ZION STATION RESTORATION PROJECT FINAL STATUS SURVEY FINAL REPORT - PHASE 2, PART 2 Revision 1 JUNE 2020
= ZIONSOLUTIONSLLC-An EnergySo/vtions Company
FINAL STATUS SURVEY FINAL REPORT - PHASE 2, PART 2 REVISION 1
[2]
Prepared By: R Yetter III Date:
FSS Specialist Reviewed By: R Yetter Date:
Director, Radiological Site Closure Approved By: S Roberts Date:
VP Radiological Programs Signature on File 6/2/2020 Signature on File 6/2/2020 Signature on File 6/2/2020
~
-ZIONSOLUTIONS;;;
FINAL STATUS SURVEY FINAL REPORT - PHASE 2, PART 2 REVISION 1
[3]
TABLE OF CONTENTS
- 1.
INTRODUCTION........................................................................................................8 1.1 Executive Summary......................................................................................................8
- 2.
FINAL STATUS SURVEY PROGRAM OVERVIEW.............................................. 13 2.1 Survey Planning.......................................................................................................... 15 2.1.1 State the Problem............................................................................................... 15 2.1.2 Identify the Decision.......................................................................................... 16 2.1.3 Identify Inputs to the Decision........................................................................... 16 2.1.4 Define the Study Boundaries.............................................................................. 16 2.1.5 Develop a Decision Rule.................................................................................... 16 2.1.6 Specify Tolerable Limits on Decision Errors...................................................... 16 2.1.7 Optimize the Design for Obtaining Data............................................................. 17
- 3.
SITE INFORMATION............................................................................................... 24 3.1 Site Description.......................................................................................................... 24 3.2 Survey Unit Description.............................................................................................. 25 3.2.1 Survey Unit 00101A (Condensate Feed Water Supply and Recirculation).......... 25 3.2.2 Survey Unit 00101B (Primary Water Supply Header)........................................ 26 3.2.3 Survey Unit 00101F (Diesel Generator Heat Exchanger Service Water Supply and Return)............................................................................................................... 27 3.2.4 Survey Unit 00101H (Service Water Supply Header)......................................... 28 3.2.5 Survey Units 00150A/B & C (North End Storm Drain)...................................... 29 3.3 Summary of Historical Radiological Data................................................................... 30 3.3.1 Historical Site Assessment and Characterization Surveys................................... 30 3.4 Conditions at the Time of Final Status Survey............................................................. 32 3.5 Identification of Potential Contaminants...................................................................... 34 3.6 Radionuclides of Concern and Mixture Fractions........................................................ 35 3.7 Radiological Release Criteria...................................................................................... 35
- 4.
FINAL STATUS SURVEY PROTOCOL................................................................... 35 4.1 Data Quality Objectives.............................................................................................. 35 4.1.1 State the Problem............................................................................................... 36 4.1.2 Identify the Decision.......................................................................................... 36 4.1.3 Identify Inputs to the Decision........................................................................... 36 4.1.4 Define the Boundaries of the Survey.................................................................. 39 4.1.5 Develop a Decision Rule.................................................................................... 39 4.1.6 Specify Tolerable Limits on Decision Errors...................................................... 40 4.1.7 Optimize Design................................................................................................ 40 4.2 Survey Unit Designation and Classification................................................................. 43
FINAL STATUS SURVEY FINAL REPORT - PHASE 2, PART 2 REVISION 1
[4]
4.3 Background Determination......................................................................................... 43 4.4 Final Status Survey Sample Plans............................................................................... 43 4.5 Survey Design............................................................................................................. 43 4.5.1 Determination of Number of Data Points........................................................... 43 4.5.2 Measurement Locations..................................................................................... 44 4.6 Instrumentation........................................................................................................... 45 4.6.1 Instrumentation Efficiencies............................................................................... 45 4.6.2 Instrumentation Sensitivities.............................................................................. 48 4.6.3 Instrument Maintenance and Control........................................................................... 48 4.6.4 Instrument Calibration....................................................................................... 48 4.7 Survey Methodology................................................................................................... 49 4.7.1 Buried Pipe Surveys........................................................................................... 49 4.7.2 Quality Control Surveys..................................................................................... 50
- 5.
SURVEY FINDINGS................................................................................................. 51 5.1 Survey Data Conversion.............................................................................................. 52 5.2 Survey Data Verification and Validation..................................................................... 54 5.3 Anomalous Data/Elevated Scan Results and Investigation........................................... 55 5.3.1 Condensate Feed Water Supply and Recirculation Buried Pipe (Survey Unit 00101A)
.......................................................................................................................... 55 5.3.2 Primary Water Supply Header (Survey Unit 00101B)........................................ 55 5.3.3 Diesel Generator Service Water Supply (Survey Unit 00101F)........................... 57 5.3.4 Service Water Supply Header (Survey Unit 00101H)......................................... 57 5.3.5 North End Storm Drain (Survey Units 00150A/B&C)........................................ 57 5.4 Evaluation of Number of Sample/Measurement Locations in Survey Units................. 57 5.5 Comparison of Findings with Derived Concentration Guideline Levels....................... 58 5.5.1 Compliance Equation......................................................................................... 58 5.6 Description of ALARA to Achieve Final Activity Levels............................................ 59
- 6.
SUMMARY
............................................................................................................... 60
- 7.
REFERENCES........................................................................................................... 60
- 8.
APPENDICES............................................................................................................ 61
FINAL STATUS SURVEY FINAL REPORT - PHASE 2, PART 2 REVISION 1
[5]
LIST OF FIGURES Figure 1-1, Phase 2, Part 2 Survey Unit Release Record Buried Piping Designation............................. 11 Figure 2-1, Characterization/License Termination Group Organizational Chart.................................... 14 LIST OF TABLES Table 1-1, Survey Units Encompassed in Phase 2, Part 2 Report.......................................................... 10 Table 2-1, Base Case and Operational DCGLs for Buried Pipe............................................................. 18 Table 4-1, Investigation Levels............................................................................................................ 37 Table 4-2, Surrogate Ratios.................................................................................................................. 37 Table 4-3, Surrogate OpDCGL Calculation Results.............................................................................. 38 Table 4-4, Synopsis of Survey Design.................................................................................................. 42 Table 4-5, Number of FSS Measurements............................................................................................ 45 Table 4-6, Typical FSS Instrument Detection Sensitivities................................................................... 47 Table 4-7, Recommended Scan Coverage............................................................................................ 49 Table 5-1, Basic Statistical Properties of Phase 2, Part 2 Survey Unit Non-Parametric Measurements.. 53
FINAL STATUS SURVEY FINAL REPORT - PHASE 2, PART 2 REVISION 1
[6]
LIST OF ACRONYMS AND ABBREVIATIONS ALARA As Low As Reasonably Achievable AMCG Average Member of the Critical Group BcDCGL Base Case Derived Concentration Guideline Level BcSOF Base Case Sum of Fractions CsI Cesium Iodide CoC Chain of Custody DQA Data Quality Assessment DQO Data Quality Objective DCGL Derived Concentration Guideline Level EMC Elevated Measurement Comparison FSS Final Status Survey HSA Historical Site Assessment HTD Hard-to-Detect IC Insignificant Contributor ID Internal Diameter ISOCS In Situ Object Counting System LTP License Termination Plan LBGR Lower Bound of the Gray Region MARSSIM Multi-Agency Radiation Survey and Site Investigation Manual MDC Minimum Detectable Concentration MDCR Minimum Detectable Count Rate NaI Sodium Iodide NIST National Institute of Standards and Technology ODCM Off Site Dose Calculation Manual OpDCGL Operational Derived Concentration Guideline Level OpSOF Operational Sum of Fractions PWST Primary Water Storage Tank QAPP Quality Assurance Project Plan QC Quality Control
FINAL STATUS SURVEY FINAL REPORT - PHASE 2, PART 2 REVISION 1
[7]
RCA Radiologically Controlled Area RE Radiological Engineer ROC Radionuclides of Concern SER Safety Evaluation Report SFP Spent Fuel Pool SOF Sum of Fractions TEDE Total Effective Dose Equivalent UCL Upper Confidence Level USNRC United States Nuclear Regulatory Commission VCC Vertical Concrete Cask WWTF Waste Water Treatment Facility ZNPS Zion Nuclear Power Station ZSRP Zion Station Restoration Project
FINAL STATUS SURVEY FINAL REPORT - PHASE 2, PART 2 REVISION 1
[8]
- 1. INTRODUCTION 1.1 Executive Summary The purpose of the second part of this Phase 2 Final Status Survey (FSS) Final Report (Phase 2, Part 2) is to provide a summary of the survey results and overall conclusions which demonstrate that buried pipe remaining in the end state of the Zion Nuclear Power Station (ZNPS) facility, or portions of the site, meets the 25 mrem/year release criterion as established in Nuclear Regulatory Commission Regulation 10 CFR 20.1402 Radiological Criteria for Unrestricted Use.
This report documents that FSS activities were performed consistent with the guidance provided in the Zion Nuclear Power Station, Units 1 and 2 - Issuance of Amendments 191 and 178 for the Licenses to Approve the License Termination Plan (LTP)
(Reference 1); NUREG-1575, Multi-Agency Radiation Survey and Site Investigation Manual (MARSSIM) (Reference 2); ZS-LT-01, Quality Assurance Project Plan for Characterization and FSS (QAPP) (Reference 3); ZS-LT-300-001-001, Final Status Survey Package Development (Reference 4); ZS-LT-300-001-003, Isolation and Control for Final Status Survey (Reference 5); ZS-LT-300-001-004, Final Status Survey Data Assessment (Reference 6); as well as various other station implementing procedures.
Revision 2 of the Zion LTP, along with the accompanying Safety Evaluation Report (SER) was approved on September 28, 2018.
The End State includes a range of buried piping, embedded piping and penetrations.
Buried piping is defined as pipe that runs through soil. The list of buried piping, penetrations and embedded piping to remain is provided in ZionSolutions Technical Support Documents (TSD)14-016 Description of Embedded Pipe, Penetrations, and Buried Pipe to Remain in Zion End State (Reference 7).
Chapter 5, Section 5.0 of the Zion LTP states, The list of buried piping, penetrations and embedded piping to remain is provided in ZionSolutions TSD 14-016. The list of end-state embedded pipe, buried pipe, and penetrations presented in Attachment F to TSD 14-016 is intended to be a bounding end-state condition. No pipe that is not listed in Attachment F will be added to the end-state condition however, pipe can be removed from the list and disposed of as waste.
On May 7, 2019, as part of an FSS surveillance performed on the north portion of the Switchyard open land survey unit (10205) in accordance with ZionSolutions procedure ZS-LT-300-001-003, Characterization/License Termination (C/LT) Technicians collected sediment samples from the bottom of manhole access points to the Switchyard storm drain. The storm drain systems were initially classified as non-impacted based on information taken from the Zion Station Historical Site Assessment (HSA)
FINAL STATUS SURVEY FINAL REPORT - PHASE 2, PART 2 REVISION 1
[9]
(Reference 8). In the sediment sample collected from the west access point, both Cs-137 and Co-60 were positively detected. Consequently, the discovery prompted a change of classification in accordance with ZionSolutions procedure ZS-LT-300-001-002, Survey Unit Classification (Reference 9). This storm drain was reclassified as a MARSSIM Class 2 buried pipe and subject to compliance demonstration as required by LTP Chapter 5, Section 5.7.1.9.
Since this section of storm drain (approximately 600 feet of piping) was not included in Attachment F of TSD 14-016, in order to perform FSS on this piping as an impacted buried pipe, TSD 14-016 Attachment F will be revised to include this section of pipe, and this system will need to be added to the TSD. In order to revise the TSD, ZionSolutions performed both a 10 CFR 50.59 review and a regulatory review against the SER for the LTP in accordance with the Attachment E-1 (License Termination Plan Change Evaluation) checklist from ZionSolutions Procedure AD-11 Regulatory Reviews (Reference 10). The results of the evaluation indicted that ZionSolutions could make this revision to the LTP without NRC pre-approval. However, ZionSolutions notified the NRC of the intent to perform this action by formal correspondence.
The FSS results provided herein assess and summarize that any residual radioactivity results in a Total Effective Dose Equivalent (TEDE) to an Average Member of the Critical Group (AMCG) that does not exceed 25 mrem/year, and the residual radioactivity has been reduced to levels that are As Low As Reasonably Achievable (ALARA). The release criterion is translated into site-specific Derived Concentration Guideline Levels (DCGLs) for assessment and summary.
This FSS Final Report has been written consistent with the guidance provided in the LTP; NUREG-1757, Vol. 2, Consolidated Decommissioning Guidance Characterization, Survey, and Determination of Radiological Criteria (Reference 11); MARSSIM; and the requirements specified in ZS-LT-300-001-005, Final Status Survey Data Reporting (Reference 12).
To facilitate the data management process, FSS Final Reports incorporate multiple survey unit Release Records. Release Records are complete and unambiguous records of the as-left radiological status of each specific survey unit. Sufficient data and information are provided in each Release Record to enable an independent re-creation and evaluation at some future time of both the survey activities and the derived results.
This report contains five (5) buried piping systems: Condensate Feed Water Supply and Recirculation, the Primary Water Supply, Diesel Generator Heat Exchanger Service Water Supply and Return, Service Water Supply Header, and the North East Storm Drain.
All FSS activities essential to data quality have been implemented and performed under approved procedures. Trained individuals, using properly calibrated instruments and
FINAL STATUS SURVEY FINAL REPORT - PHASE 2, PART 2 REVISION 1
[10]
laboratory equipment (sensitive to the suspected contaminants), performed the FSS of the Phase 2 survey units. The survey data for all Phase 2, Part 2 survey units demonstrate that the dose (TEDE) from residual radioactivity is less than the maximum annual dose (TEDE) of 25 mrem/year to the member of the public hypothesized. This dose limit corresponds to the release criterion for license termination of facilities to be released for unrestricted use as specified in 10 CFR 20.1402. It also provides the basis and support for the release of these areas from the 10 CFR 50 licenses. Finally, meeting this release criterion satisfies the ALARA requirement of 10 CFR 20.1402.
Table 1-1, Survey Units Encompassed in Phase 2, Part 2 Report Survey Unit Name Class(1)
Area (ft2)
Pipe ID 00101A Condensate Feed Water Supply and Recirculation 3
2,455 T-103, T-105, and T-106 00101B Primary Water 2
312 T-095 and T-102 00101F Diesel Generator Heat Exchanger Service Water Supply and Return 3
956 AO-27, AO-28, AO-30, AO-31, TO-32, and TO-33 00101H Service Water Supply Header 3
5,248 CO-26 and CO-29 00150A/B&C North East Storm Drain 2
2,187 NA (1)
Indicates classification of buried pipe interior
FINAL STATUS SURVEY FINAL REPORT - PHASE 2 REVISION 1
[11]
Figure 1-1, Phase 2, Part 2 Survey Unit Release Record Buried Piping Designation
FINAL STATUS SURVEY FINAL REPORT - PHASE 2, PART 2 REVISION 1
[12]
1.2 Phased Submittal Approach To minimize the incorporation of redundant historical assessment and other FSS program information, and to facilitate potential phased releases from the current licenses, FSS Final Reports are provided in a phased approach. ZionSolutions estimates that a total of five (5) FSS Final Reports will be generated and submitted to the NRC during the decommissioning project.
The Phase 1 FSS Final Report, which was submitted to the NRC in October of 2018, encompassed the release of eight (8) Class 3 open land survey units.
The Phase 2 FSS Final Report was submitted to the NRC in March of 2019, contained the thirteen (13) Final Status survey units that encompassed the basement structures including the Unit 1 and Unit 2 Containments, the SFP/Transfer Canal, the Auxiliary Building, the Crib House/Forebay, the WWTF and the Turbine Building.
The Phase 2, Part 2 FSS Final Report addresses buried pipe that is to remain onsite after decommissioning activities are completed.
The Phase 3 FSS Final Report will include the open land survey units encompassing the southern portion of the site.
The Phase 4 FSS Final Report will include the open land areas encompassing the northern portion of the site.
1.3 Phase 2, Part 2 Report This Phase 2, Part 2 FSS Final Report addresses the buried piping remaining after decommissioning activities were completed. Specifically, this report includes the FSS results for the following buried pipe:
- Condensate Feed Water Supply and Recirculation (survey unit 00101A),
- Primary Water Supply (survey unit 00101B),
- Diesel Generator Heat Exchanger Service Water Supply and Return (survey unit 00101F),
- Service Water Supply Header (survey unit 00101H), and
- North East Storm Drain (survey units 00150A, B & C).
FINAL STATUS SURVEY FINAL REPORT - PHASE 2, PART 2 REVISION 1
[13]
- 2. FINAL STATUS SURVEY PROGRAM OVERVIEW The FSS Program consists of the methods used in planning, designing, conducting, and evaluating FSS at the ZNPS site to demonstrate that the premises are suitable for release in accordance with the criteria for decommissioning in Title 10 CFR 20, Subpart E. Final Status Surveys serve as key elements to demonstrate that the TEDE to an AMCG from residual radioactivity does not exceed 25 mrem/year, and that all residual radioactivity at the site is reduced to levels that are ALARA.
To implement the FSS Program, ZionSolutions established the C/LT Group, within the Radiation Protection division, with sufficient management and technical resources to fulfill project objectives. The C/LT Group is responsible for the safe completion of all surveys related to characterization and final site closure. Approved site procedures and detailed TSDs direct the FSS process to ensure consistent implementation and adherence to the LTP and all applicable requirements. Figure 2-1 provides an organizational chart of the C/LT Group.
FINAL STATUS SURVEY FINAL REPORT - PHASE 2, PART 2 REVISION 1
[14]
Figure 2-1, Characterization/License Termination Group Organizational Chart
FINAL STATUS SURVEY FINAL REPORT - PHASE 2, PART 2 REVISION 1
[15]
2.1 Survey Planning Following the cessation of commercial operation, the planning phase for the decommissioning was initiated in 1999 by the development of HSA and characterization process. The characterization process was iterative and continued until, in some cases, up to the time of completing FSS. The HSA consisted of a review of site historical records regarding plant incidents, radiological survey documents, and routine and special reports submitted by Exelon to various regulatory agencies. Along with these assessments, interviews with current and past site personnel, reviews of historical site photos, and extensive area inspections were performed to meet the following objectives:
- Develop the information necessary to support FSS design, including the development of Data Quality Objectives (DQO) and survey instrument performance standards.
- Develop the initial radiological information to support decommissioning planning, including building decontamination, demolition, and waste disposal.
- Identify any unique radiological or health and safety issues associated with decommissioning.
- Identify the potential and known sources of radioactive contamination in systems, surface or subsurface soils, groundwater, and on structures.
- Divide the ZNPS site into manageable areas or units for survey and classification purposes.
- Determine the initial classification of each survey area or unit as non-impacted or impacted.
Impacted survey areas or units are Class 1, 2, or 3, as defined in MARSSIM.
Data Quality Objectives are qualitative and quantitative statements derived from the DQO process that clarify technical and quality objectives, define the appropriate type of data, and specify the tolerable levels or potential decision errors used as the basis for establishing the quality and quantity of data required to support inference and decisions. This process, described in MARSSIM and procedure ZS-LT-300-001-001 is a series of graded planning steps found to be effective in establishing criteria for data quality and guiding the development of FSS Sample Plans. DQOs developed and implemented during the initial phase of planning directed all data collection efforts.
The DQO approach consists of the following seven steps:
2.1.1 State the Problem This step provides a clear description of the problem, identification of planning team members (especially the decision makers), a conceptual model of the hazard to be investigated, and the estimated resources required to perform the survey. The problem associated with FSS is to determine whether a given survey unit meets the radiological release criterion of 10 CFR 20.1402.
FINAL STATUS SURVEY FINAL REPORT - PHASE 2, PART 2 REVISION 1
[16]
2.1.2 Identify the Decision This step consists of developing a decision statement based on a principal study question (i.e.,
the stated problem) and determining alternative actions that may be taken based on the answer to the principle study question. Alternative actions identify the measures to resolve the problem. The decision statement combines the principal study question and alternative actions into an expression of choice among multiple actions. For the FSS, the principal study question is: Does residual radioactive contamination present in the survey unit exceed the established DCGL values? The alternative actions may include no action, investigation, resurvey, remediation, and reclassification.
2.1.3 Identify Inputs to the Decision The information required depends on the type of media under consideration (e.g., soil, water, concrete) and whether existing data are sufficient or new data are needed to make the decision.
If the decision can be based on existing data, then the source(s) will be documented and evaluated to ensure reasonable confidence that the data area acceptable. If new data are needed, then the type of measurements (e.g., scan, direct measurement, and/or sampling) will need to be determined.
2.1.4 Define the Study Boundaries The step includes identification of the target population of interest, the spatial and temporal features of that population, the time frame for collecting the data, practical constraints, and the scale of decision making. In FSS, the target population is the set of samples or direct measurements that constitute an area of interest. The medium of interest is specified during the planning process. The spatial boundaries include the entire area of interest, including soil depth, area dimensions, contained water bodies, and natural boundaries. Temporal boundaries include activities impacted by time-related events including weather conditions, season, and operation of equipment under different environmental conditions, resource loading, and work schedule.
2.1.5 Develop a Decision Rule The step develops the binary statement that defines a logical process for choosing among alternative actions. The decision rule is a clear statement using the If...then... format and includes action level conditions and the statistical parameter of interest.
2.1.6 Specify Tolerable Limits on Decision Errors This step incorporates hypothesis testing and probabilistic sampling distributions to control the decision errors during data analysis. Hypothesis testing is a process based on the scientific method that compares a baseline condition (the null hypothesis) to an alternative condition (the
FINAL STATUS SURVEY FINAL REPORT - PHASE 2, PART 2 REVISION 1
[17]
alternative hypothesis). Hypothesis testing rests on the premise that the null hypothesis is true and that sufficient evidence must be provided to reject it.
2.1.7 Optimize the Design for Obtaining Data The final step in the DQO process leads to the development of an adequate survey design. By using an on-site analytical laboratory, sampling and analysis processes are designed to provide near real-time data assessment during implementation of field activities and FSS. Gamma scans provide information on soil areas that have residual radioactivity greater than background and allow appropriate selection of biased sampling and measurement locations. This data will be evaluated and used to refine the scope of field activities to optimize implementation of the FSS design and ensure the DQOs are met.
As stated, the primary objective of the DQO process was to demonstrate that the level of residual radioactivity found in the soils in the land area survey units, including any areas of elevated activity, was equal to or below the site-specific DCGLs that correspond to the 25 mrem/yr release criterion.
At ZNPS, compliance is demonstrated through the summation of dose from four (4) distinct source terms for the end-state (basements, soils, buried pipe and groundwater). Each radionuclide-specific Base Case DCGL (BcDCGL) is equivalent to the level of residual radioactivity (above background levels) that could, when considered independently, result in a TEDE of 25 mrem/year to an AMCG. To ensure that the summation of dose from each source term is 25 mrem/year or less after all FSS is completed, the BcDCGLs are reduced based on an expected, or a priori, fraction of the 25 mrem/year dose limit from each source term. These reduced values are designated as Operational DCGLs (OpDCGL) and these OpDCGLs (LTP Chapter 5, Section 5.2.4) are then used as the DCGL for the FSS design of the survey unit (calculation of surrogate DCGLs, investigations levels, etc.). Details of the OpDCGLs derived for each dose component and the basis for the applied a priori dose fractions are provided in ZionSolutions TSD 17-004, Operational Derived Concentration Guideline Levels for Final Status Survey (Reference 13).
Table 2-1 (reproduced from LTP Tables 5-9 and 5-10) provides a listing for the Base Case and Operational DCGLs for Buried Piping.
FINAL STATUS SURVEY FINAL REPORT - PHASE 2, PART 2 REVISION 1
[18]
Table 2-1, Base Case and Operational DCGLs for Buried Pipe Radionuclide Base Case Buried Pipe DCGL dpm/100cm2 Operational Buried Pipe DCGL dpm/100cm2 Co-60 2.64E+04 6.76E+03 Cs-134 4.54E+04 1.16E+04 Cs-137 1.01E+05 2.59E+04 Ni-63 4.89E+07 1.25E+07 Sr-90 4.50E+04 1.15E+04 The development of information to support decommissioning planning and execution was accomplished through a review of all known site radiological and environmental records. Much of this information was consolidated in the HSA, ZionSolutions TSD 14-028, Radiological Characterization Report (Reference 14), and in files containing copies of records maintained pursuant to Title 10 CFR 50.75(g) (1). These documents are discussed further in applicable sections of this report.
An initial objective of site characterization and assessment was to correlate the impact of a radiological event to physical locations on ZNPS site and to provide a means to correlate subsequent survey data. To satisfy these objectives, the entire 331-acre site was divided into survey areas. Survey area size determination was based upon the specific area and the most efficient and practical size needed to bound the lateral and vertical extent of contamination identified in the area. Survey areas that have no reasonable potential for contamination were classified as non-impacted. These areas had no radiological impact from site operations and are identified in the HSA. Survey areas with reasonable potential for contamination were classified as impacted.
Classification, as described in MARSSIM, is the process by which an area or survey unit is described according to its radiological characteristics and potential for residual radioactivity.
Residual radioactivity could be evenly distributed over a large area, appear as small areas of elevated activity, or a combination of both. In some cases, there may be no residual radioactivity in an area or survey unit. Therefore, the adequacy and effectiveness of the FSS process depends upon properly classified survey units to ensure that areas with the highest potential for contamination receive a higher degree of survey effort.
The impacted survey areas established by the HSA were further divided into survey units.
The purpose of scan measurements is to confirm that the area was properly classified and that any small areas of elevated radioactivity are within acceptable levels (i.e., are less than the applicable DCGLEMC). Depending on the sensitivity of the scanning method used, the number
FINAL STATUS SURVEY FINAL REPORT - PHASE 2, PART 2 REVISION 1
[19]
of total surface contamination measurement locations may need to be increased so the spacing between measurements is reduced.
The amount of area to be covered by scan measurements is presented in Table 2-2, which is reproduced from Table 5.9 from MARSSIM.
Table 2-2, Recommended Survey Coverage Area Classification Surface Scans Soil Samples/Static Measurements Class 1 100%
Number of sample/measurement locations for statistical test, additional sample/measurements to investigate areas of elevated activity Class 2 10% to 100%, Systematic and Judgmental Number of sample/measurement locations for statistical test Class 3 Judgmental (typically <10%)
Number of sample/measurement locations for statistical test Prior to FSS, each survey units classification was reviewed and verified in accordance with the LTP and its implementing procedures. A classification change to increase the class could have been implemented without notification to regulatory authorities. A classification change to decrease the class could be implemented only after accurate assessment and notification to regulatory authorities as detailed in the LTP and its implementing procedures. Final classification was performed in conjunction with the preparation of the FSS Sample Plan. The Sample Plan reconciles all outstanding characterization data into the final characterization.
2.2 Survey Design Final Status Surveys for the ZNPS site are designed following ZionSolutions procedures, the LTP, and MARSSIM guidance. FSS design utilizes the combination of traditional scanning surveys, systematic sampling protocols and investigative/judgmental methodologies to evaluate survey units relative to the applicable release criteria within each survey plan.
To aid in the development of an initial suite of potential radionuclides of concern for the decommissioning of ZNPS, the analytical results of representative characterization samples collected at the site were reviewed. In general, the samples associated with these results were collected from within various waste/process streams and sent off site to meet the analysis criteria of 10 CFR 61, Subparts C and D. This initial suite of potential radionuclides was further refined by the Containment and Auxiliary Building concrete core data analysis. This analysis determined that Co-60, Cs-134, Cs-137, Ni-63, and Sr-90 accounted for 99.5% of all dose in the contaminated concrete mixes. For activated concrete, H-3, Eu-152, and Eu-154, in addition to the five aforementioned nuclides, accounted for 99% of the dose. Since activated concrete will be removed and disposed of as waste, the final suite of Radionuclides-of-Concern (ROC) for all areas outside of the Containments does not include H-3, Eu-152, and Eu-154.
FINAL STATUS SURVEY FINAL REPORT - PHASE 2, PART 2 REVISION 1
[20]
The final suite of potential radionuclides and the mixture is provided in Table 2-3 (reproduced from LTP Table 5-2).
Table 2-3, Dose Significant Radionuclides and Mixture Radionuclide
% of Total Activity (normalized)(1)(2)
Co-60 0.92%
Cs-134 0.01%
Cs-137 75.32%
Ni-63 23.71%
Sr-90 0.05%
(1)
Based on maximum percent of total activity from Table 20 of TSD 14-019, normalized to one for the dose significant radionuclides.
(2)
Does not include dose significant radionuclides for activated concrete (H-3, Eu-152, Eu-154).
Characterization results determined that Co-60 and/or Cs-137 would be the primary ROC for the majority of survey design. Cs-137 characterization data for the survey units discussed in this report were used to determine the expected variability, number of samples required, and investigation levels for FSS design.
The dose contribution from each ROC was accounted for using the Sum of Fractions (SOF) to ensure that the total dose from all ROC did not exceed the dose criterion. The SOF, or unity rule, was applied to the data used for the survey planning, and data evaluation and statistical tests for soil sample analyses since multiple radionuclide-specific measurements were performed or the concentrations inferred based on known relationships. The application of the unity rule served to normalize the data to allow for an accurate comparison of the various data measurements to the release criteria. When the unity rule is applied, the DCGLW (used for the nonparametric statistical test) becomes one (1). The use and application of the unity rule was performed in accordance with section 4.3.3 of MARSSIM.
Survey design objectives included a verification of the survey instruments ability to detect the radiation(s) of interest relative to the DCGL. As standard practice to ensure that this objective was consistently met, radiation detection instruments used in FSS were calibrated on a yearly frequency with a National Institute of Standards and Technology (NIST) traceable source in accordance with ZionSolutions procedures. Instruments were response checked before and after use. Minimum Detectable Count Rates (MDCR) were established and verified prior to FSS.
Control and accountability of survey instruments were maintained and documented to assure quality and prevent the loss of data.
FINAL STATUS SURVEY FINAL REPORT - PHASE 2, PART 2 REVISION 1
[21]
The level of effort associated with planning a survey is based on the complexity of the survey, structural interferences/limitations, and the nature of the hazards. Guidance for preparing FSS plans was provided in procedure ZS-LT-300-001-001.
Final Status Surveys were conducted on the buried piping to demonstrate that the concentrations of residual radioactivity were equal to or below site-specific OpDCGLs.
Buried Piping was classified in accordance with Attachment F of ZionSolutions TSD 14-016.
The FSS of buried pipe was performed utilizing a Ludlum Model 2350-1 Data Logger paired with a Ludlum sodium iodide (NaI) gamma detector. In some cases, the detector was calibrated for a Cs-137 energy window in order to reduce the impact of Naturally Occurring Radioactive Material (NORM) in the surrounding soils. Each measurement had a calculated Field-of-View (FOV) for that specific piping diameter. One-minute static measurements were taken to quantify the activity in the pipe. The detector efficiencies were determined for each instrument using a wide range of pipe interior diameters and geometries with NIST traceable planar sources.
2.3 Survey Implementation Final Status Survey implementation of the Phase 2 Part 2 buried pipe survey units commenced on May 7, 2018. FSS implementation for the remaining Phase 2 Part 2 buried pipe survey units commenced in July 25, 2019. Implementation was the physical process of the FSS Sample Plan execution for a given survey unit. Each Sample Plan was assigned to a Radiological Engineer (RE) for implementation and completion in accordance with the LTP, ZionSolutions procedures and the QAPP for Characterization and FSS. A walk-down and turnover survey was performed for each FSS survey unit in accordance with the Isolation and Control requirements of procedure ZS-LT-300-001-003. A turnover survey was performed within each FSS survey unit and consisted of surveys for loose surface contamination as well as the acquisition of several scoping measurements.
The tasks included in the implementation were:
- Verification and validation of personnel training as required by Training Department and Radiation Protection procedures.
- Survey Packages were developed in accordance with ZionSolutions procedure ZS-LT-300-001-001. The FSS unit was inspected and controlled in accordance with ZionSolutions procedure ZS-LT-300-001-003.
- Monitoring instrument calibration and routine performance checks, as detailed in ZS-RP-108-000-000, Radiological Instrumentation Program (Reference 15) and ZS-RP-108-004-012, Calibration and Initial Set Up of the 2350-1 (Reference 16).
- Implementation of applicable operating and health and safety procedures.
FINAL STATUS SURVEY FINAL REPORT - PHASE 2, PART 2 REVISION 1
[22]
- Implementation of isolation of control of the survey unit in accordance with ZS-LT-300-001-003.
- Determination of the amount of surveys and sampling required to meet DQOs as described in ZS-LT-300-001-001.
- Proper techniques for collecting and handling FSS samples in accordance with Job Aid LT-JA-004, FSS Sample Collection (Reference 17).
- Maintaining Quality Assurance/Quality Control requirements (i.e., replicate measurements or samples) in accordance with the QAPP for Characterization and FSS.
- Sample Chain-of-Custody maintained in accordance with ZS-LT-100-001-004, Sample Media Preparation for Site Characterization (Reference 18).
- Sample submission to approved laboratories in accordance with ZS-WM-131, Chain of Custody Protocol (Reference 19).
- Application of the DCGLs to sample results in accordance with the Data Quality Assessment (DQA) process as detailed in ZS-LT-300-001-004.
- Determination of investigation methodology and corrective actions, if applicable.
The FSS implementation and completion process resulted in the generation of field data and analysis data consisting of measurements taken with handheld radiation detecting equipment, observations noted in field logs, and radionuclide specific analysis. Data were stored electronically on the ZionSolutions common network.
2.4 Survey Data Assessment Prior to proceeding with data evaluation and assessment, the assigned RE ensured consistency between the data quality and the data collection process and the applicable requirements.
The DQA process is an evaluation method used during the assessment phase of FSS to ensure the validity of FSS results and demonstrate achievement with the FSS Sample Plan objectives.
A key step in the data assessment process converts all of the survey results to DCGL units, if necessary. The individual measurements and sample concentrations are compared to the DCGL for evidence of small areas of elevated activity or results that are statistical outliers. When practical, graphical analyses of survey data that depicts the spatial correlation of the measurements was used.
The DQO process was employed to determine the ROC for each FSS unit in this report. During FSS, concentrations for HTD ROC, Ni-63 and Sr-90 were inferred using a surrogate approach.
Cs-137 is the principle surrogate radionuclide for Sr-90. Co-60 is the principle surrogate radionuclide for Ni-63. The maximum ratios were used to infer HTD concentrations during FSS unless area specific ratios were determined. In these cases, the ratios used and their basis are described in the individual Release Record.
FINAL STATUS SURVEY FINAL REPORT - PHASE 2, PART 2 REVISION 1
[23]
In accordance with LTP Chapter 5, Section 5.6.4.1.1, the Type I decision error was set at 0.05 and the Type II decision error was set at 0.05. The Upper Bound of the Gray Region was set at the OpDCGLBP. The Lower Bound of the Gray Region (LBGR) was set at the expected fraction of the OpDCGLBP. The maximum a priori total dose fraction for a basement FSS unit when summing each dose component fraction within each basement was 0.448. This is the value that is currently being applied to the site compliance equation for the expected fraction of dose for the maximum basement survey unit variable (fBasement). The remaining dose fraction for the compliance equation, assuming fBasement at 0.448, is 0.552. The expected fraction of dose for the groundwater term (fGW) due to instrument MDC is assumed to be 0.040. The remaining dose fraction of 0.512 is distributed between soil and buried pipe at 0.256 each. FSS surveys of open land and buried pipe survey units performed prior to the completion of the FSS of structures will be performed using these a priori fractions and the resulting OpDCGLs (TSD 17-004).
2.5 Quality Assurance and Quality Control Measures Quality assurance and control measures were employed throughout the FSS process to ensure that all decisions were based on data of acceptable quality. Quality assurance and control measures were applied to ensure:
- The plan was correctly implemented,
- The DQA process was used to assess results,
- DQOs were properly defined and derived,
- All data and samples were collected by individuals with the proper training and in adherence to approved procedures and sample plans,
- All instruments were properly calibrated and routinely performance checked,
- All collected data was validated, recorded, and stored in accordance with approved procedures,
- All required documents were properly maintained, and
- Corrective actions were prescribed, implemented, and tracked, as necessary.
Independent laboratories used for analysis of the samples collected during FSS maintain Quality Assurance Plans designed for their facility. ZionSolutions reviewed those plans, as required by ZS-QA-10, Quality Assurance Project Plan (Reference 20) and the QAPP for Characterization and FSS, prior to selection. In addition, regular vendor performance reviews, audits and/or surveillances of these laboratories were performed to ensure an adequate level of quality.
The ZionSolutions Quality Assurance (QA) department provided oversight of the C/LT Group on a consistent basis throughout the project at the Zion Station Restoration Project (ZSRP). QA
FINAL STATUS SURVEY FINAL REPORT - PHASE 2, PART 2 REVISION 1
[24]
surveillances have scrutinized the LTP, C/LT procedures, Sample Plans, and C/LT records. The responses to the QA surveillances are captured in the Corrective Action Program (CAP).
- 3. SITE INFORMATION 3.1 Site Description Zion Nuclear Power Station, owned by Exelon Nuclear Generation, LLC (Exelon), is located in Zion, Illinois, on the west shore of Lake Michigan. The site is approximately 40 miles north of Chicago, Illinois, and 42 miles south of Milwaukee, Wisconsin.
The owner-controlled site consisted of approximately 331-acres, and within the owner-controlled site was an approximate 87-acre, fence-enclosed nuclear facility. The center of the community of Zion was approximately 1.6 miles from the plant location on the site. There are no schools or hospitals within one mile of the site, and no residences are within 2,000 feet of any ZNPS structures.
Westinghouse Electric Corporation, Sargent and Lundy Engineers, and the Commonwealth Edison Company (ComEd) jointly participated in the design and construction of ZNPS. The plant was comprised of two pressurized water reactors with supporting facilities. The primary coolant system for each unit employed a four-loop pressurized water reactor nuclear steam supply system housed in a steel-lined, reinforced concrete containment structure. Each unit employed a pressurized water reactor nuclear steam supply system furnished by Westinghouse Electric Corporation, designed for a power output of 3,250 MWt. The equivalent warranted gross and approximate net electrical outputs of the plant were 1085 MWe and 1050 MWe, for Unit 1 and Unit 2 respectively.
ZNPS was previously operated by Commonwealth Edison until it was permanently shut down on February 13, 1998. On March 9, 1998, ComEd certified to the NRC that all fuel assemblies had been permanently removed from both reactors and placed in the Spent Fuel Pool. The NRC acknowledged the certification of permanent cessation of power operation and permanent removal of fuel from the reactor vessels in a letter dated May 4, 1998. In 2000, the licenses were transferred from ComEd to Exelon. In 2008, the licenses were transferred to ZionSolutions to coordinate and execute the decommissioning of the site. The Post Shutdown Decommissioning Activities Report (PSDAR) (Reference 21) was submitted, in accordance with 10 CFR 50.82(a), in February 2000 and accepted by the NRC. An amended PSDAR was submitted in March 2008 to accommodate the transfer of the 10 CFR 50 licenses to ZionSolutions and to revise cost estimates and the decommissioning schedule. The Defueled Safety Analysis Report (DSAR) (Reference 22) was updated in October 2016. An evaluation of the systems, structures, and components (SSCs) was performed to determine the function these systems would perform in a defueled condition. With the relocation of the spent fuel to the Independent Spent Fuel Storage Installation (ISFSI), the license basis for the majority of the SSCs was changed and only minimal SSCs were needed to support the ongoing active
FINAL STATUS SURVEY FINAL REPORT - PHASE 2, PART 2 REVISION 1
[25]
decommissioning. The remaining SSCs needed to support active decommissioning had controls established in the DSAR and the Offsite Dose Calculation Manual (ODCM) (Reference 23).
On November 2, 2011, site characterization commenced. At the time these surveys were performed, the site-specific ZionSolutions characterization plans and procedures were still under development. Consequently, due to schedule restraints, ZionSolutions contracted the EnergySolutions Commercial Services Group (ESCSG) to perform characterization of the ISFSI location, the Vertical Concrete Cask (VCC) Construction Area, and the pathway for the new rail track. The results of these surveys were validated and integrated into the subsequent site-specific characterization program, which was approved in February of 2012. Initial scheduled site characterization efforts concluded on November 11, 2013. The results of site characterization are presented in LTP Chapter 2 as well as TSD 14-028.
3.2 Survey Unit Description The following information is a description of each survey unit at the time of FSS. During this period, seven (7) FSS survey units, contained in five (5) release records, were completed and are presented in this Phase 2, Part 2 Final Report. The five (5) release records are included in this final report as appendices.
3.2.1 Survey Unit 00101A (Condensate Feed Water Supply and Recirculation)
The Condensate Feed Water Supply and Recirculation Buried Pipes consisted of three sections of pipe that ran under the Turbine Building basement floor slab. The Condensate to Feed Water section was designated as T-103. Section T-103 was a 20-inch internal diameter (ID) header with a length of approximately 226 feet, running from the penetration in the Oil Room to a vertical through the Turbine Building basement floor slab. The Condensate Pump Recirc pipe was designated as T-105. The T-105 section was a 4.5-inch ID pipe approximately 221 feet in length and ran to the Condensate Recirculation pump. The pipe to the Condensate and Makeup Pumps was designated as T-106. The T-106 section was a 12.75-inch ID pipe approximately 21 feet in length and ran to Condensate Transfer and Make-up Pumps. The total length of the Condensate Feed Water Supply and Recirculation pipe identified in these three (3) sections of pipe from TSD 14-016 Attachment F, was approximately 468 feet.
The three (3) pipes (T-103, T-105 and T-106) that constituted this survey unit were situated below the level of ground water. The pipes were cut inside the Turbine Building basement prior to the demolition and basement backfill. As they were not capped or isolated, there was unobstructed groundwater intrusion into each pipe. The T-103 pipe was accessible for survey measurements to be conducted. However, neither the T-105 nor the T-106 sections of this system were available for survey due to groundwater intrusion. In addition, due to their physical configuration and depth, complete removal of pipe sections T-105 and T-106 were also not possible. Since the T-103 buried pipe was part of the same system, it was determined that measurements taken within the T-103 section of pipe would be representative of radiological
FINAL STATUS SURVEY FINAL REPORT - PHASE 2, PART 2 REVISION 1
[26]
conditions within the system interior, including the two (2) pipes obstructed by groundwater intrusion (pipe sections T-105 and T-106). The pipe was cut into sections and placed on the ground to the northeast of the Turbine Building for survey.
Based on information from the Zion Station HSA, the initial classification for this buried pipe was Class 3. In accordance with ZionSolutions procedure ZS-LT-300-001-002, survey unit 00101A was classified as MARSSIM Class 3.
During the FSS of the Turbine Building and Crib House basements, radiological surveys were performed in several sections of Service Water Piping associated with the Circulating Water Intake Pipe and Circulating Water Discharge Tunnels. Radiological surveys were also performed to support the segmentation and removal of Condensate and Service Water pipe that was connected to the sections of end-state buried pipe.
Based upon completion of survey unit Classification Basis for final classification, which included a review of the historical information, the results of the survey data, and completion of a final survey unit Classification Worksheet, it was concluded that there was a low probability for the presence of residual radioactivity in these pipes in concentrations greater than 50% of the OpDCGLs, justifying a FSS unit classification of Class 3.
FSS of the T-103 section of the Condensate Pipe began on May 11, 2017. A Ludlum Model 2350-1, #266668 was coupled with Ludlum Model 44-162 #PR327894 to perform this FSS.
The detector was transported through the pipe interiors using the 3/4 fiber rod. A one-minute static measurement was acquired at on-foot intervals throughout the interior of the accessible pipe (257 feet). For a 20-inch ID pipe, this equates to an areal scan coverage of 1,283.8 ft2 of area, which is approximately 52.2% of the total internal surface area of the Condensate Pipe (2,456.1 ft2).
3.2.2 Survey Unit 00101B (Primary Water Supply Header)
The Primary Water Supply Header consisted of two sections of 6-inch ID pipe that ran under the Turbine Building basement floor slab. The pipe supplied water to the Primary Water Storage Tank (PWST). The length of the T-095 section was approximately 118 feet, running from the penetration in the Oil Room to a vertical through the Turbine Building basement floor slab. The length of the T-102 section was approximately 78 feet. During the removal of the PWST and the associated piping, the pipe was cut at the 588-foot elevation above the elbow into the penetration though the Oil Room wall at the 556-foot elevation. The total length of the two (2) pipe sections that made up the Primary Water Supply Header was approximately 196 linear feet. The entire internal area of the interior surfaces of the two pipes combined was 312.27 ft2.
Survey unit 00101B was initially classified as Class 3 in accordance with Attachment F of TSD 14-016 and from information taken from the HSA. The survey unit was reclassified as Class 2 in accordance with ZionSolutions procedure ZS-LT-300-001-002. Prior to performing the
FINAL STATUS SURVEY FINAL REPORT - PHASE 2, PART 2 REVISION 1
[27]
survey, the classification was changed to Class 2 in response to the discovery of detectable residual radioactivity during the removal of the PWST, which was serviced by the Primary Water Supply Header pipe.
Based upon completion of Survey Unit Classification Basis for final classification, which included a review of the historical information, the results of the survey data, and completion of a final Survey Unit Classification Worksheet, it was concluded that there was a probability for the presence of residual radioactivity in these pipes, however at concentrations less than the OpDCGL for buried pipe, justifying a FSS unit classification of Class 2 The pipes were cut inside the Turbine Building basement prior to the demolition and basement backfill. As they were not capped or isolated, there was unobstructed groundwater intrusion into each pipe. Sections for both the T-095 pipe and the T-102 pipe became inaccessible due to groundwater flooding into the pipe. Since the sections of the T-095 and T-102 pipe, as well as the sections of the pipe located above the 588 foot elevation slated for removal were part of the same system, it was determined that measurements taken within the removed sections of pipe would be representative of radiological conditions within the two (2) pipes obstructed by groundwater intrusion.
The Primary Water Supply Header pipe was surveyed with a Ludlum Model 2350-1 Data Logger paired with a Ludlum Model 44-157 NaI gamma detector. One-minute static measurements were taken to quantify the activity in the pipe. Each measurement had a calculated FOV of 1.57 ft2. A minimum of one hundred (100) measurements were necessary to provide for 50% areal surface coverage for a Class 2 survey.
3.2.3 Survey Unit 00101F (Diesel Generator Heat Exchanger Service Water Supply and Return)
The Diesel Generator Heat Exchanger Service Water Supply piping consists of 12-inch ID pipe that is 304.4 linear feet in length, which equates to a surface area of 88.8 m2. The piping consists of 4 sections: for Unit 1, AO-30 (74.5 feet) and AO-31 (77.7 feet), and for Unit 2, AO-27 (74.5 feet) and AO-28 (77.7 feet). The openings for these pipe sections are on the Diesel Generator Room floor (567-foot elevation), and on the north and south walls of the Auxiliary Building (553-foot and 554-foot elevation).
The Diesel Generator Heat Exchanger Service Water Return buried piping consisted of two (2) sections of 15-inch ID ran 367.2 linear feet under the Turbine Building basement pad (TO-32 and TO-33). The pipes were cut on the floor opening thus exposing both pipes to groundwater intrusion. At the time of FSS, the Return sections of this pipe (TO-32 and TO-33) were determined to be obstructed by unmitigated groundwater intrusion. Consequently, the measurements taken in the unobstructed sections (AO-27, AO-28, AO-30, and AO-31) were deemed as representative of the entire pipe length. The total length of the piping of this survey unit was 671.6 linear feet (204.7 meters).
FINAL STATUS SURVEY FINAL REPORT - PHASE 2, PART 2 REVISION 1
[28]
The Diesel Generator Heat Exchanger Service Water Supply and Return piping (AO-27, AO-28, AO-30, AO-31, TO-32 and TO-33) were classified as MARSSIM Class 3 in accordance with Attachment F of TSD 14-016 and from information taken from the Zion Station HSA.
Based upon completion of Survey Unit Classification Basis for final classification, which included a review of the historical information, the results of the survey data, and completion of a final Survey Unit Classification Worksheet, it was concluded that there was a low probability for the presence of residual radioactivity in these pipes in concentrations greater than 50% of the OpDCGLs, justifying a FSS unit classification of Class 3.
The Diesel Generator Heat Exchanger Service Water Supply pipes were surveyed with a Ludlum Model 2350-1 Data Logger paired with a Ludlum Model 44-10 NaI gamma detector calibrated for a Cs-137 energy window. One-minute static measurements were taken to quantify the activity in the pipe. Each measurement had a calculated FOV for a 12-inch diameter piping of 3.14 ft2 (2,919 cm2). The total length of the piping of this survey unit was 671.6 linear feet. The Diesel Generator Heat Exchanger Service Water buried piping was not accessible at the time the survey was performed due to unmitigated groundwater intrusion into the pipe. However, the Diesel Generator Heat Exchanger Service Water Return piping was the same system as the Diesel Generator Heat Exchanger Service Water Supply piping; therefore, the radiological conditions in the Supply pipe were considered to be radiologically representative of the entire piping system.
3.2.4 Survey Unit 00101H (Service Water Supply Header)
The Service Water Supply Header CO-26 and CO-29 Buried Pipe consisted of two (2) sections of 48-inch ID pipe that were approximately 208.8 feet in length. The piping ends at the G Wall of the Auxiliary Building on the 549-foot elevation. The piping ran under the Turbine Building basement. The two 48-inch Service Water Supply Header pipes exited the Auxiliary Building at the 550-foot elevation. The pipes traversed east approximately 10 feet beneath the 560-foot elevation Turbine Building floor and exited the Turbine Building Oil Room wall at the 548-foot elevation. The pipes then traversed 8 feet east and then rose vertically from the 548-foot elevation to the 579-foot elevation. The pipes then continued eastward to the Crib House wall.
The horizontal sections traversing from the Turbine Building to the Crip House at the 579-foot elevation was cut and the ends at the Crib House were capped.
The Service Water Supply Header piping (CO-26 and CO-29) was classified as MARSSIM Class 3 in accordance with Attachment F of TSD 14-016 and from information taken from the Zion Station HSA.
The Service Water Supply Header pipe was surveyed with a Ludlum Model 2350-1 Data Logger paired with a Ludlum Model 44-157 NaI gamma detector. One-minute static measurements were taken to quantify the activity in the pipe. Each measurement had a calculated FOV of 4.45 ft2 (4,134 cm2). Fifty-nine (59) measurements were necessary to
FINAL STATUS SURVEY FINAL REPORT - PHASE 2, PART 2 REVISION 1
[29]
provide for 10% areal surface coverage for a Class 3 survey. The total linear feet of pipe in this survey unit was approximately 417.6 feet.
Based upon completion of Survey Unit Classification Basis for final classification, which included a review of the historical information, the results of the survey data, and completion of a final Survey Unit Classification Worksheet, it was concluded that there was a low probability for the presence of residual radioactivity in these pipes in concentrations greater than 50% of the OpDCGLs, justifying a FSS unit classification of Class 3.
3.2.5 Survey Units 00150A/B & C (North End Storm Drain)
Survey unit 00150A consisted of the buried 6-inch ID storm sewer pipe that runs from the north end of the electrical switchyard to the open drainage ditch located in the southern portions of open land survey areas 10212 and 10213, flowing west to east into Lake Michigan. A second header is also located along the site access road in open land survey area 10214. This header ties into the west/east header under the site parking lot. The storm sewer system itself consisted of 6-inch ID smooth wall steel pipe that was approximately 135 linear feet in length. This equated to an internal surface area of approximately 212 ft2.
Survey unit 00150B, consisted of the buried 8-inch ID PVC storm sewer pipe that was located along the access road north of the Protected Area and was approximately 515 linear feet in length, which equated to a surface area of 1,076 ft2. This piping connected Catch Basin (CB)-1 to CB-6.
Survey unit 00150C, consisted of the buried 8-inch, 12-inch and 15-inch ID piping that was located along the side of the access road north of the Protected Area. The pipe was in three sections that totaled approximately 269 linear feet of pipe.
- The 8-inch ID PVC pipe ran from CB-7 to a capped off section of pipe. This section was approximately 35 linear feet in length, which equated to a surface area of 73 ft2.
- The 12-inch ID smooth steel wall piping ran from CB-6 to CB-7. This section of pipe was approximately 119 linear feet in length, which equated to a surface area of 374 ft2.
- The 15-inch corrugated steel piping ran from the West Ditch to CB-7. This section of pipe was approximately 115 linear feet in length, which equated to a surface area of 452 ft2.
On May 7, 2019, as part of an FSS surveillance performed on the north portion of the Switchyard open land survey unit (10205) in accordance with ZionSolutions procedure ZS-LT-300-001-003, C/LT Technicians collected sediment samples from the bottom of manhole access points to the Switchyard storm drain. Both storm drain systems were initially classified as non-impacted from information taken from the HSA. In the sediment sample collected from the west access point (L2-10214C-RJGS-001-SM), both Cs-137 and Co-60 were positively detected at concentrations of 2.22E+00 pCi/g and 1.80E-01 pCi/g respectively. Consequently, the discovery prompted a change of classification in accordance with ZionSolutions procedure ZS-LT-300-001-002. This storm drain, which had previously been classified as non-impacted
FINAL STATUS SURVEY FINAL REPORT - PHASE 2, PART 2 REVISION 1
[30]
was reclassified as a MARSSIM Class 2 buried pipe and subject to compliance demonstration as required by LTP Chapter 5, Section 5.7.1.9.
License Termination Plan Chapter 5, Section 5 states, The list of buried piping, penetrations and embedded piping to remain is provided in ZionSolutions TSD 14-016, Description of Embedded Pipe [sic, Piping],
Penetrations, and Buried Pipe to Remain in Zion End State (Reference 5-8)
[Reference 7 in this Release Record]. The list of end-state embedded pipe, buried pipe, and penetrations presented in Attachment F to TSD 14-016 is intended to be a bounding end-state condition. No pipe that is not listed in Attachment F will be added to the end-state condition however, pipe can be removed from the list and disposed of as waste.
Since this section of storm drain (approximately 600 feet of piping) was not included in TSD 14-016, in order to perform FSS on this piping as an impacted buried pipe, TSD 14-016 Attachment F will be revised to include this section of pipe. In order to revise the TSD, ZionSolutions performed both a 10 CFR 50.59 review and a regulatory review against the SER for the LTP in accordance with the Attachment E-1 (License Termination Plan Change Evaluation) checklist from ZionSolutions Procedure AD-11 Regulatory
- Reviews, ZionSolutions Project. The results of the evaluation indicted that ZionSolutions could make this revision to the LTP without NRC pre-approval. However, ZionSolutions notified the NRC of the intent to perform this action by formal correspondence. A figure showing the location of the storm drain piping is included in Attachment 1.
A final classification assessment was performed in accordance with procedure ZS-LT-300-001-002 as part of the survey design for FSS. The assessment confirmed that survey unit 00150A, B and C were correctly classified as MARSSIM Class 2.
3.3 Summary of Historical Radiological Data The site historical radiological data for this Phase 2 FSS Final Report incorporates the results of the HSA issued in 1999 and supplemented in 2006, and includes the initial characterization surveys completed in 2013.
3.3.1 Historical Site Assessment and Characterization Surveys The HSA was a detailed investigation to collect existing information (from the start of ZNPS activities related to radioactive materials or other contaminants) for the site and its surroundings. The HSA focused on historical events and routine operational processes that resulted in contamination of plant systems, onsite buildings, surface and subsurface soils within the Radiologically Controlled Area (RCA). It also addressed support structures, open land areas and subsurface soils outside of the RCA but within the owner-controlled area. The information compiled by the HSA was used to establish initial area survey units and their MARSSIM
FINAL STATUS SURVEY FINAL REPORT - PHASE 2, PART 2 REVISION 1
[31]
classifications. This information was used as input into the development of site-specific DCGLs, remediation plans and the design of the FSS. The scope of the HSA included potential contamination from radioactive materials, hazardous materials, and other regulated materials.
The objectives of the HSA were to:
- Identify potential, likely, or known sources of radioactive and chemical contaminants based on existing or derived information.
- Distinguish portions of the site that may need further action from those that pose little or no threat to human health.
- Provide an assessment of the likelihood of contaminant migration.
- Provide information useful to subsequent continuing characterization surveys.
- Provide an initial classification of areas and structures as non-impacted or impacted.
- Provide a graded initial classification for impacted soils and structures in accordance with MARSSIM guidance.
- Delineate initial survey unit boundaries and areas based upon the initial classification.
The survey units established by the HSA were used as initial survey units for characterization.
Prior to characterization, survey unit sizes were adjusted in accordance with the guidance provided in MARSSIM section 4.6 for the suggested physical area sizes for survey units for FSS.
Site characterization of the ZNPS was performed in accordance with ZS-LT-02, Characterization Survey Plan (Reference 24). It was developed to provide guidance and direction to the personnel responsible for implementing and executing characterization survey activities. The Characterization Survey Plan worked in conjunction with implementing procedures and survey unit specific survey instructions (sample plans) that were developed to safely and effectively acquire the requisite characterization data.
Characterization data acquired through the execution of the Characterization Survey Plan was used to meet three primary objectives:
- Provide radiological inputs necessary for the design of FSS.
- Develop the required inputs for the LTP.
- Support the evaluation of remediation alternatives and technologies and estimate waste volumes.
Characterization surveys were not specifically performed in any of the buried pipe survey units addressed in this report. During the performance of site characterization, most of the system interior surfaces of this buried pipe were not accessible. As decommissioning progressed, pipe interior surfaces were exposed, and turnover surveys were performed as part of the FSS
FINAL STATUS SURVEY FINAL REPORT - PHASE 2, PART 2 REVISION 1
[32]
preparation. In addition, during the FSS of the Turbine Building and Crib House basements, radiological surveys were performed in several sections of Service Water Piping associated with the Circulating Water Intake system. No plant-derived radionuclides were positively identified during the performance of these surveys. In addition, radiological surveys were also performed to support the segmentation and removal of Condensate and Service Water pipe that was connected to the sections of end-state buried pipe. No gross radioactivity greater than background was identified during the scanning performed as part of those surveys.
In survey unit 00101B, the Primary Water Supply Header system was initially classified as MARSSIM Class 3 in accordance with Attachment F of TSD 14-016 and from information taken from the Zion Station HSA. The survey unit was reclassified as Class 2 in accordance with ZionSolutions procedure ZS-LT-300-001-002 as detectable contamination was identified during the demolition of the PWST, which was serviced by the Primary Water Supply Header.
On May 7, 2019, as part of an FSS surveillance performed on the north portion of the Switchyard open land survey unit (10205) in accordance with ZionSolutions procedure ZS-LT-300-001-003, C/LT Technicians collected sediment samples from the bottom of manhole access points to the Switchyard storm drain. Both storm drain systems were initially classified as non-impacted from information taken from the HSA. In the sediment sample collected from the west access point (L2-10214C-RJGS-001-SM), both Cs-137 and Co-60 were positively detected at concentrations of 2.22E+00 pCi/g and 1.80E-01 pCi/g respectively. Consequently, the discovery prompted a change of classification in accordance with procedure ZS-LT-300-001-002. This storm drain, which had previously been classified as non-impacted was reclassified as a MARSSIM Class 2 buried pipe and subject to compliance demonstration as required by LTP Chapter 5, Section 5.7.1.9.
3.4 Conditions at the Time of Final Status Survey Buried pipe is defined as a pipe that runs through soil. The critical group for the buried piping dose assessment is the Resident Farmer.
The buried pipe DCGLs (DCGLBP) are expressed in units of dpm/100cm2 are determined for two (2) scenarios; assuming that all pipe is excavated and assuming that all pipe remains in situ.
Although unrealistic, for the purpose of the bounding modeling approach used, the dose from the two scenarios is summed to determine the DCGLBP. RESRAD was used to calculate DCGLBP for both the excavation and in situ buried pipe scenarios using the parameters developed for soil modified as necessary for the buried pipe source term geometry. Details on dose assessment methods are provide in LTP, Section 6.12. A brief overview of scenario assumptions is provided below.
Designated sections of buried piping will be remediated in place and undergo FSS. The inventory of buried piping located below the 588-foot grade that will remain and be subjected to FSS is provided in TSD 14-016. Compliance with the OpDCGL values, as presented in LTP Table 5-10, will be demonstrated by measurements of total surface contamination and/or the
FINAL STATUS SURVEY FINAL REPORT - PHASE 2, PART 2 REVISION 1
[33]
collection of sediment samples. The radiological survey of pipe system interiors involves the insertion of appropriately sized detectors into the pipe interior by a simple push-pull methodology, whereby the position of the detector in the piping system can be easily determined in a reproducible manner.
At ZNPS, compliance is demonstrated through the summation of dose from four (4) distinct source terms for the end-state (basements, soils, buried pipe and groundwater). Each radionuclide-specific Base Case DCGL is equivalent to the level of residual radioactivity (above background levels) that could, when considered independently, result in a TEDE of 25 mrem/year to an AMCG. To ensure that the summation of dose from each source term is 25 mrem/year or less after all FSS is completed, the Base Case DCGLs are reduced based on an expected, or a priori, fraction of the 25 mrem/year dose limit from each source term. These reduced values are designated as OpDCGLs, and these OpDCGLs (LTP Chapter 5, Section 5.2.4) are then used as the DCGL for the FSS design of the survey unit (calculation of surrogate DCGLs, investigations levels, etc.). Details of the OpDCGLs derived for each dose component and the basis for the applied a priori dose fractions are provided in ZionSolutions TSD 17-004.
Condensate Feed Water Supply and Recirculation - The pipe approached the east wall of the Turbine Building basement from the Crib House Basement approximately 51 feet under the road from east to west at approximately the 586-foot elevation. The pipe then turned 90 degrees downward and ran a distance of 30 feet and turned 90 degrees west where it penetrated the east A wall of the Turbine Building basement at the 556-foot elevation. The pipe then ran from east to west under the Turbine Building basement floor slab. The Condensate pipe branched into two different headers which both terminated on the 560-foot elevation (floor) of the Turbine Building. The pipes were cut inside the Turbine Building basement prior to the demolition and basement backfill. As they were not capped or isolated, there is unobstructed groundwater intrusion into each pipe. The T-103 pipe was accessible for survey measurements to be conducted. However, neither the T-105 nor the T-106 sections of this system were available for survey due to groundwater intrusion. Since the T-103 buried pipe was part of the same system, it was determined that measurements taken within the T-103 section of pipe would be representative of radiological conditions within the system interior, including the two (2) pipes obstructed by groundwater intrusion.
Primary Water Supply Header - The pipe consisted of two (2) sections of 6-inch ID pipe that ran under the Turbine Building basement floor slab. The pipe supplied water to the PWST.
The length of the T-095 section was approximately 118 feet, running from the penetration in the Oil Room to a vertical through the Turbine Building basement floor slab. The length of the T-102 section was approximately 78 feet. Both the pipes were cut inside the Turbine Building basement prior to the demolition and basement backfill. As they were not capped or isolated, there was unobstructed groundwater intrusion into each pipe.
The Primary Water Supply Header piping (T-095 and T-102) were initially classified as MARSSIM Class 3 in accordance with Attachment F of TSD 14-016. Prior to performing the
FINAL STATUS SURVEY FINAL REPORT - PHASE 2, PART 2 REVISION 1
[34]
survey, the classification was changed to Class 2 in response to the discovery of detectable residual radioactivity during the removal of the PWST, which was serviced by the Primary Water Supply Header pipe.
Diesel Generator Service Water Supply - The Diesel Generator Heat Exchanger Service Water Supply piping consists of a 12-inch ID pipe that is approximately 304.4 linear feet in length, which equates to a surface area of 88.8 m2. The piping consists of 4 sections: for Unit 1, A030 (74.5 feet) and A031 (77.7 feet), and for Unit 2, A027 (74.5 feet) and A028 (77.7 feet).
The openings for these pipe sections are on the Diesel Generator Room floor (567-foot elevation), and on the north and south walls of the Auxiliary Building (553 foot and 554-foot elevation).
Service Water Supply Header - The Service Water Supply Header piping consists of 2 runs of 48-inch ID pipe that is approximately 208.8 feet in length. The piping ends at the G Wall of the Auxiliary Building at 547-foot elevation. The piping runs under the Turbine Building.
North End Storm Drain - Consisted of the buried 6-inch ID storm sewer pipe that runs from the north end of the electrical switchyard to the open drainage ditch located in the southern portions of open land survey areas 10212 and 10213, flowing west to east into Lake Michigan.
A second header is also located along the site access road in open land survey area 10214. This header ties into the west/east header under the site parking lot. The storm sewer system itself consisted of 6-inch ID smooth wall steel pipe that was approximately 135 linear feet in length.
This equated to an internal surface area of approximately 212 ft2.
On May 7, 2019, as part of an FSS surveillance performed on the north portion of the Switchyard open land survey unit (10205) in accordance with procedure ZS-LT-300-001-003, C/LT Technicians collected sediment samples from the bottom of manhole access points to the Switchyard storm drain. Both storm drain systems were initially classified as non-impacted from information taken from the HSA. In the sediment sample collected from the west access point (L2-10214C-RJGS-001-SM), both Cs-137 and Co-60 were positively detected at concentrations of 2.22E+00 pCi/g and 1.80E-01 pCi/g respectively. Consequently, the discovery prompted a change of classification in accordance with procedure ZS-LT-300-001-002. This storm drain, which had previously been classified as non-impacted was reclassified as a MARSSIM Class 2 buried pipe and subject to compliance demonstration as required by LTP Chapter 5, Section 5.7.1.9.
3.5 Identification of Potential Contaminants ZionSolutions TSD 11-001, Potential Radionuclides of Concern during the Decommissioning of Zion Station (Reference 25) was prepared and approved in November 2011. The purpose of this document was to establish the basis for an initial suite of potential ROC for the decommissioning. Industry guidance was reviewed as well as the analytical results from the sampling of various media from past plant operations. Based on the elimination of some of the theoretical neutron activation products, noble gases and radionuclides with a half-life less than
FINAL STATUS SURVEY FINAL REPORT - PHASE 2, PART 2 REVISION 1
[35]
two years, an initial suite of potential ROC for the decommissioning of the ZNPS was prepared.
The initial suite of potential ROC is provided in LTP, Table 5-1.
3.6 Radionuclides of Concern and Mixture Fractions LTP Chapter 2 provides detailed characterization data that describes current contamination levels in the basements. The survey data for basements is based on core samples obtained at biased locations with elevated contact dose rates and/or evidence of leaks/spills. TSD 14-019 evaluates the results of the concrete core analysis data from the Containments and Auxiliary Building and refines the initial suite of radionuclides potential ROC by evaluating the dose significance of each radionuclide.
LTP Chapter 6, Section 6.5.2 discusses the process used to derive the ROC for the decommissioning of ZNPS, including the elimination of insignificant dose contributors from the initial suite consistent with the guidance in Section 3.3 of NUREG-1757. Based upon the analysis of the mixture in TSD 14-019, Table 19, it was determined that Co-60, Ni-63, Sr-90, Cs-134 and Cs-137 accounted for 99.5% of all dose in the contaminated concrete mixes. For activated concrete, H-3, Eu-152, and Eu-154, in addition to the five aforementioned nuclides, accounted for 99% of the dose.
Table 2-3 in this report presents the ROC for the decommissioning of ZNPS and the normalized mixture fractions based on the radionuclide mixture presented for the Auxiliary Building. This table is reproduced from LTP Chapter 5, Table 5-2.
3.7 Radiological Release Criteria Prior to FSS process proceeding, the BcDCGLs were established to demonstrate compliance with the 25 mrem/year unrestricted release criterion. The BcDCGLs were calculated by analysis of various pathways (direct radiation, inhalation, ingestion, etc.), media (concrete, soils, and groundwater) and scenarios through which exposures could occur. Chapter 6 of the LTP describes in detail the approach, modeling parameters and assumptions used to develop the BcDCGLs.
Compliance will be demonstrated through the summation of dose from four (4) distinct source terms for the end-state (basements, soils, buried pipe and groundwater). When applied to buried pipe, the DCGLs are expressed in units of activity per unit of area (dpm/100 cm2).
- 4. FINAL STATUS SURVEY PROTOCOL 4.1 Data Quality Objectives The DQO process as outlined in Section 2 of this report was applied for each FSS Sample Plan and contains basic elements common to all FSS Sample Plans at ZSRP. An outline of those elements presented in the ZSRP FSS Sample Plans are as follows:
FINAL STATUS SURVEY FINAL REPORT - PHASE 2, PART 2 REVISION 1
[36]
4.1.1 State the Problem The problem: To demonstrate that the level of residual radioactivity in a survey unit does not exceed the release criteria of 25 mR/year TEDE and that the potential dose from residual radioactivity is ALARA.
Stakeholders: The primary stakeholders interested in the answer to the problem were ZionSolutions LLC, Exelon, the Illinois Environmental Management Agency (IEMA) and the United States Nuclear Regulatory Commission (USNRC).
The Planning Team: The planning team consisted of the assigned C/LT Engineer with input from other C/LT personnel as well as the Safety Department. The primary decision maker was the Technical Lead/Radiological Engineer with input from the C/LT Manager.
Schedule: The approximate time projected to mobilize, implement, and access an FSS unit.
Resources: The following resources were necessary to implement an FSS Sample Plan:
- RE to prepare the plan and evaluate data.
- C/LT Field Supervisor to monitor and coordinate field activities.
- Survey Mapping/CAD Specialist to prepare survey maps, layout diagrams, composite view drawings, and other graphics as necessary to support design and reporting.
- C/LT Technicians to perform survey activities, collect survey measurement data, and collect media samples.
- Chemistry/Analysis laboratory Staff to analyze samples as necessary.
4.1.2 Identify the Decision Principal Study Question: Is the residual radionuclide concentrations found in the interior of the buried pipe surfaces equal to or below the applicable site-specific OpDCGLs?
Alternate Actions: Alternative actions include failure of the survey unit, remediation, reclassification, and resurvey.
The Decision: If the survey unit failed to demonstrate compliance with the release criteria, then the survey unit was not suitable for unrestricted release. The DQA process was reviewed to identify the appropriate additional action or combination of actions.
4.1.3 Identify Inputs to the Decision Information Needed: The survey unit requiring evaluation of residual activity and its surface area. The characterization surveys and HSA were preliminary sources of information for FSS.
New measurements of sample media were needed to determine the concentration and variability for those radionuclides potentially present at the site at the time of FSS.
FINAL STATUS SURVEY FINAL REPORT - PHASE 2, PART 2 REVISION 1
[37]
Historical Information: The classification as originally identified in the HSA and the verification of that classification during characterization. The information included a summary of site processes or incidents that occurred in the survey unit.
Radiological Survey Data: The current radiological survey data from characterization, Remedial Action Support Surveys (RASS), Radiological Assessments (RAs), or turnover surveys. This information was used to develop a sample size for FSS.
Radionuclides of Concern: The ROC for the FSS of Containments and all remaining survey units (identified as Auxiliary Building) are presented in Table 2-3 of this report.
Basis for the Action Level: The action levels for the survey unit discussed in this Phase 2 report were provided in Table 5-25 of the LTP and reproduced in Table 4-1 below.
Table 4-1, Investigation Levels Classification Scan Investigation Levels Direct Investigation Levels Class 1
>Operation DCGL or >MDCscan if MDCscan is greater than Operational DCGL
>Operational DCGL Class 2
>Operational DCGL or >MDCscan if MDCscan is greater than Operational DCGL
>Operational DCGL Class 3
>Operational DCGL or >MDCscan if MDCscan is greater than Operational DCGL
>0.5 Operational DCGL During FSS, concentrations for HTD ROC Ni-63 and Sr-90 were inferred using a surrogate approach. As presented in the LTP Chapter 5, section 5.2.11, Cs-137 is the principle surrogate radionuclide for Sr-90 and Co-60 is the principle surrogate radionuclide for Ni-63. The mean, maximum and 95% Upper Confidence Level (UCL) of the surrogate ratios for concrete core samples taken in the Auxiliary Building basements and Containments were calculated in TSD 14-019 and Table 5-15 of the LTP and are reproduced in Table 4-2. The maximum ratios were used in the surrogate calculations during FSS unless specific ratios were determined for a survey unit based on sample analysis.
Table 4-2, Surrogate Ratios Ratios Containment Auxiliary Building Mean Max 95%UCL Mean Max 95%UCL H-3/Cs-137 0.208 1.760 0.961 N/A N/A N/A Ni-63/Co-60 30.623 442 193.910 44.143 180.450 154.632 Sr-90/Cs-137 0.002 0.021 0.010 0.001 0.002 0.002
FINAL STATUS SURVEY FINAL REPORT - PHASE 2, PART 2 REVISION 1
[38]
For the FSS of the relevant survey units in this report, the surrogate OpDCGLs for Co-60 and Cs-137 were computed based on the maximum ratios from Table 4-2. The equation for calculating a surrogate DCGL is as follows:
Equation 1
=
1
1
+
2 2+
3 3+
Where:
DCGLSur
= Surrogate radionuclide DCGL DCGL2,3n = DCGL for radionuclides to be represented by the surrogate Rn
= Ratio of concentration (or nuclide mixture fraction) of radionuclide n to surrogate radionuclide Using the OpDCGLs presented in Table 2-1 for buried piping, and using the maximum ratios from Table 4-2, Table 4-3 presents the results of surrogate calculations performed for each survey unit addressed in this report.
Table 4-3, Surrogate OpDCGL Calculation Results Survey Unit Number Survey Unit Name Co-60 Cs-134 Cs-137 Gross Gamma(1)
(pCi/m2) 00101A Condensate Feed Water Supply and Recirculation Buried Pipe 6.16E+03 1.16E+04 2.58E+04 2.49E+04 00101B Primary Water Supply Header T-095 and T-102 Buried Pipe 6.16E+03 1.16E+04 2.58E+04 2.49E+04 00101F Diesel Generator Service Water Supply and Service Water Return Buried Pipe 6.16E+03 1.16E+04 2.58E+04 2.49E+04 00101H Service Water Supply Header CO-26 and CO-29 Buried Pipe 6.16E+03 1.16E+04 2.58E+04 2.49E+04 00150A/B
& C North End Storm Drain Buried Pipe 6.16E+03 1.16E+04 2.58E+04 2.49E+04 (1)-Indicates Gross Gamma surrogate value derived for piping surveys.
Investigation Levels: The investigation levels were based the survey unit classification and the Table 4-1 values and are provided in the individual release records.
Sampling and Analysis Methods to Meet the Data Requirements: Final Status Survey planning and design hinges on coherence with the DQO process to ensure, through compliance with explicitly defined inputs and boundaries, that the primary objective of the survey is satisfied.
The DQO process is described in the ZSRP LTP as outlined in Appendix D of MARSSIM.
FINAL STATUS SURVEY FINAL REPORT - PHASE 2, PART 2 REVISION 1
[39]
The DQO process incorporates hypothesis testing and probabilistic sampling distributions to control decision errors during data analysis. Hypothesis testing is a process based on the scientific method that compares a baseline condition to an alternate condition. The baseline condition is technically known as the null hypothesis. Hypothesis testing rests on the premise that the null hypothesis is true and that sufficient evidence must be provided for rejection. In designing the survey plan, the underlying assumption, or null hypothesis, was that residual activity in the survey unit exceeded the release criteria. Rejection of the null hypothesis would indicate that residual activity within the survey unit did not exceed the release criteria.
Therefore, the survey unit would satisfy the primary objective of the FSS sample plan.
The primary objective of the FSS sample plan is to demonstrate that the level of residual radioactivity in a survey unit did not exceed the release criteria specified in the LTP and that the potential dose from residual radioactivity is ALARA.
ZionSolutions TSD 11-001 established the basis for an initial suite of potential ROC for the decommissioning of ZNPS. LTP Chapter 2 provides detailed characterization data that described contamination levels in the basements. The survey data for basements is based on core samples obtained at biased locations with elevated contact dose rates and/or evidence of leaks/spills and analyzed for the presence of plant-derived radionuclides. ZionSolutions TSD 14-019 evaluates the results of the concrete core analysis data from the Containments and Auxiliary Building and refines the initial suite of radionuclides potential ROC by evaluating the dose significance of each radionuclide.
LTP Chapter 6, Section 6.5.2 discusses the process used to derive the ROC for the decommissioning of ZNPS, including the elimination of insignificant dose contributors (IC) from the initial suite. Based upon the analysis of the mixture, it was determined that Co-60, Ni-63, Sr-90, Cs-134 and Cs-137 accounted for 99.5% of all dose in the non-activated contaminated concrete mixes.
Table 2-3 presents the ROC for the decommissioning of Auxiliary Building structural surfaces and the normalized mixture fractions based on the radionuclide mixture.
4.1.4 Define the Boundaries of the Survey Boundaries of the Survey: The actual physical boundaries as stated for each survey unit.
Temporal Boundaries: Estimated times and dates for the survey. Scanning and sampling in a survey unit was normally performed only during daylight and dry weather.
Constraints: The most common constraints were the weather, standing water and/or ice in a survey unit.
4.1.5 Develop a Decision Rule Decision Rule: If any measurement data result exceeded the release criteria, the DQA process would then be used to evaluate alternative actions.
FINAL STATUS SURVEY FINAL REPORT - PHASE 2, PART 2 REVISION 1
[40]
4.1.6 Specify Tolerable Limits on Decision Errors The Null Hypothesis: Residual radioactivity in the survey unit exceeds the release criteria.
Type I Error: This is also known as the error. This is the error associated with incorrectly concluding the null hypothesis has been rejected. In accordance with LTP, Section 5.6.4.1.1, the Type I error was set at 0.05 (5%).
Type II Error: This is also known as the error. This is the error associated with incorrectly concluding the null hypothesis has been accepted. In accordance with LTP, Section 5.6.4.1.1, the Type II error was set at 0.05 (5%).
The Lower Bound of the Gray Region: The LBGR was set at 50% of the Operational DCGL. In using the unity rule, the Operational DCGL becomes one (1) and the LBGR is set as 0.5.
4.1.7 Optimize Design Type of Statistical Test: The Sign Test was selected as the non-parametric statistical test for FSS. The Sign Test is conservative as it increases the probability of incorrectly accepting the null hypothesis (i.e., the conclusion will be that the survey unit does not meet the release criteria) and does not require the selection or use of a background reference area.
Number of Systematic Measurements: The number of systematic measurements was determined based on survey unit classification.
In buried piping, measurements were typically acquired with a NaI detector that was transported into the pipe/penetration using a push-pull locomotion. The FOV for each measurement was conservatively assumed as 1-foot.
Number of Judgmental/Investigational Measurements and Locations: The selection of judgmental samples was at the discretion of the RE. The judgmental measurement locations were typically chosen to measure an area of interest. Areas of interest for judgmental measurements include cracks and crevasses in the surface in question, drains and low points, areas of discoloration, etc. The individual release record identifies when judgmental samples were utilized.
If during the course of performing a FSS, measurement results were encountered that were not as expected for the surface undergoing survey, then an investigation was performed to determine the cause of the discrepancy. Investigational measurements were acquired as part of a documented investigation within the individual survey unit. Investigational measurements were collected within a survey unit to bound areas of elevated activity or to verify that conditions had not changed within a FSS survey unit as a result of adjacent remediation activities.
Number of Scan Areas and Locations: Scanning, in the traditional sense, is not applicable to the survey of pipe internal surfaces. Therefore, scan measurements were not performed as part of buried piping surveys.
FINAL STATUS SURVEY FINAL REPORT - PHASE 2, PART 2 REVISION 1
[41]
Number of Measurements for Quality Control: The number of quality control measurements was 5% percent of sample set. The locations for duplicate measurements were selected randomly using a random number generator.
Power Curve: The Prospective Power Curve, developed using characterization data and COMPASS software, showed adequate power for the survey design in each of the survey units.
A synopsis of the survey designs is provided in Table 4-4.
FINAL STATUS SURVEY FINAL REPORT - PHASE 2 REVISION 1
[42]
Table 4-4, Synopsis of Survey Design FEATURE DESIGN BASIS Survey Unit #
00101A 00101B 00101F 00101H 00150A/B & C Description Condensate Feed Water Supply and Recirculation Buried Pipe Primary Water Supply Header T-095 and T-102 Buried Pipe Diesel Generator Service Water Supply and Service Water Return Buried Pipe Service Water Supply Header CO-26 and CO-29 Buried Pipe North End Storm Drain Buried Pipe Area (m2) 228.080 29.010 88.843 487.555 203.894 Number of Measurements 47 100 31 59 per pipe 272 Spacing Measurement Every 1-Foot Measurement Every 1-Foot Measurement Every 1-Foot Measurement Every 2-Feet Measurement Every 2-Feet DCGLs Operational DCGLs Presented in Table 2-10 (buried pipe)
Classification (Initial/Final) 3/3 3/2 3/3 3/3 Non-impacted/2 Investigation Level
>0.5 OpDCGL
>OpDCGL
>0.5 OpDCGL
>0.5 OpDCGL
>OpDCGL Scan Area Coverage 10%
50%
10%
10%
25%
QC 5% Duplicate Measurements
FINAL STATUS SURVEY FINAL REPORT - PHASE 2, PART 2 REVISION 1
[43]
4.2 Survey Unit Designation and Classification Procedure ZS-LT-300-001-002 defines the decision process for classifying an area in accordance with the LTP and MARSSIM. survey unit classifications are provided in Table 4-5. The justification for each survey unit classification is delineated in the individual release records for each survey unit contained in Appendices 1-5 of this report.
4.3 Background Determination During FSS area scanning of buried pipe, ambient backgrounds were determined and the technician established the Alarm Set Point (ASP) based on the background for that scan area.
Each applicable survey unit Release Record discusses scan area readings and presents the results of the scan.
4.4 Final Status Survey Sample Plans The level of effort associated with planning a survey is based on the complexity of the survey and nature of the hazards. Guidance for preparing FSS plans is provided in procedure ZS-LT-300-001-001. The FSS plan uses an integrated sample design that combines scanning surveys and sampling.
4.5 Survey Design 4.5.1 Determination of Number of Data Points Designated sections of buried piping were remediated in place prior to undergoing FSS. The inventory of buried piping located below the 588-foot grade that will remain and be subjected to FSS is provided in TSD 14-016. Compliance with the Operational DCGL values, as presented in LTP Table 5-10, was demonstrated by measurements of total surface contamination and/or the collection of sediment samples.
The survey of buried pipe will be achieved in the same manner as described for the survey of embedded pipe as discussed in Section 5.5.5 of the LTP. The radiological survey of pipe system interiors involves the insertion of appropriately sized detectors into the pipe interior by a simple push-pull methodology, whereby the position of the detector in the piping system can be easily determined in a reproducible manner.
The detectors are configured in a fixed geometry relative to the surveyed surface, thus creating a situation where a defensible efficiency can be calculated. The detectors are then deployed into the actual pipe and timed measurements are acquired at intervals commensurate with the contamination potential of the pipe. A conservative area of detection is assumed for each pipe size. It is also conservatively assumed that any activity is uniformly distributed in the area of detection.
FINAL STATUS SURVEY FINAL REPORT - PHASE 2, PART 2 REVISION 1
[44]
A static measurement is acquired at a pre-determined interval for the areal coverage to be achieved. The measurement output represents the gamma activity in gross cpm for each foot of piping traversed. This measurement value in cpm is then converted to dpm using the efficiency of the detector. The total activity in dpm is then adjusted for the assumed total effective surface area commensurate with the pipe diameter, resulting in measurement results in units of dpm/100 cm2. A surrogate correction based upon the radionuclide distribution present in the pipe is then applied to the gamma emission to account for the presence of other non-gamma emitting radionuclides in the mixture. This measurement result represents a commensurate and conservative gross measurement that can be compared to the buried pipe Operational DCGLs.
An adjusted gross gamma OpDCGL was also calculated by applying the normalized gamma mixture to the surrogate OpDCGL for Co-60, the surrogate OpDCGL for Cs-137 and the OpDCGL for Cs-134.
Radiological evaluations for piping or drains that cannot be accessed directly will be performed via measurements made at traps and other appropriate access points where the radioactivity levels are deemed to either bound or be representative of the interior surface radioactivity levels providing that the conditions within the balance of the piping can be reasonably inferred based on those data.
4.5.2 Measurement Locations For buried piping, each piping system or penetration was identified by plant drawings. TSD 14-016 was used to obtain a description and classification for each piping/penetration system.
Specific information with regard to buried piping are provided in the release record for that survey unit. Generally, one-minute timed static measurements were taken throughout the accessible portion of that pipe. The frequency of the measurements was also provided in the survey unit release record. For example, if the buried piping system was identified as a Class 1 system, then one measurement would be taken for every foot of pipe interior surface to provide 100% areal coverage for that survey unit.
The total number of measurements actually acquired for each FSS survey unit is provided in Table 5-1.
FINAL STATUS SURVEY FINAL REPORT - PHASE 2, PART 2 REVISION 1
[45]
Table 4-5, Number of FSS Measurements Survey Unit Non-Parametric Measurements Quality Control Measurements Judgmental/
Investigation Measurements Total Measurements 00101A 257 18 0
275 00101B 253 17 0
270 00101F 256 17 0
273 00101H 132 7
0 139 0150A/B &C 272 18 0
290 4.6 Instrumentation Radiation detection and measurement instrumentation for performing FSS is selected to provide both reliable operation and adequate sensitivity to detect the ROC identified at the site at levels sufficiently below the Operational DCGL. Detector selection is based on detection sensitivity, operating characteristics and expected performance in the field.
The DQO process includes the selection of instrumentation appropriate for the type of measurement to be performed (i.e., scan measurements and sample analysis) that are calibrated to respond to a radiation field under controlled circumstances, evaluated periodically for adequate performance to established quality standards, and sensitive enough to detect the ROC with a sufficient degree of confidence.
Specific implementing procedures control the issuance, use, and calibration of instrumentation used for FSS. The specific DQOs for instruments are established early in the planning phase for FSS activities, implemented by standard operating procedures and executed in the FSS Sample Plan.
4.6.1 Instrumentation Efficiencies For the survey of buried pipes, the pipe detector was calibrated for the specific geometry relating to the piping diameter. The most likely geometry for activity in these pipes is for the activity to be collected in the bottom of the pipe. To obtain an efficiency for this geometry, a mock-up of the lower half of the inner diameter of this pipe was created. The source was positioned on the bottom of the pipe. The detector was placed on the bottom of the pipe and the calibration readings obtained The survey design required the use of a Ludlum Model 44-157 (2 x 2) or 44-162 (3 x 3)
NaI detector to acquire measurements. Background was not to be subtracted from the measurements. The efficiency for each detector was determined in the same manner described above.
FINAL STATUS SURVEY FINAL REPORT - PHASE 2, PART 2 REVISION 1
[46]
These detectors were principally used to detect gamma emitters and were calibrated using Cs-137 NIST traceable sources. Efficiencies were used to quantify the gamma emitters, and those results were used to infer concentrations of HTD ROC using the maximum ratios from LTP Chapter 5, Table 5-12.
Each detector was calibrated for specific pipe diameter ranges, with the lowest efficiency in each range used to survey all pipe diameters in that range resulting in accurate to slightly conservative results.
Specific detector efficiency information is provided in the release records that are attached to this report.
Table 5-2, reproduced from LTP Table 5-28, provides typical detector sensitivities.
FINAL STATUS SURVEY FINAL REPORT - PHASE 2, PART 2 REVISION 1
[47]
Table 4-6, Typical FSS Instrument Detection Sensitivities Instruments and Detectors a Radiation
Background
Count Time (minutes)
Typical
Background
(cpm)
Typical Instrument Efficiency b (t)
Count Time (minutes)
Static MDC (dpm/100 cm2)
Scan MDC Model 43-68 Beta-Gamma 1.0 300 0.258 1.0 256 612 c Model 44-116 Beta 1.0 200 0.124 1.0 539 1990 c Model 43-51 Beta 1.0 40 0.126 810 2782 c Model 43-37 Beta-Gamma 1.0 1,200 0.236 1.0 119 372 c Model 44-10 Gamma 1.0 8,000 N/A 0.02 N/A 5.2 pCi/g d ISOCS Gamma Up to 60 N/A 60% relative 5-60 10% of the Operational DCGL (pCi/m2)
N/A Model 44-159 e Gamma 1.0 700 0.024 1
5,250 N/A Model 44-157 e Gamma 1.0 6,300 0.212 1
1,750 N/A Model 44-162 e Gamma 1.0 16,000 0.510 1
1,150 N/A aDetector models listed are used with the Ludlum 2350-1 Data Logger bTypical calibration source used is Cs-137. The efficiency is determined by counting the source with the detector in a fixed position from the source (reproducible geometry). The t value is based on ISO-7503-1 and conditions noted for each detector.
cScan MDC, in dpm/100 cm2, for the 43-68 was calculated assuming a scan rate of 5.08 cm/sec, which is equivalent to a count time of 1.73 seconds (0.028 minutes) using a detector width of 8.8 cm. The 43-37 detector assumes a scan rate of 12.7 cm/s and results in a count time of 1.05 seconds (0.018 minutes) for a detector width of 13.34 cm. The 44-116 detector width is 2.54 cm and results in a count time of 1.00 seconds at 2.54 cm/s scan speed.
dScan MDC in pCi/g is calculated using the approach described in section 6.7.2.1 of MARSSIM for a Cs-137 nuclide fraction of 0.95 and a Co-60 fraction of 0.05 with a determined detector sensitivity of 1000 and 430 cpm per uR/hr for each radionuclide respectively. The weighted MicroShield-determined conversion factor was 0.282 pCi/g per uR/hr.
eThe efficiency varies for the pipe detectors depending on the pipe diameter used. The efficiency used for the table is the averaged efficiency value for the pipe diameters. The detectors and diameters are: model 44-159: 2-4 in. dia., model 44-157: 4-8 in. dia., model 44-162: 8-12 in. dia.
FINAL STATUS SURVEY FINAL REPORT - PHASE 2, PART 2 REVISION 1
[48]
4.6.2 Instrumentation Sensitivities The measurement sensitivity or MDC will be determined a priori for the instruments and techniques that will be used for FSS. The MDC is defined as the a priori activity level that a specific instrument and technique can be expected to detect 95% of the time. When stating the detection capability of an instrument, this value should be used. The MDC is the detection limit (LD) multiplied by an appropriate conversion factor to give units of activity.
The critical level (LC) is the lower bound on the 95% detection interval defined for LD and is the level at which there is a 5% chance of calling a background value greater than background. This is the value used when actually counting samples or making direct radiation measurements. Any response above this level should be considered as above background (i.e., a net positive result). This will ensure 95% detection capability for LD.
The MDC is dependent upon the counting time, geometry, sample size, detector efficiency and background count rate.
The detectors used for the buried pipe surveys were calibrated to capture the readily detectable principal radionuclides of interest. The CsI detectors were ideal for small diameter pipes as they have a higher efficiency than the NaI detectors and are very efficient for the energies of interest in small sizes. They are typically manufactured in sizes that range from 1/2 by 1/2 inch (diameter and depth) to 1-inch diameter by 1.5 inches in depth. NaI was ideal for the large size pipes in detector sizes ranging from one by one inch to three by three inches. Both types are sensitive to the gamma energies emitted by Co-60 and Cs-137 and are calibrated using Cs-137 to which these detectors are slightly less sensitive to, (and slightly less efficient) than for the Co-60 gamma. So when calibrated to Cs-137, the same detector is approximately 15 to 20% more sensitive to Co-60 than Cs-137 which adds a level of conservatism between the assumed and actual efficiencies.
4.6.3 Instrument Maintenance and Control Control and accountability of survey instruments were maintained to assure the quality and prevent the loss of data. All personnel operating radiological instruments, analysis equipment, measurement location equipment etc., were qualified to operate any assigned equipment and recognize off normal results and indications.
4.6.4 Instrument Calibration Instruments and detectors were calibrated for the radiation types and energies of interest or to a conservative energy source. Instrument calibrations were documented with calibration certificates and/or forms and maintained with the instrumentation and project records.
Calibration labels were also attached to all portable survey instruments. Prior to using any survey instrument, the current calibration was verified and all operational checks were performed.
FINAL STATUS SURVEY FINAL REPORT - PHASE 2, PART 2 REVISION 1
[49]
Instrumentation used for FSS was calibrated and maintained in accordance with approved ZionSolutions site calibration procedures. Radioactive sources used for calibration were traceable to the NIST and were obtained in standard geometries to match the type of samples being counted.
4.7 Survey Methodology The LTP specifies the minimum amount of measurements required for each class as summarized in Table 5-3. The total fraction of scanning coverage is determined during the DQO process with the amount, and location(s) based on the likelihood of finding elevated activity during FSS.
Table 4-7, Recommended Scan Coverage Area Classification Surface Scans Class 1 100%
Class 2 10% to 100%,
Systematic and Judgmental Class 3 Judgmental 4.7.1 Buried Pipe Surveys Once remediation was completed in a section of pipe to the extent practicable, the residual radioactivity remaining in each accessible section of buried piping was assessed and quantified by direct survey. The approach used for the radiological survey of the interior surfaces of buried piping involved the insertion of a detector that was attached to the See Snake camera system and transported through the pipe to the maximum deployment length, or to a location of drain drop. A simple push-pull methodology was used, whereby the position of the detector in the piping system could be easily determined in a reproducible manner. Footage was tabulated on the See Snake, then measurements were obtained at each one-foot location while backing out of the pipe section.
The piping detectors were configured in a fixed geometry relative to the surveyed surface, thus creating a situation where a defensible efficiency could be calculated. The detectors were then deployed into the actual pipe and timed measurements were acquired at an interval of one measurement for every foot of pipe. A conservative area of detection of one-foot was assumed. It was also conservatively assumed that any activity inside of the pipe was uniformly distributed in the area of detection.
For each detector in each diameter of pipe, an instrument efficiency factor was derived by placing a flexible Cs-137 radiological plane source into a pipe jig, depending on the diameter of the pipe to be surveyed. This created a geometry similar to what would be
FINAL STATUS SURVEY FINAL REPORT - PHASE 2, PART 2 REVISION 1
[50]
encountered in the actual pipe. Using the known source activity, an efficiency factor was then derived for the detector in that geometry.
A background value was also determined for the detector/instrument combination to be used prior to deployment. The background value was obtained at the location where the pre-use response check of the instrument was performed. The background value was primarily used to ensure that the detector had not become cross-contaminated by any previous use.
Background was not subtracted from any measurement.
Daily prior to use and daily following use, each detector was subjected to an Operational Response Check in accordance with procedure ZS-LT-300-001-006, Radiation Surveys of Pipe Interiors Using Sodium/Cesium Iodide Detectors (Reference 26). The Daily Operational Response Check compared the background response and the response to check sources ranges established for normal background and detector source response to ensure that the detector was working properly.
Once the detector was determined to be fully functional, it was then deployed to the field for insertion into the targeted piping. A one-minute static measurement was acquired at each foot traversed into the pipe. The detector output represented the gamma activity for each one-minute timed measurement in units of gross cpm. The gamma measurement value in units of cpm was then converted to units of dpm using the efficiency factor for the detector applicable to the diameter of the pipe surveyed.
Each measurement assumed a conservative area of detection for the detector of one foot.
This assumption is conservative because there is additional instrument response from contamination located in the pipe at distances outside of the area of detection.
Consequently, the total activity from the measurement, in units of dpm is adjusted for the total effective surface area commensurate with the pipe diameter and the assumed area of detection, resulting in measurement results in units of dpm/100 cm2. This measurement result represents a commensurate and conservative gamma surface activity for the one foot of pipe surface where the measurement was taken.
After completion of the FSS measurements in the pipe, the sample plan was reviewed to confirm the completeness of the survey and the survey data was validated in accordance with procedure ZS-LT-300-001-004. Data processing included converting measurement data into reporting units, validating instrument applicability and sensitivity, calculating relevant statistical quantities, and verification that all DQO had been met. In accordance with the procedure, a preliminary Data Assessment was prepared for each section of pipe surveyed.
4.7.2 Quality Control Surveys The method used for evaluating Quality Control (QC) split samples collected in support of the FSS program is specified in the QAPP for Characterization and FSS. QC split data was
FINAL STATUS SURVEY FINAL REPORT - PHASE 2, PART 2 REVISION 1
[51]
assessed using criteria taken from the USNRC Inspection Manual, Inspection Procedure 84750, Radioactive Waste Treatment and Effluent and Environmental Monitoring (Reference 27).
A minimum of 5% of the measurement locations used in the FSS design were selected randomly using the Microsoft Excel RANDBETWEEN function and submitted as splits. In compliance with ZS-LT-01, replicate measurements were performed on 5% of the survey locations chosen at random. The acceptance criteria specified in section 4.1.2 of ZS-LT-01 was used to determine acceptable agreement between the replicate readings and the original readings. If there was no agreement between the measurements, the C/LT Engineer evaluated the magnitude and impact on survey design, the implementation and evaluation of results as well as the need to perform confirmatory measurements. If the C/LT Engineer had determined that the discrepancy affected quality or was detrimental to the implementation of FSS, then a Condition Report would have been issued.
To maintain the quality of the FSS, isolation and control measures were implemented throughout FSS activities until there was no risk of recontamination from decommissioning or when the survey area will be released from the licenses. Following FSS, and until the area is released, a semi-annual surveillance will be performed on FSS completed survey units. This includes an inspection of area postings, inspection of the area for signs of dumping or disturbance and some sampling from selected locations. In the event that isolation and control measures were compromised, a follow-up survey may be performed after evaluation.
- 5. SURVEY FINDINGS Procedure ZS-LT-300-001-004 provides guidance to C/LT personnel to interpret survey results using the DQA process during the assessment phase of FSS activities.
The DQA process is the primary evaluation tool to determine that data is of the right type, quality and quantity to support the objectives of the FSS Sample Plan. The five steps of the DQA process are:
- Review the Sample Plan DQOs and the survey design.
- Conduct a preliminary data assessment.
- Select the statistical test.
- Verify the assumptions of the statistical test.
- Draw conclusions from the data.
Data validation descriptors described in MARSSIM Table 9.3 were used during the DQA process to verify and validate collected data as required by the QAPP for Characterization and FSS.
FINAL STATUS SURVEY FINAL REPORT - PHASE 2, PART 2 REVISION 1
[52]
Hand held instruments utilized for surveying buried pipe and wall and floor penetrations were calibrated with NIST Traceable sources, and the efficiencies used to quantify results taken from those calibrations. Prior to, and following each use, each hand held instrument was operationally verified using check sources to verify the instruments were operating within pre-determined acceptable ranges.
5.1 Survey Data Conversion During the data conversion, the C/LT Engineer evaluated raw data for problems or anomalies encountered during Sample Plan activities (sample collection and analysis, handling and control, etc.) including the following:
- Recorded data
- Missing values
- Deviation from established procedure
- Analysis flags Once resolved, initial data conversion, which is part of preliminary data assessment was performed and consisted of converting the data into units relative to the release criteria (e.g.,
dpm/100 cm2) and calculating basic statistical quantities (e.g., mean, median, standard deviation). Table 6-1 provides a summary of the basic statistical properties for Phase 2, Part 2 systematic sample populations.
FINAL STATUS SURVEY FINAL REPORT - PHASE 2, PART 2 REVISION 1
[53]
Table 5-1, Basic Statistical Properties of Phase 2, Part 2 Survey Unit Non-Parametric Measurements Survey Unit Description Class
- of Measurements Mean OpSOF Max OpSOF
- OpSOF>
1 Mean BcSOF Dose to Survey Unit (mrem/yr) 00101A Condensate Feed Water Supply and Recirculation Buried Pipe 3
275 0.320 0.493 0
0.082 2.052 00101B Primary Water Supply T-095 and T-102 Buried Pipe 2
270 0.784 1.506 53 0.227 5.674 000101F Diesel Generator Heat Exchangers Service Water Supply and Return Buried Pipe 3
273 0.144 0.488 0
0.037 0.922 00101H Service Water Supply Header Buried Pipe 3
139 0.127 0.288 0
0.033 0.814 00150A/
B&C North End Storm Drain Buried Pipe 2
290 0.107 0.276 0
0.027 0.683
FINAL STATUS SURVEY FINAL REPORT - PHASE 2 REVISION 1
[54]
5.2 Survey Data Verification and Validation Items supporting DQO sample design and data were reviewed for completeness and consistency. This included:
- Classification history and related documents,
- Site description,
- Survey design and measurement locations,
- Analytic method and detection limits and validation that the required analytical method(s) were adequate for the radionuclides of concern,
- Sampling variability provided for the radionuclides of interest,
- QC measurements have been specified,
- Survey and sampling result accuracy have been specified,
- MDC limits,
- Field conditions for media and environment, and
- Field records.
Documentation, as listed, was reviewed to verify completeness and that it is legible:
- Field and analytical results,
- Chain-of-custody,
- Field Logs,
- Instrument issue, return and source check records,
- Instrument downloads, and
- Measurement results relative to measurement location.
After completion of these previously mentioned tasks, a Preliminary Data Assessment record was initiated. This record served to verify that all data were in standard units in relation to the DCGLs and performed the calculation of the statistical parameters needed to complete data evaluation which at a minimum, included the following:
- The number of observations (i.e., samples or measurements),
- The range of observations (i.e., minimum and maximum values),
- Mean,
- Median, and
- Standard deviation.
FINAL STATUS SURVEY FINAL REPORT - PHASE 2 REVISION 1
[55]
In order to adequately evaluate the data set, consideration as additional options included the coefficient of variation, measurements of relative standing (such as percentile), and other statistical applications as necessary (frequency distribution, histograms, skew, etc). Finalization of the data review consisted of graphically displaying the data in distributions and percentiles plots.
5.3 Anomalous Data/Elevated Scan Results and Investigation FSS survey data was assessed to determine if the data set in question met the DQO process. This process was documented in accordance with ZS-LT-300-001-004.
If during the assessment, it was determined that the data did not meet the DQOs identified in the survey package for that area, then an investigation would have been initiated The DQO process was used to evaluate the remediation, reclassification and/or resurvey actions to be taken if an investigation level was exceeded. Based upon the failure of the statistical test or the results of an investigation, LTP Chapter 5, Table 5-26 presents the actions that would be required.
5.3.1 Condensate Feed Water Supply and Recirculation Buried Pipe (Survey Unit 00101A)
FSS of the T-105 pipe interior surfaces commenced on May 11, 2017, using Ludlum Model 2350-1 #266668 coupled with Ludlum Model 44-162 #PR327894. The detector was transported through the pipe interiors using the 3/4 fiber rod. Static measurements were taken at 1-foot intervals for 257 linear feet of piping from this survey unit. This covers 1,283.8 ft2 of area, which is approximately 52.2% of the total surface area of 2,456.1 ft2. The surveys were completed on May 15, 2017 using the same instrument/detector. A total of 257 measurements were taken. All readings were below the Action Level.
As all measurements in the accessible pipe interior surface area were below an Operational SOF (OpSOF) of 0.5, no investigations were required or performed.
5.3.2 Primary Water Supply Header (Survey Unit 00101B)
The Primary Water Supply Header FSS unit was classified as a Class 2 buried pipe. Of the 253 measurements taken inside of the pipe, 244 exceeded 50% of the Action Level of 1.24E+04 dpm/100cm2, and fifty-three (53) exceeded an OpSOF of one (1). In accordance with LTP Chapter 5, Section 5.6.4.6, encountering these measurement results in a Class 2 FSS unit would prompt the acquisition of additional measurements to bound the elevated areas of concern and, to reclassify the survey unit as Class 1.
Reclassification would then prompt the requirement for 100% areal coverage which, in a pipe, is achieved by taking one measurement every foot of pipe. However, even though
FINAL STATUS SURVEY FINAL REPORT - PHASE 2 REVISION 1
[56]
the Primary Water Supply Header FSS unit was classified as Class 2 during survey design, the FSS was performed as if the pipe was Class 1. One measurement was taken for every foot of pipe that was accessible, achieving 100% areal coverage. In addition, the measurements taken clearly bound the areas of elevated activity and the dose from measurements that exceeded an OpSOF of one was added to the mean Base Case SOF (BcSOF) for compliance.
LTP Chapter 5, Section 5.6.4.2 states, The Sign Test is the most appropriate test for FSS at Zion, as background is expected to constitute a small fraction of the DCGLW based on the results of characterization surveys. Consequently, the Sign Test will be applied when demonstrating compliance with the unrestricted release criteria without subtracting background. During the performance of data assessment on the survey data taken in survey unit 00101B, the cognizant RE postulated that the elevated activity detected by the FSS measurements was not due to residual radioactivity inside the pipe but rather from increases in ambient background due to the storage, movement, packaging and shipment of radioactive waste from the Unit 2 Containment and the Auxiliary Building in an adjacent survey unit. A review of the survey data shows that the measurements taken inside of the pipe were consistent for the first nine (9) measurements (representing 9 minutes) and then, an approximate 50% increase in activity over the next two (2) measurements (representing 10 minutes). The activity again stayed consistent over the next nineteen (19) measurements (representing 19 minutes), and then decreased again over the next four (4) minutes to the originally observed levels. This occurred several times, indicating the possible movement of a radioactive material package or packages through the area adjacent to where the pipe FSS was performed.
To investigate this possibility, a background study was performed in August of 2019 on clean 6-inch ID steel pipe jigs transported to and placed at the location on the ground where the buried pipe FSS was performed. This area is located adjacent to the now-removed WWTF and northeast of the Turbine Building footprint. The reason for the delay in performing this study until after the completion of the FSS of the Primary Water Supply Header was due to waiting for removal of potential contributors to background from the area in question. This background study was performed to assess the impact of radioactive commodity removal on the ambient background.
Sample plan number S3-001101A-C was developed and implemented to quantify the background levels associated with the survey of piping at the surface. A Ludlum Model 44-157 pipe detector, attached to a Ludlum Model 2350 data logger, was inserted approximately two (2) feet into the mock-up pipe and a series of 1-minute measurements were conducted. The results of the background study indicated that the average of the twenty (20) background measurements obtained was 1,752 cpm. The maximum and minimum values were 1,805 cpm and 1,693 cpm respectively.
FINAL STATUS SURVEY FINAL REPORT - PHASE 2 REVISION 1
[57]
The results of the background study does provide indication that the elevated measurements detected during the FSS of the Primary Water Supply pipe was due to transient dose from radioactive materials that were storage and packaged nearby however, background was not subtracted from any measurement used to demonstrate compliance and the results of the background study are presented in the Release Record for information only.
5.3.3 Diesel Generator Service Water Supply (Survey Unit 00101F)
Two hundred fifty-six (256) static measurements were taken in the Diesel Generator Service Water Supply Header buried piping (Pipes AO-27, AO-28, AO-30 and AO-31).
All of the measurements taken inside the buried pipe were below an OpSOF of 0.5 when compared to the OpDCGLBP.
No anomalies were observed during the performance or analyses of the survey.
5.3.4 Service Water Supply Header (Survey Unit 00101H)
One hundred and thirty-two (132) static measurements were taken in the Service Water Supply Header (Pipes CO-26 and CO-29) buried piping.
All of the measurements taken inside the buried pipe were below an OpSOF of 0.5 when compared to the OpDCGLBP.
No anomalies were observed during the performance or analyses of the survey.
5.3.5 North End Storm Drain (Survey Units 00150A/B&C)
Two-Hundred seventy-two (272) static measurements were taken in the North End Storm Drain buried pipe.
All of the measurements were below an OpSOF of one, when compared to the OpDCGLBP.
No anomalies were observed during the performance or analyses of the survey.
5.4 Evaluation of Number of Sample/Measurement Locations in Survey Units The Sign Test was selected as the statistical test for all Release Records submitted in this report. This test, performed in accordance with ZS-LT-300-001-004 demonstrates survey design adequacy. If the data passed the Sign Test, the null hypothesis is rejected and the survey unit can be released with no further actions required. For reporting purposes, all survey unit Release Records passed the Sign Test, indicating that the survey design was adequate (i.e. adequate number of samples was collected).
FINAL STATUS SURVEY FINAL REPORT - PHASE 2 REVISION 1
[58]
5.5 Comparison of Findings with Derived Concentration Guideline Levels The SOF or unity rule was applied to FSS data in accordance with the guidance provided in Section 2.7 of NUREG-1757, Vol. 2, and the LTP. This was accomplished by calculating a fraction of the Operational DCGL for each sample or measurement by dividing the reported concentration by the Operational DCGL. If a sample had multiple ROC, then the fraction of the Operational DCGL for each ROC was summed to provide a SOF for the sample.
If a surrogate concentration was inferred as part of the survey design for the FSS, then the surrogate Operational DCGL was used to derive the SOF. Unity rule equivalents were calculated for each measurement result using the surrogate adjusted Operational DCGL (typically using gamma emitters), and then used to perform the Sign Test, if applicable.
A BcSOF was calculated for each ROC by dividing the reported mean concentration by the Base Case DCGL. A Base Case SOF of 1 is equivalent to the decision rule, meaning any measurement with a SOF of 1 or greater, would not meet the 25 mrem/year release criteria. The mean Base Case SOF was multiplied by 25 to establish the dose attributed to soil in a survey unit. The mean Base Case SOF and equivalent dose contribution for each Phase 2, Part 2 survey units is provided in Table 5-1.
5.5.1 Compliance Equation There are four distinct source terms for the end-state at Zion: backfilled basements, soil, buried piping and groundwater. Demonstrating compliance with the dose criterion requires the summation of dose from the four source terms. The final compliance dose will be calculated using LTP Chapter 6, Equation 6-11, reproduced below as Equation 3, after FSS has been completed in all survey units. The results of the FSS performed for each FSS unit will be reviewed to determine the maximum dose from each of the four source terms (e.g., basement, soil, buried pipe and existing groundwater if applicable) using the mean Base Case SOF of FSS results plus the dose from any identified elevated areas. The compliance dose must be less than 25 mrem/year. The dose contribution from each ROC is accounted for using the BcSOF to ensure that the total dose from all ROC does not exceed the dose criterion.
FINAL STATUS SURVEY FINAL REPORT - PHASE 2 REVISION 1
[59]
Equation 3 Compliance Dose
= (Max SOFBASEMENT + Max SOFSOIL + Max SOFBURIED PIPE +
Max SOFGROUNDWATER) x 25 mrem/yr where:
Compliance Dose
=
must be less than or equal to 25 mrem/yr, Max SOFBASEMENT
=
Maximum SOF (mean of FSS systematic results plus the dose from any identified elevated areas) for backfilled Basements (including surface, embedded pipe, penetrations and fill [if required]),
Max SOFSOIL
=
Maximum SOF (mean of FSS systematic results plus the dose from any identified elevated areas) for open land survey units, Max SOFBURIED PIPE
=
Maximum SOF (mean of FSS systematic results plus the dose from any identified elevated areas) from buried piping survey units, Max SOFGROUNDWATER =
Maximum SOF from existing groundwater The term for each Basement includes the dose contributions from wall and floor surfaces within the Basement, the dose contribution from embedded pipe within the Basement, the dose contribution from penetrations within the Basement and the dose contribution from concrete fill in the Basement when clean concrete debris was used as fill. Each (structural surfaces, embedded pipe and penetrations) are surveyed separately during FSS. The dose from clean concrete fill is predetermined in accordance with LTP Chapter 5, Table 5-16, which is conservatively based on a maximum allowable MDC of 5,000 dpm/100cm2.
5.6 Description of ALARA to Achieve Final Activity Levels With the exception of some penetrations, embedded and buried piping, all contaminated and non-contaminated systems were disassembled, removed, packaged, and shipped off-site as a waste stream commodity. Once commodity removal was complete, structural surfaces were remediated as necessary to meet the open-air demolition criteria. These criteria provided the removable contamination levels and contact exposure rates that allowed structures to be safely demolished without containment.
Typically, for pipe buried in soil, the pipe interiors were remediated to levels less than the site-specific DCGLs presented in Table 5-10 of the LTP, prior to FSS surveys being performed in accordance with section 5.7.1.8 of the LTP.
FINAL STATUS SURVEY FINAL REPORT - PHASE 2 REVISION 1
[60]
- 6.
SUMMARY
Final Status Survey (FSS) is the process used to demonstrate that the ZNPS structures and soils comply with the radiological criteria for unrestricted use specified in 10 CFR 20.1402. The purpose of FSS Sample Plan is to describe the methods to be used in planning, designing, conducting, and evaluating the FSS.
The two radiological criteria for unrestricted use specified in 10 CFR 20.1402 are; 1) the residual radioactivity that is distinguishable from background radiation results in a TEDE to an AMCG that does not exceed 25 mrem/year, including that from groundwater sources of drinking water, and 2) the residual radioactivity has been reduced to levels that are ALARA.
All survey units addressed in this Final Report have met the DQOs of their respective FSS plans. The ALARA criteria as specified in Chapter 4 of the LTP were achieved.
The EMC is not applicable to buried pipe.
All identified ROC was used for statistical testing to determine the adequacy of each survey unit for FSS. Evaluation of the data shows that none of the mean ROC concentration values exceeded their respective Operational DCGL; therefore, in accordance with the LTP Chapter 5, Section 5.10, the survey unit meets the release criterion.
In each survey unit, the sample data passed the Sign Test, the null hypothesis was rejected. All survey units were properly classified.
It is the conclusion of this report that all survey units addressed within are acceptable for unrestricted release.
- 7. REFERENCES
- 1.
Zion Nuclear Power Station, Units 1 and 2 - Issuance of Amendments 191 and 178 for the Licenses to Approve the License Termination Plan (LTP)
- 2.
NUREG-1575, Multi-Agency Radiation Survey and Site Investigation Manual (MARSSIM)
- 3.
ZS-LT-01, Quality Assurance Project Plan for Characterization and FSS (QAPP)
- 4.
ZionSolutions Procedure ZS-LT-300-001-001, Final Status Survey Package Development
- 5.
ZionSolutions Procedure ZS-LT-300-001-003, Isolation and Control for Final Status Survey
- 6.
ZionSolutions Procedure ZS-LT-300-001-004, Final Status Survey Data Assessment
FINAL STATUS SURVEY FINAL REPORT - PHASE 2 REVISION 1
[61]
- 7.
ZionSolutions TSD 14-016, Description of Embedded Pipe, Penetrations, and Buried Pipe to Remain in Zion End State
- 8.
ComEd Zion Station Historical Site Assessment (HSA)
- 9.
ZionSolutions Procedure ZS-LT-300-001-002, Survey Unit Classification
- 10.
ZionSolutions Procedure AD-11 Regulatory Reviews
- 11.
NUREG-1757, Vol. 2, Consolidated Decommissioning Guidance Characterization, Survey, and Determination of Radiological Criteria
- 12.
ZionSolutions Procedure ZS-LT-300-001-005, Final Status Survey Data Reporting
- 13.
ZionSolutions TSD 17-014, Operational Derived Concentration Guideline Levels for Final Status Survey
- 14.
ZionSolutions TSD 14-028, Radiological Characterization Report
- 15.
ZionSolutions Procedure ZS-RP-108-000-000, Radiological Instrumentation Program
- 16.
ZionSolutions Procedure ZS-RP-108-004-012, Calibration and Initial Set Up of the 2350-1
- 17.
ZionSolutions Job Aid LT-JA-004, FSS Sample Collection
- 18.
ZionSolutions Procedure ZS-LT-100-001-004, Sample Media Preparation for Site Characterization
- 19.
ZionSolutions Procedure ZS-WM-131, Chain of Custody Protocol
- 20.
ZS-QA-10, Quality Assurance Project Plan
- 21.
Post Shutdown Decommissioning Activities Report (PSDAR)
- 22.
Defueled Safety Analysis Report (DSAR)
- 23.
Offsite Dose Calculation Manual (ODCM)
- 24.
ZS-LT-02, Characterization Survey Plan
- 25.
ZionSolutions TSD 11-001, Potential Radionuclides of Concern during the Decommissioning of Zion Station
- 26.
ZionSolutions Procedure ZS-LT-300-001-006, Radiation Surveys of Pipe Interiors Using Sodium/Cesium Iodide Detectors
- 27.
USNRC Inspection Manual, Inspection Procedure 84750, Radioactive Waste Treatment and Effluent and Environmental Monitoring
- 8. APPENDICES
FINAL STATUS SURVEY FINAL REPORT - PHASE 2 REVISION 1
[62]
- 1.
FSS Release Record, Survey Unit 00101A (Condensate Feed Water Supply and Recirculation Buried Pipe)
- 2.
FSS Release Record, Survey Unit 00101B (Primary Water Supply T-095 and T-102 Buried Pipe)
- 3.
FSS Release Record, Survey Unit 00101F (Diesel Generator Heat Exchangers Service Water Supply and Service Water Return Buried Pipe)
- 4.
FSS Release Record, Survey Unit 00101H (Service Water Supply Header CO-26 and CO-29 Buried Pipe)
- 5.
FSS Release Record, Survey Units 00150A/B and C (North End Storm Drain Buried Pipe)