1-OM-3.6, Rrv. 0 Page 1 of 3

, (

4 h4 O V

Millstone Unit One OPERATIONS MANUAL J

SECTION 3.6 i

" OPERATIONS WORK CONTROL SUPERVISOR" i

i i

Sponsor: W.E.Spohn 7-/ 7 - (/ 7 l

Effective Date TABLE OF CONTENTS PAGE NUMBER 1 -

1.0 PURPOSE 2

i 2.0 TURNOVER 2

3.0 WORK CONTROL 2

t-i 4

i Approved By:

i d) 9707230215 970716 MP1 Operations Manager POR ADOCK.'5000245 p

PDR

.m._

.... _ _. _. _. _ - - _. _. _. _... _ - _ _ _. ~.. _.... - _ _ _ _ _. _ _ - -.. _ _ _. _... _ _

1-OM-3.6, Rev. 0 l..

Page 2 of 3 c 4. -

!P%,'1.0 PURPOSE iU i

1

)1.1

~ The primary focus of the Operations Work Control Supervisor is to coordinate work l

l.

. control functions for the shift. This requires the processing of work using appropriate documentation (i.e. AWOs, SP's) which relieves the Unit Supervisor (US) of this -

1

' administrative duty The US shall perform' these duties when the Operations Work

- ' Control Supervisor position is vacant.

1-b 2.0 TURNOVER' d.

~ Review Plant Status: Turnover Sheet, Equipment Status, CRP panel walk through.

[.

2.1 :

2.2 Review Daily Plan:

s l

a.- Previous shift's uncompleted work j

b. Present shift's scheduled work / emergent work
c. Future two shift's planned work & manpower ~

i~

i

.d. Emergent work i

3.0 WORK CONTROL 3.1 Prepare Work i

+

[

3.1.1 Surveillance Tests:

j a.

Review OPS and l&C tests for prerequisites and plant effects.

- 3.1.2-Clearances:

i-

[

a.

Review Notes Section and Clearances i.[

b.

Verify procedures (System shuidown, breaker rack out) available i

c.

Determine plant effects.

3.2 Discuss at Shift Brief 1.

OPS testing scheduled and plant effects c

l 2.

I&C testing scheduled and plant effects 3.

Clearance application / removal' scheduled and plant effects

-ph j

_ _ _. ~....., _. _ _

l*

1-OM 3,6, Rev. 0 Page 3 of 3 4.

Significant scheduled activities and plant effect (Tech. Spec. action statements, Ih,-

. down powers, Special Procedures).

' 3.3 Review Scheduled Work for next 24 Hours t

1.

Verify scheduled OPS & l&C tests are on hand and reviewed for conflicts.

2.

Verify M&TE required is signed out of l&C and at WCS work station.

j

-; 3.

Verify manpower for upcoming work.

1 3.4 Daily Plan 1.

Ensure all activities scheduled for shift are complete.

2.

Review TRs written that shift.

3.

Attend daily achedule meeting and provide status of Operation's activities (as required)

O 1

4 3

\\

6 O

.