Engineering Assurance Surveillance Rept Tsr 87-59, Lead Contractors Compliance to Procedure Ece 1.01
ML20196F787
Person / Time
Site: Comanche Peak  Luminant icon.png
Issue date: 12/15/1987
From: Morell C, Saunders A
TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC)
To:
Shared Package
ML20196F750 List:
References
NE-14716, TSR-87-59, NUDOCS 8803040188
Download: ML20196F787 (10)


Text

-.________ ___ _

.,a

'ea M

= '==="

L

=_

=

1RIELECTRIC NE 14716 December 15, 1987 S. L. Stamm Project Engineering Manager.

Stone and Webster Engineering Corporation CPSES COMANCHE PEAK STEAM ELECTRIC STATION ENGINEERINC ASSURANCE SURVEILIANCE REPORT: TSR 87 59' LEAD CONTRACTORS COMPLIANCE TO PROCEDURE ECE 1.01 A surveillance of SWEC CAP's Implementing Procedures (IPs) was conducted November 23 through November 25, 1987, by Comanche Peak Engineering -

Engineering Assurance (CPE-EA).

I.

PURPOSE i

The surveillance.was conduqted to verify on a limited basis SWEC CAPS

[

compliance with the requirements of procedure FCE 1.01, Revision 1, i

"Organization."

I II.

SCOPE The surveillance reviewed 62 SWEC CAP Implementing Procedures verifying procedural references were current and consistent with manual indexes as a basis for verification of procedural compliance. A listing of the procedures reviewed is provided in Attachment 1. is a listing of personnel contacted and those in attendance at the exit briefing.

III.

SUMMARY

The surveillance found that 19 of the SWEC-CAP's Implementing Procedures were not in full compliance with procedure ECE 1.01 requirements because they contain ECE and/or PP Procedures which were deleted or superseded.

IV.

FINDINGS DEFICIENCIES : None DISCREPANCIES:

DISCREPANCY NO. 1 PP-009, paragraph 6.2.5, page 10 of 13, bullet 4, states in part:

"Distribution shall be made utilizing SWEC transmittal form indicated on the Calculation Title Page and shall include, as a minimum the following:

8803040100 800223 PDR ADOCK 0500044S g

PDR

..A Bo.'.1002 Gen Roi*, Tetas it6434002

e I

NE 14116

-2 t

0 TU Electric Interim Calculation File (see Section 6.1.7.6)."

Section 6.1.7.6 does not exist in the current procedure.

DISCREPANCY NO. 2 PP 053, paragraph 3.0, "References", lists ECE 6.08-PE-I3; A review of the current Table of Contents for ECE procedures indicates no such procedure exists.

Action Responsibility : SWEC-CAP OBSERVATIONS: is a list of observations identifying inconsistencies with references cited in the SWEC-CAP IPs.

Action Responsibility : SWEC CAP V.

DISCUSSION / EVALUATION:

ES;ineering Assurance recommends SWEC CAP perform a complete review of IPs to assure compatibility to CPE - ECE procedures. Additionally, SWEC CAP needs to determine the impact, if any, of their activities being performed l

to procedures with inconsistencies identified as the result of the review and this surveillance.

A written response to the Discrepancies and Observations identified herein is to be submitted not later than January 15, 1988. The response should include the 7

cause of the findings reported, extent of condition, action to resolve the reported condition, action to prevent recurrence, and scheduled completion dates.

I u

l 3

J

g_.----

g, i

1 e

r

(

NE 14716

-3 If you have any. questions, please contact C. Morell at extension 6152.

I Prepared By:

),

k C.D. Morell EA Evaluations Comanche Peak Engineering

)

Approved By:

h A.H. Saunders EA Evaluations Manager Comanche Peak Engineering

[

CDM:jdb Attachments:

1) Listing of SWEC-CAP Drawings Reviewed - 4 pages
2) Listing of Observations 2 pages
3) Personnel Contacted and Exit Briefing Attendees 1 page cc: ARMS J. L, Barker E 10 M. D. Bever A 80 H. M. Carmicheal SW-1
0. W Love E-07 D.

McAfee Q 03 L. D. Nace E 01 D. M. Reynerson E-14 J. F. Streeter A 08 W. G. Westhoff T-09 I

a

O i.

NE 14716 ATTACHMENT 1 Page 1 of 4 LISTING OF SWEC CAP PROCEDURES REVIEWED PP REVISIONS CHANGE NOTICES No.

TITLE No.

Date No.

Date 000 Project Organization 1

02/02/87 1

001 Management Plan for Project Quality 1

02/19/87 1 05/19/87 002 Preparation, Issuance, and Control of 2

10/15/87 1 11/16/87 Project Procedures 003 Preparation, Review and Approval of 0

11/21/86 2 05/14/87 Generic Issue Reports (GIRs) 005 Procedure for the Evaluation and 0

10/10/87 Processing of (TDDRs) 006 Procedute for processing Corrective 1

11/08/87 Action Requests (CARS) 007 Preparation, Review and Approval of 0

03/23/87 1 04/21/87 Package Process Forms (PPFs) 008 Preparation and Approval of Task 2

09/16/87 Descriptions 009 Preparation and Control of Manual and 2

08/13/87 5 11/03/87 Computerized Calculations 010 Preparation, Issuance, and Control of 2

11/16/87 Project Correspondence 011 SWEC-CAP /TU Electric Interface 1

08/25/87 1 10/07/87 012 Westinghouse Interface 1

02/27/87 014 SWEC-CAP /Ebasco Interface 2

08/24/87 1 10/22/87 015 SWEC CAP /Impell Interface 2

08/24/87 1 10/07/87 017 Lrinneli Interface 1

02/27/87 019 Change controls for Licensing 1

02/12/87 Documents 020 Control of Design Re.ated Project 2

09/21/87 021

)ocument Control 1

09/21/87 022 ferforming Project Surveillances 1

11/10/87

t..

NE-14716 ATTACHMENT 1 Page 2 of 4 f

LISTING OF SWEC CAP PROCEDURES REVIEWED'

~PP REVISIONS CRANCE NOTICES No.

TITLE No.

Date No.

Date 023 ' Processing of Design Change 4

04/17/87 7 11/13/87 Authorizations (DCAs) and Change Verifications 024 Review of Construction, Quality 1

04/02/87 Control, Startup and Pre-Operational Procedures i

025 Record Corrections, Changes and 0

04/02/87 Supplements 026 Processing of Nonconforming Reports 5

10 05 87 2 11 06 87 (NCRs) Conditional Releases Requests and Tests Deficiency Reports (TDRs) 027 Systems for Processing Items of 0

11 03 86 2 08 27 87 Reportability 028 Project Records Management Program 2

11 10 87 029 Administration of the Problem Report System 1

04-22 87 030 Preparation, Review, and Approval of 1

10-14-87 1 10 26 87 Design Engineering Packages (DEPs) 031 Preparation and Issue of Design 0

05-19-87 1 09-29 87 l

Modifications (DMs) 032 Preparation, Review, and Approval 3

07-20 87 of SWEC Project Drawings 033 Review of Contractor Specifications 1

06 03 87 034 Processing of Procurement Documents 2

06 03 87 3 11 06 87 035 Project Training Program 2

10 08 86 2 05 07 87 036 Procedure for Computer Aided Design 1

07-20 87 (CAD) Drawing Conversion 037 Definition of Design Document Classif-0 10 08 86

[

ication and Marking of Design Documents 039 Procedure and Maintenance of Project 3

11-13 87 1

10 23 87 J

.___,_c..

7. __ _. _

l

?

a r NE 14716 ATTACHMENT 1 Page_ 3 of 4 LISTING OF SWEC CAP PROCEDURES REVIEWED PP-REVISIONS CHANGE NOTICES No.

TITLE No.

Date No.

Date 040 Procedure for Review of Wiring 0

10 29 87 t

Diagrams 041 Nenconformances Evaluation Procedure 2

10-it-27 042 _SWEC-CAP /PSAS Interface 1

08 24-87 1 10-23 87 045 Time Charging 0

12 01-86 C46 Engineering Activities to Support 0

05/21/87 1 07/02/87 i

SWEC Certification of ASME III, i

Class 2 and 3 System N 5 Data Reports as Piping System Designer I

047 ProcessinS Work Package Change Notices 1-

'06/09/87 (WPCNs) f 048 Maintenance of the Til Electric 1

09/11/87 l

Calculation File I

049 Control of Engineering Sketches 0

10/08/87 i

050 Preparation of Field Verification 2

09/03/87 3 11/03/87 Method (TVM) Procedures 05:

Control of Safeguards Information 1

03/23/87 r

2 10/22/87 055 The Qualification of Embedments in 0

06/10/87 f

Concrete 056 Preparation, Approval and Issue of 3

11/13/87

(

Specific Technical Issue Reports (STIRS) 057 Guidelines for Planning and Scheduling 0

02/12/87 058 Processing of Licensing Correspondence 1

07/07/87 t

I h

n

i, t-e 4.

P NE 14716 ATTACHMENT 1 Page 4 of 4 LISTIriG OF SWEC CAP PROCEDURES REVIEWED PP REVISIONS CHANGE NOTICES No.

TITLE No.

Date No.

Date 059 Procedure for Processing of Deficiency 0

02/24/87 5 10/20/87 Reports (DRs) 060 - Control of Concrete Attachments Spacing 1

11/11/87 Violations 062 Processing Temporary Software and Data 0

08/18/87 Base Modifications to In Plant Computers 063-Specification, Procedure and Drawing-0 07/20/87 Update (SPADU) Program 064 Preparing and Documenting Safety 1

10/14/87 Evaluations on Preoperating License Design Modifications 065 Control of Computerized Equipment List 0

04/08/87

x r

NE 14716

~ ATTACHMENT 2 Page 1 of 2 LISTING OF OBSERVATIONS REFERENCE TSR 87-59 1)

PP-000 Revision 1, paragraph 3.0 "References" lists TNE AD 1; this precedure has been deleted and superseded by ECE 1.01 accordiag to TU Electric CPE ECE Manual Table of Contents, Revision

174, 2)

PP 001c Revisioa 1,~page 1 of 7 Criterion 3, lists PP 004 as a current procedur s; this procedure has been canceled since May 21, 1987.

3)

PP-005 Revision 0, paragraph 3.0 "References" lists TUCCO TNE AD5; this procedure has been deleted and superseded by ECE 9.01.

6)

PP 012 Paragraph 3.0, "References" and 4.0 "Definitions" lists ECE AD 1; this procedure has been deleted and superseded by ECE 1.01, Revision 1 (08/13/87).

7)

PP 017 Paragraph 1.0 "Purpose", 3.0 "References", and 4.0 "Definitions" lists TNE AD 1; this procedure has been deleted and superseded by FCE 1.01, Revision' 1 (08/13/87).

8)

PP 020 Attachment PP 02 A, lists.ECE DC-21; this procedure has been deleted and superseded by ECE 5.01 13, 9)

PP-021 Paragraph 3.0, "References" lists ECE 2.13 12; this procedure has been replaced by ECE 2.13 02.

10) PP-023 Paragraph 3.0, "References" lists ECE 5.01 13; this procedure has been superseded by ECE 5,09-01.
11) PP 024 Paragraph 3.0, "References" lists ECE AD-1-1; this procedure has been deleted and superseded by ECE 1.01 11; ECE-DC 14 has been deleted and superseded by ECE 9.08 03.

s.. g-e.,

- 1, NE 14716-ATTACHMENT 2 Page 2 of 2 LISTING OF OBSERVAT' IONS REFERENCE TSR 87-59

12) PP 032 Paragraph 3.0, "References" lists ECE 2.11; this procedure has been deleted and superseded by ECE 2.11 I1; ECE AD 4 has been deleted and superseded by ECE 2.13 11.
13) PP 033 Paragraph 3.6 and 4.1 lists TNE-AD-1; this procedure has been deleted and superseded by_ECE 1.01.
14) PP 034 Paragraph 3.0 lists the following: ECE-PR4, this procedure has been deleted (6/01/87) and superseded by ECE 6.08-11: TNE PRI has been deleted (11/12/87) and superseded by ECE 6.02; ECE PR 5 2 has been deleted (10/28/87) and superseded by ECE 6.08-02.
15) PP 036 Paragraph 3,4, lists TNE AD 4; this procedure has been deleted (5/18/87) and superseded by ECE 2.13.

16)

PP 041 Paragraph 2.0, "Applicability" lists TNE AD-5; this procedure has been deleted (9/20'87) and superseded by ECE 9.01.

/

17) PP 059 Paragraph 3.0, "References" lists ECE AD-5 6; this procedure has been deleted (9/24/87) and superseded by ECE 3.06, d

.., i a

I

.i

- i g...

I i

-NE 14716 ATTACHMENT 3

. PERSONNEL CONTACTED e

~

D. Nelson SWEC-QA A. H. Saunders

- CPE EA, J. E. Soares

- CPE EA EXIT BRIEFING An Exit _ Briefing was conducted on December 2, 1987 with the following attendees:

[

H. M. Carmichael

- SWEC QA N. Hottel

- CPE-EA C. Morell

- CPE EA D. Nelson

- SWEC-QA A. H. Saunders

- CPE.EA l

J. E. Soares CPE EA e

g i

4 9

h L

n b

I i

I 1

I I

r t

v g

--y r

r..

3 y.--

- - -,