213 - - -

X -

Neue 1 Sh 1. 2 IWA-5211(d) IWC-5220 IWC-5210 IWC-5230 Tui DESCRIPTION: Hydroataric Preasure Tem of the < --- -% Spray Nozzles - (Air Tes)

L St3 T5-37 H 2 TWA-5?ll(b) IWA-5212 C-st 120 s I t090!7 5h l - - - -

IWA-5213 - - -

X - -

Neet IWA-5211(d) IWC-5220 IWC-5210 IWC-5230 Page 16 of 19

= - -

7

,OINT BEACH NUCLEAR PLANT PRESSURE TEST PROGRAM ASME SECTIGN XI PERIODIC PRESSURE APPENDIX A TESTING PROGRAM THIRD INTERVAL Resision 1 .

December 14, 1993 PROGRAM SCHEDULE UNIT I AND COMMON

" 6 D=gs UI UI UI UI Ut Ut Ut Ut Ut Ut Romerta Sys Proc Tess Cass Pwemme Ten Cat Fres: Pissa Coed R15 R19 R20 R21 R22 R23 R24 R25 R26 R27 Type Teste ,

Condmone TEST DESCRFTR)N H,2- -P, Test of(*aasa=====r Searp B h6 tese (Refuehes %

  • w)

B  !!0E017 - - X - - Nee 1 515 fr-531 H 2 IWA-5211$) IWA-5212 C-H 120 - - - - -

IWA-5213 Sh 1, 2 IWA-52114d) IWC-5220 IWC-5210 IWC-5230 l TEST DESCRIPTION: "fyd.a:ie Preemore Test of the St Syssess B A r IWA-5212 C-H 120 B Il0EDl7 2 8 - - - - - - - - X - Noe l SIS TBD H 2 IWA-5211(b)

(WA-3213 IWA-5211(d) IWC-5220 l

l IWC-5210 IWC-5230 l TEST DE5CR2PTRIN: Hydr - e Pressure Test of the 51 Synssa A Accurrmaleeur i IWA-5212 C-H 120 B 110Ecl75h 1 - - - - - - - - X - Nee i SIS TBD H 2 IW A-52tl@)

IWA-5213 IWA-52tl(d) IWC-5220 IWC-5210 IWC-5230 ,

TEST DESCRFTION: Innervsce Pressure Tem of the 51 Syneesa B Accumulasnr I

SIS IT-520A I 2 tw A-52ii'6t7

  • ~~ *'**

l C :! l 40 lB I

110E017 5h 1 - -

Y - - X IWA-5213

!WA-5211(d) IWC-5220 $

IWC-5210 IW C-5230 TE3* DESCRFTION: Inservice Pressure Tem of the M Symese A Accummissor

$!$ IT-520A 1 2 IWA-5211@) IWA-5212 C-H 40 B 1100017 5% 8 - -

I' - - X - - - -

IWA-5213 IWA-52tl(d) IWC-5220

!WC-5210 IWC-5230 1 TEST DESCRIPTION: Hydrwenatsc Pressure Test Servsce Weser Symena (Mein 5=roly Imy)

SW fr-IISO-l H 3 IWA-3211@) IWA-5212 D,B 120 A M-207 5h t-4 - - - - ' - - - - X -

IWA-5211(c) IWA-5213 M-208 sh 2,4 1

IWA-5211(d) IWC-5220

!WC-5210 IWC-5230 l Page 17 of 19

n -

OINT BEACH NUCLEAR PLANT PREFSURE TEST PROGRAM

- ASME 3ECTION XI PERIGDIC PRESSURE APPENDIX A TESI1NG PROGRAM THIRD INTERVAL Revision 1 .

December 14, 1993 PROGRAM SCHEDULE UNIT 1 AND COMMON Resenete l

beene Ten Cet Nel Ples Doge UI UI Ut Ut Ut UI UI Ut Ut UI .

Sys Mc Tea Clase Tees C=ah- Cand Rtt R19 R20 R21 R22 R23 R24 R25 R26 R27 Type TEST DESCR1FrlON: Hp Neews Tee of the Service Weser Symes Icende Casemmera r#A-5212 DB 120 5 14-207 5h 4 - - - - - - - X - -

SW rr-1080 1 H 3 IWA-5211(b)

IWA-5211(c) IW A-5213 IWA-5211(J) EWC-5220 IWC-5210 IWC-5230 {

TEST DESCRIFtION: Hyde - Neewe Tea Service Weser (C--- ~m Ceminne SW SyW IWA-5212 D-B 120 B M-207 5h 4 - - - - - - X -

rr-Il % 2 IWA-52tl(b) - -

SW H 3 IWA-5211(c) r# A-5213 r#A-5211(d) IWC-5220

[ IWC 5210 IWC-5230 TEST DESCRIFr10N: leservice Neewe Tem of the Service Wese:- Syses inside Cassmenmse SW TT-1980-1 1 3 IWA 5211(b) IWA-3212 DB 40 B M-207 5h 4 -

Y - - X - - - - -

IWA-5211(c) IWA-5213 IWA-5211(d) IWC-5220 IWC-5210 IWC-5230 TEST DESCRIFrlON: Inservice Neews Ted of she Gee Decay Symem WG TBD I 3 IWA-52tl(b) IWA-5212 D-A 40 A 684f972 5h 1 - - -

X - -

X - - -

IWA-5211(c) IWA-5213 PBM 229 sh 1 IW A-5211(d) IW C-5220 lIWC-5210 } IWC-5230 g l ll l g _

TEST DESCRIPTION: f%eameene Pressee Tem of Gee Decey Tank T . 'A and B WG TT-ll33-1 F 3 IWA-5211(b) IWA-5212 M 120 A 684J972 5h 1 - - - - - - - X - -

IWA-5211(c) IWA-5213 PEM-229 5h I l

IWA-52t l(d) IWC-5220 IWC-5210 IWC-5230 l l

l l

l rege18.fl9

1 OINT BEACH NUCLEAR PLANT PRESSURE TEST PROGRAM ASME SECTION XI PERIODIC PRESSURE APPENDIX A TESTING PROGRAM THIRD INTERVAL Revisi:rt 1 ,

December 14 1993 r PROGRAM SCHEDULE UNIT I AND COMMON W

i Piers D=gs UI UI UI Ut UI UI UI UI UI UI Rammets sys Pros Ten C1see Przemure Ted Cat Frog Condams Cond RIS R19 R20 R21 R22 R23 R24 R25 R26 R27 Type Tema TEST DESCRIPT10N: Pnemminnae P..  ; Tem of Gee Decay TenLa T-20C amt D IWA-5212 D-A 120 A 6241972 Sh 1 . - - - - - - X - .

WG FT-Il33-2 P 3 IWA-5211(b)

IWA-5211(c) TWA-5213 PBM:229 % i rw A-5211(d) twC-5220 IWC-5210 r#C-52.30 l t

R EM ARK 5 Ncee 1: ASME Code Cees N-498.

Nees 2: Consannenent pencerstaans are sessed mem$er the 10 CFR 50 Appendam J. assag progreat. Dghcans temeg maler the ASME Secesas X1 Pressere Teatesq Progene is me perheed. See Relief Request FTP-%C2 (APPsamhm C).

Ncae 3: Tees y .cformed denag U1R20 acceert hed mader MWR 930445.

I I

i Page 19 of 19

POINT DEACli NUCLEAR PLANT PRESSURE TEST PROGRAM ASMB SECTION XI PERIODIC APPENDIX B PRESSURE TEST PROGRAM Revision 1 THIRD INTERVAL December 14, 1993 PROGRAM SCIIEDULE UNIT 2 The database shown is a schedule for the implementation of the pressure test program for PBNP Unit 2. Pts eding the table is a brief description of the fields that are used in the Unit 2 program.

FIELD NAME DESCRIPTION TEST Description of the type of test to be performed and an explanation of what DESCRIPTION system / component the test pertains to.

SYSTEM A portion of the plant that performs a particular function and is usually identified by an acronym of the function performed.

AF - Auxiliary Feedwater RC -

Reactor Coolant CC - Component Cooling Water RIIR - Residual IIeat Removal CVC Chemical & Volume Control SC -

Sampling DA - Diesel Air Start SIS -

Safety injection FO - Fuel Oil SF -

Spent Fuel II2V - IIydroger: Venting SW -

Service Water hts - Main Steam WG - Waste Gas PEN Containment Penetrations PROCEDURE Pressure test procedure number. Several test procedures may be required to examiae a single system. Likewise, a single test procedure may encompass

. multiple systems.

An indication of "TBD" denotes that the procedure number has not yet been assigned. An indication of "MWR" denotes that the test is accomplished under a maintenance work request and associated work plan. " APP J" denotes that testing is accomplished under the 10 CFR 50, Appendix J, testing program.

TEST TYPE Indication of the type of test to be performed.

F = Functional 11 = Hydrostatic I = Inservice P = Pneumatic Page 1 of 18

POINT BEACH NUCLEsR PLANT PRES 3URE TEST PROGRAM ASME SECTION XI PEMODIC APPENDIX B PRESSURE TEST PROGRAM Revision 1 THIRD INTERVAL December 14, 1993 1

PROGRAM SCHEDULE UNIT 2 CLASS The classification of a component for ISI as outlined in the " Basis for ASME Section XI Classification Boundaries" for the Third Inspection Interval (Units 1 and 2).

1 = ASME CLASS 1

} 2 = ASME CLASS 2

. 3 = ASME CLASS 3 2/3 = ASME CLASS 2 and 3 PR'sWE TESTS ASME Section XI Pressure Test Requirements.

[

TEST ASME Section XI Pressure Test Conditions.

CONDITIONS CATEGORY ASME Section XI Category. A category f " MULTI" is used for a test that >

encompasses more than one examination category.

FREQUEACY Indication of the frequency (in months) at v:hich the system and/or 1ponent h required to be tested under the respective ten year interval.

40 = 40 month interval <

120 = 120 month interval (once during tei. year interval)

PLANT Special plant conditions required to ccanplete the Lst procedure.

J CONDITIONS '

A = No Special Concitions Required B = Refueling Outage C = Cefueled DRAWINGS The Priniary P&ID drawings of the system / component to be tested.

OUTAGE Relates to the designated outages within tne inspection interval. Note that test SCHEDULE procedures which due not require an outage cond' tion to accomplish may be performed at any time during the calendar year of the or age specified.

X u Exam Due Y = Exam Satisfactorily Completed

- = No Exam Scheduled REMARKS Notes relating to the exam / test. This field may indude such references as relief request numbers, MWR numbers, IDR numbers, indicaion of ASME Code Case N-498 Referenet., exam notes, and procedure notes.

Page 2 of 18

?)Y M I l

~

POINT BEACH NUCLEAR PLANT PRESSURE TEST PROGRAM

ASME SECTION XI PERIODIC PRESSURE APPENDIX B TEST PROGRAM THIRD INTERVAL Revision i .

December 14, 1993 PROGRAM SCHEDULE UNIT 2 .

Tea Cat Freq Plant Dwge U2 U2 U2 U2 U2 U2 U2 U2 U2 U2 Remasta Sys Proc Ten Class Iweaur.s Cwh= Comi R19 - R2C R21 R22 R23 R24 R25 R26 R27 R22 Type Tess 1 TEST DESCRIPTION: Functional Pressurs Tem of the Turtune Driven Auxiliary Feed = ster Puenp 2P-29 P 3 IWA-52tl(b) IWA-5212 D-A 40 B M-217 - - X - - X - - - -

AF IT-295 IWA-521 f(c) IWA-5213 Sh i IWA-5211td) IWC-5220 I IWC-5210 IWC-5230 l TEST DESCRIPTION: Hydromatic Pressure Tem of ther1ase 2 Peruun of Main and Ammiliary Feedwates C-H 120 B M.217 - - .- X - Noss i AF TBD H 2 IWA-5211(b) IWA 52tl(b) - - - - -

IWA-52t f(c) Sh I IW A-5211(4) IWA-5211(d) M-2202 IWC-5210 IWC-5210 .c:. 2 TEST DESCRIPTION: Hydrostatic Pressure Ted of the Auxiliary Feedweter Section Piping AF fr-2095-1 H 3 fWA-5211(b) IWA-5212 D-A 120 B M-217 - - - - . - - - X -

IWA-5211(c) IWA-5213 Sh I IWA-5211(4) IWC-5220 IWC-5210 IWC '230 TLST L a.aCRIFilOM: Ilydrostatic Pressors Tem of the Au.iliary Feedwater Discharge Piping _.

AF fi-1095-3 H 3 IWA-5211(b) IWA-5212 D-A 120 B M-2!7 - - - - - - . -

X -

IWA-5211(c) PAA-5213 Sh !

IWA-5211(d) IWC-5220 g ,

IWC-5210 IWC-5230 3 Page 3 of is

(. . . . _ . . . . ,

'OINT BEACH NUCLEAR PLANT PRUSURE TEST PROGRAM

  • . ASME SECTION XI PERIODIC PRESSURE APPENDIX B TEST PROGRAM THIRD Iffl11RVAL Revision 1 .

December 14, 1993 PROGRAM SCHEDULE UNIT 2 i

I Ten C: Feeg Pians  !)wgs U2 U2 U2 U2 U2 U2 U2 U2 U2 U2 Ramarks sy. Proc Ten Clam Pmmure Card 121 R22 R23 R24 R25 R26 P27 R28 j Type Tees CMgions R19 l R20 TEST DESCRIPTION: Inservice Pressure Tem of the class 2 Portion oa'dw Main and Aemiliary Feedwater IWA-5212 C-H O B M-217 - - X - - X - - - -

AF fr-IP I 2 5#A-5211(b)

IWA-5213 Sh I IW A-521I(d) IWC-5220 M 2202 IWC-5210 IWC-5230 Sh I TEST DESCRIPTION: Hydrostatic Pressure Tem of the Cor paners Couting Symem Leide Containmess IWA-51i2 C-II 120 B 110E029 - - - - - - - X - - Nese 1 CC TBD H 2 IWA-5211(b)

IWA-5213 Sh 2 IWA-5211(d) IWC-5220 IWC-5210 IWC-5230 -

TEST DESCRIPTION: Hydrustatic Preasure Tem :(the C ~ Cefing Symem Outside Containmess 2 IWA-5212 C II 120 B 110E029 - - - - - - - X - - Nas !

CC TBD h IWA-5211(b)

IWA-5211(c) IWA-5213 Sh 1, 2, 3 IWA-521I(d) IWC,D-5220 IWC.D-5210 IWC.D-5230 TEST DESCRIPrlON: Hydrostatic Presaure Test of the IP-1 A RCP Componce Cs= Jing Water Symem x  %.I l CC fr-Il95-4 II 2 IWA-5211(b) IWA-5212 C-H 120 C 1100029 - - - - - - - - -

IWA-5213 sh I. 2,3 IWA-5211(,) IWC-5220 PBM-230 IWC-5210 IWC-5210 l

I%ge 4 of I8

~

'OINT BEACH NUCLEAR PLANT PRESSURETEST PROGRAM

- ASMil SECTION XI PERIODIC PRESSURE APPENDIX B TEST PROGRAM THIRD INTERVAL Revision 1 .

December 14, 1993 i

PROGRAM SCHEDULE UNIT 2

{

Cat Freq Plear U2 U2 U2 U2 U2 U2 U2 U2 U2 U2 Remerb l sys Pme Test Class Pressure Ten Dwas Condsione Ce R19 R20 R21 R22 R23 R2d R25 R26 g R27 F28 l

Type Tees ,

j TEST DESCRF.10N: Inservice pressure T6m of the Carmeness Cooling Symem inside Ceciainme-c 2 r#A-5211(b) IWA-5212 C-H to B 110fD29 Y . . X . . . . . .

CC fr-Il25-1 I IWA-5213 Sh 2 IWA-52I1(d) IWC-5220 IWC-5210 PC-5230 TEsi DESCRIPTION: laservice Presse Tem of the Cesmoners Cooling Symem Outade Cassainmens 2 IW A-5211(b) IWA-5212 C-H 40 A Il0E029 . X . -

X . . . . ..

CC fr-8125-2 1 IW/.-5213 Sh 1,2,3 IWA 5211(c)

IWA-52II(d) IV'C,D-5220 I%t 230 IWC.D-5210 IWC,D-5230 TEST DESCRIPTION: Inservice Pressure Test of the Chemical and Volume Corerol Symem Outade Cossainment 2 IWA-52titb) IWA-5212 C-H 40 B 6851175 - -

X - - X - . . .

i WC TBD I IWA-5213 Sh I,2 IWA-5211(d) IWC-5220 .541F448 IWC-5210 !W C-5230 6841961 Sh 2 6841972 sh 3 PBM-226 TEST DESCRIPTION: Inaervice Pressure Tem of the Chemical eral Volume Ceserol System lamide Corwimment CVC TBD I 2 IWA-5211(b) IWA-5212 C-H 40 B 685fl75 - -

X - - X . . . .

IWA-5213 Sh 2 IWA-5211(d) IWC-5220 IWC-5210 IWC-5230 Page 5 efI8

--~ -

l -

'OINT BEACE NUCLEAR PLANT PRESSURE TEST PROGRAM ASME SECTION XI PERIODIC PRESSURE APPENDIX B TEST PROGRAM THIRD INTERVAL Revision 1 .

December 14, 1993 PROGRAM SCHEDULE UNIT 2 Test Class Presswe Tem Cat Freq Plan Dwge U2 U2 U2 U2 U2 U2 U2 U2 U2 U2 Renaris Sys Proc Type Tema Condaiana cond R19 R20 R21 R22 R13 R24 R25 R26 127 R2B TEST DESCRIPTION: Hydrostatic Pres- te Test of the Chemical and Veh.me Control Symem Outsade Containment CVC M 2 IWA-5211(b) IWA-5212 C-Il 120 B 6851175 - - - - - . - -- X - Nees

  • TBD IWA-5213 Sh 1,2 IWA-3211(d) IWC-5220 541F448 IWC-5210 IWC-5230 6s41%I Sh 2 6841972 Sh 3 PBM-226 TEST DESCRIPTION: Ilydrostatic Pressues Test c'1s Cbenskal and Volume Control Systerr. Outside Corsainment CVC TBD H 2 IWA-5211(b) IWA-5212 C-H 120 B 6851175 - - - - - - - - 'f- X Note I nWA-5213 sh 2 8

IWA-5211(d) IWC-5220 IWC-5210 IWC-5230 TEST DESCRIPTION: Pncomstic Presmre Test of the Post Accideen Cmaainmerd Venaire and Monitoting System H2V TBD P 2 IWA-5211(b) IWA-5212 C-li 120 B M-224 - - - - . - ,- l X - PAse 1 IWA-5213 IWA-5211(4) IWC-5220 1

IWC-5210 IWC-5230 I i TEST DESCRIPTION: Functional Pressure Tem of the Main Steam Symem so the Tony Turbe OutasJe Containmean MS TT-295 F 2 IWA-5211(b) IWA-5212 C-II 40 B M-2201 -

X - -

X - - - - -

IWA-5213 Sh !

IWA-52II(d) IWC-5220 IWC-5210 IWC-5230 TEST l>ESCRIPTION: Functional Pressure Test of the Maia Sicam Sysiem to the " o e Turbe Inside Containmers MS TT-295 F 2 IWA-5211(b) IWA-3212 C-II 40 B M-2201 - - X - - X - - - -

IWA-5213 Sh !

IWA-5211(d) IWC-5220  :

IWC-5210 IWC-5230 l Page 6 of 18

^

v 4

~

?OINT BEACII NUCLEAR PLANT PRESSURE TEST PROGRAM

- ASME SECTION XI PERIODIC PRESSURE APPENDIX B TEST PROGRAM TIi1RD INTERVAL ' Revision 1 .

December 14, 1993 PROGRAM SCHEDULE UNIT 2 mm Sys Proc Tea closs Pressurs Tee Ca* Freq Ptard D=ge U2 U2 U2 U2 U2 til U2 U2 U2 U2 Remorts Type Tens C.alitions Cand R19 R20 R21 R22 K23 R24 R25 R26 R27 R28 l TEST DESCRIPI10N: Hydrostatic Presmars Tem of the Main Sacam System to etw Terry Turbine (2P-29) Oms;de MS Tr-295 H 2 IWA-5211(b) r#A-5212 C-H 120 B M-22i)I . . . . . . . X .

. NasI

) IWA-5253 Sh I l IWA-5211(d) IWC-5220

( IWC-5210 IWC-5'30 TEST DESCRIPT10N: Hydrostatic Pressure Test cf the Maia Steam System so & Terry Turbine (IP-29) Inside i

M5 rr-295 H 2 IWA-5211(b) IWA-5212 C-II 120 B M-2201 . . . . . . . . x . Note i IWA-5213 Sh 1 IWA-52il(d) IWC-5220 l

l IWC *: .10 IWC 5230 l l

TEST DESCRIPTION: Functional Pressuss Test of Penetration P-V2 PEN APPJ F 2 IWA-5211(b) IWA-5212 C-H l40 B M-2215 - . . . . . . . . . Nose 2 IWA-5213 sh 1 IWA-521 f(d) IWC-5220 IWC-5210 IWC-5?10 l

TEST DESCRIPIION: Functional Pressure Test of Penetration P-71 (Corsairment Sony Discharge)

PEN APPJ F 2 IWA-5211(b)  !"A-5212 C-H 40 B 684J971 . . . . . . . . . . Nose 2 IWA-5213 Sh I A IWA-5211(d) IWC-5220 IWC-5210 IWC-5230 ,

TEST DESCRIPTION: Functional Pressure Ts.: of P netration P-53 (Condensaie Return)

PEN APPI F 2 IWA-5211(b) IWA-5212 C-H 40 B M-2214 . . . . . . . . - - Nast IWA-5213 IWA-5211(d) IWC-5220 IWC-5210 IWC-5230 Pege 7 of 18

POINT BEACH NUCLEAR PLANT PRESSURE TEST PROGRAM ~

A

' SME SECTION XI PERIODIC PRESSURE APPENDIX B TEST PROGRAM THIRD INTERVAL Revision 1 .

December 14, 1993 PROGRAM SCHEDULE UNIT 2 Sys Pme Ten Class Pressure Ted Cat Freq Pt. ass Dogs U2 U2 U2 U2 U2 U2 U2 Remaria U2 U2 U2 Type Tests Conditaone - Cond R19 R20 R21 R22 R23 R24 R25 R26 127 R28 TEST DESCRIPTION: Fuustia ul Pressure Ted of Peactratius P-52 (Auxiliary Steam Supply)

PEN APP J F 2 IWA-5211(b) IWA-5212 C-H 40 B M-2214 - - - - - - . - - - Nass 2 IWA-5213 IWA-5211(d) IWC-5220 IWC-5210 IWC-5230 TEST DESCRIPTION: Functional Pressure Tem of Penetratina P-34D (Reactor Coulass Drain Tank)

PEN APPI F 2 TWA-5211(b) IWA-5212 C-is 40 C 684J971 - - - - - - - . . Nasa 2 TA A-5213 Sh I A IWA-5211(d) IWC-5720 IWC-5210 IV'C-5230 TEST DESCRIPrlON: Functional Preneure Tem of Penetration P-34A (Pressurizer Relief Tank Gas)

PEN APP ' F 2 IWA-5211(b) IWA-5212 C-H 40 B 54aF445 - - - - - . . . . - Nese 2 IWA-5213 sh 2 IWA-5211(d) IWC-5220 IWC-5210 IWC-5230 l TEST DESCRIPTION: Functional Pressure Tem of P--Stration P-33C (Service' Air)

PEN AIP J F 2 IWA-5211(b) IWA-5212 C-H 40 B M 209 5h - - - - .

Neee 2 IWA-5213 1, 2 IWA-5211(d) IWC-5220 IWC-5210 IWC-5230 l TEST DESCRIPTION: Furstional Pressure Tem of Penetration P-33B (Inarumens Air)

PEN APPJ F 2 IWA-5211(b) IWA-5212 C-H 40 B M-209 - - - - - - - - . - Nose 2 IWA-5213 Sh T,11 IWA-521I(d) IWC-5220 IWC-5210 IWC-5230 Page 8 of 18

PRESSURE TEST PROGRAM

?OINT BEACH NUCLEAR PLANT ASME SECTION XI PERIODIC PRESSURE APPENDIX B TEST PROGRAM THIRD INTERVAL Revision 1 .,

December 14, 1993 PROGRAM SCHEDULE UNIT 2 U2 U2 U2 U2 U2 U2 U2 U2 U2 U2 Remarb Sys Proc Ten Claas Pressure Ten Cat Freq Plara Dws.

Coed Rl9 R20 R21 R22 R23 R24 R14 R26 R27 R28 Type Tess Conditions TEST DESCRIPTION: Functional Pressure Tem of Penetratic < S-33A (Inarumers Air) rs B M-209 - - - - - . - Noss 2 '

APPJ F 2 IWA-5211(b) IWA-5212 C41 - - -

PEN IWA-5213 Sh 7,1I IWA-521 f(d) IWC-5220 IWC-5210 IWC-5230 i I TEST DESCRIFI'lON: Funce 61 Pressure Tem of Penetration P-30C (Nemurizer Relief Tank) 40 B 543F445 - - - - . Nese 2 PEN APPI F 2 IWA-52 t l(b) IWA-5212 C-H - - - - -

IWA-5213 Sh 2 j

IWA-5211(d) IWC-5220 IWC-5210 IWC-5230 TEST DESCRIFrlON: Func0--- ? Pressure Tem of Penetration P-28D (Dead Weight Tester Unc) l l M-2215 - None 2 PEN APPI F 2 IWA-5211(b) IWA-5212 CH 40 B - - - - - - - - -

l Sh 1 l

6 IWA-5213 IWA-5211(d) IWC-5220 IWC-5210 IWC-5230 TEST DESCRIPTION: Func'6-1 Pressure Tem of aenetration P-14A (Pressurizer Rebf Tank)

C-H 40 B 541F445 - - - - - - - - - - None 2 l PEN APPJ F 2 IWA-5211(b) IWA-5212 IWA-5213 Sh 2 IWA-5211(d) IWC-5220 IWC-5210 IWC-5230 TEST DESCRIPTION: Functiossal Pressum Test of Penetration P-12C (Corsainrriers Ves:t Ilcader) 2 IWA-52ll(b) IWA-5212 C-H 40 E 684I971 - - - - - - - - - - h2 PEN APPJ F IWA-5213 Sh I A IWA-5211(d) IWC-5220 IWC-5210 IWC-5230 l

Page 9 of I8 l

I

?OINT BEACH NUCLEAR PLANT PRESSURE TEST PROGRAM -

ASME SECTION XI PERIODIC PRESSURE APPENDIX B -

TEST PROGRAM THIRD INTERVAL Revision I ,

December 14, 1993 PROGRAM SdHEDULE UNIT 2 Sys Proc . Tea Class Pmesure Ted Cet Freq Plaze Dwge U2 U2 U2 U2 U2 U2 U2 U2 U2 U2 ReinsAs Type Team Canditions Coad R19 R20 R21 122 R23 R24 R25 R26 R27 R28 TEST DESCRIPTION: Functional Pressure Test of Penetration P-12A (De Ionized Water)

PEN APPJ F 2 IWA-5211(b) IWA-5212 C-H 40 B PEM-231 - - -

- j - - - - - - Ness 2 IWA-5213 IWA-1211(d) IWC-5220 IWC-5210 IWC-5230 TEST DESCRIPTION: Functional Pweauro Tem of Penetransoa P& (Reacsor Coolant Drain Tank)

PEN APPI F 2 IWA-5211(b) IWA-5212 C-P 40 B 684J971 - - - - - - - - - - Note 2 IWA-5213 = Sh I A IWA-5211(d) IWC-5220 IWC-5210 IWC-5230 TEST DESCRWTION: Functional Prtsaure Tem of Penetratico P-V1 PEN APPJ F 2 IWA-5211$) IWA-5212 C-H 40 B M-2215 - - - - - - - - - . Note 2 IWA-5213 sh I IWA-52Il(d) IWC-5220 IWC-5210 IWC-5230 l

T EST DESCRIPTION: Functional Pressure Tem of Penetration P-X2 PEN APPJ F 2 IWA-5211(b) IWA-5212 C-II 40 B M-2215 - - - - - - - - - - Nose 2 IWA-5213 Sh 2 IWA-5211(d) IWC-5220 IWC-5210 IWC-5230 TEST DESCRIPTION: Hydrostat;c Pressure Tem of Penetrataon P-X2 PEN APPJ H 2 IWA-5211(b) IWA-5212 C-H 120 B M-2215 - - - - - - - -

.. - Nose 2 IWA-5213 Sh 2 IWA-5211(d) IWC-5220 IWC 5210 IWC-5230 Page 10 of IE

?OINT EEACH NUCLEAR FLANT PRESSURE TEST PROGRAM ASME SECTION XI PERIODIC PRESSURE APPENDIX B -

TEST PROGRAM THIRD INTERVAL Revision 1 ,

December 14,1993 PROGRAM SCHEDULE UNIT 2 Sys Proc Ten Claw Preesee Ten Cat Freq Plam D=ge U2 U2 U2 U2 L7 U2 U2 U2 U2 U2 Remarts Type Tess Ceeditions Cand R19 R20 R21 R22 R23 R24 R25 R26 R27 R2s TEST DESCRIPTION: Hydrostatic Preamre Tem of Penetration P-XI PEN APPJ H 2 IWA-5211(b) IWA-5212 C-H 120 B M-2215 - . . . . . . . . .

None 2 IWA-5213 Sh 2 IWA-5211(d) IWC-5220

! IWC-5210 IWC-5DO TEST DESCRifTION: Hydrostatic Presasre Tem of Pewsretion P-V2 PEN APPJ H 2 IWA-5211(b) IWA-5212 C-H 120 B M-2215 - . - . . . . . . . Nene 2 IWA-5213 Sh 1 IWA-5211(d) IWC-5220 IWC-5210 TWC-5230 TEST DESCRIPTION: Hydromatic Pressure Test of Penet stion P-33B (tamrument Air)

PEN APP J II 2 IWA-5211(b) IWA-5212 C-H 120 B M-209 . . . . . . . . . . Nose 2 IWA-5213 ,

$b 7.1I IWA-521 f(d) IWC-5220 IWC-5210 IWC-5230 TEST DESCRIPTION: Hydrostatic pressure Tem of Penetration P& (Reactor Coolars Drain Tank)

PEN APPJ H 2 IWA-5211(b) IWA-5212 C-H 120 B 6J Jv71 . . . . . . . . . . Nce. 2 IWA-5213 Sh l A IWA-5211(d) IWC-5220 IWC-5210 IWC-5230 TEST DESCRIPTION: Hydrostatic Pressure Tem of Penetration P-52 (Condensate Return)

~

PEN APPJ H 2 IWA-5211(b) IWA-5212 C-H 120 B M-2214 . . . . . . . . . . Note 2 IWA-5213 IWA-5211(d) IWC-5220 IWC-5210 IWC-5230 i Page 11 of 18

, ?OINT BEACH NUCLEAR PLANT PRESSURE TEST PROGRAM -

ASME SECTION XI PERIODIC PRESSURE APPENDIX B -

TEST PROGRAM THIRD INTERVAL Revision 1 ,

December 14, 1993 PROGRAM SCHEDULE UNil' 2

  • Sys Proc Test Claes Preasure Tea Cat Freq Ptard Dwas U2 U2 U2 U2 U2 U2 U2 U2 U2 U2 Re.% i Type Tens 'fondatsuna Cood R19 R20 R21 R22 R23 R24 R25 R26 R27 It28 TEST DESCRIPTION: Hyderdatic Pissem Tem of Penetrauon P-28D (Dead Weigtd Teater Une)

PEN APPJ H 2 IWA-5211(b) IWA-5212 C-H 120 B M-2215 - - - - . - - - - - Nees 2 IWA-5213 Sn 1 IWA-521l(d) IWC-5220 IWC-5210 IWC-5230 TE3T DESCRIPTION: Hydrostatic Pressure Test cf Penetrataan P-12A (De-lonized Water) 1EN APPI H 2 IWA-52tl(b) IWA-5212 C-Il 120 B PBM-231 - - . . . . . . . - Nees 2 IWA-5213 IWA-5211(d) IWC-5220 IWC-5210 IWC-5230 l ___

TEST DEM3tPTION: Hydrostatic Pressure Tem of Penetration P-52 (Auxiliary Steam Supply)

PEN APP J ll 2 IWA-5211(b) IWA-5212 C-li 120 B M-2214 - - . - - - . . . . Nm2 IWA-5213 IWA-5211(d) !W C-5220 l IWC-5210 IWC-5230 TEST DESCRIPTION: Hydrostatic Pressure Test of Penetration P-12C (Containment Vent Header)

PEN APPJ H 2 IWA-52tl(b) IWA-5212 C-H 120 8 684I971 - - - - - - . . . Note 2 IWA-5213 MaIA IWA-5211(d) IWC-5220 )

IWC-5210 IWC-5230 g TEST DESCRilTUN: Hydrostatic Treasure Test of Penetration P 14A (Pressuri.v er Relief TanL)

PEN APPJ L 2 IWA-3211(b) IWA-5212 C.H ". 20 B 541F445 - - - . . . . . - -

Nusa 2 IWA-5213 sh 7 IWA-521I(d) IWC-5220 IWC-5210 IWC-5230 Page 12 of 18

'OINT BEACH NUCLEAR PLANT PRESSURE TEST PROGRAM .

ASME SECTION XI PERIODIr PRESSURE APPENDIX B '

TEST PROGRAM THIRD INTERVAL Revision 1 December 14, 1993 PROGRAM SCHEDULE UNIT 2 Sys Proc Ted Claes Pressure Tea Cat Freq Plant Dogs U2 U2 U2 Type Testa; U2 U2 UI U2 UI U2 U2 Raamerks Ceeditiocs Cond R19 R20 R21 R22 R23 R24 R25 R26 R27 R28 its r DESCRIPTION: Hydrostatic Pressure Tem of Penetretion P-VI PEN APPI 11 2 IWA-5211(b) IWA 5212 C-Il IWA 5213 120 B M-2215 . . . . !. . . . . .

Ness 2 Sh I IWA-5211(d) IWC-5220 IWC-5210 IWC-523J a t.si DESCRIPTION: Ilydrostatk Pressure Test of Penetration P-71 (Cwaairsne:s Surg Diacharge)

PEN APPJ II 2 IWA-5211(b) IWA-5212 C-li 120 e 6841971 . . . . . .

IWA-5213

. . . . None2 Sh I A

!WA-5211(d) IWC-522e IWC-5210 IWC-5230 TEST DESCRIPTION: 11ydroutade Pressere Test c f Penetration P 30C (Pressurizer Relief Tank)

PEN APPJ II 2 IWA-5211(b) !WA-5212 C-H 120 B 54tF445 - . . .

Ne2 IWA-5213 Sb 2

[

Tr &5211(d) IWC-5220 g IWC-5210 IWC-5230

[

l TEST DESCRIFTION: llydrw atic Pressure Test of Penetration P-34D (Reacaw Coolars Drain Tank) e PEN APP J H 2 IWA-5211(b) IWA-5212 C-It 120 B 684J971 . . . . . . . . .- Nune 2 IWA-5213 Sh I A IWA-5211(J) IWC-5220 IWC-52:0 IWC-5230 l

TEST DESCRIPTION: 11ydrostatic ?ressure Test of Penetration P-33A Gnatrussers Air)

PEN APPJ II 2 IWA-5211(b) IWA-5212 C-H 120 E M 209 . . . . . . .

IWA-5213 . . . Nine 2 sh 7.11 IWA-52!!(d) IWC-5220 IWC-5210 ,

IWC-5230 Page 13 of 18

?OINT BEACH MUCLEAR PLANT PRESSURE TEST PROGRAM ASME SECTION XI PERIODIC PRESSURE APPENDIX B

^

TEST PROGRAM THIRD INTERVAL Revision 1 -

December 14,1993 PROGRAM SCHEDULE UNIT 2 i i Sys Proc Test Class Presaus Tea Cat Freq Plane Dwge U2 U2 U2 U2 U2 U2 U2 tJl U2 U2 Remarks Type Tees Condatsens Comi R19 R20 R21 R22 R23 R24 R25 R26 R27 R28 TEST DESCRHTION: Hydrostatic Prcesure Test of Penettstion P-34A (Pressurizer Relief Tank Gas)

PEN APPJ *i e 2 IWA-5211(b) IWA-5212 C-H 120 B 541F445 - - - - - - - - - - Notr 2 IWA-5213 Sh 2 IWA-5211(d) IWC-5220 nWC-5210 IWC-5230

_ l 1 TEST DEscalITION: Hydmetatic Pressurs ?est of Penetration P-33C (Service Air)

PEN APPJ H 2 IWA-52 t l(b) IWA-5212 C-H 120 B M-209 - - - - - - - - - - Nose 2 IWA-5213 Sh I,2 IWA-5211(d) IWC-5214 IWC-5210 IWC-5230 TEST DESCRIPTION: Hydrostatic Pressure Test of the Reactor Coolaat and Safety trgeetwe Systems CC fr-1015 H I IWAA211(a) IWA-52i2 B-P 120 B 54?F445 - - - - - - . - -

X None 1 IWA-5213 Sh 1, 2, 3 IWA-5211(d) IWC-5220 IWC-5210 IWC-5230 TEST DESCRIPTION: System Laakage Test of Class 1 Components Following a R-fuehag Outage RC INE35 L 1 IWA-5211(s) IWA-5212 B-P REF B 541F445 Y X X X X Y X X X -

IWA-5213 St 1, 2, 3 IWA-5; ; d).

IWC-5220 IWC-52 t > IW C-5230 TEST DESCRIITION: Functional Pressure Test of the Residual Heat Ramos al System RHR IT-535 P 2 IWA-5211(b) IWA-5212 C-H 40 B 110E029 X - l -

- - - - X - -

IWA-5213 Sh 1 IWA-5211(d) IWC-52?O 541F448 IWC-5210 IWC-5230 Page 14 of 18

7OINT BEACH NUCLEAR PLANT PRESSURE TEST PROGRAM ASME SECTION XI PERIODIC PRESSURE APPFNDDI B -

TEST PROGRAM THIRD INTERVAL Revision 1 ,

. December 14, 1993 PROGRAM SCHED'ULE UNIT 2 Ne Ten Sys ten C1.as M asure Cat Freq I1ern Dogs U2 U2 U2 U7 U2 U2 U2 U2 U2 U2 Remmets Type Tems Canditiars Cond R19 R20 R21 R22 R23 R24 R25 R26 R27 R28 TEST DESCRIPTION: Ilydrostatic Picasurs Tem of the Residual Heat Removal Symem RHR TT-1035 H 2 IWA-521'l(b) IWA-3212 C-H 120 B 110E029 - . . . - - - .

X' . None 1 IWA-5213 sh I IWA-5211(d) IWC-5220 541F448 IWC-5210 IWC-5230 ,

TEST DESCRIPTION: Functional Pressure Ted of Refueling Water Snorse e Tera Piping S'? fr-1075 F 2 IWA-5711(b) IWA-5212 C-H 40 A Il0E035 -

X . -

X -

IWA-5213 Sh i IWA-5211(d) IWC-5220 IWC-5210 IWC-5230 TEST DESCRIPTION: Functional Pressure Ten of the Spray Additive Tank Piping SIS TBD F 2 IWA-5211(b) IWA-5212 C-H 40 A 110E035 -

X - -

X - . . . ..

IWA-5213 , Sh 1

-" Sa l(d) IWC-5220 l . IWC-5230 TEST DESCRIPTION: Functional Pressure Tem of the Safety lajection System SIS IT-525A F 2 IWA-52il(b) IWA-5212 C-H 40 B 110E035 - . X - .

X - . . .

IWA-5213 sh I,2 IWA-5211(d) IWC-5220 IWC-5210 IWC-5230 l

'IEST DESCRIPTION: Functional Pressure Tem of the Containmese Spray Portma of the Safety Injection System

$15 IT-545A F 2 IWA-52 tiso) IWA-5212 C-H 40 B 110fD35 - -

X -

X - . . -

IWA-5213 sh 3 IWA-5211(d) IWC-5220 IWC-5210 IWC-5230 l _

Page 15 of 18

yINT BEACH NUCLEAR PLANT. PRESSUF,5 TEST PROGRAM ,

ASME SECTION XI PERIODIC PRESSURE APPENDIX B '

TEST PROGRAM TillRD INTERVAL Revisio<l 1 ,

Decemoer 14, 1993 PROGRAM SCHEDULE UNIT 2 Sys Proc Ten Class b eaure Test Cat Freq Nas Dogs U. U2 U2 U2 U2 U2 U2 U2 U2 U2 Rasaarte Type Tess Commfkians ,

Cond Kl9 R20 R21 R22 R23 R24 R25 k26 R27 R28 TEST DESCRIPHON: Functional Pressure Tem of Containment Sump B Section Une SIS TT-536 F 2 IWA-5211(b) IWA-5212 C-II 40 B ll0E035 Y - -

X - - - - - -

IWA-5213 Sh 1, 2 IWA-5211(d) IWC-5220 g IWC-5210 IWC-5230 I, TEST DESCRIPTION: Hydrostatic Pressure Tem of Refueling Water S.orege Tank Piping i

ils TT-1075 H 2 IWA-5211(b) IWA-5212 C-H 120 A 110E015 - - - - - - -

X - - Note 1 IWA-5213 Sh I IWA-5211(3) IWC-5220 IWC-5210 IWC-5230 g TEST DESCRIFTION: Hydrostatic Pressure Tem of the Spany Adddive Tank Piping SIS T3D H 2 IWA-5211(b) IWA-5212 CH 120 A  !!0E035 - - - - - - -

X - - goes !

IWA-5213 sh I IWA-5211(d) IWC-5220 IWC-5210 IWC-5230 j TEST DESCRIPTION: Hydmetatic Presauro Tem of the Containrness Spray Portion of the Safety injection System SIS IT-1045 H O IWA-5211(b) IWA-5212 C-H 120 B 11013)35 - - - - - - - -

2 - Neu 1 IWA-52" Sh 3 IWA-5211(d) IWC-522s?

IWC-5210 IWC-5230 TEST DESCRIPTION: Hydrtotatic Pressure Test of Corsainment Sorry B Suctaoa Une

$1S TBD H 2 IWA-5211(b) IWA-5212 C-H 120 B 110E035 - - - - - - .

x - -

Not.1 IWA-5213 Sh 1,2 IWA-52 t l(d) IWC-5220 IWC-5210 IWC-5230 Page 16 of 18

'OINT BEACH NUCLEAR PLANT PRESSURE TEST PROGRAM APPENDIX B ASME SECTION XI PERIODIC PRESSURE TEST PROGRAM TIIIRD INTERVAL Revision 1 December 14, 1993 PROGRAM SCHEDULE UNIT 2 Sy. rrue . Ten Cl. Pr. re T,. C.t Pres m at D-as u: v2 tn u2 v2 u2 v2 u2 v2 v2 Rem L Tess A4h Cend R19 R20 R21 R22 223 R24 US R26 R27 R23 Type I TEST DESCRIPTION: !!ydro.tatic Pressure Tem of the St Sydem A Accumulaser

! C 'I 120 B li4E035 - - - - . . . - X . Ne, ! .

l $~.J TBD H 2 IWA-5211(b) IWA-5212 IWA-5213 Sh I IWA-521 f(d) !WC-5220 l IWC-5230

, P.YC-5210 TEST DESCRIPTION: Hydrostatic Preneurs Tem of the SI Symem (SI Pury Discharre)

I l

IWA-5212 C41 120 B 110E035 - - - - - - - . X - Nee !

SIS rr-!!75-3 i 11 2 IWA-5211(b)

IWA-5213 Sh 1, 2 IWA-5211(d) IWC-5220 IWC-5210 IWC-5230 TEST DESCRIPTION: Hydrosatic Pressure Tem of the $1 Symem B Accumulator 2 IWA 5212 C-ll 120 B 110E035 - - - - - - - - X - Nte i SIS T3D 11 IWA-5211(b)

IWA-5213 sh !

IWA 5211(d) IWC-5220 IWC-5210 TWC-5230 l TEST DESCRIF110N: Hydromatic Pressurs Test of the C--l-ra Spray Nozzice Check - (Air Test)

C-Il 120 B 110E031 - - - . X - -' Nose 1 SIS ORT-34 11 2 IWA-5211(b) IWA-5212 - -

IWA-5213 Sh !

IWA-5211(d) IWC-5220 IWC-5210 IWC-5230 TEST DESCRIPTION: Inse vice Pressure Ted of she SI System f Accumulator SIS IT-525A I 2 IWA-5211(b) IWA-5212 C-It 40 8 110E035 - - X - -

X - - . -

IWA-5213 Sh 1 IWA-5211(d) TWC-5220 IWC-5210 IWC-5230 Page 17 of ad

'OINT BEACH NUCLEAR PLANT PRESSURE TEST PROGRAM

' o ASME SECTION XI PERIODIC PRESSURE APPENDIX B TEST PROGRAM THIRD INTERVAL Revision 1 .

December 14, 1993 PROGRAM SCHEDULE UNIT 2 Freq Piers D=ge U2 U2 U2 U2 U2 U2 U2 U2 U2 U2 Remarks Sys Proc Ten Class Preamiro Ten Cat Tens Cornficians cond R19 R20 all R22 R23 R24 R25 *26

- R27 R28 Type TEST DESCRIPTION: Innervice Pressure Test of the SI Symem A Ac~-letar IWA-5212 40 B 110E035 - - X - - X - - . -

SIS Tr $25A I 2:- IWA-52tl(b) C 'I IWA-5213 Sh !

IWA-52IIt7 IWC-5220 IWC-5210 IWC-5230 TEST DESCRIPTION: Hydresistic Pressurs Test Service Water (C- ; ament Centing SW Symem)

\

E IW A-5212 D-B 120 B M-2207 - - - - - - - - X -

, SW TT-Il55-1 H 3 IWA-5211(b)

IWA-52 t l(c) IWA-5213 Sh I. 2 IWA-5211(d) IWC-5220 IWC-5210 IWC-5230 TEST DESCRIPTION: Inservice Pressure Tem of the Service Water System ia Cordainmers SW TT-1085-1 1 3 IWA-52t l(b) IWA-5212 D-B 40 B M-2207 Y - - X - - - - . -

IWA-5211(c) IWA-5213 sh 1,2 IWA-52tl(d) IWC-5220 IWC-5210 IWC-5230 MEMARKS Note 1: ASME Code Case N-498-Note 2: Containmers penetrations are semed rater the IG CFR 50, Appendix J, seeing psegram. Duplicate testing under sha ASME Sectim XI Pressure Teming Prog mm is rus performed See Relics Request FTP-342 (Agendix C).

L Page 16 ci l8

e . .

POINT BSACH NUCLEAR PLANT ASME SECTION XI PERIODIC PRESSURE TEST PROGRAM APPENDIX C PRESSURE TEST PROGRAM Revision 1 TIIIRD INTERVAL December 14, 1993 RELIEF REQUESTS RELIEF REOUEST PTP-3-01 '

COMPONENTSI ASME Class 1, 2, and 3 Bolting (Units 1&2).

ASME SECTION XI REOUIREMENT:

IWA 5250 CORRECTIVE MEASURES (a)

The source of leakages detected during the conduct of a systern pressure test shall be located and evaluated by the Owner for corrective measures as follows:

(2) ifleakage occurs at a bolted connection, the bolting shall be removed, VT 3 visually examined for cor:osion, and evaluated in accordance with IWA 3100; P30 POSED ALTERNATE REOUIREMENT:

(a)

De source of leakages detected during the condu:t of a system prestare test shall be located

  • and evaluated by the Owser for corrective nueasures as follows:

(2)(a) y if leakage occurs at a bolted connection of boric acid systems, the evaluation shall be conducted as follows:

(i) If the bolting material is fabricated of a material other than an austenitic stainless steel (e.g. low alloy B 7, etc.), one bclt shall be removed, VT-1 examined, and evaluated in accordance with IWA-3100. The bolt selected shall be the one c the source of leakage. When the removed bolt has evidence of degradation, all remaining bolting in the connection shall be reraoved, VT 1 examined, and evaluated in accordance with IWA-3100. The cause of the leakage shall be corrected. An evaluation made.

of the effect of the leskage on adjacent components and equipment shall be NOTE - All removel botting shall be subject to a surface erantination when required by Wisconsin Electric's response to IE Bulletin No. 82-02.

(ii) If the bolting material is fabricated of an austenitic stainless steel material a VT-3 examination of the bolted joint shall be performed and evaluated in accordance with IWA 3100. In addition, an examination of adjacent components and equipment will be conducted to determine the effects of the boric acid. He les' age shall be evaluated in accordance with the requirements of the Owner's limits acceptable for conticued service. He evaluation shall consider the effects of the leakage on adjacent components and equipment. He cause of the leakage shall be corrected when the Owner's limits for continued service are exceeded or when practical.

(2)(b) if the leakage occurs at a bolted connection of systems other than boric acid systeme, the evaluation shall oc conducted as follows:

Page 1 of 4

4 + .

l POINT BEACH NUCLEAR PLANT PRESSURE TEST PROGRAM ASME SECTION XI PERIODIC APPENDIX C PRESSURE TEST PROGRAM Revision 1 THIRD INTERVAL December 14, 1993 RELIEF REQUESTS -

(i) ne bolted connection shall be VT 3 examined and evaluated in accordance with the requirements of IWA 3100. The leakage will be evaluated in accordance with the requirements of the Owner's limits for continued service. The evaluation shall consider the effects of the leakage on adjacent components and equipment. The cause of the leakage shall be corrected when the Owner's limits for continued service are exceeded or when practical.

BASIS FOR RELIES ne leakage of boric acid onto carbon and low alloy steel bolting is known to cause excessive corrosion rates. De alternate examination requirement will require evaluation of leakage from bolted connections of bo;ic acid systems.

De bolt closest to the leakage will be the bolt tnat exhibits the maximum corrosion and degradation. Therefore, examination ,f this bolt will be a conservative representation of the remainder of tlw bolts in the bolted connection. If the bolt shows evidence of degradation all remaining bolting in the connection shall be removV and examined. Thir is consistent with the reauirements of IWA 5250 of the 1989 edition of ASME Section XI. A "i 1 examination, in lieu of the ASME Section XI reqdre nent of a VT 3 examination, is a more accurate and qualitative examination of bolrL . By removing only one bolt of a bolted connection that exhibits leakage significant man-rem may be saved without compaomising the integrity of the bolted connection or the pressure boundary.

Leakage of boric acid on austenitic stainless steel bolting does not indicate a great potential for excessive corrosion. A VT-3 examination of the bolted connection will adequately determine any degradation of the bolted connection or of the pressure boundary a a result of the leakage from that connection. Evaluation of the effects of the leakage on adjacent components and equipm nt is above and beyond the requirements of ASME Section XI and serves to further insure that the leakage has no adverse effects on surrounding components.

Technical Specification requirements have been established to permit acceptable limits of leakage. Leakage at a bolted connection does not indicate failure of a pressure boundary. Ifleakage occurs at an austenitic stainless steel bolted connection that does not exceed these requirements, then continued operation shall be permitted provided the leakage does not affect adjacent components or equipment and that the integrity of the prtssure boundary is no; affected.

For those systems that do not contain boric acid, leakage at a bolted connection. does not indicate's great potential for excessive corrosion of the bolting as a result of the leakage. By conductin3 a VT-3 examination of the bolted connection, evidence of any corrosion / degradation of the bolting or bolted cc,nnection can be adequately made to insure the integrity of the pressure boundary, t STATUS: Awaiting NRC Response. Request originally submitted to the NRC as ISI Program Relief Request RR-1-15 (Unit 1) and RR-2-16 (Unit 2) on March 4,1993 (VPNPD-93-056/NRC-93-032). Request incorporated into Hird Interval Pressure Testing Program, Revision 0, with the issuance of that document, Page 2 of 4

.. o POINT BEACH NUCLEAR PLANT PRESSURE TEST PROGRAM ASME SECTION XI PERIODIC APPENDIX _ C PRESSURE TEST PROGRAM Revision 1 TIHRD INTERVAL December 14, 1993 RELIEF REQUESTS RELIEF REOUEST PTP-3-02 COMPONENT: ASME Class 2 Containment Penetrations Associated With Non-ASME Classed Systeins (Umts 1&2) 6.SME SFCTION XI REOUIREMENT:

DVA 5211 TEST DESCRIPTION ne pressure retainiog components within each system boundary shall be subject to system pressure tests under which conditions visual examination VT-2 is performed in accordance with IWA-5240 to detect leakages.

DVC-5210 TEST (a) ' Tbc pressure ietaining components within each system boundary shall be subjected te the following system pressue tests and visually examined by the method specified ia Table IWC 2500-1, Examination Category C-H:

(1) a system pressure test conducted during a system functiona' N of those [lWA 5211(b)]

systems (or compocents) not required to operate during nord plant operation but for which periodic system (or component) functional tests are performed to meet the Owner's requirements; (2p a system pressure test conducted during a system inservice test of those [lWA 5211(c)]

systems (or components) required to operate during normal plant operstion; (3) a system hydrostatic pressure wat [IWA 5?ll(d)] for each system or ponions of systems and for repaired o placed components, or altered portions of systems.

(b) ne system pressu-e tests and visual examinations shall be conducted in accordance with IWA-5000 and this Article, ne contained fluid in the system shall serve as the pressurizing medium, except that ,

in steam systems either air or water may be used. Where air is used, the test pressure shall permit the detection and location of through-wall leakages in components of the systems tested.

PROPOSED ALTERNATE REOIRREMENT:

ASME Section XI pressure testing requirements for ASME Class 2 containment penetrations associated with non-ASME classed systems shall be satisfied by the testing performed to meci the requirements of 10 CFR 50, Appendix L "ontainment penetrations included within larger ASME ci-e--d g stems shall be pressure tested normally in accordance vlth Code requirements as part of the larget system pressure test.

BASIS FOR RELIEF:

All contatament pene. ration piping, regardless of whether or not the penetration is part of a larger ASME classed system, is classified as ASME Class 2. For those containment penetrations which are not part of larger ASME classed systems, the only fwiction important to safety associated with the ASME classification of this piping and/or components is the contamment isolation function.

Page 3 of 4

e ..D o

' POINT BEACH NUCLEAR PLANT PRESSURE TEST PROGRAM ASME SECTION XI PERIODIC APPENDIX C l'RESSURE TEST PROGRAM Revision 1 THIR12 INTERVAL December 14, 1993 RELIEF REQUESTS The pressure retai .'ag components within each of these containment penetrations is adequately tested through the 10 CFR 50, Appendix J, testing progrun, and ad3itional testing under Section XI would only be redundant. Testing in accordance with 10 CFR 50 Appendix J, is fully capable of detecting and locating leakage associated with the pressure retaining components of con'.iinment penetrations.

STATUS: Awaiting NRC Response. Request submitted to the NRC with transmittal of Third Interval Pressure Testing Program, Revision 1.

1 4

i Page 4 of 4