1-OM-3.6, Rrv. 0 Page 1 of 3
, (
4 h4 O V
Millstone Unit One OPERATIONS MANUAL J
SECTION 3.6 i
" OPERATIONS WORK CONTROL SUPERVISOR" i
i i
Sponsor: W.E.Spohn 7-/ 7 - (/ 7 l
Effective Date TABLE OF CONTENTS PAGE NUMBER 1 -
1.0 PURPOSE 2
i 2.0 TURNOVER 2
3.0 WORK CONTROL 2
t-i 4
i Approved By:
i d) 9707230215 970716 MP1 Operations Manager POR ADOCK.'5000245 p
.m._
.... _ _. _. _. _ - - _. _. _. _... _ - _ _ _. ~.. _.... - _ _ _ _ _. _ _ - -.. _ _ _. _... _ _
1-OM-3.6, Rev. 0 l..
Page 2 of 3 c 4. -
- !P%,'1.0 PURPOSE iU i
1
)1.1
~ The primary focus of the Operations Work Control Supervisor is to coordinate work l
l.
. control functions for the shift. This requires the processing of work using appropriate documentation (i.e. AWOs, SP's) which relieves the Unit Supervisor (US) of this -
1
' administrative duty The US shall perform' these duties when the Operations Work
- ' Control Supervisor position is vacant.
1-b 2.0 TURNOVER' d.
~ Review Plant Status: Turnover Sheet, Equipment Status, CRP panel walk through.
[.
- 2.1 :
2.2 Review Daily Plan:
s l
a.- Previous shift's uncompleted work j
- b. Present shift's scheduled work / emergent work
- c. Future two shift's planned work & manpower ~
i~
i
.d. Emergent work i
3.0 WORK CONTROL 3.1 Prepare Work i
+
[
3.1.1 Surveillance Tests:
j a.
Review OPS and l&C tests for prerequisites and plant effects.
- 3.1.2-Clearances:
i-
[
a.
Review Notes Section and Clearances i.[
b.
Verify procedures (System shuidown, breaker rack out) available i
c.
Determine plant effects.
3.2 Discuss at Shift Brief 1.
OPS testing scheduled and plant effects c
l 2.
I&C testing scheduled and plant effects 3.
Clearance application / removal' scheduled and plant effects
-ph j
_ _ _. ~....., _. _ _
l*
1-OM 3,6, Rev. 0 Page 3 of 3 4.
Significant scheduled activities and plant effect (Tech. Spec. action statements, Ih,-
. down powers, Special Procedures).
' 3.3 Review Scheduled Work for next 24 Hours t
1.
Verify scheduled OPS & l&C tests are on hand and reviewed for conflicts.
2.
Verify M&TE required is signed out of l&C and at WCS work station.
j
-; 3.
Verify manpower for upcoming work.
1 3.4 Daily Plan 1.
Ensure all activities scheduled for shift are complete.
2.
Review TRs written that shift.
3.
Attend daily achedule meeting and provide status of Operation's activities (as required)
O 1