ML20154H867

From kanterella
Jump to navigation Jump to search
Proposed Tech Spec Change,Extending Date for Insp of Divider Barrier Seal Until Refueling Outage in Aug 1986
ML20154H867
Person / Time
Site: Catawba Duke Energy icon.png
Issue date: 03/04/1986
From:
DUKE POWER CO.
To:
Shared Package
ML20154H853 List:
References
NUDOCS 8603100390
Download: ML20154H867 (1)


Text

__

CONTAINMENT SYSTEMS DIVIDER BARRIER SEAL LIMITING CONDITION FOR OPERATION 3.6.5.9 The divider barrier seal shall be OPERABLE.

APPLICABILITY: MODES 1, 2, 3, and 4.

ACTION:

With the divider barrier seal inoperable, restore the seal to OPERABLE status prior to increasing the Reactor Coolant System temperature above 200*F.

SURVEILLANCE REQUIREMENTS 4.6.5.9 The divider barrier seal shall be determined OPERABLE at least once per 18 months during shutdown by:

Removing two divider barrier seal test coupons and verifying that a.

the physical properties of the test coupons are within the acceptable range of values shown in Table 3.6-3, and b.

Visually inspecting at least 95% of the seal's entire length and:

1)

Verifying that the seal and seal mounting bolts are properly installed, and 2)

Verifying that the seal material shows no visual evidence of deterioration due to holes, ruptures, chemical attack, abrasion, radiation damage, or changes in physical appearances.

en+eria Her samowa Ritans A u i Q uh(g.

CATAWBA - UNITS 1 & 2 3/4 6-52 8603100390 860304 PDR ADOCK 0500 3

P

_