ML20196F793

From kanterella
Jump to navigation Jump to search
Engineering Assurance Surveillance Rept Easr 87-79, Control of Lead Contractor Procedures
ML20196F793
Person / Time
Site: Comanche Peak  Luminant icon.png
Issue date: 01/14/1988
From: Rankin R, Saunders A
TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC)
To:
Shared Package
ML20196F750 List:
References
EASR-87-79, NE-15932, NUDOCS 8803040190
Download: ML20196F793 (41)


Text

_ _ _ _ _ _ _ _ _ _ _ __ _ _.

ifC CS l'

'b)'

M

1::::

L C

C t

t RIELECTRIC -

t NE 15932 To:

Distribution January 14, 1988 COMANCHE PEAK STEAK ELECTRIC STATION ENCINEERING ASSURANCE SURVEILIANCE REPORT; EASR 87-79 CONTROL OF LEAD CONTRACTOR PROCEDURES A' surveillance of Lead Contractors (LC) Procedure Manuals was conducted December 14 through December-31, 1987 by Comanche Peak Engineering -

Engineering Assurance (CPE-EA).

[

f I.

PURPOSE The purpose of the surveillance was to verify that Lead Contractor Procedure Manuals were controlled and updated in accordance with individual organization requirements and instructions.

II.

SCOPE l

The surveillance was conducted on a basis of 1006 check of each manual examined. A total of 22 randomly selected Lead Contractors. manuals were examined. A listing of procedures reviewed, personnel contacted during the surveillance and those in attendance at the exit briefings is provided in attachments 1 through 6.

III.

SUMMARY

The surveillance revealed numerous cases where manual updating is a i

problem. The surveillance also revealed that the interim chango system requires more clarification in regards to flagging paragraph or sentence

-changes in the body of the procedure when a new page is not issued with the change.

IV.

FINDINCS DEFICIENCIES : None s

DISCREPANCIES : None I

i 8803040190 890 45 PDR ADOCK 0 g

M I

i I

I I

I P.O. Boa 1002 Glen Rose Tesas 7&M31002 i

NE 15932 2-OBSERVATIONS Attachments 1 through 6 are listings of observations identified during the surveillance. Action responsibility is noted on each individual Lead Contractor listing.

V.

DISCUSSION / EVALUATION Engineering Assurance recommends Lead Contractor's conduct frequent manual surveillances within their organization and if the results show a continued problem. withdraw manuals that are not being properly maintained.

Additionally, Lead Contractors need to determine the impact, if any, of activities being performed to procedures with revision status out of date.

No response is required where observations cited in the surveillance were noted:

"Corrected during Surveillance."

A written response is required addressing the observations identified in this report no later than February 15, 1988. The response should include the cause of the findings reported. extent of condition, action to resolve the reported condition, action to prevent recurrence, and scheduled completion dates.

If you have any questions, please contact R. Rankin at extension 8956.

0" Prepared by R. Rankin E10 EA Evaluations Engineer Comanche Peak Engineering Approved by:

I

(

M A. H. Saunders E10 EA Evaluations Manager Comanche Peak Engineering RR:Jdb

l NE 15932 3-Attachments: 1. SWEC CAP Procedures Reviewed and Observations

2. SWEC P9E Procedures Reviewed and Observations
3. Impell EQ, FP, RE Procedures Reviewed and Observations
4. Impell Cable Tray Hanger Procedures Reviewed and Observations
5. Impell Train C Conduit Procedures Reviewed and Observations
6. Ebasco Procedures Reviewed and Observations Distribution: R. A. Berry lL, lA SW1 E. N. Odar IL, lA EB1 S. L. Stamm IL, lA SW1 K. C. Warapius IL, lA IM1 R. G. Withrow IL, lA E10 A. H. Saunders lL, lA E10 cc: ARMS 1L, lA L. D. Nace IL E01 J. C. Aldridge IL, lA SW1 B. L. Ramsey lL, lA IM1 J. L. Barker IL, lA E10 R. R. Rankin IL, lA E10 R. J. Bentley lL, lA EB1 D. M. Reynerson lL, lA E14 M. D. Bever IL, lA A08 J. F. Streeter IL A08 H. M. Carmichael IL, lA SW1 W. C. Westhoff IL, lA T09
0. W. Lowe IL, lA E07 L. H.*Strope IL, lA QO1 D. McAfee IL QO3

o i

NE 15932 ATTACHMENT 1 Page 1 of 10 LISTING OP SVEC CAP PROJECT PROCEDURES REVIEWED VOLUMES 1 THROUGH 5 PP PEVISIONS CRANCE NOTICES No.

TITLE No.

Date No.

Date 000 Project Organization 1 02/02/87 1

001 Management Plan for Project Quality 1 02/19/87 1

05/19/87 002 Preparation, Issuance, and Control of 2 10/15/87 1

11/16/87 Project Procedures 003 Preparation, Review and Approval of 0 11/21/86 2

05/14/87 Generic Issue Reports (GIRs) 005 Procedure for the Evaluation and 0 10/10/87 Processing of (TDDRs) 006 Procedure for Processing Corrective 12 12/11/87 Action Requests (CARS) 007 Preparation, Review and Approval of 0 03/23/87 3

8/27/87 Package Process Forms (PPFs) 008 Preparation and Approval of Task 2 09/16/87

==

Description:==

009 Preparation and Control of Manual and 2 08/13/87 8

12/02/87 Computerized Calculations 010 Preparation, Issuane.e. and Control of 2 11/16/87 1

11/16/87 Project Correspondence 011 SWEC CAP /TU Electric Interface 1 08/25/87 1

10/07/87 012 Vestinghouse Interface 1 02/27/87 014 SWEC CAP /Ebasco Interface 2 08/24/87 1

10/22/87 015 SWEC CAP /Impell Interface 2 08/24/87 1

10/07/87 017 Crinnell Interface 1 02/27/87 019 Change Controls for Licensing 2 11/24/87 Documents

e a

NE 15932 ATTACRMENT 1 Page 2 of 10 LISTING OF SWEC CAP PROJECT PROCEDURES REVIEWED FP REVISIONS CHANGE NOTICES to.

TITLE No.

Date No.

Date j

020 Control of Design Related Project 2 U9/21/87 021 Document Control 1 09/21/87 022 Performing Project Surveillances 1 11/10/87 023 Processing of Design Change 4 04/17/87 8

12/09/87 Authorizations (DCAs) and Change Verifications 024 Review of Construction, Quality 1 04/02/87 1

11/13/87-Control, Startup and Pre Operational Procedures 025 Record Corrections, Changes and 0 04/02/87 Supplements 026 Processing of Nonconforming Reports 5 10-05-87 3

12/08/87 (NCRs) Conditional Releases Requests and Tests Deficiency Reports (TDRs) 027 Systems for Processing Items of 0 11 03 86 3

12/08/87 Reportability 028 Project Records Management Program 2 11 10-87 1

11/10/87 029 Administration of the Problem Report System 1 04-22-87 030 Preparation, Review, and Approval of 1 10 14 87 1

10 26-87 Design Engineering Packages (DEPs) 031 Preparation and Issue of Design 0 05-19-87 1

09 29-87 Modifications (DMs) 032 Preparation, Review, and Approval 3 07-20 87 of SWEC Project Drawings 033 Review of Contractor Specifications 1 06-03 87 034 Processing of Procurement Documents 3 12/09/87 035 Project Training Program 0 10 08 86 2

05 07-87 036 Procedure for Computer Aided Design 1 07-20 87 (CAD) Drawing Conversion

(,s >

e' t

l s

i

-NE 15932-ATTACRMENT 1 Page 3 of 10 LISTINC OF SWEC CAP PROJECT PROCEDURES REVIEWED PP REVISIONS CHANCE NOTICES No.

TITLE No.

Dare No.

Date 037 Definition of Design Document Classif.

0 10 08-86 l

ication and Marking of Design Documents i

039 Procedure and Maintenance of Project 3 11-13 87 040 Procedure for Review of Wiring 0 10-29 87 Diagrams 041 Nonconformances Evaluation Procedure 2 10 16 87 042 SWEC-CAP /PSAS Interface 1 08 24 87 1

10-23 87 045 Time Charging 0 12 01 86 i

046 Engineering Activities to Support 0 05/21/87 1

07/02/87 SWEC Ceicification of ASME III, Class 2 and 3 System N 5 Data Reports' as Piping System Designer 047 Processing Work Packaga Jhange Notices 1 06/09/87 I

(WPCNs) l 048 Maintenance of the TU Electric 1 09/11/87 Calculation File i

049 Control of Engineering Sketches 0 10/08/87

[

050 Preparation of Field Verification 2 09/03/87 3

11/03/87 l

Method (FVM) Procedures

[

5 052 Implementation & Operation of 0 05/11/87 Project Control System (PCS) i 053 Review & Approval of Vendor Documents 2 07/02/87 3

12/12/87 054 Control of Safeguards Information 2 10/22/87 r

t*

055 The Qualification of Embedments in 0 06/10/87 Concrete 056 Preparation, Approval and Issue of 3 11/13/87 1

12/15/87 i

Specific Technical Issue Reports l

(STIRS) i 1

~

. o; i

hr

+

NE 15932 ATTACHMENT 1

.Page 4 of 10

~

LISTING OF SWEC CAP PROJECT PROCEDURES REVIEWED PP REVISIONS

-CHANGE NOTICES No.

TITLE No.

Date No.

Date C37 Cuidelines for Planning and Scheduling 0 02/12/87 058 Processing of Licensing Correspondence-1 07/07/87 4

059 Procedure for Processing of Deficiency 0 02/24/87 5

10/20/87 Reports (DRs) 060 Control of Concrete Attachments Spacing 1 11/11/87 Violations 061 Procedure for Vendor Technical Manual 0 10/13/87 Review Program (VTMR) Review 062 Processing Temporary Software and Data.

0 08/18/87 Base Modifications to In Plant Computers 063 Specification, Procedure and Drawing 0 07/20/87 Update (SPADU) Program

-064 Preparing and Documenting Safety 1 10/14/87 1

10/14/87 Evaluations on Preoperating License Design Modifications 065 Control of Computerized Equipment List 0 02/20/87 1

12/17/87 1

066 Initiation of Design Modification Requests 1 08/19/87 1

09/29/87 (DMRs) 067 Resolutions of Discrepancy / Issue 1 05/04/87 Resolution Reports 068 fcop Work Orders 0 12/08/87 069 Off Project Monitoring System 0 11/24/87 070 EPM Interface 0 02/27/87 071 Evaluation of Sellers Bids 0 05/21/87 072 Design Modification ALARA Review 0 05/21/87 1

09/10/87 073 Reporting Attachment Loads Information 1 06/15/87 2

12/02/87 tc Engineering Support Group 074 Eng. 6 Design Requirements ASME XI Repairs 0 03/27/87 1

06/19/87

& Replacements / Modifications

i i

NE 15932 ATTACHMENT 1 Page 5 of 10 LISTINC OF SWEC CAP PROJECT PROCEDURES REVIEWED PP REVISIONS CHANCE NOTICES No.

TITLE No.

Date No.

Date 075 Computerized Cable & Raceway 11 09/30/87 2

11/2/87 and Data Systems (CARDS) 076 Technical Procedure for Maintaining 1 08/10/87 Spaced Cable Design 077 Control of CPE Database (CPED) 0 07/14/87 078 Procedure for Eng. Review of CPSES 1 10/15/87 Equip / Materials Storage and Maintenance 079 Prop., Review, Approval & Control 0 11/19/87 of Test Procedures I

200 CPSES Design Basis Consolidation 0 01/08/87 Program Plan 201 Prep. Review & Approval of DBDs 2 11/23/87 1

12/03/87 202 Design Validation Packages (DVPs) 0 08/10/87 203 Calculation Validatior. Procedure 1 08/19/87 4

12/15/87 204 Drawing / Diagram Validation Procedure 2 09/09/87 5

12/16/87 205 Spec. Validation Procedure 3 12/10/87 1

12/16/87 206 Discrepancy Information Program 1 11/23/87

(

207 Potential Cost and Schedule Impact 0 06/23/87 (PCSI) 208 Eng. Eval of Hardware Attributes 0 12/11/87 209 Technical Spec. Validation 0 08/31/87 1

12/15/87 l

210 Load Verification of Seismic Cat 1 1 12/08/87 Structures 212 Design Validation Related Documents 0 06/23/87 1

08/13/87 213 Access Program Interface Procedure 0 11/10/87 214 Component Validation Procedure 0 07/10/87 215 Prep. Review Approval & Control of 0 07/02/87 Project Status Reports

NE 15932 ATTACRMENT 1 Page 6 of 10 LISTING OF SVEC-CAP PROJECT PROCEDURES REVIEVED P

PP REVISIONS CHANGE NOTICES No.

TITLE No.

Date No.

Date 216 Tech. Procedure for 480V Systems 0 06/10/87 Short Circuit Calculation 217 Tech. Procedure for Station Service 0 06/16/87 volt Profile Calculation Down to 480v 218 Tech Procedure for Volt Drop 0 07/14/87 Calculations for AC and DC Control Circuits 219 Validation of Instrument Setpoint on 0 07/31/87 I/C Equip. List 6 Calibration Cards 220 Commodity Attribute Matrix 1 10/15/87 1

11/25/87 i

NE 15932 ATTACRMENT 1 Page 7 of 10 LISTING OF MANUALS REVIEVED AND OBSERVATIONS SWEC CAP MANUAL.NO. 6 1)

PP 002 Revision 2, issued, effective date 10/15/87 plus change 2 effective date 11/16/87. Revision 1 still in manual not removed or marked cancelled. Changes to Revision 2 not i' lagged in body of the procedure.

2)

PP 003 Revision 0, Reference 3.1 not deleted or flagged for changes 1 or 2.

3)

PP-009 Revision 2, change 8 misfiled in PP 008. Changes 3, 4, 6 6 8. New pages not inserted in body of the procedure. Superseded pages still installed. All paragraph changes not flagged in body of procedure.

4)

PP-011 Revision 1, change 1, new page changes not inserted in procedure.

Superseded pages still in procedure.

5)

PP 014 Revision 2, change 1, new pages not inserted in procedure, superseded pages still in procedure.

6)

PP 015 Revision 2, change 1, new page changes not inserted in procedure.

Superseded still in procedure.

7)

PP 023 Revision 4, changes 4, 5, 6 & 7, new page changes not inserted in procedure, deleted pages still installed. Change 6 missing.

8)

PP 026 Revision 5, change 1 missing. Change 2, new page changss not inserted in procedure.

9)

PP 027 Revision 0, change 1, paragraph change not flagged in body of procedure.

10) PP-028 Revision 2, change 1, indexed.nange date incorrect. Revision date added instead of change date. Now page change not inserted in procedure, deleted page still installed.
11) PP 030 Revision 1, change notice 1 missing.
12) TP-034 Revision 2, change notice 1 missing, paragraph changes not added to body of procedure.

~ 3)

PP 35 Revision 0, changes 1 and 2; paragraph changes not added to body of 4

procedure.

14) PP 042 Revision 1, change 1. new page changes not inserted in procedure.

Deleted pages still installed.

15)

PP 050 Revision 2, changes 2 and 3; new page changes not installed in procedure. Superseded pages still installed.

r NE 15932' ATTACHMENT 1 Page 8 of 10 LISTING OF MANUALS REVIEWED AND OBSERVATIONS SWEC CAP MANUAL NO. 6

16) PP 053 Revision'2, change notice 1 missing. Change 2, paragraph changes not inserted in body of procedure.

17)

PP-054 Revision 0 still in manual. Not cancelled or removed.

18)

PP 059 Revision 0, changes 1, 3, 4 & 5; paragraph changes not added to the body of procedure. Change 2 instructions missing from change notice.

19) PP 061 Revision 0 missing
20) PP-064 Revision 1, change 1, new page changes not inserted in procedure.

Superseded pages still installed.

21). PP 072 Revision 0, paragraph changes not added to body of procedure.

22) PP 073 Revision 1, paragraph changes not added to body of procedure.

Change 2, no effective date on change notice (clerical error at DCC, corrected during surveillance). Also change 2, new page change not installed in procedure.

23) PP 074 Revision 0, change 1, new page changes not inserted in procedure.

Deleted pages still installed.

24) FP 075 Revision 1, changes 1 and 2, new page changes not installed in procedure. Superseded pages still installed.
25) PP-201 Revision 2, change 1 incorrect change date in index, revision date instead of change date. Instruction in change not added to body of procedure.
26) PP 203 Revision 1, change 1 and 2; paragraph changes not added to body of procedure.
27) PP 204 Revision 2, changes 1 and 2; paragraph changes not added to body of proced*2re.
28) PP-205 Revision 2, change 1; paragraph changes not added to body of procedure.
29) PP-206 Revision 1; revision 1 indexed as change 1.
30) PP 210 Revision 0. Changes 1 and 2 not added to body of procedure.
31) PP 212 Revision 0, change 1 not added to body of procedure.

1

NE 15932 ATTACRMENT 1 Page 9 of 10 LIST OF KANUALS REVIEWED & OBSERVATIONS SWEC CAP Manual No. 6

32) PP-219 Revision 0, partially misfiled into PP-220,
33) PP 220 Revision 1, change 1; new pages not inserted in procedure, Superseded pages still installed.

Manual No. 36 Volumes 1 through 5 1)

All current precedures in place. However, all paragraph other than complete new page changes were not added to the body of procedures as required by change notice instruction.

Manual No. 55 volumes 1 through 5 1)

PP 003 Revision 0 missing.

2)

PP 007 Revision 0, change 2, page 2 of change notice missing 3)

PP 009 Revision 2, page 2 of 13 missing 4)

PP-065 Revision 0 missing 5)

PP 203 Revision 1, change 2 missing All of the above observations were corrected during the surveillance.

Manual No. 58 volumes 1 through 5 1)

Manual holder name change not in manual.

2)

Manual holder not updating index to project procedures and applicability matrix.

3)

PP-009 Revision 2, change 7, attachmenc I not attached to body of procedure.

4)

PP 023 Revision 4, change 1 missing 5)

PP 034 Revision 2, superseded pages of P 34-L still installed in procedure 6)

PP-073 Revision 1, change 2 attachment PP-073-F not noted as change 2 7)

PP 075 Revision 1, page 5 of 8. unclear if change is 1 or 2.

NE 15932 ATTACHMENT 1 Page 10 of 10 LIST OF MANUALS REVIEWED AND OBSERVATIONS SWEC CAP 8)

No paragraph partial page changes made in any of the procedures in this manual as required by change notice instruction except for item 8. All above observations were corrected during the surveillance.

Manual No. 63 volumes 1 through 5 1)

PP 011 Revision 1, change 1, PP-011-B page 1 of 33 not installed.

Superseded page still installed.

2)

PP 015 Revision 2, change 1, page 1 of 11 of PP 015 B not installed.

Superseded page still in procedure.

3)

PP 024 Revision 1. Change notice 1 for Revision 0 still attached to revision 1 procedure. Incorrect change date noted in index.

4)

PP-046 Revision 0, change 1, page 8 of 18 not installed in procedure.

Superseded page still installed.

l 5)

PP-050 Revision 2, change 3 missing.

f 6)

PP-204 Revision 2, change misfiled with PP 053.

7)

PP-206 Revision 1, index entry is for a change, should be for revision.

8)

PP 212 Revision 0, change 1 missing.

9)

No paragraph partial page changes made in any of the procedures in this manual as required by change notice instruction. Except for item 9, all above observations were corrected during the surveillance.

PERSONNEL CONTACTED D. Nelson

- SWEC CAP C. Aldridge - SWEC PSE J. Soares CPE EA EXIT BRIEFING An exit briefing was conducted with D. Nelson by Telephone, on January 4,

1988, with R. Rankin.

Action Responsibility : SWEC CAP Manuals 6, 36 Action Responsibility SWEC PSE Manual 55 Ac_ tion Responsibility : CPE Systems Manual 58 Actige "$sponsibility : CPE-Evalustions Manual 63 l

e NE 15932

, Page 1 of 7 ATTACHMENT 2 LISTING OF SWEC PSE PROCEDURES REVIEWED 7

I Proc.

Rev.

Date of No.

Title No.

Issue i

CPPP1

. Management Plan for Project Quality 7

3/25/87 (Piping System Qualification /

-Requalification)

CPPP2 Project Organization Chatts

-3 9/21/87 CPPP-3 Document Control Procedute 6

2/27/87 CPPP 4 Project Records Management Procedure 2

2/27/87 CPPP-5 Field Walk Procedure - Unit No. 1 2

3/12/86 CPPP 6

' Pipe Stress / Support Requalification 4

4/08/87 Procedure Unit No. 1 CPPP-7 Design Criteria for Pipe Stress and 3

2/23/87 Pipe Supports CPPP.8

' Piping and Support System Engineering 1

4/25/86 Walkdown Procedure CPPP-9 Pipe Stress / Support As-Built 1

4/08/86 Procedure - Unit No. 2 CPPP 10 Procedure for Review of Plant 1

4/01/86 Operating Mode Conditions CPPP ll Administrative Control of Calculations 1 2/13/87 CPPP-12 Cost and Schedule Control Procedure 1

9/04/86 CPPP-14 Procedure for the Preparation and 3

9/19/86 Control of Project Procedures CPPP 15 Small Bore Stress / Support 1

1/07/87 Requalification - Unit 1 CPPP 16 Procedure for Stress Reports for 1

7/03/87 Class 1 Piping Supports CPPP 18 Procedure for Evaluation of ERC 2

6/17/87 Deviation Reports

r NE 15932 LISTING OF SWEC PSE PROCEDURES REVIEWED Page 2 of 7 ATTACHMENT 2 CONT Proc.

Rev.

Date of No.

Title No.

Issue CPPP 19 Procedure for Processing of Problem 0

6/09/86 Reports and Initial Problem Reports CPPP-20 Pipe Break / Crack Postulation 2

10/27/87 Analysis Procedure

-CPPP-21 Procedure for the Preparation and 1

7/13/87 Control of Site Procedures CPPP-22 Clearance Walkdown Procedure 1

10/23/87 CPPP-23 Pipe Stress / Support Final 1

7/31/87 Reconciliation Procedure CPPP-24 Thermal Expansion Test Procedure -

0 12/01/86 Unit 1 CPPP-25 Piping Vibration Test Procedure -

0 12/08/86 Unit 1 CPPP-26 Thermal Expansion Test Procedure -

0 1/07/87 Unit 2 CPPP-27 Piping Vibration Test Procedure -

0 1/30/87 Unit 2 CPPP 28 Procedure for Identification 6 0

2/20/87 Evaluation of Interfaces Between Seismic & Non-Seismic Piping CPPP 29 Moment Restraint Qualification 0

9/25/87 Procedure and Design Criteria CPPP-30 Validation of Seismic Category II 2

10/23/87 Large Bore Piping and Support Designs CPPP 31 CPSES Safety Related Piping and Pipe 1

$/15/87 Supports Design Basis Consolidation Program CPPP-32 Request for Changes to Licensing 0

6/08/87 Documents CPPP 33 Engineering Activities to Support SWEC 0 5/21/87 Certification of ASME III Class 2 and 3 System N-5 Data Reports as Piping System Designer l-

NE-15932 LISTING OF SVEC PSE PROCEDURES REVIEWED Page 3 of 7 ATTACHMENT 2 CONT Proc.

Rev.

Date of No.

Title No.

Issue CPPP-35 Piping & Pipe Support-Qualification 1

11/20/87 Procedure for Secondary Wall Displacements CPSP NO.

Table of Contents 12/21/87 1

Processing NCRs and Conditional 7

12/21/87 Releases 2

Building Cleanliness, Protection 0

01/22/87 of Permanent Plant Equipment, and Housekeeping Zones 3

CANCELLED 4

Processing Engineering Change 0

09/29/86 Notices (ECNs) 5 Scope and Interface - Hot 0

11/12/86 Functional Site Support Croup Test Activities Procedure 6

Verification of the Adequacy of 0

09/15/87 Piping Support for System Testing Activities 7

CANCELLED 8

CANCELLED 9

Processing Unit 1 Pipe Support 2

03/19/87 Modifications 10 New Pipe Support Designs 0

10/15/86 11 TSMD Drawing Preparation 4

06/22/87 12 As Built Verification 4

09/03/87 13 Processing FPLs for Pipe 1

08/26/87 Supports 14 Processing Design Changes Utilizing 8

11/19/87 DCAs

)

NE 15932 LISTING OF SWEC PSE PROCEDURES REVIEWED Page 4 of 7 ATTACHMENT 2 (CONT)

Proc.

Rev.

Date of No.

Title No.

Issue CPSP NO.

16 Preparation of Problem Boundary 2

07/17/87 Sketches for Unit 1 Small Bore Piping 17 Qualification of SWEC Test Personnel 1

04/22/87 at CPSES Units 1 and 2 18 Personnel Indoctrination and Training 3

11/24/87 for Pipe Support Engineering (PSE) 19 Preparation, Review, and Approval of 3

12/21/87 Specifications and Specification Revs.

20 Processing Deficiency Reports (DRs) 2 11/17/87 21 Processing CVCs 5

12/1/87 22 Processing Discrepancy / Issue 1

05/14/87 l

l Reports (DIRs) 23 Processing SA, PSM, and PSC Letters 0

12/21/87 24 Project Surveillances 0

05/07/87 25 Control and Approval of Non Pipe 0

05/27/87 Attachments to Pipe Supports 26 Pre-DCA As-Built of Unit 1 and Common 0

08/26/87 Pipe Supports 27 Preparation, Issue, and Control of 0

06/23/87 Site Procedures 28 Processing Corrective Action Requests 0

07/17/87 29 General Guidelines for Activities 0

11/10/87 l

Performed by Field Verification Group 30 Processing Requests for Temporary 0

10/01/87 Hangers 31 Preparation and Review of Field 3

11/24/87 Verification Methods (FVHs) 32 Review of DCAs and NCRs Regarding 0

07/187/87 Minimum Wall and Radial Veld Shrinkage Violations

e NE 15932 LISTING OF SWEC PSE PROCEDURES REVIEWED Page 5 of 7 ATTACHMENT 2 CONT Proc.

Rev.

Date of No.

Title No.

Issue CPSP NO I

33 CANCELLED 0

11/10/87 l

l 34 35 NCR Review 0

11/24/87 36 Post Construccion Hardware 0

11/17/87 Validation Program Engineering Evaluations 37 Preparation and Approval of Task 0

11/24/87 Descriptions 38 39 Construction Holds 1

12/14/87 40 41 TSD Drawing Preparation - Unit 2 0

12/17/87 LISTING OF HANUAL3 REVIEWED AND OBSERVATIONS SVEC PSE Manual No. 73 CPPP Procedures: Procedures 1 through 35 - Satisfactory Manual No. 3 CPPP,_ Procedures: Procedures 1 through 41 Satisfactory Manual No. 61 CPPP Procedures 1 through 35 CPP 13 Revision 2, Current status of procedure, cancelled. Cancelled procedure, Revision 1 still in manual.

- Manual No. 26 CPSP Procedures: Procedures 1 through 41 - Satisfactory

i<

il l

NE-15932 ATTACHMENT 2 Page 6 of 7 LISTINC OF MANUALS REVIEWED AND OBSERVATIONS SWEC PSE Manual No. 12 CPSP Procedures 1 through 41 Table of contents in manual dated 10/01/87.

CPS? 1 Revision 6 in manual, current status Revision 7.

CPSP 7 Revision 1 in manual, current status cancelled.

CPSP 14 Revision 5 in manual, current status Revision 8.

CPSP 18 Revision 2 in manual, current status Revision 3.

CPSP 19 Revision 0 in manual, current status Revision 3.

CPSP 20 Revision 1 in manual, current status Revision 2.

CPSP 21 Revision 3 in manual, current status Revision 5.

CPSP 23 Missing CPSP 29 Missing CPSP 31 Revision 1 in manual, current status Revision 3 CPSP 35 Missing CPSP 36 Missing CPSP 37 Missing CPSP 39 Missing CPSP 41 Missing Manual No. 92 CPPP Procedures 1 through 35 I

Index in manual dated 09/30/87, current status 12/23/87 CPPP 1 Revision 7 in manual, current status Revision 8.

CPPP 4 Revision 2 in manual, current status Revision 3.

t CPPP 6 Revision 4 in manual, current status Revision 5.

l CPPP 9 Revision 4 in manual, current status Revision 5 CPPP 20 Revision 1 in manual, current status Revision 2.

CPPP-22 Revision 0 in manual, current status Revision 1.

i

4 NE 15932 ATTACHMENT 2 Page 7 of 7 LISTING OF MANUALS REVIEWED AND OBSERVATIONS SWEC PSE Manual 92 continued CPPP 30 Revision 1 in manual, current status Revision 2.

- CPPP 35 Revision 0 in manual, current status Revision 1.

Action Responsibility : SWEC PSE SWEC - PSE PERSONNEL CONTACTED:

C. Aldridge EXIT BRIEFINC Exit briefing was conducted January 4, 1988 with the following personnel in attendance:

C. Aldridge SWEC PSE N. Hottel CPE EA Evaluations Supervisor R. Rankin CPE EA Evaluations Engineer t

l NE 15932 NITACliflENT 3 Pags 1 of 10

~

LISTit;G OF It1PELL EQ, FP, RE PROCEDURES REVIEWED HWECT Df1 TRIM DrSIPUCTICH TITE BEY EDI DC-FP-23 CDtGICATICH FIQJIRD92fr EVAUATICH 3

DC-FP-24 FIRE PFOTECTICN DfITRFACES 1

DC-FP-25 REVID4 OF 'INE DESIGi IEFICID4CY REPORTS O

(TDCRs)

DC-FP-25-1 DUTIATIQi OF 'IE DE:SIGi CEFICIDiCY REPDRIS 0

('HXR)

DC-??-26 EXVIUf OF }mCEtGOFMANCE REPORTS (NCRs) 4 4A.

IMP-FP-27 H1Nr.IM OF TGT DEFICIENCY PEFORIS (IIRs) 0 i

D C-FP-28 RWISICN OF 'IUEC hED FIRE PFOTECTICH 3

REIATED IPNfDGS DC-FP-29 RLVIDi mfd APFFCT/AL OF GFPS AS-RJILT 4

DCSICE DOCLKDTIS D T-FP-33 FIRE IWIFxuQi FILDG SYSIDi 5

D C-FP-34 MAXDiH PDHISSIBIE JGE IDADDG mfd 2

!W-PATED TEAIURES ANALYSIS DC-FP-35 DfITIATICH OF IEFICID1CY REKRIS (ERs) 3 DC-FP-36 DIADVDEDfr ACIUATICE EVAIDATICH 3

DC-FP-37 IDE2frIFICATICH, EVAUATICH, AND REEOIIJrICH 2

OF IEFICIDfr CENDITIQG DC-FP-39 FIRE PBOITDTICH PREVDfrIVE ACTICH PBOGRAM 2

2A DC-FP-40 DiSIFUCTIQG FOR DTIIRFACDC WIDi VDTIDRS 0

r DC-IP-41 DGDfEERDG REVIDf OF PBOCU1ENDfr 2

COCIM2frATIQi IMT-FP-42 FREPARATICH OF PRE-OPERATDG LIC22GE SAFETY l

EVAIL%TIQG f

DC-FP-4 3 10CFR21 EVAUATIQI NID REVIDf 1

l

NP,15932 ATTACllflENT 3 Tage 2 or 10 LISTI!;G OF ULPEU. EQ FP. RE PROCEDURES REVIEWED PfG ECT DfIERIM DEIRDCTICH TITII E

M DE-FP-06 MADTII2WICE OF HR 0

DE-FP-07 REVIDi MD UPEATE OF FHA 1

DC-FP-08 PREPAPATICH OF O26INXTICH TRAVEIIRS 1

DC-FP-09 REVIDf AND ANAINSIS OF EXISTDC FIRE 1

ISCTECTIQi DEVIATIQG DE-FP-10 IDDITIFICATICN AND VERIFICATIQi OF 3

IMPIIMDCATIQi OF LICDGDG 00tCINDfIS DE-FP-10-1 VIRIFICATICH OF IMP 12MDfIATICH OF 0

LICDGDG O2HTIMDfIS DE-IP-il AS-EUIIT VERIFICATIQi MEDCD IUR MD3MTICAL 1

PIPDC PDEIPATICtG D E-FP-12 REVIDf OF FIRE TESIS 1

D C-FP-13 DEIIIMDaTICti OF PDEIPATICH SEALDC 1

REQUIRD4DfIS DC-FP-15 CDGUIERIZID PDEIPATICH SEAL SOEUIZ 2

DC-FP-16 CABIE/RACDRY rum 10PS 0

QA DC-FP-17 REVIDi OF UNIT 2 PDEIPATIQi SEAL 2

FABRICATICH IPAWDCS DE-FP-18 PDEIPATICH SEAL CIZARANCE CAICJIATICH 0

OA (D11NGED ANWIAR GAP) IEEPAPATICH AND REVIDi DC-FP-19 VDiCDR DOCUMDff REVIDi 2

DE-FP-19-1 VD1 DOR IDCLHDff REVIDi (VDC & VDI) 0 DC-FP-20 LEAITDG SIANDARDIZATICti DiSIFUCTIQi 1

DC-FP-21 PREPARATIQi AND REVIDf OF FIRE Thu;nQi 4

CAINIATICtG

.,1sE 15932 ATTACllflEtiT 3 Pega 3 of 10 l

LISTIriG OF IllPELL EQ, FP, RE PROCCDURES REVIEWED PR17ECT DEIRIM DiSIBXTICH TITIE M

M DE-EQ-09-2 DbMCtG FOR D2 D00M2R CCtfIROL 2

DC-D?-09-3 DGIRUCTICtG FOR DEERFACE hTIH DCD{EERDC 0

DC-D2-09-6 DISIR,'CICtiS FOR DEIRFACDG WrIH EBASCO O

DC-D2-09-7 DISTHXTIQG FOR DfITRFACDG WTIH DQUIEMDft 3

VDID3RS DC-D2-13 D6IFUCIIQG FOR RE.tvuuG EEFICIENCIES 0,

WRSUMir 10 CFR 21 NfD 10 CFR 50.55e DC-D2-16 DfIERDISCIPLD{ARY REVIIW (IIR) FIRFCIMED 2

BY DeELL DE-D2-17 B2UIPMDff QUALIFICATICt1 IRXmAM IMPACT IDG 1

DE-D2-18 PREPARATICti REVID4 & ISSUANC OF DQUIEMDir 3

QUALIFICATICti CAILUIATICtiS DE-D2-21 RUvamG NiD CEtCROL OF NCriCCtiFCR4ANCES 1

(NCPs)

DC-D2-22 FFOCESSDG OF DEFICIDiCY REPORIS (IPs) 1 DC-D2-24 PREPARATIQi, CEtfIFOL, MID ISSUANCE OF 0

DESIGi VALIDIATICH PACKAGZ3 (If&s)

DC-D2-26 COEFDfVP 'IFACXDG SYSIDi (CIS) 0 DC-D2-27 POSI CCtGIFUCTICti HARIMARE VALIIATICH 0

PPoGRAM D C-FP-Ol GFPS DCGMDfr REVID4 3

DC-FP-02 G.F.P.S FCAs 2

DC-FP-03 DISPOSITICti OF GFPS IGNCCtfEDRMANCE REICRIS 0

DE-FP-04 CCtiEUCFDC AND DCCMDTFDG NFPA (DDE 1

CQ @LIRfCE REVIEWS DE-FP-05 IBODLICTICli MiD REVISIcti OF IRANDCS 2

NE 15932 ATTACnMEttr 3 Page 4 of 10 LISTitlG OF IMPELL EQ, FP, RE PROCEDURES REVIEWED '

9 Ht17ECT DirDuM DismocrIm TITG EEY BEY D C-EQ-04-6 REVIDf AND APPPOVAL OF VDfDOR DOCUOfIS 1

EDR SEISMIC Q D C-EQ-04-7 VERIFICATICli OF AS-BUILT IDADS W QUIINDir AND VALVES 1

l DC-D2-04-9 EVAWATICri OF EUIRiDC }CZZIE IDAD 1

EXCEDWEE DC-EQ-4-10 EVAIL%TICtf OF KUIRiDC }CZZIE 1

STIFDESS P%'ECT DEIPUCTIm IMT-D2-05-1 MEPAPATICN OF MIDWfICAL EUIR{DC 0

QUALIFICATICti DATA PAQEDS (DNIPCt0(DirAL)

DE-IQ-05-2 DNIRCtaiDfIAL QUALIFICATICti OF EIE.'IRICAL 3

KUIR4Dir DC-D2-05-3 REVID4 AND AFFPCTAL OF VDiDDR DOCLHDTIS IVR 0

DiVIRCt0(DfIAL D2 DC-D2-05-4 HEPARATICli OF KUIHiDC QUALIFICATICri 3

3A,3B SLBMARY PAOMES - (DNIBCliMDfIAL) (HARSH) l DE-D2-05-5 DNIPCNMDfIAL QUALIFICATIW OF SAFE 1Y-2 REIAHD ELECIRICAL KUIRiDE ICCAHD Di MIID DNIBCreens DC-D2-06 EQUIINDE QUALIFICATICH DAIABASE HOCESSDC 2

DC-M-07 EQUUNDE QUALIFICATICN DISCREPANCY FWM 5

APHENAL DC-D2-08 RESOIUTICH OF IQUIRiDC CEtiIITIT DfIIRFACE O

DISCREPANCIES DC-DdO8-1

[EIUMDRTICti OF FZOWIICAL CYCLDC 0

RDQUIRD(DfIS FOR CIASS 1E EUIIMDir D e-D2-09-1 DISTPUCTICtlS FOR DirIRFACE WI'IH SIulE &

O Wm~~ m DGDfEIRDG CORICPATICH

NE 15932 ATTACllMENT 3 Page 5 of 10 LISTING OF IMPELL EQ,

'P, RE PROCEDURES REVIEWED

/

HuTECT INIIRIM DISIPLtTICH TITIE M

M DC-AD-23 REVIDi AND IRANSKITIAL OF RFIs (RDQUEST FOR 3

DiFOM%TICH CIARIFICATICN)

DC-AD-24 AS-RJII2 PACKAGE FREPARATIQi (FIEID 4

VIRIFICATIQi)

DC-AD-26 FPOCESSDG OF DISGEPANCY ISSUE RESOU1TIQi 1

Te.ru cs (DIRs)

DC-AD-27 REVIDf AND URATE OF FSAR 1

DC-AD-28 DESIGN YERITICATICH AND DfIIRDISCIPLDERY 3

REVID4 OF DCAs AND NCRs DG-AD-29 DESIGi QWGE TRDODG 1

DC-AD-30 DTITIATICH NO REVIDi OF u.wu.m'E ACTICH 2

REQUISIS (CARS)

DC-AD-31 PREPAFATIcti NO REVIDi OF DCDEIRDG IASK 0

DESCRIPTICNS DC-AD-32 QUALIFICATICN OF FIIID WAIFIn@i PERSOOTEL 0

DC-IQ-01 EQUIReft QUALIFICATICH MASTIR IIST 1

DC-IQ-01-1 EEVEIDRE2ft OF DQUIIMDir QUALIFICATICH 2

MASTER LIST DC-IQ-01-2 10CFR50.49(b)(2) EQUIINDir IrrDMDaTICH 1

DC-IQ-02 REVIDf OF DOCUMDfIS FKH ODER UTILITIIS 3

DC-IQ-03 REVIDf AND IPOCESSDG OF NGs, ECRs, O

airl SDARs D!r-EQ-04-1 SEISMIC QUALIFICATICtl CF MEQ WiICAL 1

D2UInCtr DC-IQ-04-2 SEISMIC CUALIFICATIcti OF 22DCIRICAL 0

D2GIRiDTP D C-D2-04-5 IREPARATICti OF D2VIRC7T QUALIFICATICH 4

SLMGRY PACW4ES - SEISMIC

NE 15932 ATTACm!ENT 3 Pa'ga 6 of 10 LISTI!;G OF IMPELL EQ, FP RE PROCEDURES REVIEWED HWECT DfnRIM DGMCTIOf TITIE M

M DC-AD-01 OPGANIZATICH 5

DE-AD-03 PREPAPATIQi OF HWECT.UISMCTICtG 6

DC-AD-04 PERSCtaiEL DIDOCIRINATICH MID 'IPADTDG 5

DE-AD-05 CDRRESPONDUICE CCtTIPOL 4

DE-AD-08 CCt@ POL OF QUALITI ASSUFMICE RECCFM 0

OA,0C DC-AD-08-1 IMPEIL RECORDS MMWIDinff MD 'IURGVER 3

OF RECORDS 'IO 'IU EIICIRIC DC-AD-08-2

'IURGVD1 OF D2

SUMMARY

PAQGGES 1

DC-AD-ll PREPAPATICH AND REVIDf OF SPECIFICATICtG 2

2A DC-AD-13 FREPAPATICH AND REVIDf OF DESICH QWGE 4

4A AUD10RIZATICtG (DCAs)

DC-AD-13-1 PREPARATICH MID REVIDi OF DCDIEIRDG QWE 1

NOTICES (D31s)

D C-AD-13-2 REVIDi AND RESOIUTICH OF FIEID QWE 1

RD2UEIS (FGs)

D C-AD-14 REVIDi AND PROC 2:SSDG OF PAQGGE PROCESS 1

ICRMS (PPFs) AND IISIQi lODIFICATIQG (IHs)

DE-AD-14-1 PREPARATICH MC REVIDi OF PAQGGE PROCESS 0

IGMS (PPFs)

D E-AD-15 IEEPAPATICH MID Pr/IDf OF IESIGi DGDIZERDG 1

PAQGGES (IEPs)

DE-AD-15-1 FREPAPATION MID REVIDf OF DC3IGi BASIS 2

DOCLHDfIS (DBDs)

DC-AD-16 DESIGi VIRFICATIQi OF DCDIEERDG IXXLMDES 3

DE-AD-20 DESIGi CCt(IPOL GDiFPAL RD?UIRDIDTIS 1

DC-AD-21 DIS'IFJCTIQG ICR WRITDG FIEID RD2UISITIcts 0

NE 15932 ATTAClif1Ctif 3 Pags 7 of 10 LISTit;G OF IttPELL EQ, FP, RE PROCEDURES REVIEWED DfIIRIM PR17ECT DMcN TITII E

E D C-FP-44 10CFR50.55(e) EVAIIRTICH AND REVIDi 1

DC-FP-45 REVIDf MID APPfCVAL OF GFPS PFOCEDURES 1

DC-FP-46 S!OKE RDOVAL MtALYSIS 0

IMI-FP-47 NFPA 72E DEVIATICH EVAI1RTIQ(

0 DC-FP-48 D4ERDNCY LIGEDC EVAI1RTICH 1

DE-FP-49 FIELD VERIFICATICH 0

D G-FP-50 UIDM>-IM AND PADIMir DEMY SHIELD 0

OA SGEEULE DC-FP-51 SURVEIIIANCE OF UhuuGEOJND FIRE MAIN 0

DC-IP-53 PARTIAL SPRD012R COVEPME EVAIDATIQf 1

D C-FP-54 HIGl DGEDANCE FAULT S"IUIN O

DC-FP-55 CEffDOL OF FIRE PPOIECTIQi CAICJIATIOG 0

i DC-FP-56 FIRE IElh.11CH K6r CEttS'IBUCTIQi HARDaRE 1

VALIIRTIQi HOG %M DC-FP-57 UIERfD-IM REEUCFIQi/SYSTDG DirD%CTICH 1

ANALYSIS D G-IP-58 IREPARATICH OF FIRE HOIECTICH CESIGi 0

VALIIATICH PAGACES (DVPs) l D C-FP-60 INITIATICH OF IESIGi PODIFICATICH REQUESIS 1

(IHRs)

DC-RE-01 3CIATDC BgUIIt!Dir ANOCEWES PPCGPAM 1

D C-RE-02 DirERTACE CrtinOL D6IPUCTIOG 1

NE 15932 ATTACHMENT 3 Page 8 of 10 LISTINC OF MANUALS REVIEWED AND OBSERVATIONS IMPELL, EQ, FP, RE Manual No. 22 IMT FP-16 Revision 0 Change OA; no reference letter in procedure. Change over 90 days old contrary to IMT AD 03, paragraph 2.6.2.

IMT-FP-18 Revision 0, Change OA; no reference letter in procedure. change over 90 days old contrary to IMT AD 03 paragraph 2.6.2.

IMT FP 26 Revision 4, Change 4A; no reference letter in procedure.

IMT-FP 39 Revision 2, Change 2A; no reference letter in procedure.

IMT FP 50 Revision 0, Change OA; no reference letter in procedure. No issue date on page 3 of 4. Change OA over 90 days old contrary to IMT AD 03, paragraph 2.6.2.

IMT AD 8 Revision 0, Change OB not in procedure. Change OC no reference letter in procedure. Also change OC not listed in table of contents. Change OA no issue date. Above changes over 90 days old contrary to IMT AD 03 paragraph 2.6.2.

IMT-EQ 09 2 Revision 1, Change 1A over 90 days old contrary to IMT AD-03 paragraph 2.6.2, Manual No. 3 Table of contents in manual is Revision, 56 current status Revision 57.

IMT-AD 8 Revision 0. Changes OA,0B,0C in manual but procedure missing.

IMT-AD-8 2 Revision 0 in manual, current status Revision 1.

IMT AD-13 1 Revision 0 in manual, current status Revision 1.

IMT AD 26 Revision 1 procedure division not tagged IMT AD 27 Revision 1 procedure division not tagged IMT AD 31 Missing

NE 15932 ATTACitMENT 3 Page 9 of 10 LISTING OF MANUALS REVIEVED AND OBSERVATIONS IMPELL, EQ, FP, RE IMT T EQ 4 Revision 1 procedure division not tagged.

10 IMT EQ 5 2 Revision 3 procedure division not tagged.

IMT EQ 7 1 Revision 1 still in manual, current status deleted.

IMT-EQ 7-2 Revision 1 still in manual, current status deleted.

IMT-EQ 7 3 Revision 2 still in manual, current status deleted.

Iht EQ 9 2 Revision 1, Change 1A, page 6 not installed in procedure.

Superseded page still in procedure.

IMT EQ 9 7 Revision 2 riot reparated or section tagged.

l IMT EQ 26 Revision 0, no division tag.

Manual No. 2 IMT AD 8 Revision 0 no letter referencing changes OA and OB IMT AD B 2 Revision 1, no division tag IMT AD 31 Revision 0, no division tag IMT AD 5 3 Revision 0, page 6 misfiled.

l IMT EQ 16 Revision 1, misfiled in manual.

l IMT.EQ 17 Revision 0, no procedure division tag.

IMT iQ 26 Revision 0, no procedure division tag.

IMT.EQ 27 Revision 0, no procedure division tag.

IMT FP 44 Revision 1. no procedure division tag.

IMT FP 47 Revision 0, no procedure tag.

l IMT FP 54 Revision 0, no procedure tag.

IMT FP 55 Revision 0, no procedure tag.

IMT FP 56 Revision 1 no procedure tag.

IMT FP 57 Revision 0, no procedure tag.

IMT FP-58 Revision 0, no procedure tag.

IMT FP-60 Revision 1, no procedure tag.

Action Responsibility Impell t

a NE 15932 ATTACHMENT 3 Page 10 of 10 LISTING OF MANUALS REVIEWED AND OBSERVATIONS IMPELL, EQ, FP, RE PERSONNEL CONTACTED DURING SURVEILLANCE M. Goodson G. Kast EXIT BRIEFING An exit briefing was conducted by phone between B. Rankin, G. Kast and B. Ramsey on January 4,1988.

r NE 15932 ATTACRMENT 4 Page 1 of 2 LISTING OF IMPELL CABLE TRAY RANGER PROCEDURES REVIEVED PI.02 Dynamic Analysis of Cable Tray Systems Revision 6 PI.03 Design Verification of Cable Tray Supports Revieion 5 PI 04 Procedure for Obtaining Site Information Revision 2 PI 06 Design Verification of Cable Trays and Revision 1 Cable Tray Clamps PI 07 Design Verification of Base Plates, Base Revisien 4 Angle and Embedment Plate PI 08 Cable Tray Fill Loads Revision 0 PI 11 Cable Tray System Analysis and Revision 3 Qualification Closeout PI 12 Control of Design Change to Cable Revision 1 Tray Hangers PI 13 Procedure for Dispositioning Revision 1 TU Electric Nonconformance Reports PI 14 Processing of Discrepancy / Issue Revision 0 Resolution Reports PI 15 Procedure for Dispositioning Revision 0 TU Electric Deficiency Reports PI-16 Cable Tray Design Verification Revision 0 Record Turnover Program PI 17 Post Construction Hardware Revision 0 Validation Program SUPERPOST User's Manual Version 3C SUPERPOST Qualification of Tubes, Vide Flanges and Double angles SUPERPOST Errors Addendum Memorandums Addendum No. 1, 2, 3, 4, 5, 6, 7, 8, 9, 10, 11, 12, 13, 14, 15, 16, 17, 18, 19, 20, 21, 22, 23, 24, 25, 26, 27, 28, 29, 30, 21, 23, 33, 34, 35, 36, 37, 38 -

SUPERSEDED Addendum No. 39, PI 12, Rev. 1 Addendum No. 40. PI-06, Rev. 1 Addendum No. 41, PI-02, Rev. 6

NE 15932 ATTACitMENT 4 Page 2 of 2 CABLE TRAY llANGERS LISTING OF MANUALS REVIEWED AND OBSERVATIONS Master Copy; PI 2 Revision 6 Revision 5 still '.n manual not stamped superseded. Also addendum 20, 25, 29 not superseded, contrary to QA manual instruction QP 3 9 Revision 5.

PI-06 Revision 1 Revision 0 still in manual not stamped superseded as per above QA instruction.

PI 07 Revision 4 Revision 3 still in manual not stamped suparseded as per above QA instruction.

PI ll Revision 3 Revision 2 still in manual not stamped superseded. Also addendum 24, 26, 17, 18, 30, 31, 35 not stamped superseded as per above QA instruction.

PI 13 Revision 1 Revision 0 still in manual not stamped superseded. Also addendum 38 not stamped superseded as per above QA instruction.

Manual No. 7:

PI 08 Revision 0 Missing PI-12 Revision 1 No division tag PI 13 Revision 1 No division tag PI-14 Revision 0 No division tag PI-15 Revision 0 Missing PI 16 Revision 0 Missing PI 17 Revision 0 No division tag IP 05 Revision 0 Uncontrolled copy in manual not stamped superseded.

Action Responsibility : Impell PERSONNEL CONTACTED DURING SURVEILIANCE S. Abuyounes B. Ramsey EXIT BRIEFING l

An exit briefing was held by phone between B. Ramsey and R. Rankin on January 4, 1988.

I L

NE 15932 ATTACHMENT 5 Page 1 of 3 LISTING OF MANUALS REVIEVED AND OBSERVATIONS IMPELL TRAIN C CONDUIT Number Title Rev, No.

0210 052 02 Verification of Existing Train C Conduit Walkdown 1

0210 052 03 Seismic Evaluation of Train C 4

0210 052 04 As. Built Data Train C Walkdown 2

0210 052 05 Procedures for Implementation Screen Level 4

0210 052 006 Rigorous Analysis of Conduit Systems 2

0210 0520007 Calculation Numbering 1

0210 0520008 Procedure for Implementation Rework Option 2 -

1 Seismic Restraints by Aircraft Cable 0210 052 009 Processing of Discrepancy / Issue Resolution Reports 1

0210 052 010 Procedures for Implementation Screen Level 8 1

0210 052 011 Procedures for Utilizing Test Data of Train 0

C Conduit 0210 0520012 Enhanced Level 2 Screening Criteria for Simple Supports 1 Train C Conduit, 2 inch 6 Less (Including Reclassified Lighting Systems) 0210 053-001 Multi Level Screening criteria for Train C Conduit 8

(Two Inch and Under) 0210 053-002 Level Four Screening Criteria for Type 1 Supports 4

0210 053 003 Level 4 Screening Criteria for Type 2 Supports 0

0210 053 004 Procedures for Implementation of Design change 0

Authorization Forms (DCA) for Train C Conduit Supports 0210 053 005 Procedure for Implementation of Nonconformance Report 1

l (NCR) Resolution for Train C Conduit I

0210 053 006 Engineering Evaluation of Separation Violation Between 1

two Hilti bolts or Between a Hilti Bolt and a Richmond Anchor J

NE 15932 ATTACHMENT 5 Page 2 of 3 LISTING OF PROCEDURES REVIEWED IMPELL TRAIN C CONDUIT 0210 053 007 Level 4 Screening criteria for Type 7 5 17 Supports 0

f Train C Conduit Two Inch and Under (Including Reclassified Lighting Systems)

{

0210 053-008 Procedure for Dispositioning and Reviewing Deficiency 0

Reports (DRs) 0210 053 009 Engineering Inspection Procedure 0

0210 053 010 Review and Resolution of Field Change Requests (FCR) 0 0210 053 011 Train C Conduit (2 Inch and Less) Record Turnover 1

[

Program l

0210 053 012 Procedure for Dispositioning Corrective Action Requests 0 l

for Train C (2 and Less) r 0210 053 013 Train C Conduit Program Maintenance 1

l 0210 053 014 Procedure for the Control of Train C's Intermediate 0

t Storage Area (ISA)

[

0210 054 01 Load Development for New and Temporary Supports Train 2

C Conduit 0210 054 02 Support Design / Qualification for New and Temporary 2

Supports 0210 054 03 Procedure to Generate Loads and Qualify Velded 0

Attachments to Exisuing Embedded Plates r

LISTING OF MANUALS REVIEWED AND OBSERVATIONS IMPELL TRAIN C CONDUIT l

1 L

Master Copy Title j

t PI 0210 053 001 Rev.8 Parts I through VIII, including change notices 80 through 87 Superseded. Change notices not marked i

superseded as per QA instruction QP 3 9, Revision 5.

L PI 0210 053 002 Rev. 4 Superseded change notices not marked as per

(

QA instruction, t

l.

l l

l

NE.15932 ATTACitMENT 5 Page 3 of 3 LISTING OF PROCEDURES REVIEVED IMPELL TRAIN'C CONDUIT PI.0210 052 006 Rev. 2 Change notice 1 not marked superseded as per QA instruction.

Action Responsibility : Impell PERSONNEL CONTACTED DURING SURVEILINICE B. Marshall EXIT BRIEFING An exit briefing was conducted by phone between B. Ramsey and R. Rankin on January 4, 1988.

l l

1

NE 15932 ATTACRMENT 6 Page 1 of 6 LISTING OF PROCEDURES REVIEVED EBASCO Volume I SECTION CONTENTS DATE REVISION 1.1 List of Ebasco & TU Engineering Procedures 12/23/87 24 12/23/87 22 1.

Project File Index 12/23/87 21 2.

Distribution Schedule 10/26/87 11 3.

Specification Review List 01/07/87 0

4 Drawing Review List 06/05/87 7

A E 7 CP Review / Approval of Drawings, Diagrams, 10/26/87 7

& Lists Nuclear Projects B E 65 CP Control of Project Related Design 11/25/887 9

Documents C E 76 CP Procedure for Design Verification for 12/10/87 9

Nuclear Power Plants D E 77 CP Procedure for Identifying, Selecting & 07/10/86 1

Documenting Design Inputs for Nuclear Power Plants E PJ-1 CP Project Filing System 10/26/87 5

F PJ-2 CP Project Communications 04/10/87 5

G E 21 CP Preparation of Project Equipment 10/26/87 2

Specifications H E 66 CP Control of CPSES Design Drawings &

12/23/87 3

i Documents i

I L 7 CP Nuclear Safety Design Review 10/26/87 3

1 l

l f

l NE 15932 ATTACHMENT 6 Page 2 of 6-s LISTING OF PROCEDURES REVIEVED EBASCO SECTION CORTENTS DATE REVISION J CPE EB Field Verification Method Unit s2 10/16/87 3

~

FVM CS Cable Tray Hanger As Building &

003 Design Adequacy Verification Program K Instruction : Instructions for Calculation 11/18/87 8

Package Preparation for Cable Tray Hangers N CP SC Cuidelines for Calculation Package 12/04/86 4

01 Preparation. Review and Filing by Site Civil Engineering VOLUME II P CPE.EB Field Verification Method Unit s 1 08/24/87 8

i FVM CS Cable Tray Hanger as Building &

l 001 Design Verification Program l

Q Instruction : Instructions for Conduits &

12/23/86 2

Supports Calculation Package Preparation U CPE EB. Design Control of Electrical Conduit 07/06/87 4

CS 002 Raceways V CPE EB Field Verification Method Procedure for 09/21/87 5

FVM CS. Seismic HVAC Duct & Duct Hanger As Built 029 Verificatior. in Unit al and 2 Common Areas V Instruction : Instruction for (HVAC) 06/09/86 1

Calculation Package Preparation X ECE-DC Procedure for Preparation & Review of 10/28/86 1

33 FSAR Change Request YK1 Guidelines for Unit a 2 Cable Tray 01/30/87 0

Calculation Package Format Backfit VOLUME III AA CP SC Technical Guidelines For Seismic 01/22/87 1

-02 Category I Electrical Conduit System (Unit a2) l l

r NE 15932 ATTACHMENT 6 Page 3 of 6 LISTING OF EBASCO PROCEDURES REVIEVED VOLUME III BB CP SG Guidelines for Preparation & Checking 2/20/87 0

03 of Calculation for Seismic Category I Electrical Conduit System (Unit s2)

CC E-30 Preparation of Calculations 02/20/83 4

DD Instruction : Instruct n,r Calculation 09/14/87 2

Package Prepara

r Class I HVAC Ducts & Hangers FF Instruction
Instructions for Calculation 09/14/87 2

Package Preparation for Class II HVAC Ducts & Duct Supports J Instruction : Instructions for Calculation C//?4 ?7 0

a

/

Package Preparation for Seismic Category I & II Air Handling Units, Plenums, and Equipment Supports (APES)

JJ PCP 1 Project Control Procedure 10/26/87 1

CP KR TRC.

Turnover of Calculation 09/10/87 0

1 CF Records Procedure MM ECE Reporting Attachment Loads Information 08/24/87 1

5.11 04 to Civil Engineering (EDCN 01)

NN ECE Preparation and Review of Design Basis 10/31/87 4

DC 17 Documents (EDCN 06) 00 CPE_

Procedure for As Built Verification 09/18/87 1

i EB FVM.

of Seismic HVAC Air Handling Units, l

CS 066 Plenums and Equipment Supports in Unit 1 & Common Areas LISTING OF EBASCO MANUALS REVIEVED AND OBSERVATIONS Unable to locate manual distribution listing on site.

Manual No. 26: Volume I Table of Contents dated 11/25/87, current status 12/23/87. Section 1.1, lists Ebasco and TU Eng. Procedures. Attachment 1 in manual is Rev 23, current status Rev. 24. in manual is Rev 21, current status Rev. 22 l

l l

L_.

47' ug fp

~,1 4

NE-15932:

ATTACHMENT 6 Page 4 of 6 LISTING OF EBASCO MANUALS REVIEWED AND OBSERVATIONS Appendices: Proj ect' file index in manual Rev. 20, current status Rev. 21 Section b: E-65-CP missing Section C: E-76-CP Rev. date in manual 10/26/87, current status 12/23/87 Section H: E-66-CP Rev. date in manual 7/10/87, current status 12/23/87 L

Section L: SAG-CP2 in manual, current status deleted Section M: SAG-CP-3 in manual, current status ~ deleted Section 0: SAG-CP-4 in manual, current status deleted volume II, Manual No. 26:

Table of contents in manual dated 11/25/87, current status 12/23/87.

Section R: SAG-CIl0 in manual, current status deleted

-Section S: SAG CP-17 in manual,. current status deleted-Section T: SAG CP-12 in manual, current status deleted Section V: CPE-EB-FVM-CS 029 Revision 5 in manual, current status is interim change notice # 2.

3 Section Z: SAG CP 23 in manual, current status deleted

' Manual No. 26: Volume III Section EE: SAG CP19 in manual, current status deleted Section HH: SAG CP31 in manual, current status deleted Section II: SAG-CP-30 in manual, current status deleted Section MM: Missing Section NN: Missing Section 00: Missing

q

-NE 15932 ATTACHMENT 6 Page 5'of 6

. LISTING OF EBASCO MANUALS REVIEWED. AND OBSERVATIONS Manual No. 40 Volume I

.Section H: E 66-CP Rev date - in manual 7/10/87, current statu.' J/23/87 Section L: SAG-CP2 in manual', current status deleted Section M: SAG-CP3 in manual, current status deleted Section 0: SAG CP4 in manual, current status deleted Manual No. 40 Volume II Section R: SAG CP10 in manual, current status deleted Section S: SAG-cpl 7 in manual,- current status deleted Sectioa T: SAG-CP12 in manual, current status deleted aSection'V: CPE-EB-FVM-CS-029 Rev. 5 in manual, current status interim change r.otice No. 2.

-Section'Z: SAG-C'P23 in. manual, current status deleted Manual No. 40 Volume III Section EE: SAG-CP19 in manual, current status deleted Section HH: SAG-CP31 in manual, current status deleted Section II: SAG CP30 in manual, current status deleted Section MM: Missing Section NN: Missing Section 00: Missing l

l Manual No. 21 Volume I i

Section H: E-66-CP Rev date in manual 7/10/87, current status 12/23/87 l

Section L: SAG CP2 in manual, current status deleted Section M: SAG-CP3 in manual, current status deleted Section 0: SAG CP4 in manual, current status deleted

r-kI d4

~

A f's..c ^

NE-15932.

ATTACHMENT 6

.Page 6 of 6 LISTING OF EBASCO MANUALS REVIEWED AND OBSERVATIONS

. Manual 21 Volume 21

. Table of Contents in manual ' dated 11/25/87, current status 12/23/87 Section R: SAG-CP12 in manual,_ current status deleted Section V: CPE-EB-FVM-CS-029 Rev. 5 in manual, current status change notice No. 2.

Manual 21 Volume-III Section EE: SAG CP19 in manual, current status deleted Section RH: SAG CP31 in manual, current status deleted

- Section MM: Missing Section NN: Missing Section 00: Missing Action Responsibility : Ebasco.

PERSONNEL CONTACTED DURING SURVEILIANCE

_ Bob Bentley Joe Dwyer Joan Curry, New York Head Office Cy Chiou EXIT BRIEFING

. An exit briefing was held by telephone between E. Odar and R. Rankin on January 6, 1988.