ML20155C588

From kanterella
Jump to navigation Jump to search

Forwards Amend 226 to License DPR-44,SE & Notice of Partial Denial.Amend Revises TSs for Safety Limit MCPR from Current Value of 1.11 to 1.10 for Two Recirculation Loop Operation & from 1.13 to 1.12 for Single Recirculation Loop Operation
ML20155C588
Person / Time
Site: Peach Bottom Constellation icon.png
Issue date: 10/26/1998
From: Thadani M
NRC (Affiliation Not Assigned)
To: Geoffrey Edwards
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
Shared Package
ML20155C593 List:
References
TAC-MA2353, NUDOCS 9811020278
Download: ML20155C588 (3)


Text

Mr. G::rrrtt D. Edw1rds October 26, 1998 Dir;:ctor-Licensing, MC 62A-1 PECO Enirgy Comprny Nuclear Group Headquarters Correspondence Control Desk P.O. Box No.195 Wayne, PA 19087-0195

SUBJECT:

PEACH BOTTOM ATOMIC POWER STATION, UNIT NO. 2, REVISION TO TECHNICAL SPECIFICATIONS SAFETY LIMIT MINIMUM CRITICAL POWER RATIO FOR CYCLE 13 OPERATION (TAC NO. MA2353)

Dear Mr. Edwards:

The Commission has issued the enclosed Amendment No. 226 to Facility Operating License No.

DPR-44 for the Peach Bottom Atomic Power Station, Unit No. 2. This amendment consists of changes to the Technical Specifications (TSs) in response to PECO Energy Company's (the licensee's) application dated July 10,1998, as supplemented by two letters dated September 11, 1998.

This amendment revises the TSs for safety limit Minimum Critical Power Ratio from its current value of 1.11 to 1.10 for two recirculation loop operation, and from 1.13 to 1.12 for single recirculation loop operation. A second change request to add a footnote to TS 5.6.5.b.1 is determined not to be required. Therefore, that change request is denied. A Notice of Partial Denial is enclosed.

A copy of the safety evaluation is also enclosed. Notice of Issuance will be included in the Commission's Bi-Weekly Federal Reaister Notice. The Notice of Partial Denial will be published in the Federal Reaister.

The Nuclear Regulatory Commission staff has noted that the licensee's requests for the NRC staff's actions and the submittals of supporting docurnentation, on occasions, are not timely. The NRC staff, in a phone conversation with Mr. John Hufnagel of your staff, requested that submittals and the supporting documents regarding future refueling outages be more timely.

I Sincerely,

/s/

Mohan C. Thadani, Senior Project Manager 98110gggy g j$277 Project Directorate 1-2 PDR PDR Division of Reactor Projects - l/II P

Office of Nuclear Reactor Regulation Docket No. 50-277

Enclosures:

1. Amendment No.226 to l!

License No. DPR-44

/

y

2. Safety Evaluation

{h_ h r '

3. Notice of Partial Denial 7

cc w/encls: See next page DISTRIBUTION:

Docket File MO'Brien TCollins JLyons PUBLIC MThadani ACRS THuang PDI-2 Reading OGC CAnderson, RGN-l JZwolinski A l' GHill(2)

THarris (E-Mail SE)

RCapra mX WBeckner

  • See prevbus concurrence fPhhM PIMM SRXB/BC*

OGC*

PDI-2/D OFFICE NAME Thadani:rb Mhl b

m TCollins MYoung RCapra DATE 10 /M98 Pr$98 10/05/98 10/22/98 M /N98 OFFICIAL RECORD COPY DOCUMENT NAME: P2353.AMD l

3 m

I n rg il UNITED STATES n

[

j NUCLEAR REGULATORY COMMISSION 2

WASHINGTON, D.C. 20666-0001 g ***** p

October 26, 1998 4

Mr. Garrett D. Edwards Director Licensing, MC 62A-1 PECO Energy Company

)

Nuclear Group Headquarters Correspondence Control Desk l

P.O. Box No.195 i

Wayne, PA 19087-0195

SUBJECT:

PEACH BOTTOM ATOMIC POWER STATION, UNIT NO. 2, REVISION TO TECHNICAL SPECIFIC /.TIONS SAFETY LIMIT MINIMUM CRITICAL POWER RATIO FOR CYCLE 13 OPERATION (TAC NO. MA2353)

I

Dear Mr. Edwards:

The Commission has issued the enclosed Amendment No. 226 to Facility Operating License No.

DPR-44 for the Peach Bottom Atomic Power Station, Unit No. 2. This amendment consists of changes to the Technical Specifications (TSs) in response to PECO Energy Company's (the licensee's) application dated July 10,1998, as supplemented by two letters dated September 11, 1998.

l This amendment revises the TSs for safety limit Minimum Critical Power Ratio from its current value of 1.11 to 1.10 for two recirculation loop operation, and from 1.13 to 1.12 for single recirculation loop operation. A second change request to add a footnote to TS 5.6.5.b.1 is determined not to be required. Therefore, that change request is denied. A Notice of Partial i

l Denial is enclosed.

A copy of the safety evaluation is also enclosed. Notice of Issuance will be included in the Commission's Bi Weekly Federal Reaister Notice. The Notice of Partial Denial will be published i

in the federal Reaister.

The Nuclear Regulatory Commission staff has noted that the licensee's requests for the NRC staff's actions and the submittals of supporting documentation, on occasions, are not timely. The NRC staff, in a phone conversation with Mr. John Hufnagel of your staff, requested that submittals and the supporting documents regarding future refueling outages be more timely.

Sincerely, f

Mohan C. Thadani, Senior Project Manager l

Project Directorate 1-2 Division of Reactor Projects - 1/II Office of Nuclear Reactor Regulation Docket No. 50-277 l

Enclosures:

1. Amendment No.226 to License No. DPR-44
2. Safety Evaluation
3. Notice of Partial Denial cc w/encis: See next page

-.. -. _ -. - ~,

Mr. Garrett D. Edwards Peach Bottom Atomic Power Station, PECO Energy Company Units 2 and 3 cc:

J. W. Durham, Sr., Esquire Chief-Division of Nuclear Safety Sr. V.P. & General Counsel PA Dept. of.

PECO Energy Company Environmental Resources 2301 Market Street, S26-1 P.O. Box 8469 Philadelphia, PA 19101 Han,4 burg, PA 17105-8469 PECO Energy Company ATTN: Mr. J. Doering, Vice President Board of Superviscis Peach Bottom Atomic Power Station Peach Bottom Township 1848 Lay Road R.D.#1 Delta, PA 17314 Delta, PA 17314 PECO Energy Company Public Service Commission of Maryland ATTN: Regulatory Engineer, A4-SS Engineering Division Peach Bottom Atomic Power Station Chief Engineer 1848 Lay Road-6 St. Paul Centre Delta, PA 17314 Baltimore, MD 21202-6806 Resident inspector Mr. Richard McLean U.S. Nuclear Regulatory Commission Power Plant and Environmental Peach Bottom Atomic Power Station Review Division P.O. Box 399 Department of Natural Resources Delta, PA 17314 B-3, Tawes State Office Building Annapolis, MD 21401 Regional Administrator, Region i U.S. Nuclear Regulatory Commission

. Dr. Judith Johnsrud 475 Allendale Road National Energy Committee L

King of Prussia, PA 19406 '

Sierra Club 433 Odando Avenue Mr. Roland Fletcher State College, PA 16803

. Department of Environment 201 West Preston Street Manager-Financial Control & Co-Owner Baltimore, MD 21201 Affairs Public Service Electric and Gas A. F. Kirby, Ill Company Extemal Operations - Nuclear P.O. Box 236 Delmarva Power & Light Company Hancocks Bridge, NJ 08038-0236 P.O. Box 231 Wilmington, DE 19899 Manager-Peach Bottom Licensing PECO Energy Company l-PECO Energy Company Nuclear Group Headquarters Plant Manager Correspondence Control Desk Peach Bottom Atomic Power Station P.O. Box No.195 1848 Lay Road Wayne, PA 19087-0195 Delta, PA 17314 4

1 m

.