DUKE Pownn Goximvy 15.0. ItOK 3318D CllAl41.OTTE, N.C. 28242 HALB. TUCKER Trisenown vna rammanstwe (704) II?O~4 FWil wrcLaan reopowttune March 4, 1986 Mr. Harold R. Denton, Director Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Counission Washington, D. C.
20555 Attention:
Mr. B. J. Youngblood, Project Director PWR Project Directorate No. 4 Re: Catawba Nuclear Station Docket No. 50-413 Technical Specification Amendment
Dear Mr. Denton:
As a supplement to my letter of February 12, 1986 regarding the extension of time for the Engineered Safety Features surveillances attached is an additional Technical Specification change.
Technical Specification Surveillance Requirement 4.6.5.9 requires an inspection of the divider barrier seal at least once per 18 months during shutdown. The next surveillance is due to be performed no later than May 7, 1986. The first refueling outage for Catawba Unit 1 is anticipated to start in mid-August 1986. Therefore an extension of about 3 1/2 months is needed in order to allow the unit to continue operation.
Given the short extension time plus the fact that the divider barrier seal is a passive component, significant degradation of the seal would not be expected. Therefore, granting the extension would not significantly reduce a margin of safety associated with the operation of the plant. There will be no modifications to plant systems or operations, therefore this amendment would not involve an increase in the probability or consequences of a previously evaluated accident, and it would not create the possibility of a new or different kind of accident previously evaluated.
8
I peR'2888itBI8Slha P
r Mr. Harald R. Danten, Dirceter March 4, 1986 Page 2 Since this request is supplemental to my letter of February 12, 1986, the
$150 check enclosed therein covers this request as well.
Pursuant to 10 CFR 50.91 (b) (1) the appropriate South Carolina State Official is being provided a copy of this amendment request.
Very truly yours, f/
Hal B. Tucker RWO: sib Attachment ec:
Dr. J. Nelson Grace, Regional Administrator U. S. Nuclear Regulatory Commission Region II 101 Marietta Street, NW, Suite 2900 Atlanta, Georgia 30323 Mr. Heyward Shealy, Chief Bureau of Radiological Health South Carolina Department of Health &
Environmental Control 2600 Bull Street Columbia, South Carolina 29201 INPO Records Center Suite 1500 1100 circle 75 Parkway Atlanta, Georgia 30339 American Nuclear Insurers c/o Dottie Sherman, ANI Library The Exchange, Suite 245 270 Farmington Avenue Farmington, CT 06032 i
M&M Nuclear Consultants 1221 Avenue of the Americas New York, New York 10020 Mr. P. H. Skinner NRC Resident Inspector Catawba Nuclear Station