_ _ _ _ _ _ _ _ _

ADMICai. iATi t C %TROLS

(

RESPONSIBILITIES (Continued) 1.

Review of the Security Plan and implementing procedures and shall submit reconnended changes to the SRB.

  • ~ ' ' *
j. Review of the Emergency Plan and implementing procedures and shall submit reconnended changes to ths SRB.

k.

Review of any unplanned onsite release of radioactive material to the environs when such release is in excess of 1 Ci, excluding dissolved I

and entrained gases and tritium for liquid of fluents, and in excess of 150 Ci of noble gases or 0.02 Ci of radioiodines for gaseous effluents. Also included is the preparing and forwcrding to the Plant Manager and the SRB reports covering evaluatich, reconnendations j

and disposition of the corrective action to prevent recurrence.

1.

Review of changes to the PROCESS CONTROL PROGRAM and the OFFSITE DOSE CALCULATION MANUAL (00CM), except for the section on the Radiological Environmental Monitoring Program in the 00CM.

Review of proposed change (s) to plant systems and equipment to m.

determine whether the proposed change has a potential radiological environmental impact. Such change (s) will be reported to the l

Manager-Radiological Safety, i

n.

Review of the Fire Protection Program and implementing precedures and shall submit reconnend*d changes to the SR8.

AUTHORITY 6.5.1.7 The PR8 shall:

Recommend in writing to the Plant Manager approval or disapproval a.

of items considered under 6.5.1.6(4) through (d) above.

I b.

Render determinations in writing with regard to whether or not each item considered under 6.5.1.6(a) through (e) above constitutes an 1

unreviewed safety question.

l i

Provide written notification within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> to the General Manager-c.

Nuclear Plant, the Vice President-Nuclear, and the SRB of disagreement between the PRB and the Plant Manager; however, the Plant Manager shall have responsibility for resolution of such disagreements

{

pursuant to 6.1.1 above.

RECORDS 6.5.1.8 The PRB shall maintain written minutes of each PRB meeting that, at a minimum, document the rcsults of all PR8 activities performed under the responsibility and authority provisions of these Technical Specifications.

Copies shall be provided to the General Manager-Nuclear Plant, the Vice President-Nuclear, and the SRB.

kK050003g3 4 80001j P

PNu i

HATCH - UNIT 1 6-8 Amendment No. 155

'o 4

4 DATED August 11, 1988 AMENDMENT NO.

155 AND 94 TO FACILITY OPERATING LICENSE DPR-57 AND NPF-5, EDWIN 1. HATCH, UNITS 1 AND 2 DISTRIBUTION beshotsfile

NRC PDR Lccal PDR PDII-3 Reading S. Varga 14-E-4 G. Lainas 14-H-3 D. Matthews 14-H-25 H. Rood 14-H-25 L. Crocker OGC 15-B-18 D. Hagan MNBB-3302 E. Jordan MNBB-3302 B. Grimes 9-A-2 T. Barnhart (4 cys)

P1-137 Wanda Jones P-130A E. Butcher 11-F-23 ACRS(10)

H-1016 GPA/PA 17-F-2 ARM /LFMB AR-2015 HATCH PLANT FILE 4

5 i

4 l

O f0I

\\

l \\

.