  1. *
  • 1-OM-3.6, Rrv. 0 Page 1 of 3

,(

4 h

4 O V Millstone Unit One OPERATIONS MANUAL J

SECTION 3.6 i

" OPERATIONS WORK CONTROL SUPERVISOR" i

i i Sponsor: W.E.Spohn 7-/ 7 - (/ 7 l Effective Date TABLE OF CONTENTS PAGE NUMBER 1- 1.0 PURPOSE 2 i

! 2.0 TURNOVER 2 3.0 WORK CONTROL 2 l l

t-  ;

i I

4 i

l l

l Approved By: l i

d) -

MP1 Operations Manager 9707230215 970716 POR ADOCK .'5000245 p PDR

. . _ _ _ _ . .m._ . . . . _ _ . _ . _ . _ - - _ . _ . _ . _ . . . _ - _ _ _ . ~ . . _ . . . . - _ _ _ _ _ . _ _ - - . . _ _ _ . _ . . . _ _

  • ' * . 1-OM-3.6, Rev. 0 l .. Page 2 of 3 c 4. -
!P%,'1.0 PURPOSE  ;

iU 1

i

)1.1 ~ The primary focus of the Operations Work Control Supervisor is to coordinate work l

l. . control functions for the shift. This requires the processing of work using appropriate documentation (i.e. AWOs, SP's) which relieves the Unit Supervisor (US) of this -

1

' administrative duty The US shall perform' these duties when the Operations Work

< - ' Control Supervisor position is vacant.

l 1-b 2.0 TURNOVER'

d. .. .

[.  : 2.1 :

. ~ Review Plant Status: Turnover Sheet, Equipment Status, CRP panel walk through.

2.2 Review Daily Plan

s ,

l a.- Previous shift's uncompleted work j

b. Present shift's scheduled work / emergent work ,
c. Future two shift's planned work & manpower ~

i~

i

. .d. Emergent work '

i 3.0 WORK CONTROL

3.1 Prepare Work ,

i +

[

j 3.1.1 Surveillance Tests:  ;

a. Review OPS and l&C tests for prerequisites and plant effects.

- 3.1.2- Clearances:

i- .

[

a. Review Notes Section and Clearances i.

[ b. Verify procedures (System shuidown, breaker rack out) available ,

i

c. Determine plant effects.  !

3.2 Discuss at Shift Brief l'

1. OPS testing scheduled and plant effects 1

c l

2. I&C testing scheduled and plant effects
3. Clearance application / removal' scheduled and plant effects

-p h j

. _ _ . _ . . . _ . - _ _ _ _ . ~ . . . . . , _ . _ _ . _ . . _ _ . . _ . . _ . - _ . - . . . . _ . _ _ . _ _ . _ . . . . . . . . _ . . . _ _ . . . . _ .

l* . . 1-OM 3,6, Rev. 0 Page 3 of 3

4. Significant scheduled activities and plant effect (Tech. Spec. action statements, Ih,- . down powers, Special Procedures).
' 3.3 Review Scheduled Work for next 24 Hours t
1. Verify scheduled OPS & l&C tests are on hand and reviewed for conflicts.
2. Verify M&TE required is signed out of l&C and at WCS work station.

j -; 3. Verify manpower for upcoming work.

1 3.4 Daily Plan

1. Ensure all activities scheduled for shift are complete.
2. Review TRs written that shift.
3. Attend daily achedule meeting and provide status of Operation's activities (as required)

O 1