Category:CORRESPONDENCE-LETTERS
MONTHYEARML20217J3141999-10-15015 October 1999 Requests Emergency Publication of Document Entitled South Carolina Electric & Gas Co;Vc Summer Nuclear Station,Environ Assessment Transmitted on 991015 to Ofc of Fr for Publication ML20217J3281999-10-15015 October 1999 Forwards Copy of Environ Assessment & Finding of No Significant Impact Re Application for Exemption from Requiremets of 10CFR50,Section 50.60(a) for VC Summer Nuclear Station ML20217F8851999-10-0808 October 1999 Forwards Insp Rept 50-395/99-06 on 990801-0911.One Violation Occurred Being Treated as NCV RC-99-0192, Forwards Updated 1999 ECCS Evaluation Model Revs Rept for VC Summer Nuclear Station.Rept Is Being Submitted Pursuant to 10CFR50.46,which Requires Licensees to Notify NRC of Corrections to or Changes in ECCS Evaluation Models1999-09-28028 September 1999 Forwards Updated 1999 ECCS Evaluation Model Revs Rept for VC Summer Nuclear Station.Rept Is Being Submitted Pursuant to 10CFR50.46,which Requires Licensees to Notify NRC of Corrections to or Changes in ECCS Evaluation Models RC-99-0181, Forwards Anticipated Schedule for Operator Licensing Examinations.Sce&G Requests That NRC Prepare Examinations Stated on Attachment1999-09-21021 September 1999 Forwards Anticipated Schedule for Operator Licensing Examinations.Sce&G Requests That NRC Prepare Examinations Stated on Attachment ML20212C5091999-09-15015 September 1999 Forwards Anticipated Schedule for Operator Licensing Exams for Sce&G.Util Requests That NRC Prepare Exams on Encl RC-99-0184, Submits Seven Requests for Using Alternatives to Requirements of ASME Code,Section XI Re Subsection IWE & Iwl Insps to Be Performed at Vsns.Proposed Alternatives Will Provide Acceptable Level of Quality & Safety1999-09-15015 September 1999 Submits Seven Requests for Using Alternatives to Requirements of ASME Code,Section XI Re Subsection IWE & Iwl Insps to Be Performed at Vsns.Proposed Alternatives Will Provide Acceptable Level of Quality & Safety ML20212A8341999-09-0909 September 1999 Requests That Licensees Affected by Kaowool Fire Barriers Take Issue on Voluntary Initiative & Propose Approach for Resolving Subj Issues.Staff Plans to Meet with Licensees to Discuss Listed Topics ML20212A6951999-09-0909 September 1999 Requests That Licensees Affected by Kaowool Fire Barriers Take Issue on Voluntary Initiative & Propose Approach for Resolving Subj Issues.Staff Plans to Meet with Licensees to Discuss Listed Topics ML20211N4301999-09-0808 September 1999 Discusses Proposed Meeting to Discuss Kaowool Fire Barriers. Staff Requesting That Affected Licensees Take Issue on Voluntary Initative & Propose Approach for Resolving Issues ML20211Q8911999-09-0101 September 1999 Sumbits Summary of Training Managers Conference on Recent Changes to Operator Licensing Program.Meeting Covered Changes to Regulations,Exam Stds,New Insp Program & Other Training Issues.List of Attendees Encl RC-99-0177, Forwards Rev 2 to VC Summer Nuclear Station,Colr for Cycle 12, IAW Section 6.9.1.111999-08-31031 August 1999 Forwards Rev 2 to VC Summer Nuclear Station,Colr for Cycle 12, IAW Section 6.9.1.11 RC-99-0173, Requests That Info Listed in Rvid,Version 2,be Amended to Reflect Date for VC Summer Nuclear Station,As Marked in Encl to Ltr1999-08-31031 August 1999 Requests That Info Listed in Rvid,Version 2,be Amended to Reflect Date for VC Summer Nuclear Station,As Marked in Encl to Ltr ML20211L5181999-08-30030 August 1999 Forwards Insp Rept 50-395/99-05 on 990620-0731.One Violation Identified & Being Treated as non-cited Violation Consistent with App C of Enforcement Policy ML20211H2481999-08-25025 August 1999 Forwards Four Controlled Copies of Amend 43 to Physcial Security Plan. Summary of Plan Changes, Are Included as Part of Each Controlled Copy.Encls Withheld Per 10CFR73.21 05000395/LER-1999-004, Submits Suppl 1 to LER 99-004-00 Re Discovery of Several Fuel Assembly Top Nozzle Holdown Screws Which Had Failed. Root Cause Will Not Be Completed by 990829,as Committed.W Analysis Will Be Issued After Fall Outages Are Complet1999-08-24024 August 1999 Submits Suppl 1 to LER 99-004-00 Re Discovery of Several Fuel Assembly Top Nozzle Holdown Screws Which Had Failed. Root Cause Will Not Be Completed by 990829,as Committed.W Analysis Will Be Issued After Fall Outages Are Completed RC-99-0171, Notifies NRC of Intent Re Submittal of Application to Renew OL of Vcs.Preparatory Work Has Begun to Develop Application for License Renewal to Be Submitted After 020806 Contingent Upon Final Approval of Board of Directors1999-08-23023 August 1999 Notifies NRC of Intent Re Submittal of Application to Renew OL of Vcs.Preparatory Work Has Begun to Develop Application for License Renewal to Be Submitted After 020806 Contingent Upon Final Approval of Board of Directors RC-99-0152, Seeks Exemption Under 10CFR0.12a(2)ii from 10CFR50,App G Requirements to Establish pressure-temperature Limits Curves Using Methodology Presented in 1989 ASME Section Xi,App G1999-08-19019 August 1999 Seeks Exemption Under 10CFR0.12a(2)ii from 10CFR50,App G Requirements to Establish pressure-temperature Limits Curves Using Methodology Presented in 1989 ASME Section Xi,App G RC-99-0164, Forwards semi-annual Fitness for Duty Rept from 990101 to 990630 for VC Summer Nuclear Station,Iaw 10CFR26.71(d)1999-08-17017 August 1999 Forwards semi-annual Fitness for Duty Rept from 990101 to 990630 for VC Summer Nuclear Station,Iaw 10CFR26.71(d) ML20210Q4851999-08-0505 August 1999 Informs That NRC Plans to Administer Gfes of Written Operator Licensing Exam on 991006 at VC Summer.Requests Info Re Individuals Who Will Take Exam,Personnel Who Will Have Access to Exam.Sample Registration Ltr Encl ML20210R5501999-08-0505 August 1999 Ack Receipt of 990707 Response to NCVs Identified on 990607 Re Activities Conducted at VC Summer.Informs That After Consideration of Basis for Denial of NCV 50-395/99-03, Concluded,For Reasons Stated,That NCV Occurred RC-99-0156, Forwards Rev 1 to VC Summer Nuclear Station COLR for Cycle 12, IAW TS Section 6.9.1.11.Sections 2.1 & 3.0 Were Added to Include Beacon Tsm1999-08-0404 August 1999 Forwards Rev 1 to VC Summer Nuclear Station COLR for Cycle 12, IAW TS Section 6.9.1.11.Sections 2.1 & 3.0 Were Added to Include Beacon Tsm RC-99-0147, Submits Attached Request for Relief from Performing SG PORV Strike Time Testing to Acceptance Criteria of Asme/Ansi OMa-19881999-07-26026 July 1999 Submits Attached Request for Relief from Performing SG PORV Strike Time Testing to Acceptance Criteria of Asme/Ansi OMa-1988 ML20210B7451999-07-22022 July 1999 Informs That as Result of Staff Review of Licensee Responses to GL 92-01,rev 1 & Rev 1,suppl 1,staff Revised Info in Reactor Vessel Integrity Database & Releasing Database as Rvid Version 2 ML20210E3771999-07-16016 July 1999 Forwards Insp Rept 50-395/99-04 on 990509-0619.One Violation Being Treated as Noncited Violation RC-99-0127, Estimates Submittal of Eleven Licensing Actions in Fy 2000. Based on Statistical Estimates of Past Licensing Actions, Number of Licensing Actions in Fy 2001 Should Be Approx Ten, in Response to AL 99-021999-07-0707 July 1999 Estimates Submittal of Eleven Licensing Actions in Fy 2000. Based on Statistical Estimates of Past Licensing Actions, Number of Licensing Actions in Fy 2001 Should Be Approx Ten, in Response to AL 99-02 RC-99-0129, Provides Response to non-cited Violations Noted in Insp Rept 50-395/99-03.C/As:concluded That Cask Loading Pit Inaccessible & Duration of Dose Rates on Operating Floor of Fhb So Short That High Radiation Area Did Not Exist1999-07-0707 July 1999 Provides Response to non-cited Violations Noted in Insp Rept 50-395/99-03.C/As:concluded That Cask Loading Pit Inaccessible & Duration of Dose Rates on Operating Floor of Fhb So Short That High Radiation Area Did Not Exist RC-99-0131, Forwards Rev 9 to VC Summer Nuclear Station Safeguards Contingency Plan,Per 10CFR50.54(p).Encl Withheld1999-07-0707 July 1999 Forwards Rev 9 to VC Summer Nuclear Station Safeguards Contingency Plan,Per 10CFR50.54(p).Encl Withheld ML20210B7111999-07-0606 July 1999 Provides Summary of 990701 Meeting with Sce&G in Atlanta, Georgia Re Recent Virgil C Summer Refueling Outage & Other Items of Interest.List of Meeting Attendees & Licensee Presentation Handouts Encl RC-99-0114, Submits Response to GL 98-01,Suppl 1, Y2K Readiness of Computer Sys at Npps, Under Oath or Affirmation1999-06-30030 June 1999 Submits Response to GL 98-01,Suppl 1, Y2K Readiness of Computer Sys at Npps, Under Oath or Affirmation ML20195H5861999-06-0707 June 1999 Confirms 990604 Telcon Between J Proper & R Haag Re Meeting Scheduled for 990701 in Atlanta,Ga,To Discuss Plant Refueling Outage & Items of Interest ML20207H5241999-06-0707 June 1999 Forwards Insp Rept 50-395/99-03 on 990328-0508.Six Violations of NRC Requirements Occurred & Being Treated as non-cited Violations,Consistent with App C of Enforcement Policy ML20207D1881999-05-28028 May 1999 Informs That Effective 990524,K Cotton Assigned as Project Manager,Project Directorate II-1,for Virgil C Summer Nuclear Station 05000395/LER-1999-006, Forwards LER 99-006-00,describing Identified Safety Hazard with GE 7.2kV Magne-Blast Circuit Breakers.Event Is Being Reported Per 10CFR21.21a(1)1999-05-17017 May 1999 Forwards LER 99-006-00,describing Identified Safety Hazard with GE 7.2kV Magne-Blast Circuit Breakers.Event Is Being Reported Per 10CFR21.21a(1) RC-99-0104, Forwards Amend 17 to Training & Qualification Plan, Under Provisions of 10CFR50.54(p).Summary of Plan Changes Is Included as Part of Controlled Copy1999-05-13013 May 1999 Forwards Amend 17 to Training & Qualification Plan, Under Provisions of 10CFR50.54(p).Summary of Plan Changes Is Included as Part of Controlled Copy RC-99-0105, Forwards Copy of Sce&G Co 1998 Annual Financial Rept & Sc Public Service Authority 1998 Annual Financial Rept, for VC Summer Nuclear Station1999-05-13013 May 1999 Forwards Copy of Sce&G Co 1998 Annual Financial Rept & Sc Public Service Authority 1998 Annual Financial Rept, for VC Summer Nuclear Station 05000395/LER-1999-005, Forwards LER 99-005-00 for VC Summer Nuclear Station.Rept Describes Potential Condition for Exceeding Vsns Plant Design Basis Due to Submergence Qualification Issues for Certain ESF Components1999-05-12012 May 1999 Forwards LER 99-005-00 for VC Summer Nuclear Station.Rept Describes Potential Condition for Exceeding Vsns Plant Design Basis Due to Submergence Qualification Issues for Certain ESF Components ML20206L5121999-05-11011 May 1999 Informs That NRC Reorganized,Effective 990328.Reorganization Chart Encl ML20206P5771999-05-0707 May 1999 Informs That During 980519 Telcon Between T Matlosz & G Hopper,Arrangements Were Made for Administration of Licensing Exam at Virgil C Summer Nuclear Station During Wk of 990927 RC-99-0080, Submits Supplemental Info Re 970128 Response to NRC GL 96-06 Assurance of Equipment Operability & Containment Integrity During Design-Basis Accident Conditions. Addl Analysis & Manpower Expenditure Involved Not Cost Effective1999-05-0606 May 1999 Submits Supplemental Info Re 970128 Response to NRC GL 96-06 Assurance of Equipment Operability & Containment Integrity During Design-Basis Accident Conditions. Addl Analysis & Manpower Expenditure Involved Not Cost Effective RC-99-0097, Forwards Sce&G Cycle 12 COLR, IAW TS Section 6.9.1.111999-05-0606 May 1999 Forwards Sce&G Cycle 12 COLR, IAW TS Section 6.9.1.11 RC-99-0092, Informs That Util Has Reviewed Proposed Notice of Rulemaking & Fully Endorse Comments Prepared & Submitted on Behalf of Commercial Nuclear Power Industry by NEI1999-05-0303 May 1999 Informs That Util Has Reviewed Proposed Notice of Rulemaking & Fully Endorse Comments Prepared & Submitted on Behalf of Commercial Nuclear Power Industry by NEI RC-99-0090, Submits Special Rept (Spr 1999-003) Re Completion of ISI of SG Tubes,Indicating Number of Tubes Plugged or Repaired in Each Generator,Per TS 4.4.5.5.a & Section 4.4.5.5.b1999-04-29029 April 1999 Submits Special Rept (Spr 1999-003) Re Completion of ISI of SG Tubes,Indicating Number of Tubes Plugged or Repaired in Each Generator,Per TS 4.4.5.5.a & Section 4.4.5.5.b ML20206E1681999-04-29029 April 1999 Informs That FERC & NRC Will Conduct Category I Svc Water Pond (Swp) Dam Insp at Facility on 990610 ML20206P5021999-04-26026 April 1999 Forwards Insp Rept 50-395/99-02 on 990214-0327.One Violation of NRC Requirements Occurred & Being Treated as non-cited Violation,Consistent with App C of Enforcement Policy ML20205M0431999-04-13013 April 1999 Eighth Partial Response to FOIA Request for Records.App Q & R Records Encl & Being Made Available in PDR 05000395/LER-1999-002, Forwards LER 99-002-00 Re Condition for Exceeding Vsns Design Basis During Surveillance Testing Utilizing Certain ECCS Valves.Simplified Flow Diagram Included to Identify Configurations Discussed by Rept Encl1999-04-12012 April 1999 Forwards LER 99-002-00 Re Condition for Exceeding Vsns Design Basis During Surveillance Testing Utilizing Certain ECCS Valves.Simplified Flow Diagram Included to Identify Configurations Discussed by Rept Encl ML20205T2311999-04-0909 April 1999 Informs That on 990318,A Koon & Ho Christensen Confirmed Initial Operator Licensing Exam Scheduled for Y2K.Initial Exam Date Schedules for Wk of 000807 for Approx Eight Candidates ML20205G4181999-04-0101 April 1999 Advises That 970725 Application & Affidavit Which Submitted, WCAP-14932, Probabilistic & Economic Evaluation of Reactor Vessel Closure Head Penetration Integrity for Plant, Will Be Withheld from Public Disclosure,Per 10CFR2.790(a)(4) RC-99-0078, Submits Summary of Present Levels of Property Insurance & Cash Flow Statement for VC Summer Nuclear Station,Per 10CFR50.54(w)(3) & 10CFR140.21(e)1999-04-0101 April 1999 Submits Summary of Present Levels of Property Insurance & Cash Flow Statement for VC Summer Nuclear Station,Per 10CFR50.54(w)(3) & 10CFR140.21(e) 1999-09-09
[Table view] Category:INCOMING CORRESPONDENCE
MONTHYEARRC-99-0192, Forwards Updated 1999 ECCS Evaluation Model Revs Rept for VC Summer Nuclear Station.Rept Is Being Submitted Pursuant to 10CFR50.46,which Requires Licensees to Notify NRC of Corrections to or Changes in ECCS Evaluation Models1999-09-28028 September 1999 Forwards Updated 1999 ECCS Evaluation Model Revs Rept for VC Summer Nuclear Station.Rept Is Being Submitted Pursuant to 10CFR50.46,which Requires Licensees to Notify NRC of Corrections to or Changes in ECCS Evaluation Models RC-99-0181, Forwards Anticipated Schedule for Operator Licensing Examinations.Sce&G Requests That NRC Prepare Examinations Stated on Attachment1999-09-21021 September 1999 Forwards Anticipated Schedule for Operator Licensing Examinations.Sce&G Requests That NRC Prepare Examinations Stated on Attachment ML20212C5091999-09-15015 September 1999 Forwards Anticipated Schedule for Operator Licensing Exams for Sce&G.Util Requests That NRC Prepare Exams on Encl RC-99-0184, Submits Seven Requests for Using Alternatives to Requirements of ASME Code,Section XI Re Subsection IWE & Iwl Insps to Be Performed at Vsns.Proposed Alternatives Will Provide Acceptable Level of Quality & Safety1999-09-15015 September 1999 Submits Seven Requests for Using Alternatives to Requirements of ASME Code,Section XI Re Subsection IWE & Iwl Insps to Be Performed at Vsns.Proposed Alternatives Will Provide Acceptable Level of Quality & Safety RC-99-0177, Forwards Rev 2 to VC Summer Nuclear Station,Colr for Cycle 12, IAW Section 6.9.1.111999-08-31031 August 1999 Forwards Rev 2 to VC Summer Nuclear Station,Colr for Cycle 12, IAW Section 6.9.1.11 RC-99-0173, Requests That Info Listed in Rvid,Version 2,be Amended to Reflect Date for VC Summer Nuclear Station,As Marked in Encl to Ltr1999-08-31031 August 1999 Requests That Info Listed in Rvid,Version 2,be Amended to Reflect Date for VC Summer Nuclear Station,As Marked in Encl to Ltr ML20211H2481999-08-25025 August 1999 Forwards Four Controlled Copies of Amend 43 to Physcial Security Plan. Summary of Plan Changes, Are Included as Part of Each Controlled Copy.Encls Withheld Per 10CFR73.21 05000395/LER-1999-004, Submits Suppl 1 to LER 99-004-00 Re Discovery of Several Fuel Assembly Top Nozzle Holdown Screws Which Had Failed. Root Cause Will Not Be Completed by 990829,as Committed.W Analysis Will Be Issued After Fall Outages Are Complet1999-08-24024 August 1999 Submits Suppl 1 to LER 99-004-00 Re Discovery of Several Fuel Assembly Top Nozzle Holdown Screws Which Had Failed. Root Cause Will Not Be Completed by 990829,as Committed.W Analysis Will Be Issued After Fall Outages Are Completed RC-99-0171, Notifies NRC of Intent Re Submittal of Application to Renew OL of Vcs.Preparatory Work Has Begun to Develop Application for License Renewal to Be Submitted After 020806 Contingent Upon Final Approval of Board of Directors1999-08-23023 August 1999 Notifies NRC of Intent Re Submittal of Application to Renew OL of Vcs.Preparatory Work Has Begun to Develop Application for License Renewal to Be Submitted After 020806 Contingent Upon Final Approval of Board of Directors RC-99-0152, Seeks Exemption Under 10CFR0.12a(2)ii from 10CFR50,App G Requirements to Establish pressure-temperature Limits Curves Using Methodology Presented in 1989 ASME Section Xi,App G1999-08-19019 August 1999 Seeks Exemption Under 10CFR0.12a(2)ii from 10CFR50,App G Requirements to Establish pressure-temperature Limits Curves Using Methodology Presented in 1989 ASME Section Xi,App G RC-99-0164, Forwards semi-annual Fitness for Duty Rept from 990101 to 990630 for VC Summer Nuclear Station,Iaw 10CFR26.71(d)1999-08-17017 August 1999 Forwards semi-annual Fitness for Duty Rept from 990101 to 990630 for VC Summer Nuclear Station,Iaw 10CFR26.71(d) RC-99-0156, Forwards Rev 1 to VC Summer Nuclear Station COLR for Cycle 12, IAW TS Section 6.9.1.11.Sections 2.1 & 3.0 Were Added to Include Beacon Tsm1999-08-0404 August 1999 Forwards Rev 1 to VC Summer Nuclear Station COLR for Cycle 12, IAW TS Section 6.9.1.11.Sections 2.1 & 3.0 Were Added to Include Beacon Tsm RC-99-0147, Submits Attached Request for Relief from Performing SG PORV Strike Time Testing to Acceptance Criteria of Asme/Ansi OMa-19881999-07-26026 July 1999 Submits Attached Request for Relief from Performing SG PORV Strike Time Testing to Acceptance Criteria of Asme/Ansi OMa-1988 RC-99-0129, Provides Response to non-cited Violations Noted in Insp Rept 50-395/99-03.C/As:concluded That Cask Loading Pit Inaccessible & Duration of Dose Rates on Operating Floor of Fhb So Short That High Radiation Area Did Not Exist1999-07-0707 July 1999 Provides Response to non-cited Violations Noted in Insp Rept 50-395/99-03.C/As:concluded That Cask Loading Pit Inaccessible & Duration of Dose Rates on Operating Floor of Fhb So Short That High Radiation Area Did Not Exist RC-99-0131, Forwards Rev 9 to VC Summer Nuclear Station Safeguards Contingency Plan,Per 10CFR50.54(p).Encl Withheld1999-07-0707 July 1999 Forwards Rev 9 to VC Summer Nuclear Station Safeguards Contingency Plan,Per 10CFR50.54(p).Encl Withheld RC-99-0127, Estimates Submittal of Eleven Licensing Actions in Fy 2000. Based on Statistical Estimates of Past Licensing Actions, Number of Licensing Actions in Fy 2001 Should Be Approx Ten, in Response to AL 99-021999-07-0707 July 1999 Estimates Submittal of Eleven Licensing Actions in Fy 2000. Based on Statistical Estimates of Past Licensing Actions, Number of Licensing Actions in Fy 2001 Should Be Approx Ten, in Response to AL 99-02 RC-99-0114, Submits Response to GL 98-01,Suppl 1, Y2K Readiness of Computer Sys at Npps, Under Oath or Affirmation1999-06-30030 June 1999 Submits Response to GL 98-01,Suppl 1, Y2K Readiness of Computer Sys at Npps, Under Oath or Affirmation 05000395/LER-1999-006, Forwards LER 99-006-00,describing Identified Safety Hazard with GE 7.2kV Magne-Blast Circuit Breakers.Event Is Being Reported Per 10CFR21.21a(1)1999-05-17017 May 1999 Forwards LER 99-006-00,describing Identified Safety Hazard with GE 7.2kV Magne-Blast Circuit Breakers.Event Is Being Reported Per 10CFR21.21a(1) RC-99-0104, Forwards Amend 17 to Training & Qualification Plan, Under Provisions of 10CFR50.54(p).Summary of Plan Changes Is Included as Part of Controlled Copy1999-05-13013 May 1999 Forwards Amend 17 to Training & Qualification Plan, Under Provisions of 10CFR50.54(p).Summary of Plan Changes Is Included as Part of Controlled Copy RC-99-0105, Forwards Copy of Sce&G Co 1998 Annual Financial Rept & Sc Public Service Authority 1998 Annual Financial Rept, for VC Summer Nuclear Station1999-05-13013 May 1999 Forwards Copy of Sce&G Co 1998 Annual Financial Rept & Sc Public Service Authority 1998 Annual Financial Rept, for VC Summer Nuclear Station 05000395/LER-1999-005, Forwards LER 99-005-00 for VC Summer Nuclear Station.Rept Describes Potential Condition for Exceeding Vsns Plant Design Basis Due to Submergence Qualification Issues for Certain ESF Components1999-05-12012 May 1999 Forwards LER 99-005-00 for VC Summer Nuclear Station.Rept Describes Potential Condition for Exceeding Vsns Plant Design Basis Due to Submergence Qualification Issues for Certain ESF Components RC-99-0097, Forwards Sce&G Cycle 12 COLR, IAW TS Section 6.9.1.111999-05-0606 May 1999 Forwards Sce&G Cycle 12 COLR, IAW TS Section 6.9.1.11 RC-99-0080, Submits Supplemental Info Re 970128 Response to NRC GL 96-06 Assurance of Equipment Operability & Containment Integrity During Design-Basis Accident Conditions. Addl Analysis & Manpower Expenditure Involved Not Cost Effective1999-05-0606 May 1999 Submits Supplemental Info Re 970128 Response to NRC GL 96-06 Assurance of Equipment Operability & Containment Integrity During Design-Basis Accident Conditions. Addl Analysis & Manpower Expenditure Involved Not Cost Effective RC-99-0092, Informs That Util Has Reviewed Proposed Notice of Rulemaking & Fully Endorse Comments Prepared & Submitted on Behalf of Commercial Nuclear Power Industry by NEI1999-05-0303 May 1999 Informs That Util Has Reviewed Proposed Notice of Rulemaking & Fully Endorse Comments Prepared & Submitted on Behalf of Commercial Nuclear Power Industry by NEI RC-99-0090, Submits Special Rept (Spr 1999-003) Re Completion of ISI of SG Tubes,Indicating Number of Tubes Plugged or Repaired in Each Generator,Per TS 4.4.5.5.a & Section 4.4.5.5.b1999-04-29029 April 1999 Submits Special Rept (Spr 1999-003) Re Completion of ISI of SG Tubes,Indicating Number of Tubes Plugged or Repaired in Each Generator,Per TS 4.4.5.5.a & Section 4.4.5.5.b 05000395/LER-1999-002, Forwards LER 99-002-00 Re Condition for Exceeding Vsns Design Basis During Surveillance Testing Utilizing Certain ECCS Valves.Simplified Flow Diagram Included to Identify Configurations Discussed by Rept Encl1999-04-12012 April 1999 Forwards LER 99-002-00 Re Condition for Exceeding Vsns Design Basis During Surveillance Testing Utilizing Certain ECCS Valves.Simplified Flow Diagram Included to Identify Configurations Discussed by Rept Encl RC-99-0078, Submits Summary of Present Levels of Property Insurance & Cash Flow Statement for VC Summer Nuclear Station,Per 10CFR50.54(w)(3) & 10CFR140.21(e)1999-04-0101 April 1999 Submits Summary of Present Levels of Property Insurance & Cash Flow Statement for VC Summer Nuclear Station,Per 10CFR50.54(w)(3) & 10CFR140.21(e) RC-99-0066, Submits Rept of Status of Decommissioning Funding (RR-1950), for Vsns Per 10CFR50.751999-03-31031 March 1999 Submits Rept of Status of Decommissioning Funding (RR-1950), for Vsns Per 10CFR50.75 ML20205B9981999-03-29029 March 1999 Informs That Authority & Sce&G Has Ownership Interests of one-third & two-thirds,respectively in VC Summer Nuclear Station.Operating License Scheduled to Expire in 2022.Rept Addresses Decommissioning Cost Estimates & Financing RC-99-0054, Forwards Rev 2 to VC Summer Nuclear Station Training Simulator Quadrennial Certification Rept,1996-99, Per 10CFR55.45(b)(5)(ii)1999-03-22022 March 1999 Forwards Rev 2 to VC Summer Nuclear Station Training Simulator Quadrennial Certification Rept,1996-99, Per 10CFR55.45(b)(5)(ii) RC-99-0053, Requests That Implementation Date of Proposed TS Change Request Re Best Estimate Analyzer for Core Operations - Nuclear (Beacon) Be Extended. Util Requests 120 Day Time Frame to Perform Initial Beacon Calibrs During Cycle 121999-03-22022 March 1999 Requests That Implementation Date of Proposed TS Change Request Re Best Estimate Analyzer for Core Operations - Nuclear (Beacon) Be Extended. Util Requests 120 Day Time Frame to Perform Initial Beacon Calibrs During Cycle 12 RC-99-0048, Informs That Util Has Implemented Policy That Requires All Personnel Granted Unescorted Access to Vsns Satisfactorily Complete Test on Site Specific Info1999-03-10010 March 1999 Informs That Util Has Implemented Policy That Requires All Personnel Granted Unescorted Access to Vsns Satisfactorily Complete Test on Site Specific Info ML20207J5661999-02-16016 February 1999 Requests That Proprietary Rev 1 to WCAP-14932 Re Rv Closure Head Penetrations Integrity for VC Summer Nuclear Plant,Be Withheld from Public Disclosure,Per 10CFR2.790(b)(4) RC-99-0026, Provides Response to NRC RAI Re TS Change Request Re Best Estimate Analyzer for Core Operations - Nuclear1999-02-0505 February 1999 Provides Response to NRC RAI Re TS Change Request Re Best Estimate Analyzer for Core Operations - Nuclear RC-99-0023, Informs That in Response to GL 97-06,SCE&G Informed NRC of Plan to Perform Secondary Side Examination Scheduled for Refueling Outage RF-11.SCE&G Has Decided to Defer Secondary Side Insp of Sg.Reasons for Change of Plan Listed1999-02-0101 February 1999 Informs That in Response to GL 97-06,SCE&G Informed NRC of Plan to Perform Secondary Side Examination Scheduled for Refueling Outage RF-11.SCE&G Has Decided to Defer Secondary Side Insp of Sg.Reasons for Change of Plan Listed 05000395/LER-1998-009, Forwards LER 98-009-01 for VC Summer Nuclear Station.Rept Describes Unanalyzed Condition for non-safety Related Component for Which All Failure Mechanisms Had Not Been Evaluated1999-01-28028 January 1999 Forwards LER 98-009-01 for VC Summer Nuclear Station.Rept Describes Unanalyzed Condition for non-safety Related Component for Which All Failure Mechanisms Had Not Been Evaluated RC-99-0015, Forwards Amend 16 to Training & Qualification Plan,Per 10CFR50.54(p).Summary of Changes,Encl1999-01-22022 January 1999 Forwards Amend 16 to Training & Qualification Plan,Per 10CFR50.54(p).Summary of Changes,Encl RC-99-0005, Responds to 980908 RAI Re GL 97-01, Degradation of Control Rod Drive Mechanism Nozzle & Other Vessel Closure Head Penetrations1999-01-15015 January 1999 Responds to 980908 RAI Re GL 97-01, Degradation of Control Rod Drive Mechanism Nozzle & Other Vessel Closure Head Penetrations RC-98-0225, Forwards Rev 41 to EP-100, Radiation Emergency Plan. List of Changes by Page Number Affected by Rev 41 Also Encl1998-12-14014 December 1998 Forwards Rev 41 to EP-100, Radiation Emergency Plan. List of Changes by Page Number Affected by Rev 41 Also Encl RC-98-0226, Forwards Amend 42 to Psp.Changes Do Not Degrade Safeguards Effectiveness in PSP or Safeguards Contingency Plan,As Described in 10CFR50.54(p).Without Encl1998-12-14014 December 1998 Forwards Amend 42 to Psp.Changes Do Not Degrade Safeguards Effectiveness in PSP or Safeguards Contingency Plan,As Described in 10CFR50.54(p).Without Encl RC-98-0216, Requests Extension of Response Period to 990115 to Respond to NRC 980908 RAI Re GL 97-01, Degradation of CRDM Nozzle & Other Vessel Closure Head Penetrations. Util Intends to Utilize Industry Generic RAI Response1998-12-0404 December 1998 Requests Extension of Response Period to 990115 to Respond to NRC 980908 RAI Re GL 97-01, Degradation of CRDM Nozzle & Other Vessel Closure Head Penetrations. Util Intends to Utilize Industry Generic RAI Response RC-98-0189, Provides Assessment Results of GL 98-02, Loss of Rc Inventory & Associated Potential for Loss of Emergency Mitigation Functions While in Shutdown Condition, Per 10CFR50.54f1998-11-24024 November 1998 Provides Assessment Results of GL 98-02, Loss of Rc Inventory & Associated Potential for Loss of Emergency Mitigation Functions While in Shutdown Condition, Per 10CFR50.54f RC-98-0207, Forwards 120-day Response to NRC GL 98-04, Potential for Degradation of ECCS & CSS After LOCA Because of Construction & Protective Coating Deficiencies & Foreign Matl in Containment1998-11-11011 November 1998 Forwards 120-day Response to NRC GL 98-04, Potential for Degradation of ECCS & CSS After LOCA Because of Construction & Protective Coating Deficiencies & Foreign Matl in Containment RC-98-0177, Informs That Sce&G Will Classify as Moderate Any Stratification Condition That Results in Total Cuf,Based on Design Basis Values Plus Any Contribution from Stratification,Of Between 0.1 & 0.71998-11-0909 November 1998 Informs That Sce&G Will Classify as Moderate Any Stratification Condition That Results in Total Cuf,Based on Design Basis Values Plus Any Contribution from Stratification,Of Between 0.1 & 0.7 RC-98-0194, Provides Response to RAI Re GL 96-05, Periodic Verification of Design-Basis Capability of SR Movs1998-11-0202 November 1998 Provides Response to RAI Re GL 96-05, Periodic Verification of Design-Basis Capability of SR Movs RC-98-0202, Forwards Response to RAI Re Response to GL 96-06, Assurance of Equipment Operability & Containment Integrity During Design-Basis Accident Conditions1998-10-30030 October 1998 Forwards Response to RAI Re Response to GL 96-06, Assurance of Equipment Operability & Containment Integrity During Design-Basis Accident Conditions RC-98-0186, Expresses Appreciation for Opportunity to Present Topical Rept TR-104965, On-Line Monitoring of Instrument Channel Performance1998-10-26026 October 1998 Expresses Appreciation for Opportunity to Present Topical Rept TR-104965, On-Line Monitoring of Instrument Channel Performance RC-98-0185, Forwards non-proprietary Trs,Including Rev 0 to WCAP-15101, Analysis of Capsule W from Sce&G VC Summer Unit 1 Rv Radiation Surveillance Program & Rev 0 to WCAP-15103, Evaluation of PTS for VC Summer Unit 11998-10-0909 October 1998 Forwards non-proprietary Trs,Including Rev 0 to WCAP-15101, Analysis of Capsule W from Sce&G VC Summer Unit 1 Rv Radiation Surveillance Program & Rev 0 to WCAP-15103, Evaluation of PTS for VC Summer Unit 1 RC-98-0182, Responds to 980402 RAI Re GL 96-05, Periodic Verification of Design-Basis Capability of Safety-Related Movs1998-10-0808 October 1998 Responds to 980402 RAI Re GL 96-05, Periodic Verification of Design-Basis Capability of Safety-Related Movs RC-98-0178, Provides Comments on SALP Insp Rept 50-395/98-99.Util Ack That Station Can Enhance Future Performance Further with More Focus & Attention on Change Mgt Practices Re Plant & Procedure Changes1998-10-0505 October 1998 Provides Comments on SALP Insp Rept 50-395/98-99.Util Ack That Station Can Enhance Future Performance Further with More Focus & Attention on Change Mgt Practices Re Plant & Procedure Changes 1999-09-28
[Table view] Category:UTILITY TO NRC
MONTHYEARML20059K4071990-09-17017 September 1990 Advises That Author Succeeded Os Bradham as vice-president, Nuclear Operations,Effective 900915.All Correspondence to Util Should Be Sent to Listed Address ML20059J9141990-09-14014 September 1990 Responds to Violations Noted in Insp Rept 50-395/90-21. Violation Occured,However Description of Violation in Error. Corrective Action:Valve XVT02803B Placed in Proper Position & Verification of Emergency Feedwater Sys Lineup Completed ML20059E2821990-08-30030 August 1990 Advises That Programmed Enhancements Per Generic Ltr 88-17 Re Loss of DHR Implemented & Mods Operable ML20059D6911990-08-29029 August 1990 Forwards Technical Rept 90-02, Seismic Activity Near VC Summer Nuclear Station for Apr-June 1990 ML20059B9541990-08-28028 August 1990 Forwards Semiannual Effluent & Waste Disposal Rept for Jan-June 1990, Per 10CFR50.36a & Sections 6.9.1.8 & 6.9.1.9 of Tech Spec ML20056B4901990-08-22022 August 1990 Discusses NRC Bulletin 88-004, Potential Safety-Related Pump Loss. Decision on Future Insp Frequency &/Or Sys Mods Should Be Deferred Until Internal Components Could Be Inspected ML20059A2041990-08-16016 August 1990 Forwards First Semiannual fitness-for-duty Rept from 900103- 0630.Util Pleased W/Program,However,Concerned About Incorrect Test Results for Blind Performance Specimens Received from Roche Labs ML20058P6581990-08-15015 August 1990 Forwards Monthly Operating Rept for Jul 1990 & Rev 13 to ODCM for Virgil C Summer Nuclear Station.Rev Implements Changes Necessary to Permit Removal of Radiological Effluent Specs from Tech Specs as Recommended by Generic Ltr 89-01 ML20058P7681990-08-13013 August 1990 Forwards Mods to 900516 Tech Spec Change Request Re Pressurizer Code Safety Valve Setpoint Tolerance & Mode 3 Exception,Per 900713 Telcon.Changes Do Not Affect Technical Intent of 900516 Submittal Nor Alter Safety Evaluation ML20058N6961990-08-10010 August 1990 Responds to Violations Noted in Insp Rept 50-395/90-18. Corrective Action:Personnel Counseled on Procedural Compliance & Importance of Independent Verification in Maintaining Proper Sys Alignment ML20056A3441990-08-0101 August 1990 Responds to NRC Request for Further Justification Re Relocating Emergency Operations Facility to Corporate Headquarters ML20059A3691990-07-30030 July 1990 Ack Receipt of SALP Rept 50-395/90-11 & Forwards Comments on Rept ML20056A0201990-07-27027 July 1990 Provides Notification That All Actions Re Generic Ltr 88-14, Instrument Air Supply Sys Problems Affecting Safety-Related Equipment, Completed ML20055H9821990-07-20020 July 1990 Forwards Amend 28 to Physical Security Plan.Amend Withheld (Ref 10CFR73.21) ML17305B7681990-07-19019 July 1990 Responds to NRC NRC Bulletin 90-001, Loss of Fill Oil in Transmitters Mfg by Rosemount. No Transmitters Identified in Item 1 from Suspect Lots Identified by Rosemount ML20044B0241990-07-11011 July 1990 Responds to Violations Noted in Insp Rept 50-395/90-15. Corrective Actions:Relay Rewired & Verified Against Design Drawings ML20055F3631990-07-10010 July 1990 Forwards Rev 1 to Plant Core Operating Limits Rept Cycle 6, as Result of Typo ML20055E0341990-07-0505 July 1990 Forwards Technical Rept 90-1, Seismic Activity Near VC Summer Nuclear Station for Period Jan-Mar 1990 ML20055D4661990-07-0303 July 1990 Forwards Amend 4 to Updated Virgil C Summer Nuclear Station Fire Protection Evaluation Rept, Effective 900301 ML20058K4421990-06-29029 June 1990 Forwards Response to Generic Ltr 90-04 Re Status of Licensee Implementation of Generic Safety Issues Resolved W/Imposition of Requirements or Corrective Actions ML20043F6621990-06-0707 June 1990 Requests for Change in QA Program 10CFR50.54 & FSAR Biennial Reviews of Plant Procedures Based on Justification Contained in Proposed Change to FSAR.SAP-139 Will Be Revised Immediately Following Approval of Request ML20043D5861990-06-0101 June 1990 Forwards LERs 90-004 & 90-006 Which Respond to Violation Noted in Insp Rept 50-395/90-12.Corrective Actions:Training Conducted & Tech Spec Instruments Evaluated for Adequate Testing ML20043C5001990-05-29029 May 1990 Forwards marked-up Pages to Util 900410 Tech Spec Change Request Indicating Location of Incorrect Std Refs,Per 900419 Telcon W/Jj Hayes ML20043B7351990-05-23023 May 1990 Forwards Rev 0 to Core Operating Limits Rept,Cycle 6. ML20043A9181990-05-17017 May 1990 Forwards List Detailing Tubes in Which F* Criteria Applied During Steam Generator Tube Insp Subsequent to Fifth Inservice Eddy Current Exam.Location of Degradation Measured from Tube End on Hot/Cold Leg Up to Degradation ML20043G4621990-05-0303 May 1990 Advises That Util Will Control Operations to Abide by More Restrictive Required Shutdown Margin Curve While Awaiting NRC Approval to Place Revised Curve in Tech Specs ML20042G4741990-05-0101 May 1990 Special Rept Spr 90-003 Listing Number of Steam Generator Tubes Plugged or Repaired During Fifth Refueling Outage ML20042E1931990-04-11011 April 1990 Forwards Seismic Activity Near VC Summer Nuclear Station, Oct-Dec 1989. Several Seismic Monitoring Stations Inoperable During Reporting Period & Also During First Quarter 1990 ML20012F3551990-04-0303 April 1990 Withdraws 900321 Request for Relief from Testing RHR Containment Isolation Valves Xvg 08701 A/B at Frequency Specified in ASME Section XI Code.Meeting Requested to Discuss Util Interpretation of Testing in 10CFR50,App J ML20012E9061990-03-23023 March 1990 Submits Supplemental Response to Station Blackout Re Proper Documentation & Consistent Implementation of NUMARC 87-00 Guidance.Plant Currently Maintains Targeted Emergency Diesel Generator Reliability by Ensuring Compliance W/Tech Specs ML20012E0431990-03-23023 March 1990 Forwards Corrected Pages to Rev 26 to Radiation Emergency Plan. ML20012D9691990-03-23023 March 1990 Forwards, Sante Cooper 1989 Annual Financial Rept, South Carolina Gas & Electric 1989 Annual Financial Rept Summary of Present Levels of Property Insurance & Cash Flow Statement for VC Summer Nuclear Plant ML20012E5881990-03-21021 March 1990 Forwards Corrected Slide to Clarify Util Current Plans Re Steam Generator Insp Plan,Per 900312 Meeting W/Nrc ML20012D8271990-03-21021 March 1990 Requests Relief from Testing RHR Containment Isolation Valves Xvg 08701 A/B at Frequency Specified in ASME Section XI Code.Valves Will Be Tested at Frequency Specified for Type a Valves in 10CFR50,App J ML20012D0371990-03-19019 March 1990 Responds to Generic Ltr 89-19 Re Design of Steam Generator Overfill Protection.Util Does Not Plan to Implement Physical Mods or Administrative Changes Since Overfill Protection Sys Meets or Exceeds Guidance in Generic Ltr ML20012D4781990-03-16016 March 1990 Forwards First Annual ECCS Evaluation Model Revs Rept,Per 881017 Rev to 10CFR50.46.Rept Identifies Several Mods to Large & Small Break LOCA Evaluation Models Used at Facility & Provides Estimated Effects of Changes on ECCS Analyses ML20012C0661990-03-0909 March 1990 Forwards Addl Info Re Natural Circulation Evaluation Program Rept,Per 900208 Telcon Request ML20012A0921990-03-0101 March 1990 Forwards Response to Generic Ltr 90-01,consisting of Completed NRC Regulatory Impact Survey Questionnaire Sheets Containing Estimates of Time Spent by Managers on Insps & Audits ML20006E3411990-02-0606 February 1990 Forwards Proprietary Addl Info,Per NRC 900104 Request,Re Util Tech Spec Change Request for Elimination of Resistant Temp Detector Bypass Manifold sys,marked-up Tech Spec Pages & Block Diagrams.Encls Withheld ML20006D1241990-02-0101 February 1990 Requests Approval,Per 10CCFR50.55a,for Use of Alloy 690 Matl in Fabricating/Use of Steam Generator Plugs During Upcoming Refueling Outage.Alloy 690 Currently code-approved Matl for Steam Generator Tubing Based on Corrosion Resistance ML20011E1211990-01-31031 January 1990 Forwards Response to Generic Ltr 89-13, Svc Water Sys Problems Affecting Safety-Related Equipment. Util Currently Performs Visual Insps & Dredgings of Svc Water & Circulating Water Intake Structures Once Each Refueling Cycle ML20006D2951990-01-26026 January 1990 Forwards WCAP-12464, VC Summer Nuclear Station Natural Circulation Evaluation Program Rept. Rept Provides Info to Resolve Branch Technical Position Rsb 5-1, Design Requirements for RHR Sys for Facility,Per 890719 Telcon ML20006B1211990-01-24024 January 1990 Forwards Technical Rept 89-3, Seismic Activity Near VC Summer Nuclear Station for Period Jul-Sept 1989. ML20006A7191990-01-19019 January 1990 Provides Update of long-term Corrective Action for 890711 Loss of Offsite Power.Installation of Voltage Regulator on 230/7.2 Kv Emergency Auxiliary Transformer Neither Required Nor Any Appreciable Benefit Derived from Installation ML20006A5521990-01-16016 January 1990 Advises That Util Will Validate Adequacy of Any Sys Used for Periodic Inservice Insp & Will Upgrade,As Required,Eddy Current Test Methods Used as Better Methods Developed & Validated for Commercial Use,Per 900111 Discussion ML20005H0791990-01-12012 January 1990 Advises That Response to NRC Request for Addl Info Re L* Implementation Will Be Submitted by 900801 Due to Refueling Outage Schedule ML20005F1191990-01-0505 January 1990 Forwards Description of F* Application at Plant & Sample Eddy Current Lissajous Figures for 12 Steam Generator Tubes, Per 891218 Request for Extension of Application of F* Tube Plugging Criterion for Life of Steam Generators ML20005G4921990-01-0505 January 1990 Responds to NRC Bulletin 89-003, Potential Loss of Required Shutdown Margin During Refueling Operations. Bulletin & Core Shuffle Procedure Will Be Discussed Among Core Engineering Personnel in Documented Training Session ML20005F4531990-01-0404 January 1990 Forwards Application for Approval to Incinerate Oil Contaminated W/Very Low Levels of Licensed Radioactive Matls within Site Boundary of Facility ML20005F0601990-01-0303 January 1990 Forwards Justification for Continued Operation Re Pressurizer Surge Line Thermal Stratification,Per NRC Bulletin 88-011.Util Believes That Plant Can Continue Operation for at Least 20 Addl Heatup/Cooldown Cycles 1990-09-17
[Table view] |
Text
r gCa,rogl na E!ectric& GasComporty
%Caus?'*
SCE&G
. - . , ,n g41414, 1986 d
Dr. J. Nelson Grace Regional Administrator U. S. Nuclear Regulatory Commission Region II, Suite 2900 101 Marietta Street, N.W.
Atlanta, Georgia 30323
SUBJECT:
Virgil C. Summer Nuclear Station Docket No. 50/395 h Operating License No. NPF-12 Comments on SALP Report
Dear Dr. Grace:
On March 18, 1986 a meeting between South Carolina Electric and Gas Company (SCE&G) management and members of the NRC Region II Staff was held at SCE&G's corporate offices. The purpose of this meeting was to discuss the Systematic Assessment of Licensee Performance (SALP) Board Report transmitted to SCE&G by letter dated March 12, 1986. As discussed in the March 18, 1986 meeting and the March 12, 1986 letter, certain weaknesses in fire protection and plant operations were identified and Category 3 ratings were assigned to these areas. However, SCE&G and the SALP Board noted that the perceived weaknesses in the area of fire protection were identified before SCE&G had completed the review for the correction of the program, and that the implementation of aggressive corrective actions demonstrated a positive management attitude toward nuclear safety. Furthermore, both groups noted that the trend of performance in the areas of operations and outages was improving and that no instances of declining trend were identified. This letter is hereby provided to address the Category 3 ratings and inform the NRC Staff of actions which SCE&G has pursued to improve performance in these areas.
Fire Protection As discussed in the March 12, 1986 letter, SCE&G attended the NRC Region II Appendix R Workshop on May 4, 1984. At that time SCE&G recognized a divergence between its pre-license (1980-1982) interpretations of Appendix R and those considered standard by the NRC in May of 1984. Therefore, in July 1984, SCE&G appointed a special project manager for fire protection and initiated a two million dollar reanalysis of the plant for compliance with current Appendix R interpretations. In a letter from Mr. O. W. Dixon, Jr.,
to Mr. H. R. Denton dated May 29, 1985, SCE&G submitted an initial listing of modifications and deviation requests identified from the in-progress reanalysis.
ger2888;81>88)ip Oficia' Coyf
%O
Dr. J. Nelson Grace l Coments on SALP Report Page2
- April 14, 1986 On June 3-7, 1985, an audit was performed by Region II on SCE&G's implementation of 10CFR50, Appendix R, Section III.G. III.J. III.L. and i 111.0. At the time of this audit the issues involved were well understood
! by SCE&G and the reanalysis was underway; however, the reanalysis was ,
incomplete. The items identified on page 13 of the March 12, 1986 SALP Board '
letter were being addressed by SCE&G at the time of the NRC audit, but the desired data were not in a form or degree of completion that the inspection t i team considered suitable for audit purposes. Subsequent to the June 3-7, 2
1985 audit, an Enforcement Conference was held between Region II and SCE&G on August 9, 1985 at which potential violations resulting from the audit were .
addressed in detail by SCE&G. l
- In a letter dated June 21, 1985, SCE&G committed to voluntarily establish a !
l special two hour roving fire watch as an interim measure until the Appendix R modifications were completed or until interim procedures were reviewed and
, approved by the Office of Nuclear Reactor Regulation (NRR). Efforts
! continued to complete the original work scope of the reanalysis, and in a i i meeting between SCE&G, NRR, and Region II held on Jul 24 and 25, 1985, an agreement was reached on the information which SCE&C aeeded to provide to the NRC to address open technical issues. By letters f rJm SCE&G to the NRC dated September 4, 1985, September 16, 1985, September 20, 1985, November 1, 1985, 1
December 30, 1985 February 27, 1986, and April 1, 1986, SCE&G provided supplemental, clarifying information and current status of the Appendix R 3
reanalysis effort. These letters were made available to the NRC as soon as j practical in accordance with the completion of corresponding portions of the i reanalysis effort.
I
! On April 2, 1986, a meeting was held in Bethesda, Maryland between SCE&G and '
4 NRC representatives to discuss outstanding issues and the current status of
- the Appendix R effort. In this meeting, SCE&G agreed to provide two l
- additional clarifying letters to support NRR's review of the technical i
- Appendix R issues. SCE&G expects, following the submittal of this portion of
- information to NRR, that Safety Evaluation Reports can be written which will ,
! close the final technical issues under review. As discussed in that meeting, i SCE&G's updated Fire Protection Evaluation Report sumarizing the new
- i analysis is on schedule to be completed by July 1986. Furthermore, final ;
e plant modifications are scheduled for completion and full compliance with the t j Appendix R regulations is expected by startup after third refueling
- (scheduled for the second quarter of 1987). l 2
i SCE&G has devoted extraordinary resources in what it believes is an effective ;
- manner in order to reach compliance with the current interpretations of 10CFR50, Appendix R. From the time SCE&G initiated the reanalysis effort in
- mid-1984 to the present, a great deal of attention has been focused on ,
adhering to the original schedule and work effort. SCE&G is confident that ~
- completion of the reanalysis effort and implementation of the resulting modifications will address the requirements of 10CFR50, Appendix R and
- provide adequate fire protection design at the Virgil C. Sumer Nuclear j
- Station for the health and safety of the public. t f
- s. .
'. .Dr. J. Nels:n Grace Comments cn SALP Report Page3 April 14, 1986 Plant Operations SCE&G has implemented both short term and long term programmatic changes to provide improved control over plant operations. In 1985, SCE&G conducted a management evaluation of operating trends which resulted in the identification of possible problem areas. The evaluation indicated that the majority of negative operating performances could be attributed to personnel errors and the fact that some secondary plant systems were at times difficult to manipulate. As a result of these findings, the following actions were initiated:
- 1. Plant systems were evaluated for reliability improvements;
- 2. Meetings were held with all personnel;
- 3. A personnel error root cause determination plan was formed;
- 4. The training program effectiveness was evaluated;
- 5. A Pursuit of Excellence Program (PEP) was devised; and
) 6. A stress survey was conducted.
These actions have led to a variety of new and improved programs and procedures designed to increase personnel awareness and improve plant 4
operating performance.
The review of plant systems identified several areas in which improvements could be made to allow for more " user friendly" plant operation. The steam generator level trip margin was increased to allow for more flexibility in plant transients. The turbine trip setpoint was raised to 50% to prevent reactor trips on turbine trips when the plant is being started up.
Furthermore, the Deaerator Control System, the Condensate System, and the Feedwater System were modified to make the systems more reliable.
Meetings with all the plant employees have been held with emphasis placed on NRC violations, personnel errors, and feedback from the employees on how to improve performance. The meetings increased employee awareness of
- performance and educated them on the necessity of positive performance.
- Employees stressed that they should be held accountable for their actions and
- thus make them more conscious of their activities. Employees also recomended that management allow everyone to benefit from mistakes made by educating them on the events surrounding the errors.
l l A study was undertaken to determine the root causes of personnel errors which occurred at the plant. The causes were placed into classifications such as
, individual mistakes, procedure / program compliance, procedure / program adequacy, repetitive errors, lack of understanding / training, or human performance factors. In order to address these root causes, and in an attempt to decrease overall personnel errors, several corrective actions have i
\ . ,,
Dr. J. Nelsin Grace Comments on SALP Riport Page4 April 14, 1986 been initiated. Individual and group counseling has been held with personnel to stress the importance of adhering to procedures and competently performing jobs. Increased awareness of how certain actions can impact plant operation has also been stressed to personnel. Procedures which have been determined to be inadequate have been revised and upgraded along with programs in which specific enhancements have been determined to be beneficial.
Where necessary, training programs have been revised and new programs added in an effort to reduce personnel errors which have been caused by a lack of understanding or possible incomplete training. The organization and staffing of the training department have been improved to provide for more efficient training. An upgrade of system descriptions and design basis documents has been initiated in an effort to assure accurate and precise information is made available to personnel. Training has also established stronger 1 interfaces with the plant in order to be more attuned to the normal day-to-
! day activities associated with plant operations.
i Simulator training has been improved to provide for new training techniques l and increased emphasis on problem areas. Non-traditional training exercises have been introduced to improve operators' control board familiarity and basic communications skills. Exercises have been formulated to help operators improve their ability to recognize and analyze transient plant conditions. An increased emphasis has been placed on the understanding of information and data which are observed, and the results and consequences of actions which are taken. In addition, annual simulator requalification i training hours have been increased significantly, and additional time is
]
spent on the simulator practicing infrequently performed activities.
A " Pursuit of Excellence Program" (PEP) has been organized and is underway.
! PEP is composed of several sub-programs all aimed at improving plant
! operations at the Virgil C. Summer Nuclear Station. These sub-programs address team building, professional improvement, the necessities of different j programs, industrial safety awareness and human performance error correction. l
! Although PEP has only recently been formally organized, many of the programs l l are well underway with improvements already being realized. j 4
The Team Building Program is in progress and the Operations Group is the I i pilot organization. The objective of this program is to enhance plant safety I and operating efficiency by encouraging input and shared decision making i among the employees on topics that may impact their specific jobs. The j success of the program is based on the premise that employees within organizations have some of the best ideas for working more efficiently and l productively. Preliminary results as observed from the pilot group indicate that the team building concept is perceived by participating members as a
- positive concept. The program is currently in the process of expanding to j incorporate other groups at the plant. .
A Control Room Enhancement Program has been developed to help improve
] operator professionalism. Several modifications have been made to the
, Control Room in order to provide an improved work area for the operators
h .' ,
Dr. J. Nels n Grac2 Comments on SALP Report Page5 April 14, 1986 i
i including adding carpet, repainting the area, and organizing materials needed for reference. Modifications required as a result of SCE&G's Control Room :
j Design Review are also being implemented. In addition, a plant-wide effort i is in effect to improve personal appearance and establish a more professional i atmosphere.
I Program " Content and Criteria" Overview training is being planned to inform 4
personnel of the various administrative control systems that exist and the {
reasons for the existence of these programs. In addition, the training will j identify how and why certain programs _ interface with each other and the ,
, regulatory requirements that serve as the basis for the programs. This j training is hoped to educate personnel on the necessity and usefulness of ;
I many of the programs which govern much of their work activities. l f
l An Increased Awareness Program has been initiated to improve communications )
- to plant personnel as related to SCE&G's Nuclear Operations goals. The )
objective is to increase the awareness of plant personnel of the importance
- of their efforts on the overall goals and objectives of the Company. The !
t tool for accomplishing this objective is to display graphs and charts, in !
areas visible to all personnel, showing goals and current status in achieving :
these goals. This action enables personnel to readily keep abreast of !
present attainment relative to Company objectives. ,
j . i An Industrial Safety Improvement Program has also.been formed to help
- increase the involvement of supervisors and managers"in the enforcement of {
4 industrial safety requirements. This increased managerial attention is !
! expected to help decrease injuries and provide a more safety conscious !
i working environment for all the employees. l t
4 The final element of the PEP involves an evaluation of INP0's Human !
l Performance Evaluation System Pilot Program (Near Miss Evaluation). The i
, objective of this evaluation is to develop a program which will reduce human -
! error related occurrences by emphasizing the recognition and correction of i i " set-ups" which lead to such errors. This plan is hoped to encourage !
! personnel to remain attentive to their duties and to increase their awareness l of the surroundings. ;
i Many of the programs and activities which have been initiated were done so to !
j address the findings of a stress survey conducted to help identify areas in (
! which the employees were experiencing stress related problems. Other ;
j findings from the survey, which include difficulties associated with rotating !
j shifts, excessive paperwork burdens, and limited progression opportunities, :
are being studied to determine if more acceptable alternatives are available. I i Furthermore, in an attempt to help relieve operators of some of the excessive !
, burdens experienced during plant startups, additional-support has been '
, provided to assist this group. Operations management, a Reactor Engineering l representative, and a Shift Technical Advisor are now present during startup i
!, to support the shift supervisor. i I
i !
i
Dr. J. Nelstn Grcce Coments on SALP Report
> Page6 April 14, 1986 Overall, increased management attention to the operational aspects of the plant have been initiated to help improve operational performance.
Leadership changes made in the plant organization combined with an increased dedication of all management and personnel to plant performance excellence is expected to further improve operation of the Virgil C. Summer Nuclear Station.
In the review of the March 12, 1986 SaLP Board letter, SCE&G identified certain portions of the letter which deserved specific comments. In the Plant Operations portion of the Performance Analysis section on page 4, the following statement is made: "This inspection revealed degradation of management control in areas that included the lack of attention to nuclear system operating conditions, outdated and poorly controlled procedures, inadequate methods of tracking equipment status involving limiting conditions of operation, and a generally relaxed attitude toward procedure compliance."
By letter dated October 23, 1985, SCE&G received Audit Report 50-395/85-36 which is a summary of the inspection (referenced above) conducted by the NRC on September 3-6, 1985. This audit report identified a deficiency in the methods for tracking equipment status involving limiting conditions for operations; however, it did not indicate that the inspection revealed the other issues mentioned in the preceding quote.
Additionally, in the Outage Section on page 17, it was stated that 100 percent eddy current testing of the steam generator tubes was accomplished
- during both the first and second refueling outages. As noted in Special Report 85-12, submitted by letter dated September 20, 1985 from Mr. O. W.
Dixon, Jr., to Dr. J. Nelson Grace, the following tubes were inspected in each steam generator during the first refueling outage: 100 percent of rows 44, 45, 46, 47, 48 and 49, a 7x4 matrix of the remainder of the tubes, all peripheral tubes (including row 1) and 10 percent of row 2. During the second refueling outage, eddy current testing of the steam generators included the Technical Specification required sample of tubes plus a 100 percent inspection of the hot leg tube sheet area of all three steam generators. These data were initially supplied by SCE&G in LER 85-31 dated November 13, 1985 and LER 85-31, Revision 1, dated December 4, 1985.
If you snould have any questions, please advise. ,
1 er ruhours, D. . Na an AM: DAN / led pc: See Page 7 1
Dr. J. Nelsin. Grace Comments on SALP Report Page7 -
April 14, 1986 '
pc: 0. W. Dixon, Jr./T. C. Nichols, Jr. ,
E. H. Crews, Jr.
E. C. Roberts J. G. Connelly, Jr.
W. A. Williams, Jr.
Group Managers
- 0. S. Bradham D. R. Moore C. A. Price W. T. Frady C. L. Ligon (NSRC)
R. M. Campbell K. E. Nodland
. R. A. Stough G. O. Percival R. L. Prevatte -
J. B. Knotts, Jr.
I&E Washington NPCF File f
b
?
I E
l
, - - ,, - --