ML20196F693

From kanterella
Jump to navigation Jump to search
Forwards Rev 3 to AP-404, Loss of Decay Heat Removal, Rev 9 to AP-470, Loss of Instrument Air & Rev 2 to AP-510, Rapid Power Reduction
ML20196F693
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 11/24/1998
From:
FLORIDA POWER CORP.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20196F697 List:
References
NUDOCS 9812070108
Download: ML20196F693 (1)


Text

-__ . _ _ .. _ .. - .. . _ _ _ _ _ _ _ _ _ _ - . . - - . _ . _ . . _ _...~,. _. _ ~ . . _ _ . _ . . . .

i

(

Document Transmittal #: 108068 Date: 11/24/98 .l Tc: NRC (DC DESK) MAC: . N/A .' Holder #: 1242 Destination: Description.

Copy Totals l Document: Revision: Comment: INFO CNTL' MSTR l l

. APO404 03 MINOR CHANGE 1 0 0 -

APO470 09 MINOR CHANGE 1 0 0 I l

AP0510 02 MINOR CHANGE 1 0 0 l

)

I i

I l

l f

O

' Instructions to the Addressee: Piease verify the document (s) received agrees with the above information.

' Engineering managers are required by NEP-121 to determine if new, revised, or temporary changes to )

procedures affect job functions of their personnel. Managers will communicate change information appropriately and provide documentation of any training conducted to the Engineering Training Coordinator.

Operations department must attach old document (s) or portions of document (s) superseded by the above .

to this transmittal.

The signature indicates acknowledgment of receipt of the above document (s) and that documents have been updated. Retum signed and dated transmittal to Document Control within 15 working days of transmittal date to mail code:

NA1C Florida Power Corporation 1 Document Control. NA1C Crystal River Energy Complex 15760 W. Power Line St. -

] G i': ,3 ' Crystal River, FL 34428-6706 Signature of Addressee: Date:

4 b

9812070108 981124 PDR ADOCK 0 g2 _