MONTHYEARML24067A0372024-03-20020 March 2024 Federal Register Notice - Issuance of Multiple Exemptions Regarding 10 CFR Part 73 - February 2024 ML24019A1842024-02-16016 February 2024 Exemption from Select Requirements of 10 CFR Part 73 Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting ML21340A2452021-12-0909 December 2021 Exemption from Specific Requirements of 10 CFR Part 26 (EPID L-2020-LLE-0053 (COVID-19)) NRC-21-0057, Work Hour Limits Exemption Request Due to COVID-192021-12-0606 December 2021 Work Hour Limits Exemption Request Due to COVID-19 NRC-21-0036, DTE Electric Company - Request for Exemption from 10 CFR 72.44(d)(3) for Fermi 22021-07-27027 July 2021 DTE Electric Company - Request for Exemption from 10 CFR 72.44(d)(3) for Fermi 2 ML21159A0542021-06-17017 June 2021 Temporary Exemption from Biennial Emergency Preparedness Exercise Frequency Requirements of 10 CFR Part 50, Appendix E, Sections IV.F.2.B and IV.F.2.C (EPID L-2021-LLE-0029 (COVID-19) NRC-21-0031, Request for Exemption from 10 CFR 50, Appendix E, Biennial Emergency Preparedness Exercise Requirements Due to COVID-19 Pandemic2021-05-17017 May 2021 Request for Exemption from 10 CFR 50, Appendix E, Biennial Emergency Preparedness Exercise Requirements Due to COVID-19 Pandemic ML21109A3742021-04-22022 April 2021 Exemption from Select Requirements of 10 CFR Part 26 (EPID L-2021-LLE-0025 (COVID-19)) NRC-21-0027, Work Hour Limits Exemption Request Due to COVID-192021-04-19019 April 2021 Work Hour Limits Exemption Request Due to COVID-19 ML21005A4212021-01-13013 January 2021 Exemption from Select Requirements of 10 CFR Part 26 (EPID L-2021-LLE-0002 (COVID-19)) ML21004A1952021-01-0404 January 2021 Work Hour Limits Exemption Request Due to COVID-19 - Supplement ML20335A0902020-12-21021 December 2020 Federal Register Notice - November 2020 COVID-19 Exemptions ML20343A3502020-12-18018 December 2020 Exemption from Annual Force-on-Force Exercise Requirement of 10 CFR Part 73, Appendix B, General Criteria for Security Personnel, Subsection VI.C.3(l)(1) (EPID L-2020-LLE-0204 (COVID-19)) ML20332A1792020-12-0808 December 2020 Temporary Exemption from Biennial Emergency Preparedness Exercise Frequency Requirements of 10 CFR Part 50, Appendix E, Sections IV.F.2.B and IV.F.2.C (EPID L-2020-LLE-0188 (COVID-19)) ML20317A2722020-11-18018 November 2020 Exemption from Select Requirements of 10 CFR Part 26 (EPID L-2020-LLE-0187 (COVID-19)) NRC-20-0071, Request for Exemption from the Annual Force on Force Training Requirements of 10 CFR 73, Appendix B, Section VI, Due to the COVID-19 Public Health Emergency2020-11-13013 November 2020 Request for Exemption from the Annual Force on Force Training Requirements of 10 CFR 73, Appendix B, Section VI, Due to the COVID-19 Public Health Emergency NRC-20-0070, Work Hour Limits Exemption Request Due to COVID-192020-11-10010 November 2020 Work Hour Limits Exemption Request Due to COVID-19 ML20226A1162020-09-11011 September 2020 Temporary Exemption from the Annual Force-on-Force Training Requirements of 10 CFR Part 73, Appendix B, General Criteria for Security Personnel, Section VI (EPID L-2020-LLE-0128) (COVID-19) ML20192A1802020-07-14014 July 2020 Extension of Exemption from Select Requirements of 10 CFR Part 26 (EPID L-2020-LLE-0109 (COVID-19)) NRC-20-0049, Work Hour Limits Exemption Request Due to COVID-19 Revised Second Supplement2020-07-11011 July 2020 Work Hour Limits Exemption Request Due to COVID-19 Revised Second Supplement NRC-20-0048, Work Hour Limits Exemption Request Due to COVID-19 Second Supplement2020-07-10010 July 2020 Work Hour Limits Exemption Request Due to COVID-19 Second Supplement NRC-20-0045, Work Hour Limits Exemption Request Due to COVID-19 Supplement2020-07-0606 July 2020 Work Hour Limits Exemption Request Due to COVID-19 Supplement ML20133K0552020-05-14014 May 2020 Exemption from Select Requirements of 10 CFR Part 26 (EPID L-2020-LLE-0056 (COVID-19)) ML1112903592011-05-23023 May 2011 Scheduler Exemption from Certain Requirements of 10 CFR Part 73, Section 73.55 NRC-2010-0388, Fed Notice - Fermi 2 Exemption Notice2010-12-27027 December 2010 Fed Notice - Fermi 2 Exemption Notice ML1034303952010-12-27027 December 2010 Exemption from the Requirement of 10 CFR Part 50, Appendix E, Section IV.F.2.b ML1034304212010-12-27027 December 2010 Fed Notice - Fermi 2 Exemption Notice ML1003502252010-03-19019 March 2010 Scheduler Exemption from Certain Requirements of 10 CFR Part 73, Section 73.55 ML0731104822007-12-17017 December 2007 Exemption from the Requirements of 10 CFR 74.19(c) Regarding the Frequency of Physical Inventory of Special Nuclear Material in the Spent Fuel Pool, TAC MD5416 2024-03-20
[Table view] Category:Letter type:NRC
MONTHYEARNRC-24-0064, Supplement to License Amendment Request for a Risk Informed Approach to ECCS Strainer Performance2024-10-31031 October 2024 Supplement to License Amendment Request for a Risk Informed Approach to ECCS Strainer Performance NRC-24-0058, Status of License Renewal Commitments2024-10-0303 October 2024 Status of License Renewal Commitments NRC-24-0057, Update to NRC 24-0041: Technical Specification (TS) 5.6.7 – Post Accident Monitoring Report2024-09-0303 September 2024 Update to NRC 24-0041: Technical Specification (TS) 5.6.7 – Post Accident Monitoring Report NRC-24-0053, Enrico Fermi Atomic Power Plant, Unit 1, Annual Report for Period Ending June 30, 20242024-08-30030 August 2024 Enrico Fermi Atomic Power Plant, Unit 1, Annual Report for Period Ending June 30, 2024 NRC-24-0050, Inservice Inspection-Nondestructive Examination (ISI-NDE) Program for the Fourth 10-Year Inspection Interval2024-08-12012 August 2024 Inservice Inspection-Nondestructive Examination (ISI-NDE) Program for the Fourth 10-Year Inspection Interval NRC-24-0048, Submittal of Inservice Inspection Summary Report2024-08-0606 August 2024 Submittal of Inservice Inspection Summary Report NRC-24-0046, Fenni 2 Power Plant - Approval of the National Pollutant Discharge Elimination System Permit Application for Reissuance2024-07-25025 July 2024 Fenni 2 Power Plant - Approval of the National Pollutant Discharge Elimination System Permit Application for Reissuance NRC-24-0020, Submittal of Revision 51 to the Fermi 2 Radiological Emergency Response Preparedness Plan2024-07-24024 July 2024 Submittal of Revision 51 to the Fermi 2 Radiological Emergency Response Preparedness Plan NRC-24-0044, Enrico Fermi 1 License Expiration - 10 CFR 50.51 (Continuation of License)2024-07-10010 July 2024 Enrico Fermi 1 License Expiration - 10 CFR 50.51 (Continuation of License) NRC-24-0041, Technical Specification (TS) 5.6.7 - Post Accident Monitoring Report2024-06-21021 June 2024 Technical Specification (TS) 5.6.7 - Post Accident Monitoring Report NRC-24-0042, Regulat01y Issues Summaty (RIS) 24-01 Preparation and Scheduling of Operator Licensing Examinations to Submit Fonn 536, Operator Licensing Examination Data2024-06-18018 June 2024 Regulat01y Issues Summaty (RIS) 24-01 Preparation and Scheduling of Operator Licensing Examinations to Submit Fonn 536, Operator Licensing Examination Data NRC-24-0040, Verification of No Significant Hazards Considerations for License Amendment Request for a Risk Informed Approach to ECCS Strainer Performance Supplement Provided in NRC-24-00332024-06-0606 June 2024 Verification of No Significant Hazards Considerations for License Amendment Request for a Risk Informed Approach to ECCS Strainer Performance Supplement Provided in NRC-24-0033 NRC-24-0033, DTE Electric Company - Final Response to Request for Additional Information for License Amendment Request Regarding Risk Informed Approach to Performance ECCS Strainer Performance2024-05-30030 May 2024 DTE Electric Company - Final Response to Request for Additional Information for License Amendment Request Regarding Risk Informed Approach to Performance ECCS Strainer Performance NRC-24-0017, 2023 Annual Radioactive Effluent Release Report and 2023 Radiological Environmental Operating Report2024-04-29029 April 2024 2023 Annual Radioactive Effluent Release Report and 2023 Radiological Environmental Operating Report NRC-24-0032, Transmittal of the Core Operating Limits Report for Cycle 232024-04-25025 April 2024 Transmittal of the Core Operating Limits Report for Cycle 23 NRC-24-0027, Partial Response to Request for Additional Information for License Amendment Request Regarding Risk Informed Approach to Performance ECCS Strainer Performance2024-04-24024 April 2024 Partial Response to Request for Additional Information for License Amendment Request Regarding Risk Informed Approach to Performance ECCS Strainer Performance NRC-24-0031, Retake Exam Outline Submittal Letter2024-04-22022 April 2024 Retake Exam Outline Submittal Letter NRC-24-0018, 2023 Annual Non-Radiological Environmental Operating Report2024-04-0909 April 2024 2023 Annual Non-Radiological Environmental Operating Report NRC-24-0015, Enrico Fermi Atomic Power Plant, Unit 1, Decommissioning Funding Status Report2024-03-31031 March 2024 Enrico Fermi Atomic Power Plant, Unit 1, Decommissioning Funding Status Report NRC-24-0001, License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Rev. 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b, TSTF-439, Rev. 2, Eliminate Second Completion2024-03-21021 March 2024 License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Rev. 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b, TSTF-439, Rev. 2, Eliminate Second Completion NRC-24-0019, Submittal of 2023 Safety Relief Valve Challenge Report, Main Steam Bypass Lines Report, and ECCS Cooling Performance Evaluation Model Changes or Errors Report2024-03-14014 March 2024 Submittal of 2023 Safety Relief Valve Challenge Report, Main Steam Bypass Lines Report, and ECCS Cooling Performance Evaluation Model Changes or Errors Report NRC-24-0023, NRC-24-0023, Post Exam Package Submittal Letter to NRC2024-03-0707 March 2024 NRC-24-0023, Post Exam Package Submittal Letter to NRC NRC-24-0008, Levels and Sources of Property Insurance Coverage2024-02-15015 February 2024 Levels and Sources of Property Insurance Coverage NRC-24-0009, Request for NRC to Suspend Regulatory Audit of License Amendment Request for a Risk Informed Approach to ECCS Strainer Performance for Fermi Unit 22024-02-0606 February 2024 Request for NRC to Suspend Regulatory Audit of License Amendment Request for a Risk Informed Approach to ECCS Strainer Performance for Fermi Unit 2 NRC-24-0002, Clarification for Request for Additional Information Responses for License Amendment Request to Revise Technical Specification 3.8.1, AC Sources - Operating, Surveillance Requirement SR 3.8.1.122024-01-12012 January 2024 Clarification for Request for Additional Information Responses for License Amendment Request to Revise Technical Specification 3.8.1, AC Sources - Operating, Surveillance Requirement SR 3.8.1.12 NRC-24-0007, Report of Changes to Quality Assurance Program for Radioactive Material Packages2024-01-12012 January 2024 Report of Changes to Quality Assurance Program for Radioactive Material Packages NRC-23-0079, Transmittal of Revision 1 of the Core Operating Limits Report for Cycle 222023-12-14014 December 2023 Transmittal of Revision 1 of the Core Operating Limits Report for Cycle 22 NRC-23-0077, Submittal of Revision 50 to the Fermi 2 Radiological Emergency Response Preparedness Plan2023-12-0404 December 2023 Submittal of Revision 50 to the Fermi 2 Radiological Emergency Response Preparedness Plan NRC-23-0075, Request for Exemption from Enhanced Weapons, Firearms Background Checks and Security Event Notification Implementation2023-11-30030 November 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks and Security Event Notification Implementation NRC-23-0073, Guarantee of Payment of Deferred Premiums2023-11-29029 November 2023 Guarantee of Payment of Deferred Premiums NRC-23-0071, Response to Request for Additional Information (RAI) for Exigent License Amendment Request for Revision of Technical Specification (TS) 3.8.1 AC Sources - Operating2023-10-13013 October 2023 Response to Request for Additional Information (RAI) for Exigent License Amendment Request for Revision of Technical Specification (TS) 3.8.1 AC Sources - Operating NRC-23-0062, Response to Request for Additional Information for License Amendment Request to Revise Technical Specification 3.8.1, AC Sources - Operating, Surveillance Requirement SR 3.8.1.122023-10-12012 October 2023 Response to Request for Additional Information for License Amendment Request to Revise Technical Specification 3.8.1, AC Sources - Operating, Surveillance Requirement SR 3.8.1.12 NRC-23-0068, Exigent License Amendment Request for Revision of Technical Specification (TS) 3.8.1 AC Sources - Operating2023-09-28028 September 2023 Exigent License Amendment Request for Revision of Technical Specification (TS) 3.8.1 AC Sources - Operating NRC-23-0064, Additional Supplemental Information to Exigent License Amendment Request for Technical Specification 3.7.2, Emergency Equipment Cooling Water (Eecw)/Emergency Equipment Service Water (Eesw) System and Ultimate Heat Sink (UHS)2023-09-11011 September 2023 Additional Supplemental Information to Exigent License Amendment Request for Technical Specification 3.7.2, Emergency Equipment Cooling Water (Eecw)/Emergency Equipment Service Water (Eesw) System and Ultimate Heat Sink (UHS) NRC-23-0057, Independent Spent Fuel Storage Installation Cask Registration2023-08-31031 August 2023 Independent Spent Fuel Storage Installation Cask Registration NRC-23-0054, Enrico Fermi Atomic Power Plant, Unit 1, Annual Report for Period Ending June 30 20232023-08-31031 August 2023 Enrico Fermi Atomic Power Plant, Unit 1, Annual Report for Period Ending June 30 2023 NRC-23-0056, Inservice Testing (IST) Program for the Fourth 10-Year Inspection Interval2023-08-31031 August 2023 Inservice Testing (IST) Program for the Fourth 10-Year Inspection Interval NRC-23-0061, Clarification for NRC-23-0059, Response to Request for Additional Information for Exigent License Amendment Request for Technical Specification 3.7.2, Emergency Equipment Cooling Water (Eecw)/Emergency Equipment Service Water..2023-08-30030 August 2023 Clarification for NRC-23-0059, Response to Request for Additional Information for Exigent License Amendment Request for Technical Specification 3.7.2, Emergency Equipment Cooling Water (Eecw)/Emergency Equipment Service Water.. NRC-23-0059, Response to Request for Additional Information Exigent License Amendment Request for Technical Specification 3.7.2,Emergency Equipment Cooling Water (Eecw)/Emergency Equipment Service Water (Eesw) System and Ultimate Heat Sink (UHS)2023-08-25025 August 2023 Response to Request for Additional Information Exigent License Amendment Request for Technical Specification 3.7.2,Emergency Equipment Cooling Water (Eecw)/Emergency Equipment Service Water (Eesw) System and Ultimate Heat Sink (UHS) NRC-23-0060, Supplemental Information to Exigent License Amendment Request for Technical Specification 3.7.2, Emergency Equipment Cooling Water (Eecw)/Emergency Equipment Service Water (Eesw) System and Ultimate Heat Sink (UHS)2023-08-25025 August 2023 Supplemental Information to Exigent License Amendment Request for Technical Specification 3.7.2, Emergency Equipment Cooling Water (Eecw)/Emergency Equipment Service Water (Eesw) System and Ultimate Heat Sink (UHS) NRC-23-0053, Independent Spent Fuel Storage Installation Cask Registration2023-08-23023 August 2023 Independent Spent Fuel Storage Installation Cask Registration NRC-23-0050, Exigent License Amendment Request for Technical Specification 3.7.2, Emergency Equipment Cooling Water (Eecw)/Emergency Equipment Service Water (Eesw) System and Ultimate Heat Sink (UHS)2023-08-10010 August 2023 Exigent License Amendment Request for Technical Specification 3.7.2, Emergency Equipment Cooling Water (Eecw)/Emergency Equipment Service Water (Eesw) System and Ultimate Heat Sink (UHS) NRC-23-0048, Independent Spent Fuel Storage Installation Cask Registration2023-08-0101 August 2023 Independent Spent Fuel Storage Installation Cask Registration NRC-23-0049, Request for Enforcement Discretion for Technical Specification 3.7.2, Emergency Equipment Cooling Water (Eecw)/Emergency Equipment Service Water (Eesw) System and Ultimate Heat Sink (UHS)2023-07-24024 July 2023 Request for Enforcement Discretion for Technical Specification 3.7.2, Emergency Equipment Cooling Water (Eecw)/Emergency Equipment Service Water (Eesw) System and Ultimate Heat Sink (UHS) NRC-23-0043, Independent Spent Fuel Storage Installation, Cask Registration2023-06-27027 June 2023 Independent Spent Fuel Storage Installation, Cask Registration NRC-23-0020, License Amendment Request for a Risk Informed Approach to ECCS Strainer Performance2023-06-13013 June 2023 License Amendment Request for a Risk Informed Approach to ECCS Strainer Performance NRC-23-0039, Request for Enforcement Discretion for Technical Specification 3.7.2, Emergency Equipment Cooling Water (Eecw)/Emergency Equipment Service Water (Eesw) System and Ultimate Heat Sink (UHS)2023-06-0606 June 2023 Request for Enforcement Discretion for Technical Specification 3.7.2, Emergency Equipment Cooling Water (Eecw)/Emergency Equipment Service Water (Eesw) System and Ultimate Heat Sink (UHS) NRC-23-0030, Inservice Inspection-Nondestructive Examination (ISI-NDE) Program for the Fourth 10-Year Inspection Interval2023-06-0505 June 2023 Inservice Inspection-Nondestructive Examination (ISI-NDE) Program for the Fourth 10-Year Inspection Interval NRC-23-0029, Snubber Program for the Fourth 10-Year Testing Interval2023-06-0505 June 2023 Snubber Program for the Fourth 10-Year Testing Interval NRC-23-0037, 56542-EN 56542 - Fermi2023-05-26026 May 2023 56542-EN 56542 - Fermi 2024-09-03
[Table view] |
Text
Peter Dietrich Senior Vice President and Chief Nuclear Officer DTE Energy Company 6400 N. Dixie Highway, Newport, MI 48166 Tel: 734.586.4153 Fax: 734.586.1431 Email: peter.dietrich@dteenergy.com DTE July 11, 2020 10 CFR 26.205(d)
NRC-20-0049 U.S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, DC 20555-0001 Fermi 2 Power Plant NRC Docket No. 50-341 NRC License No. NPF-43
Subject:
Fermi 2 Work Hour Limits Exemption Request due to COVID-19 Revised Second Supplement
References:
- 1. NRC Letter from H. Nieh to NEI, U.S. Nuclear Regulatory Commission Planned Actions Related to the Requirements for Work Hour Controls During the Coronavirus Disease 2019 Public Health Emergency, March 28, 2020 (ML20087P237).
- 2. DTE Electric letter to NRC, Fermi 2 Work Hour Limits Exemption Request Due to COVID-19, NRC-19-0024, dated May 11, 2020 (ML20132A239)
- 3. NRC Letter to DTE, Fermi Exemption from Select Requirements Of 10 CFR PART 26 (EPID L-2020-LLE-0056 [COVID-19]), dated May 14, 2020 (ML20133K055)
- 4. DTE Electric letter to NRC, Fermi 2 Work Hour Limits Exemption Request due to COVID-19 Supplement, NRC-20-0045, Dated July 6, 2020 (ML20188A339)
- 5. DTE Electric letter to NRC, Fermi 2 Work Hour Limits Exemption Request due to COVID-19 Second Supplement, NRC-20-0048, Dated July 10, 2020 (ML20192A107)
As a result of the Coronavirus Disease 2019 (COVID-19) public health emergency (PHE), in Reference 2 DTE Electric Company (DTE) requested NRC approval for Fermi Unit 2 (Fermi 2) to proactively enter into the alternative work hour controls described in Reference 1. In reference
USNRC NRC-20-0049 Page 2 3, the NRC approved this exemption with an effective period through 12:00 a.m. on July 14, 2020. Subsequently, DTE requested an extension of the alternative work hour controls in Reference 4 due to a COVID-19 outbreak affecting the Torus recoating effort and extending the refueling outage to over 100 days.
By email from Mr. Surinder Arora dated July 9, 2020, the NRC requested that DTE provide additional information regarding the effects of cumulative fatigue that may be encountered during the extension requested in Reference 4. In Reference 5, DTE submitted the additional information to the NRC. This letter replaces Reference 5 in its entirety and adds scheduling information for the Maintenance category.
The information in the following table describes how cumulative fatigue has been managed for the various positions included in the initial work hour limit exemption period approved in Reference 3 and how it will be managed during the exemption extension period requested in Reference 4.
10 CFR Positions Additional Information 26.4(a)(1) Operators During the initial exemption period, 99 workers were considered to meet this category. These personnel worked a 4 day on and 1 day off schedule of 12-hour shifts with up to 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> of additional time for thorough turnover and with the maximum average work hours of 71.5 hour5.787037e-5 days <br />0.00139 hours <br />8.267196e-6 weeks <br />1.9025e-6 months <br />s/week. During this initial exemption period, additional off days, including vacation, have been taken by the majority of Operators. Five Operators swapped from day shift to night shift or night shift to day shift during the initial exemption period.
For the requested extension period, Operations will adjust to a 5 day on and 2 day off schedule of 12-hour shifts with up to 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> of additional time for thorough turnover. Also, Operators will not swap shifts between day and night until the outage is complete and online rules established.
Operators have maintained consistent schedules through the initial exemption period and will add consecutive days off in the extension period.
26.4(a)(2) Health During the initial exemption period, 12 Radiation Protection Physics personnel were considered to meet this category. Of the 12 workers in this category, 10 had two consecutive days off within the past two weeks. Personnel is this category have worked and will continue to work a two-week schedule of one week of six 12-hour shifts followed by one day off and then a week of five 12-hour shifts followed by two days off. This schedule averaged 66 hours7.638889e-4 days <br />0.0183 hours <br />1.09127e-4 weeks <br />2.5113e-5 months <br /> per week over the initial exemption period. This average
USNRC NRC-20-0049 Page 3 10 CFR Positions Additional Information does not include time off from work due to sick or quarantine periods.
Radiation Protection personnel will maintain current schedules, which include at least two consecutive days off, through the extension period.
26.4(a)(2) Chemistry During the initial exemption period, 7 Chemistry personnel were considered to meet this category. Personnel in this category worked a 4 day on and 1 day off schedule of 12 and one-half hour shifts, including turnover, with the maximum average work hours of 66 hour7.638889e-4 days <br />0.0183 hours <br />1.09127e-4 weeks <br />2.5113e-5 months <br />s/week. Of the 7 workers in this category, 3 had two consecutive days off within the past two weeks.
For the requested extension period, Chemistry will adjust to a 5 day on and 2 day off schedule of 12 and one-half hour shifts, including turnover. Chemistry will implement rest hours during the extension period to transition to online requirements.
26.4(a)(3) Fire Brigade Operations personnel fulfill Fire Brigade positions. Therefore, fire brigade personnel are subsumed into Operators category.
26.4(a)(4) Maintenance Personnel defined by the Maintenance category cover a broad spectrum of specialized work positions including mechanics, electricians, Instrument & Controls technicians, local leakage rate testers, welders, appliers of specialized coatings, and their supervision.
There are 142 DTE mechanical, electrical, and Instrument &
Controls personnel in this category during the initial exemption period. During the initial exemption period, personnel in this group typically worked a two-week schedule of one week of six 12-hour shifts followed by one day off and then a week of five 12-hour shifts followed by two days off. For the extension period, all personnel in this group will follow the two-week schedule of one week of six 12-hour shifts followed by one day off and then a week of five 12-hour shifts followed by two days off. The workers in this group had a maximum average of 66 hour7.638889e-4 days <br />0.0183 hours <br />1.09127e-4 weeks <br />2.5113e-5 months <br />s/week during the initial exemption period. In addition, within the past 2 weeks all DTE Maintenance personnel have taken a minimum of 2 consecutive days off.
There are 99 supplemental Maintenance personnel performing maintenance functions also in this category during the initial
USNRC NRC-20-0049 Page 4 10 CFR Positions Additional Information exemption period and they worked a maximum average of 66 hour7.638889e-4 days <br />0.0183 hours <br />1.09127e-4 weeks <br />2.5113e-5 months <br />s/week. During the extension period, these personnel will apply a 5 day on and 2 day off schedule of 12-hour shifts. In addition, these resources are being augmented with new individuals. Of the 99 workers in this category, 71 had two consecutive days off within the past two weeks.
There are an additional 41 supplemental Maintenance personnel that support the refuel floor activities which recently reported to Fermi 2 for work and have had a minimum of 6 consecutive days off within the past 2 weeks.
There are 6 DTE Performance Engineering personnel that supported local leakage rate testing activities in this category during the initial exemption period. All 6 workers in this category have had a minimum of two consecutive days off within the past two weeks and 4 of the personnel have had 21 days off over the last 60 days.
26.4(a)(5) Security Nuclear Security utilized alternate controls during the initial exemption period but will not utilize them in the extension period.
As described above, many personnel have had additional time off in the last two weeks and many schedules are being adjusted for the extension period to provide consecutive days off.
Additionally, Fermi will perform a cumulative fatigue awareness stand down prior to implementation of this request and will focus on fatigue in our safety and human performance messages as we have throughout the refueling outage. These measures and conditions prevent cumulative fatigue to ensure that the ability of individuals to safely and competently perform their duties is not compromised.
There have been no self-declarations during the initial exemption period. In addition, during the entire duration of the refueling outage thus far there were 2 fatigue assessments. These assessments took place prior to the initial exemption period. One was a For-Cause and the other was a Post-Event fatigue assessment. Neither were determined to be fatigue-related.
Fermi will continue to implement the alternative controls described in Reference 4 upon NRC approval.
DTE now requests approval of the exemption request in Reference 4 by no later than July 13, 2020.
No new commitments are being made in this submittal.
USNRC NRC-20-0049 Page 5 Should you have any questions or require additional information, please contact Ms. Margaret Offerle, Manager- Nuclear Licensing, at (734) 586-5076.