ML20155C610

From kanterella
Jump to navigation Jump to search
Notice of Partial Denial of Amend to FOL DPR-44 & Opportunity for Hearing.Amend Would Revise TSs to Add Footnote to TS Section 5.6.5.b.1.NRC Concluded That Part of Licensee Request Cannot Be Granted
ML20155C610
Person / Time
Site: Peach Bottom Constellation icon.png
Issue date: 10/26/1998
From: Capra R
NRC (Affiliation Not Assigned)
To:
Shared Package
ML20155C593 List:
References
NUDOCS 9811020290
Download: ML20155C610 (2)


Text

.. . - - . - _ . .. . , - . - . _. _~ - . . . -.

7590-01 P UNITED STATES NUCLEAR REGULATORY COMMISSION PECO ENERGY COMPANY PEACH BOTTOM ATOMIC POWER STATION. UNIT 2 DOCKET NO. 50-277 NOTICE OF PARTIAL DENIAL OF AMENDMENT TO FACILITY OPERATING LICENSE AND OPPORTUNITY FOR HEARING The U.S. Nuclear Regulatory Commission (the Commission) has partially denied a request by PECO Energy Company (the licensee), for an amendment to Facility Operating t

License No. DPR-44 issued to the licensee for operation of the Peach Bottom Atomic Power Station, Unit 2, located in York County, Pennsylvania. Notice of Consideration of issuance of the amendment was published in the FEDERAL REGISTER on September 9,1998 (63 FR 48261).

The purpose of the licensee's amendment request was to revise the Technical Specifications (TS) to add a footnote to TS Section 5.6.5.b.1.

The NRC staff has concluded that a part of the licensee's request cannot be granted. The licensee was notified of the Commission's partial denial of the proposed change by conference calls on September 2 and 9,1998, and by letter dated October 26, 1998.

By November 30,1998, the licensee may demand a hearing with respect to the denial described above. Any person whose interest may be affected by this proceeding may file a written petition for leave to intervene.

A request for hearing or petition for leave to intervene must be filed with the Secretary of the Commission, U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001 Attention:

Rulemakings and Adjudications Staff, or may be delivered to the Commission's Public Document Room, the Gelman Building,2120 L Street, NW., Washington, DC, by the above date.

9811020290 981026 PDR ADOCK 05000277 P PDR

- - - -. - --. . . .= . . . . .- .- .

O I

l 2 A copy of any petitions should also be sent to the Office of the General Counsel, U.S.

Nuclear Regulatory Commission, Washington, DC 20555-0001, and to J. W. Durham, Sr.,

Esquire, PECO Energy Company,2301 Market Street, Philadelphia, PA 19101, attomey for the licensee.

For further details with respect to this action, see (1) the application for amendment dated July 10,1998, as supplemented by two letters dated September 11,1998, and (2) the l

l Commission's letter to the licensee dated October 26, 1998.

These documents are available for public inspection at the Commission's Public Document Room, the Gelman Building,2120 L Street, NW., Washington, DC, and at the local public document room located at the Govemment Publications Section, State Library of Pennsylvania, (REGIONAL DEPOSITORY) Education Building, Walnut Street and Commonwealth Avenue, Box 1601, Harrisburg, PA 17105.

Dated at Rockville, Mary.snd, this 26th dayof October 1998.

FOR THE NUCLEAR REGULATORY COMMISSION RaJd lw Robert A. Capra, Project Director Project Directorate 1-2 Division of Reactor Projects - 1/11 Office of Nuclear Reactor Regulation l

l I

,