MONTHYEARML20211K8611999-09-0101 September 1999 Informs That There Has Been Some Confusion Re Recently Issued ODCM Generic Section Rev Which Needs to Be Clarified. Clarifications Are Listed ML20210P1361999-08-0404 August 1999 Notification of 990817 Meeting with Util in Rockville, Maryland to Discuss Status of Licensing Actions Submitted by Comm Ed & Plan for Proposed Licensing Workshop ML20210C7061999-07-16016 July 1999 Forwards Facility Submitted Outline & Initial Exam Submittal for Operator Licensing Exams Administered During Wk of 990607 ML20209H2231999-07-16016 July 1999 Forwards Operator Licensing Exam Repts 50-456/99-301(OL) & 50-457/99-301(OL) of Exam Administered During Wk of 990607 ML20206Q2751999-05-13013 May 1999 Forwards Official Case File for DPO-99-1,request of Review of Concerns Related to TS Setpoints & Allowable Value for Instrumentation Under Formal DPO Procedures,For Disposition in Accordance with Provisions of NRC MD 10.159 ML20206E9331999-05-0303 May 1999 Notification of 990524 Meeting with Commonwealth Edison,Co in Rockville,Md to Discuss Technical Issues Related to Proposed re-rack of SFPs at Braidwood Station & Byron Station ML20206Q3211999-02-19019 February 1999 Responds to e-mail Message Sent on 980202,re Status of Staff Actions on Recipient Dpv.With Regard to Dpv Concerning Dynamic Testing of Instrument Channels at Braidwood,Staff Pursuing Resolution of Issue with Licensee ML20206Q3391999-01-0505 January 1999 Provides Update on Status of Resolution of follow-up Actions from Resolution of Dpv on Dynamic Testing of Instrumentation at Braidwood Station ML20155E7361998-11-0202 November 1998 Forwards NRC Operator Licensing Exam Repts 50-456/98-305 & 50-457/98-305 for Tests Administered on 980914 ML20154G2361998-10-0707 October 1998 Responds to Memo Sent on 981002 Re Resolution of follow-up Actions for NRR Differing Professional View Panel on Dynamic Testing of Instrumentation at Plant ML20196D7921998-10-0202 October 1998 Forwards Comments Related to Staff Responses to follow-up Actions Re Dynamic Testing of Instrument Channels at Braidwood ML20196D7801998-09-21021 September 1998 Informs That Staff Completed Review of follow-up Actions Identified in Memo from Bw Sheron to Ba Boger, on Dymanic Testing of Instrumentation Channels at Braidwood ML20151V2951998-09-0202 September 1998 Informs That Braidwood Station Concurs with Encl Proposed 980904 Util Response to NRC Re IPEEE ML20197C8041998-09-0202 September 1998 Informs That Braidwood Station Concurs with Proposed Encl Response to NRC Re RPV Integrity at Braidwood & Byron Stations ML20197C8301998-09-0101 September 1998 Informs That Rev 2 to Calculation BYR98-109/BRW-98-339-E Has Been Reviewed & Found Acceptable for Transmittal to Nrc. Draft Util Ltr Re Thermo-Lag Ampacity Derating Factor Calculation,Encl ML20237D4331998-08-21021 August 1998 Notification of 980903 & 04 Meetings W/Util in Rockville,Md to Discuss Technical Issues Related to Byron & Braidwood Improved Std TSs Conversion,Including Section 3.3,beyond Scope Issues,Closeout Packages & Amends to Current TSs ML20196D7211998-08-0404 August 1998 Responds to 980720 Memo from Sj Collins to Lj Callan Re When & How Mesac Approved.Licensee Installed Mirco Electronic Surveillance & Calibration (Mesac) Sys Measurement & Test Equipment as Backup Sys to Normal M&TE ML20196D7711998-07-22022 July 1998 Discusses Staff Review of Braidwood Mesac System ML20249A2231998-06-12012 June 1998 Notification of 980625-26 Meeting W/Util in Rockville,Md to Discuss Technical Issues Re Byron & Braidwood Improved Std TSs Conversion ML20216B6731998-05-11011 May 1998 Discusses Closure of TAC M94439 for Braidwood,Unit 1,steam Generator Replacement ML20217P0131998-04-29029 April 1998 Forwards NRC Approved Operator Licensing Exam (Facility Outline & Initial Exam Submittal & as-given Operating Exam) for Tests Administered During Wk of 980413 ML20217P0731998-04-29029 April 1998 Forwards NRC Operator Licensing Exam Repts 50-456/98-304(OL) & 50-457/98-304(OL) (Including Completed & Graded Tests) for Tests Administered on 980413-15 ML20217E3881998-04-23023 April 1998 Notification of 980506 & 07 Meetings W/Util in Rockville,Md to Discuss Technical Issues Re Plants Improved STS Conversion ML20216H3401998-03-17017 March 1998 Notification of 980331-0402 Meeting W/Util in Rockville,Md to Discuss Reviewer Comments on Byron & Braidwood Improved Std TS Submittal ML20216H6971998-03-17017 March 1998 Notification of 980326 Meeting W/Commonwealth Edison Co in Lisle,Il to Discuss Comed Request to Consolidate near-site Emergency Operations Facility Into Single Central EOF ML20203G8551998-02-23023 February 1998 Notification of 980305 Meeting W/Util in Rockville,Md to Discuss Status of Byron & Braidwood Licensing Issues ML20198G4921998-01-0707 January 1998 Forwards Facility Submitted Outline,Initial Exam Submittal & as Given Operating Exam for Test Administered During Wk of 971006 at Plant ML20198J6881998-01-0707 January 1998 Forwards NRC Operator Licensing Exam Rept w/as-given Written Exam for Tests Administered During Wk of 971006 at Plant ML20202E5831997-11-25025 November 1997 Notification of 971215 Meeting W/Commonwealth Edison Co in Rockville,Md to Review Schedule for Listed Plants Improved Std TS Conversion & Supplemental Submittals ML20203C3621997-11-25025 November 1997 Revised Notification W/New Starting Time of Meeting W/Ceco on 971215 in Rockville,Maryland to Discuss Review Schedule Byron & Braidwood Improved TS Conversion & Supplemental Submittals ML20202D2221997-11-25025 November 1997 Notification of Meeting W/Ceco on 971211 in Rockville,Md to Discuss Proposed Mod to Methodology for Estimating SG Tube Leakage Attributable to Outer Diameter Stress Corrosion Crack Indications Restricted from Burst for Plant SGs ML20236N5111997-10-22022 October 1997 Fowards Staff Response to 960912 TIA Re Containment Spray Additive Sys Conformance W/Design Basis & Tss.Analysis Concluded That 2,400-2,600 Ppm in RWST Acceptable ML20217K8271997-10-16016 October 1997 Notification of 971024 Meeting W/Util to Discuss Results of Comed Investigation Into Sensitivity of Proposed voltage- Dependent Growth Rates to Binning Strategy for ODSCC Indicators ML20212A1501997-10-15015 October 1997 Forwards Response for NRC RAI Re SG Interim Plugging Criteria 90 Day Rept for Braidwood,Unit 1 Sixth Refuel Outage (A1R06).Station Concurs W/Response as Proposed for CE ML20217D4261997-09-30030 September 1997 Informs of Scheduled Visits W/Nuclear Services at Gpu on Nov 14th & Visit at Commonwealth Edison on Dec 3rd & Would Like to Receive Any Info Available.Supporting Documentation Encl ML20217B3901997-09-23023 September 1997 Forwards Questions Re Ceco Submittal of Revised SG Tube Rupture Analysis for Byron,Unit 1 & Braidwood,Unit 1 ML20149L1901997-07-22022 July 1997 Notification of 970723 Meeting W/Commonwealth Edison Co in Rockville,Md to Discuss Results of Spring 1997,Braidwood,1 SG Tube Eddy Current Insp.Time of Meeting Rescheduled ML20149F2731997-07-0303 July 1997 Notification of 970723 Meeting W/Util in Rockville,Md to Discuss Results of Spring 1997 Plant,Unit 1 SG Tube Eddy Current Insp Including Determination of Impact of Data ML20138D2781997-04-28028 April 1997 Notification of 970430 Meeting W/Util in Rockville,Md to Discuss Results of EC Insps of Plant SGs Conducted During Present Refueling Outage IA-97-178, Forwards Partially Withheld Background Briefing Package in Preparation for 970425 Meeting Between Comed & Commission1997-04-18018 April 1997 Forwards Partially Withheld Background Briefing Package in Preparation for 970425 Meeting Between Comed & Commission ML20217D5461997-04-18018 April 1997 Forwards Partially Withheld Background Briefing Package in Preparation for 970425 Meeting Between Comed & Commission ML20147J2391997-04-0909 April 1997 Notification of Meeting on 970416 W/Util in Rockville,Md to Discuss Overall Response & Present Addl Details Re Performance Indicators Used to Monitor Performance Stations ML20236N0071997-04-0707 April 1997 Responds to Request for TS Interpretation on Containment Vent & Drain Valves at Braidwood ML20138J7671997-02-0505 February 1997 Informs That NRC Plans to Administer Generic Fundamentals Exam Section of Written Operator Licenseing Exam on 970409. Ltr W/Copy to Chief,Operator Licensing Branch Must Be Submitted to Listed Address in Order to Register Personnel ML20149M6901997-01-19019 January 1997 Notification of 970128 Meeting W/Commonwealth Edison Co to Discuss Licensee Proposed Program for Use of Mixed Oxide Fuel ML20133J5811997-01-15015 January 1997 Notification of 970122 Meeting W/Util in Rockville,Md to Discuss Licensee Status of Program for Replacement & Operation of New SG at Byron 1 & Braidwood 1 ML20133J4821997-01-15015 January 1997 Notification of 970123 Meeting W/Licensees in Rockville,Md to Discuss Contents of Plants TS Conversion Submittal, Provide Staff Comments Based on Initial Screening Review & Discuss Review Schedule ML20196D8881997-01-0202 January 1997 Provides Results of Review of Dpv That Was Expressed in 961017 Memo Re Dynamic Testing of Instrumentation Channels at Braidwood ML20196D8011997-01-0202 January 1997 Forwards NRR Ad Hoc Dpv Review of Recipient Differing Professional View Re Dynamic Testing of Instrumentation Channels at Braidwood,Per 961017 Memo ML20196D8671997-01-0202 January 1997 Submits Review of Ad Hoc NRR Dpv Review Panel Re 961017 Memo Dpv on Dynamic Testing of Instrumentation Channels at Braidwood 1999-09-01
[Table view] Category:MEMORANDUMS-CORRESPONDENCE
MONTHYEARML20211K8611999-09-0101 September 1999 Informs That There Has Been Some Confusion Re Recently Issued ODCM Generic Section Rev Which Needs to Be Clarified. Clarifications Are Listed ML20210P1361999-08-0404 August 1999 Notification of 990817 Meeting with Util in Rockville, Maryland to Discuss Status of Licensing Actions Submitted by Comm Ed & Plan for Proposed Licensing Workshop ML20209H2231999-07-16016 July 1999 Forwards Operator Licensing Exam Repts 50-456/99-301(OL) & 50-457/99-301(OL) of Exam Administered During Wk of 990607 ML20210C7061999-07-16016 July 1999 Forwards Facility Submitted Outline & Initial Exam Submittal for Operator Licensing Exams Administered During Wk of 990607 ML20206Q2751999-05-13013 May 1999 Forwards Official Case File for DPO-99-1,request of Review of Concerns Related to TS Setpoints & Allowable Value for Instrumentation Under Formal DPO Procedures,For Disposition in Accordance with Provisions of NRC MD 10.159 ML20206E9331999-05-0303 May 1999 Notification of 990524 Meeting with Commonwealth Edison,Co in Rockville,Md to Discuss Technical Issues Related to Proposed re-rack of SFPs at Braidwood Station & Byron Station ML20206Q3211999-02-19019 February 1999 Responds to e-mail Message Sent on 980202,re Status of Staff Actions on Recipient Dpv.With Regard to Dpv Concerning Dynamic Testing of Instrument Channels at Braidwood,Staff Pursuing Resolution of Issue with Licensee ML20206Q3391999-01-0505 January 1999 Provides Update on Status of Resolution of follow-up Actions from Resolution of Dpv on Dynamic Testing of Instrumentation at Braidwood Station ML20155E7361998-11-0202 November 1998 Forwards NRC Operator Licensing Exam Repts 50-456/98-305 & 50-457/98-305 for Tests Administered on 980914 ML20154G2361998-10-0707 October 1998 Responds to Memo Sent on 981002 Re Resolution of follow-up Actions for NRR Differing Professional View Panel on Dynamic Testing of Instrumentation at Plant ML20196D7921998-10-0202 October 1998 Forwards Comments Related to Staff Responses to follow-up Actions Re Dynamic Testing of Instrument Channels at Braidwood ML20196D7801998-09-21021 September 1998 Informs That Staff Completed Review of follow-up Actions Identified in Memo from Bw Sheron to Ba Boger, on Dymanic Testing of Instrumentation Channels at Braidwood ML20197C8041998-09-0202 September 1998 Informs That Braidwood Station Concurs with Proposed Encl Response to NRC Re RPV Integrity at Braidwood & Byron Stations ML20151V2951998-09-0202 September 1998 Informs That Braidwood Station Concurs with Encl Proposed 980904 Util Response to NRC Re IPEEE ML20197C8301998-09-0101 September 1998 Informs That Rev 2 to Calculation BYR98-109/BRW-98-339-E Has Been Reviewed & Found Acceptable for Transmittal to Nrc. Draft Util Ltr Re Thermo-Lag Ampacity Derating Factor Calculation,Encl ML20237D4331998-08-21021 August 1998 Notification of 980903 & 04 Meetings W/Util in Rockville,Md to Discuss Technical Issues Related to Byron & Braidwood Improved Std TSs Conversion,Including Section 3.3,beyond Scope Issues,Closeout Packages & Amends to Current TSs ML20196D7211998-08-0404 August 1998 Responds to 980720 Memo from Sj Collins to Lj Callan Re When & How Mesac Approved.Licensee Installed Mirco Electronic Surveillance & Calibration (Mesac) Sys Measurement & Test Equipment as Backup Sys to Normal M&TE ML20196D7711998-07-22022 July 1998 Discusses Staff Review of Braidwood Mesac System ML20249A2231998-06-12012 June 1998 Notification of 980625-26 Meeting W/Util in Rockville,Md to Discuss Technical Issues Re Byron & Braidwood Improved Std TSs Conversion ML20216B6731998-05-11011 May 1998 Discusses Closure of TAC M94439 for Braidwood,Unit 1,steam Generator Replacement ML20217P0731998-04-29029 April 1998 Forwards NRC Operator Licensing Exam Repts 50-456/98-304(OL) & 50-457/98-304(OL) (Including Completed & Graded Tests) for Tests Administered on 980413-15 ML20217P0131998-04-29029 April 1998 Forwards NRC Approved Operator Licensing Exam (Facility Outline & Initial Exam Submittal & as-given Operating Exam) for Tests Administered During Wk of 980413 ML20217E3881998-04-23023 April 1998 Notification of 980506 & 07 Meetings W/Util in Rockville,Md to Discuss Technical Issues Re Plants Improved STS Conversion ML20216H3401998-03-17017 March 1998 Notification of 980331-0402 Meeting W/Util in Rockville,Md to Discuss Reviewer Comments on Byron & Braidwood Improved Std TS Submittal ML20216H6971998-03-17017 March 1998 Notification of 980326 Meeting W/Commonwealth Edison Co in Lisle,Il to Discuss Comed Request to Consolidate near-site Emergency Operations Facility Into Single Central EOF ML20203G8551998-02-23023 February 1998 Notification of 980305 Meeting W/Util in Rockville,Md to Discuss Status of Byron & Braidwood Licensing Issues ML20198J6881998-01-0707 January 1998 Forwards NRC Operator Licensing Exam Rept w/as-given Written Exam for Tests Administered During Wk of 971006 at Plant ML20198G4921998-01-0707 January 1998 Forwards Facility Submitted Outline,Initial Exam Submittal & as Given Operating Exam for Test Administered During Wk of 971006 at Plant ML20202D2221997-11-25025 November 1997 Notification of Meeting W/Ceco on 971211 in Rockville,Md to Discuss Proposed Mod to Methodology for Estimating SG Tube Leakage Attributable to Outer Diameter Stress Corrosion Crack Indications Restricted from Burst for Plant SGs ML20202E5831997-11-25025 November 1997 Notification of 971215 Meeting W/Commonwealth Edison Co in Rockville,Md to Review Schedule for Listed Plants Improved Std TS Conversion & Supplemental Submittals ML20203C3621997-11-25025 November 1997 Revised Notification W/New Starting Time of Meeting W/Ceco on 971215 in Rockville,Maryland to Discuss Review Schedule Byron & Braidwood Improved TS Conversion & Supplemental Submittals ML20236N5111997-10-22022 October 1997 Fowards Staff Response to 960912 TIA Re Containment Spray Additive Sys Conformance W/Design Basis & Tss.Analysis Concluded That 2,400-2,600 Ppm in RWST Acceptable ML20217K8271997-10-16016 October 1997 Notification of 971024 Meeting W/Util to Discuss Results of Comed Investigation Into Sensitivity of Proposed voltage- Dependent Growth Rates to Binning Strategy for ODSCC Indicators ML20212A1501997-10-15015 October 1997 Forwards Response for NRC RAI Re SG Interim Plugging Criteria 90 Day Rept for Braidwood,Unit 1 Sixth Refuel Outage (A1R06).Station Concurs W/Response as Proposed for CE ML20217D4261997-09-30030 September 1997 Informs of Scheduled Visits W/Nuclear Services at Gpu on Nov 14th & Visit at Commonwealth Edison on Dec 3rd & Would Like to Receive Any Info Available.Supporting Documentation Encl ML20217B3901997-09-23023 September 1997 Forwards Questions Re Ceco Submittal of Revised SG Tube Rupture Analysis for Byron,Unit 1 & Braidwood,Unit 1 ML20149L1901997-07-22022 July 1997 Notification of 970723 Meeting W/Commonwealth Edison Co in Rockville,Md to Discuss Results of Spring 1997,Braidwood,1 SG Tube Eddy Current Insp.Time of Meeting Rescheduled ML20149F2731997-07-0303 July 1997 Notification of 970723 Meeting W/Util in Rockville,Md to Discuss Results of Spring 1997 Plant,Unit 1 SG Tube Eddy Current Insp Including Determination of Impact of Data ML20138D2781997-04-28028 April 1997 Notification of 970430 Meeting W/Util in Rockville,Md to Discuss Results of EC Insps of Plant SGs Conducted During Present Refueling Outage ML20217D5461997-04-18018 April 1997 Forwards Partially Withheld Background Briefing Package in Preparation for 970425 Meeting Between Comed & Commission IA-97-178, Forwards Partially Withheld Background Briefing Package in Preparation for 970425 Meeting Between Comed & Commission1997-04-18018 April 1997 Forwards Partially Withheld Background Briefing Package in Preparation for 970425 Meeting Between Comed & Commission ML20147J2391997-04-0909 April 1997 Notification of Meeting on 970416 W/Util in Rockville,Md to Discuss Overall Response & Present Addl Details Re Performance Indicators Used to Monitor Performance Stations ML20236N0071997-04-0707 April 1997 Responds to Request for TS Interpretation on Containment Vent & Drain Valves at Braidwood ML20138J7671997-02-0505 February 1997 Informs That NRC Plans to Administer Generic Fundamentals Exam Section of Written Operator Licenseing Exam on 970409. Ltr W/Copy to Chief,Operator Licensing Branch Must Be Submitted to Listed Address in Order to Register Personnel ML20149M6901997-01-19019 January 1997 Notification of 970128 Meeting W/Commonwealth Edison Co to Discuss Licensee Proposed Program for Use of Mixed Oxide Fuel ML20133J4821997-01-15015 January 1997 Notification of 970123 Meeting W/Licensees in Rockville,Md to Discuss Contents of Plants TS Conversion Submittal, Provide Staff Comments Based on Initial Screening Review & Discuss Review Schedule ML20133J5811997-01-15015 January 1997 Notification of 970122 Meeting W/Util in Rockville,Md to Discuss Licensee Status of Program for Replacement & Operation of New SG at Byron 1 & Braidwood 1 ML20196D8671997-01-0202 January 1997 Submits Review of Ad Hoc NRR Dpv Review Panel Re 961017 Memo Dpv on Dynamic Testing of Instrumentation Channels at Braidwood ML20196D8011997-01-0202 January 1997 Forwards NRR Ad Hoc Dpv Review of Recipient Differing Professional View Re Dynamic Testing of Instrumentation Channels at Braidwood,Per 961017 Memo ML20196D8881997-01-0202 January 1997 Provides Results of Review of Dpv That Was Expressed in 961017 Memo Re Dynamic Testing of Instrumentation Channels at Braidwood 1999-09-01
[Table view] |
Text
, . _ _ . _ . , - _ _ _ _ . ._. .- _ --. .._ _. _ _ . _ _ _ _ _ . _ _ _ . . . _ _ _ . _ _ _ _ _ _ _ _ _ _ _ . . _
.... . y 's~euq' g, t UNITED STATES
. .. g NUCLEAR REGULATORY COMMISSION l g* WASHINGTON, D.C. 30006 4001
- ..... October 17, 1996 l
MEMORANDUM To: Dale F. Thatcher, Section Chief Advanced Designs Section
{ and Electrical Components l Electrical Engineering Branch Division of Engineering l FROM:
3 Frederick H. Burrows Electrical Engineering Branch Electrical Enginee ugf j
.! Division of Engineering
SUBJECT:
DIFFERING PROFESSIONAL VIEW CONCERNING DYNAMIC TESTING OF INSTRUMENTATION CHANNELS AT BRAIDWOOD Attached hereto is the subject Differing Professional View (DPV) which you should forward to our Office Director per the latest DPV policy guidelines.
Attachment:
As stated l
9812020340 970102 PDR ADOCK 05000456 P PDR
DIFFERING PROFESSIONAL VIEW CONCERNING DYNAMIC TESTING OF INSTRUMENTATION CHANNELS AT BRAIDWOOD During my seven years in the Instrumentation and Controls Branch (1981-1988), I reviewed mainly Westinghouse instrumentation and control systems. My major efforts were completing the licensing reviews for Byron /Braidwood, Catawba, Beaver Valley 2, and Vogtle. I also participated in the development and final approval of the instrumentation and controls sections of the technical specifications for McGuire and the aforementioned plants.
In order to complete those efforts and reach acceptable conclusions, many meetings were held with the applicants / licensees and personnel from Westinghouse to exchange detailed technical information. During the teview of the last several plants, I became concerned about the adjustment of dynamic components (lead-lag networks) in Westinghouse instrument channels. I was told during discussions with Westinghouse personnel that exact, nominal values for these components were used in FSAR Chapter 15 analyses. Values for these adjustable components were not contained in Westinghouse Technical Specifications (except and errors associated with Overtemperature these adjustments wereAT not and Overpower addressed by the Westing AT reactor trips) house setpoint methodol Only Westinghouse plant-specific guidance (not reviewed by the staff and not agreed upon by all Westinghouse personnel) addressed lead-lag adjustment tolerances. Additionally, the periodic channel function testing of Westinghouse instrument channels, et reviewed and approved by myself and others in the Instrumentation and Controls Branch up to the, development of my concerns, specifically required those dynamic components to be jumpered out.
In an effort to address my concerns, Westinghouse and the licensees for the last plants that I reviewed (e.g. Vogtle) agreed to place footnotes in the plants' Technical Specifications on the trip setpoit ts for instrument channels that contained dynamic components (e.g. pressurizer pssure - low reactor trip).
These footnotes required that the dynamic components be adjusted exactly to a specified value during channel calibration to ensure the plants' Chapter 15 analyses remained bounding since those analyses (per Westinghouse) did not provide for any tolerance. Admittedly, neither Westinghouse (to my knowledge) nor I addressed this issue generically following my Vogtle/ Beaver Valley 2 reviews.
Towards the end of my time in the Instrumentation and Control Branch, I was requested to review a new automatic test system (MESAC) being using at Braidwood for periodic, functional testing of the safety-related instrumentation channels.
This system deviated from the Westinghouse static testing all dynamic components jumpered out with slow-varying input signal with the measu(red bistable trip point compared to setpoint contained in the Technical Specifications dynamic testing (dynamic components not jumpered out with a ram)p signal inputby utilizing with measured time response compared to the licensee calculated time response).
To complete my review, I visited the site during November 1987 and wrote a request for additional information (dated January 14,1988) upon my return to headquarters. That request (signed by my acting branch chief, sent to the
i project manager, but not sent to the licensee) was intended to have the licensee address the impact of dynamic component errors (part of the assumptions used to calculate acceptable dynamic testing results) upon the setpoint methodology, technical specification setpoints and allowable values, and FSAR Chapter 15 analyses.
Subsequently, I left the Instrumentation and controls Branch and, to the best of my knowledge, the subject was forgotten until it surfaced during a personal grievance meeting with Bill Russell (then Director, NRR) in October 1992.
Because my concerns were heightened by second-hand information which indicated l
that dynamic testing similar to that utilized at Braidwood may be marketed to other nuclear power plants, I started an informal process to have my concerns pertaining to dynamic testing of instrument channels addressed. To that end, I stated my concerns in an October 3,1995, memo to Jared Wermiel, Branch Chief of the Instrumentation and Controls Branch.
The Instrumentation and Controls Branch response, dated October 11, 1995, failed to resolve my concerns. I then responded to the specific technical issues in an October 18, 1995, memo and stated that Braidwood may not be meeting its Technical Specifications and that plant operation may be outside its licensing basis.
Also, I stated that I was perplexed that the Instrumentation and Controls Branch chose to address my concerns based on only informal discussions with the licensee and that I believed it was inappropriate for the staff to justify and analyze licensing basis deviations for licensees. These statements were based on my
'oelief that dynamic testing of safety-related instrument channels can not substitute for the staff approved static testing without prior staff review since FSAR Chapter 15 analyses, Technical Specitications and setpoint methodology are directly impacted.
In a January 17, 1996, response to my October 18, 1995, memo, the Instrumentation and Controls Branch addressed each of my points and concluded that the concerns that I identified related to dynamic testing at Braidwood have been effectively resolved based on a staff member's visit to the site and the licensee's headquarters. In my January 31, 1996, memo back to the Instrumentation and Controls Branch, I once again stated that my concerns were not resolved, I provided detailed comments on the January 17 memo, and I included three fundamental questions to be sent to the licensee in an effort to formalized the process of reviewing what I considered to be a deviation from the plant's licensing basis. In a May 22, 1996, letter to the licensee, the staff formally requested the licensee to address sty concerns in detail.
Because the licensee has not responded in what I con:ider to be a timely fashion, the Instrumentation and Controls Branch has r+paatedly taken an informal approach, and the change from static testing to dynamic testing hits directly at the heart of.the 10 CFR 50.59 process; I now wish to express my concerns as a Differing Professional View.
Specifically and in summary, I believe Braidwood's use of dynamic testing of I safety-related instrument channels is outside of the plant's licensing basis (Technical Specifications, FSAR Chapter 15 analyses, and setpoint methodology) ,
and represents an unreviewed safety question because: I
s.
- 1. Braidwood's Chapter 15 safety analyses are based on nominal values and do not account for any tolerances for dynamic components such as the lead-lag network used for pressurizer pressure - low reactor trip. This was an assumption based on a discussion with Westingho(use personnel.)
- 2. An increase in the lag time constant or a decrease in the lead time constant (resulting from plant adjustment errors) from the nominal values used in Chapter 15 analyses can delay the plant's accident / transient response beyond the corresponding Chapter 15 analyses. (Again,thiswasanassumption,butwassupportedbythe Instrumentation and Controls Branch screening analysis contained in the October 11,1995, memo.)
- 3. Admittedly, individual lead-lag adjustment errors may produce small increases in accident / transient response times, but they are similar to other instrumentation errors which the staff formally reviews /
approves and expects / requires all licensees to account for and track.
- 4. The staff-approved Westinghouse setpoint methodology for Braidwood relates periodic testing, setpoints for safety-related instrument channels and Chapter 15 analyses to each other is a meaningful, structured way. Dynamic testing of instrument channels, with its own licensee-developed acceptance criteria, is completely foreign to this structured approach and has received only limited, informal staff review.