ML20154J369

From kanterella
Jump to navigation Jump to search
Monthly Operating Repts for Apr 1988
ML20154J369
Person / Time
Site: Catawba  Duke Energy icon.png
Issue date: 04/30/1988
From: Reavis J, Tucker H
DUKE POWER CO.
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
References
NUDOCS 8805260323
Download: ML20154J369 (14)


Text

'

OFERATING DATA REFORT DOCKET 50-413 DATE 5-13-88 OPERATING STATU3 COMFLETED BY J. A. Roavis TELEPH0hE 704/373-7567

1. Unit Nase: CATAWBA 1
2. Reporting Period: AFRIL 1, 1988-AFRIL 30, 1958
3. Licensed Thersal Power (MWtli 3411 ...............................,
4. Naseplate Rating (Gross MWeh IN5 1 Notes *Naseplate Rating I
5. Design Electrical Rating (Net MWel: 1145 I (Gross MWel calculated as 1
6. Marisa Dependable Capacity (Bross MWe): 1450.000 MVA i .90 poner I
7. Manieus Dependable Capacity (Net MWe): 1129 I facter per Page lii, 1
8. If Changes Cccur in Capesty Ratings (Itass Nuater 3 Through 7) Sina Last i NL'RES-0020. I Report. Give Reasons .........__......... ,,......,_,. . .............. l... __

l

9. Foaer Leye1 Te Which Re5tr. 4ei, If Any (Net MWe): ..._, ,,,,,...,,,,,.. .,,,.........................................
10. Reason For Restrittions, If at,; .....................................................................................-

... . ................................--.........................-- .........--- - =...........-......--.-.........

................................ ..............................--.....: - =.............................-......-.-- .

This Month Yr.-to-Date Cusulative

11. Hours In Reporting Feriod 719.0 2,903.0 24,898.0
12. Number Of Hours Reactor Was Critical 719.0 2,616.7 17,730.4
13. Reactor Reserve Shutdenn Hours --0-- - - 14. Hours Senerator On-Line 719.0 2,573.5 17,172.6
15. Unit Reserve Ehutdown Hours --0-- - 16. Brass Thereal Energy Generated (MWH) 2,413,567 B,292,891 54,347,755
17. Gross Electrical Energy Generated (MWH) 860,692 2,945,762 19,036,B34
18. Net Electrical Energy Generated (MWH) 816,617 2,776,677 17,777,522 100.0 69.7 69.0
19. Unit Service Factor
20. Unit Availability Facter 100.0 58.7 69.0
21. Unit Capacity Factor (Using MDC Net) 100.6 94.7 62.5
22. Unit Capacity Factor (Using DER Wet) 99.2 83.5 62.4
23. Unit Forced Outage Rate 0.0 11.3 17.3
24. Shutdowns Scheduled Over Nest 6 Months (Type, Date, and Duration of Each):

.....Ji0AC.-..........---......-........-..--..--...............--..........--....-.....-....-..--.....------------------ *

25. I f Shu t De nn A t End Of Rep o r t F e r i o d. E s t i e a t ed C a t e o f S t a r tup s ..................................................-....
26. Units In Test Status (Frior to Commercial Operation): Forecast Achieved 1

INITIAL CRITICALITY ......-. ........

INITIAL ELECTRICITY ........ ........

COMMERCIAL 0FERATICN ........ ........

8805260323 880430 dg PDR ADOCK 05000413 R DCD i

r_

n tl AVERAGE DAILY UNIT PCWER LEVEL i DOCKET NO. 50-413

- UNIT Catamba 1 DATE May 13,1988 COMPLETED 6f J. A. Feavis TELEfHONE 704-373-7567 M3(TH APRIL,1950 DAY AVERA6E DAILY FCWER LEVEL DAY AVERA6E DAILY F0WER LEVEL

-.- ( M -Net) ---

(MWE-Net) 1  !!33 17 1158 2 1136 18  !!34 3 1133 19 1136 4 1134 20 1140 5 1137 21 1131 6 1139 22 1132 7 1142 23 1132 8 1140 24 , 1130 9 1141 25 1136 10 1138 26 1137

'l 11 1136 27 1134

.................... =__ _-

12 1140 28 li37 13 1140 29 1137 14 1137 30 1135 16 1117 h

Uti1T SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-413 UNIT NAME CATAWBA 1 .

DATE 05/13/88 REPORT MONTH April 1988 COMPLETED BY J. A. REAVIS TELEPHONE (704)-373-7567-(1) (2) (3) (4) (5)

R MET-E HOD T A OF LICENSE N Y S SHUT EVENT SYS- CAUSE AND CORRECTIVE O P DURAT10N O DOWN REPORT TEM COMPONENT ACTION TO

. DATE E HOURS N R/X NO. CODE CODE PREVENT RECURRENCE 31-P 88- 4-14 F --

A --

HH PIPEXX POWER REDUCTION DUE TO MAIN STEAM LINE WELD LEAKING, CAUSING LOSS OF VACUUM 32-P 88- 4-16 S --

B --

HB VALVEX REDUCTION DUE TO CONTROL VALVE MOVEMENT TEST s

(1) (2) (3) (4)

F Forced Reason: Method: Exhibit G - Instructions S Scheduled A-Equipment Failure (Explain) 1-Manual for Preparation of Data B-Maintenance or test 2-Manual Scram Entry Sheets For Licensee:

C-Refueling 3-Automatic Scram Event Report (LER)

D-Regulatory Restriction 4-Other (Explain) File (NUREG-0161)

E-Operator Training & License Examination i F-Administrative (5)

G-Operator Error (Explain) Exhibit I - Same Source H-Other (Explain)

DOCKET No: 50-413 UNIT: Catawba 1 DATE: 05/13/88 NARRATIVE

SUMMARY

Month: April, 1988 On 4/14 Catawba Unit 1 began the month of April operating at 100% full power.

at 1030, power was reduced to 99% due to a loss of vacuum caused by a leaking Power The unit returned to 100% power at 1154 on 4/14.

main steam line veld.

was then reduced to 90% on 4/16 from 1948 to 2037, to conduct a Control Valve The unit returned to 100% power at 0137 on 4/17, where it Movement Test.

operated for the remainder of the month.

l i

l l

l l

l l

l

MONTHLY REFUELING INFORMATION REQUEST

1. Facility name: Catawba, Unit 1
2. Scheduled next refueling shutdown: Novembe , 1988
3. Scheduled restart following refueling: January, 1989
4. Will refueling or resumption of operation thereafter require a technical specification change or other license amendment? No If yes, what will these be?

If no, has reload design and core configuration been reviewed by Safety Review Committee regarding unreviewed safety questions? N/A

5. Scheduled date(s) for submitting proposed licensing action and supporting information: N/A
6. Important licensing considerations (new or different design or supplier, unreviewed design or performance analysis methods, significant changes in design or new operating procedures).
7. Number of fuel assemblies (a) in the core: 193 (b) in the spent fuel pool: 132
8. Present licensed fuel pool capacity: 1418 Size of requested or planned increase: -
9. Projected date of last refueling which can be accommodated by present licensed capacity: September, 2011 l

DUKE POWER COMPANY DATE: May 13, 1988 l

l Name of

Contact:

J. A. Reavis Phone: 704-373-7567 i

l l

~

OFERATINS DATA REFORT DOCKET 50 414 DATE 5-13-8B OPERATING STATUS COMPLETEDBY J. A. Reavis TELEPHONE 704/373-7567

1. Unit Nase: CATAWPA 2
2. Feporting Period: AFRIL 1,1988-APRll 30,1988
3. Licensed Thersal Poner (MWt): 3411 , , , , _ , , _ , , _ _ , , , , , , _ _ _ , _ _
6. Naseplate Rating (Brcss MWel: 1305 l Notes (Nassplate Rating I
5. Design Electrical Ratirg (Net MWe): 1145 I (Bross Muel calculated as 1
6. Marisus Dependable Capacity (Gross MWe): I 1450.000 MVA i 90 po.er i
7. Matisas Dependable Capacity (Net MWe): 1129 i factor per Page iii,  !
8. If Changes Occur in Capacity Ratings (itens Naaber 3 Through 7) Since last i NUREG-0020. I Report. Give Reasons: , , , , , , , , , , _ , , , , , , , , . . , _ , , , , , , , _ , , , , , , , , , , , , , , , _ ,

I,_,_,,,,,,,,_,,,,,,,,,,,,__t

............... ....................................................... ~ ................. ............................ .

9. Feuer Level To Which Restricted, if Any (Net MWe): ,,,,,,,,,,, ,,,,,,_ ,,,,,,,_ _ ,,_ ,,,,,_ ,,,,,,,,____,,. ,,,,,,,
10. Reason for Restrictions, If any: ,,_ ,_ ,,_ ...........,_.,,,,,,,,,,,,,,_ ,,,,,,_.....,_.......,_.._ ............

=. .................................................................................................................

This Month Yr.-to-Date Cuaulative

11. Hours in Reporting Feriod 719.0 2,903.0 14,104.0
12. Nusber Of H)urs Reacter Was Ciitical 566.4 944.1 9,549.6
13. Rea: tor Reserve Shutdcun Hours --0-- --0-- -
14. Hours Benerator On-Line 556.6 871.6 9,216.2
15. Unit Resene Shutdown Hours --0-- - --0--
16. Gross Thersal Energy Generated (M W) 1,523,048 2,363,133 28,090,626
17. Bross Electrical Erergy Generated (MW) 530,403 B21,690 9,Si2,71B
18. Net Electrical Energy Generated (MW) 491,127 726,799 9,193,496
19. Unit Service Factor 77.4 30.0 61.0
20. Unit Availability Factor 77.4 30.0 61.8
21. Unit Capacity Factor (Using MDC Net) 60.5 22.2 54.0
22. Unit Capacity Factor (using DER Net) 59.7 21.9 53.9
23. Unit Ferced Outage Rate 0.0 34.7 29.5
24. Shutdesns Scheduled Over Next 6 Months (Type, Date, and Duiation of Each):

_.....Wne................................................................................................................

25. If Shut Donn At End Cf Repor t Period. Estisates Date of Star tup s ,fsty,,31 MS3,,,,,,,,,,,,_,,,,,,,_... ,,,, _,,,
26. Units In Test Status (Prior te Ccasercial Operation): Forecast Achieved INITIAL CRlilCAllif ........ ........

INITIAL ELECTRICITY ,,,... . ........

COMERCIAL 0FERATION ........ ........

r 7 9

AVERAGE DAILY UNIT F0WER LEVEL LOCKET O. 50-414 UNIT Cat uta 2 DATE May 13,1933 CCMPLETED BY J. A. Feavis TELEFPGNE 704-373-7567 MNTH AlRIL,1988 DAY AVERASE DA!LY F0WER LEVEL CAY AVE USE CA!LY F0WER LEVEL (M4E-Neti (MWE-het)

I 166 17 1147 2 123 16 1139 3 118 19 1144 4 549 20 1147 5 1104 21 1141 0 1075 22 1070 7 1123 23 645 8 1128 24 2 9 701 25 0 644 26 0 10 B07 27 0 11 1143 ES 0 12 1144 29 0 13 1143 30 0 14 l'  !!41 16  !!48

Page.1 of 3 .

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-414 ,

UNIT NAME CATAWBA 2 -

DATE 05/13/88 REPORT MONTH April 1988 COMPLETED BY J. A. REAVIS-TELEPHONE (704)-373-7567 (1? (2) (3) (4) (5) >

R MET-E HOD T A OF LICENSE N Y S SHUT EVENT SYS- CAUSE AND CORRECTIVE O P DURATION O DOWN REPORT TEM COMPONENT ACTION TO

. DATE E HOURS N R/X NO. CODE CODE PREVENT RECURRENCE 18-P 88 1 F --

B --

HH VALVEX POWER DECREASE TO REPAIR STEAM GENERATOR '2A' FEEDWATER CONTROL y VALVE 19-P 88 1 F --

B --

HH VALVEX HOLDING POWER TO REPAIR STEAM GENERATOR '2A' FEEDWATER CONTROL VALVE l

i 20-P 88 4 S --

B --

CB INSTRU HOLDING POWER FOR REACTOR COOLANT SYSTEM LEAKAGE CALCULATION 21 P 88 4 S --

B --

HB VALVEX HOLDING POWER FOR CONTROL VALVE MOVEMENT TEST 22-P 88 4 S --

B --

IE INSTRU HOLDING POWER FGR NUCLEAR INSTRUMENTATION CAL 1BRATION 23-P 88 5 F --

H -- CB xxxxxx POWER DECREASE DUE TO LOW SUBCOOLING ON TRAIN A. INADEQUATE CORE COOLING SYSTEM MONITOR (1) (2) (3) (4)- ,

F Forced Reason: Method: Exhfbit G - Instructions '

S Scheduled A-Equipment Failure (Explain) 1-Manual for Preparation of Data B-Maintenance or test 2-Manual Scram Entry Sheets For Licensee!

C-Refueling 3-Automatic Scram Event Report (LER)

D-Regulatory Restriction 4-Other (Explain) ' File (NUREG-Ol61)

E-Operator Training & License Examination F-Administrative (5)

G-Operator Crror (Explain) Exhibit I - Same Source H-Other (Explain)

Page 2 of 3 UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-414 UNIT NAME CATAWBA 2 -

DATE 05/13/88 REPORT MONTH April 1983 COMPLETED BY J. A. REAVIS TELEPHONE (704)-373-7567 (1) (2) (3) (4) (5)

R HET-E HOD T A OF LICENSE N Y S SHUT EVENT SYS- CAUSE AND CORRECTIVE O P DURATION O DOWN REPORT TEM COMPONENT ACTION TO

. DATE E HOURS N R/X NO. CODE CODE PREVENT RECURRENCE 24-P 88 5 F --

B --

HJ VALVEX HOLDING POWER FOR FEEDWATER HEATER DRAIN TO CONDENSER VALVE REPATR 25-P 88 6 S --

B --

ZZ INSTRU HOLDING POWER FOR PRECISION CALORIMETRICS 26-P 88 8 F --

B --

HH HTEXCH REPAIR '2B' CONDENSATE l'EEDWATER PUMP TURBINE 27-P 88- 4-11 S --

B --

IE INSTRU POWER INCREASE DELAY DUE TO NUCLEAR INSTRUMENTATION CALIBRATION 28-P 88- 4-22 S --

F --

ZZ 72ZZZZ POWER DECREASE PER DISPATCHER l REQUEST 29-P 88- 4-23 F --

A --

HA XXXXXX POWER REDUCTION DUE TO GROUND FAULT ON EXCITER FIELD l

(1) (2) (3) (4)

F Forced Reason: Method: Exhibit G - Instructions S Scheduled A-Equipment Failure (Explain) 1-Manual for Preparation of Data B-Maintenance or test 2-Manual Scram Entry Sheets For Licensee C-Refueling 3-Automatic Scram Event Report (LER)

D-Regulatory Restriction 4-Other (Explain) File (NUREG-0161)

E-Operator Training & License Examination F-Administrative (5)

G-Operator Error (Explain) Exhibit I - Same Source H-Other (Explain)

Page 3 of 3 UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-414 .

UNIT NAME CATAWBA 2 .~

DATE 05/13/88 REPORT MO;ITH Ap;11 1988 COMPLETED BY J. A. REAVIS .

TELEPHONE (704)-373-7567 (1) (2) (3) (4) (5)

R MET-E HOD T A OF LICENSE N Y S SHUT EVENT SYS- CAUSE AND COdRECTIVE O P DURATION O DOWN REPORT TEM COMPONENT ACTION TO

. DATE E HOURS N R/X NO. CODE CODE PREVENT RECURRENCE 8 88- 4-24 S 162.38 B 1 HA XXXXXX UNIT REMOVED FROM SERVICE TO REPAIR EXCITER GROUND FAULT I

hl) (2) (3) (4) l F Forced Reason: Method: Exhibit G - Instructions S Scheduled A-Equipment Failure (Explain) 1-Manual for Preparation of Data B-Maintenance or test 2-Manual Scram Entry Sheets For Licensee C-Refueling 3-Automatic Scram Event Report (LER)

D-Regulatory Restrict 1:n 4-Other (Explain) File (NUREG-0161)

E-Operator Training & License Examination F-Administrative (5)

G-Operator Error (Explain) Exhibit I - Same Source H-Other (Explain)

DOCKET NO: 50-414 UNIT: Catawba 2 DATE: 05/13/88 i

NARRATIVE

SUMMARY

Month: April, 1988 Catawba Unit 2 began the month of April at 45% and decreasing, to repair a S/G Feedwater Control Valve. The repair was completed and power escalation was begun at 0405 on 4/04. The unit reached 100% power on 4/05 at 0310, following power holds at 65%, 90%, and 98%, for a Reactor Coolant System Leakage Calculation, a Control Valve Movement Test, and Nuclear Instrumentation Calibration, respectively. The unit reduced power to 90% at 1830 on 4/05, due of the Inadequate Core to an indication of low subcooling margin on Train "A" Cooling System. The unit then began increasing power at 2144 on 4/05,The and held unit power at 95% to repair a Feedwater Heater Drain to Condenser Valve.

returned to'100% power at 1755 on 4/07, following a power hold at 98% for On 4/08 at 2236, power was reduced to 60% to repair precision calorimetrics. The unit returned to 100% power at the "2B" condensate Feedwater Pump Turbine.

2237 on 4/11, following a hold at 90% power for Nuclaar Instrumentation Calibration. At 1645 on 4/22, a power reduc lon to 60% was commenced due to low system load. The unit then operated at 60% power until 4/23 at 2015, when a The unit was unit shutdown was commenced to repair an Exciter Field Ground.

removed from service at 0537 on 4/24, and finished the month of April in a Maintenance Outage.

~

P t MONTHLY REFUELING INFORMATION REQUEST

1. Facility name: Catawba, Unit 2
2. Scheduled next refueling shutdown: Currently Refueling
3. Scheduled restart following refueling: May, 1988
4. Will refueling or resumption of operation thereafter require a technical specification change or other license amendment? No If yes, what will these be?

If no, has reload design and core configuration been reviewed by Safety Rcview Committee regarding unreviewed safety questions? N/A

5. Scheduled date(s) for submitting proposed licensing action and supporting information: N/A
6. Important licensing considerations (new or different design or supplier, unreviewed design or performance analysis methods, significant changes in design or new operating procedures).
7. Number of fuel assemblics (a) in the core: 193

~

(b) in the spent fuel pool: 64

8. Present licensed fuel pool capacity: 1418 Size of requested or planned increase: ---
9. Projected date of last refueling which can be accommodated by present licensed capacity: January, 2013 DUKE POWER COMPANY DATE: riay 13, 1988 l Name of

Contact:

J. A. Reavis Phone: 704-373-7567

E .

a -

CATAWBA NUCLEAR STATION MONTHLY OPERATING STATUS REPORT

1. Personnel Exposure For the month of March, no individual (s) exceeded 10 percent of their allowable annual radiation dose limit.
2. The total station liquid release for March has been compared with the Technical Specifications maximum annual dose commitment and was less than 10 percent of this limit. ,

The total station gaseous release for March has been compared with the Technical Specifications maximum annual dose commitment and was less than 10 percent of this limit.

t I-11 t

1 L t

s t

Duim Pownn Gonmxy 18.0. IlOX 33180 CILAltLOT"Tl*, N.C. 28242 II AL 11. Tt'CKER re t.c rnown vu a rarswawr (704) 373-4 Nil mtsma emosu cTion May 13, 1988 U. S. Nuclear Regulatory Commission Attention: Document Control Desk Hashington, D. C. 20555 Re: Catawba Nuclear Station Docket No. 50-413 and 50-414

Dear Sir:

Please find attached information cmcerning the performance and operating status of the Catawba Nuclear Station for the month of April, 1988.

Very truly yours,

- 23 dec/Lt g Hal B. Tucker (

JAR /6/sbn Attachment xc: Dr. J. Melson Grace INPO Records Center Regional Administrator. Region II Suite 1500 U. S. Nuclear Regulatory Commission 1100 Circle 75 Parkway 101 Marietta Street, NW, Suite 2900 Atlanta, Georgia 30323 Atlanta, Georgia 30323 Mr. Richard G. Oehl, NE-44 Mr. Phil Ross U. S. Department of Energy U. S. Nuclear Regulatory Commission 19901 Germantown Road MNBB-5715 Germantown, Maryland 20874 Washington, D. C. 20555 American Nuclear Insurers Dr. K. Jabbour, Project Manager c/o Dottie Sherman, ANI Library Office of Nuclear Reactor Regulation The Exchange, Suite 245 U. S. Nuclear Regulatory Cocraission 270 Farmington Avenue Washington, D. C. 20555 Farmington, CT 06032 Mr. P. K. Van Doorn NRC Resident Inspector Catawba Nuclear Station l

-