ML20155H767

From kanterella
Jump to navigation Jump to search
Forwards Rev 1 to COLR for Peach Bottom Atomic Power Station Unit 2,Reload 12,Cycle 13
ML20155H767
Person / Time
Site: Peach Bottom Constellation icon.png
Issue date: 11/05/1998
From: Geoffrey Edwards
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20155H770 List:
References
NUDOCS 9811100277
Download: ML20155H767 (1)


Text

-

Etttion Support Depcriment

$ '4 TR 5 8 5 d i

PECO NUCLEAR eeco eee,2< cemoamv 96s crestertrook raievard

. A Unit of PECO Energy Wayne. PA 19087-5691 November 5,1998 Docket No. 50-277 License No. DPR-44 1

U.S. Nuclear Regulatory Commission Attention: DocumentControlDesk Washington DC 20555

Subject:

Peach Bottom Atomic Power Station, Unit 2 Issuance of the Core Operating Limits Report for Reload 12, Cycle 13 j

Dear Sir / Madam-Endosed is the Core Operating Limits Report (COLR) for Peach Bottom Atomic Power i

Station (PBAPS), Unit 2, Reload 12, Cyde 13. Cyde 13 is the operating cyde following the restart from the PBAPS, Unit 2, refueling outage 12 (2R12).

Revision 0 of this COLR was approved prior to the start of Cycle 13, but was superceded by Revision 1 prior to the startup from 2R12.

This COLR is being submitted to the NRC in accordance with PBAPS, Unit 2 Technical Specifications (TS) Sechon 5.6.5.d.

l If you have any questions, please do not hesitate to contact us.

/

Very truly yours, b'hU Garrett D. Edwards Director-Licensing Enclosure

/

cc:

H. J. Miller, Administrator, Region I, USNRC (w/ Enclosure)

A. C. McMurtray, USNRC Senior Resident inspector, PBAPS (w/ Enclosure) 9811100277 981105 e

PDR ADOCK 05000277 P

PDR

~

x 00 1n0

!