Requests 3-wk Extension in Order to Consult W/Ofc of General Counsel & Commission Re Ofc of Investigation Testimony at Contested Licensing Hearings
ML20154B568
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 06/04/1985
From: Hayes B
NRC OFFICE OF INVESTIGATIONS (OI)
To: Bright G, Carpenter J, Kelley J
Atomic Safety and Licensing Board Panel
Shared Package
ML20154B089 List:
References
FOIA-85-173 82-472-03-OL, 82-472-3-OL, OL, NUDOCS 8603040338
Download: ML20154B568 (2)


Text

... . . -_ . .- ..

r F

+

UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION ATOMIC SAFETY AND LICENSING BOARD Before Administrative Judges:

  • June 4. 1985 James L. Kelley, Chairman '

Atomic Safety and Licensing Board Panel ,

U.S. Nuclear Regulatory Commission ,

Washington, DC 20555 Dr. James H. Carpenter Glenn 0. Bright

, Administrative Judge Administrative Judge l Atomic Safety and Licensing Atomic Safety and Licensing Board Panel Board Panel i U.S. Nuclear Regulatory Comission ..S.

U Nuclear Regulatory Commission Washington, DC 20555 Washington, DC 20555 I In the matter of CAROLINA POWER & LIGHT COMPANY Docket Nos. 50-400 OL and NORTH CAROLINA EASTERN MUNICIPAL (ACLBP N0. 82-472-03 OL)

POWER AGENCY i (Shearon Harris Nuclear Power Plant) l

Dear Administrative Judges:

We have been advised by the Office of the Executive tagal Director that parties to this proceeding have requested that a member of the Office of Investigations (01) staff be made available for a hearing scheduled later this month. We. have also been advised that this O! staff member will be testifying both to the conduct and contents of the OI report of investigation recently provided to you.

In that this request is a matter of first impression, 01 respectfully requests ,

a three week extenstion in time so that we can consult with our counsel (OGC) and other members of the Comission to arrive at a conclusion regarding our testifying at a contested licensing hearings. ,

cc: S. Chilk, SECY Sincerely, H. Plair.e, OGC G. Cunningham, ELD / ,W ,

4 Distribution:

01:s/f 2-84-021 -

01:c/f Ben B. Hayes, Director f

Office of Investigations 2

Of:r/g OI OI 4

RAFortuna/jh BBHpyec\. -

06/03/85 06/')/85 -

A iST DW:198501/ Memo /Jud g e Kelly gg i

N B603040338 851231 PDR FOIA GUILD 85-173 pm g -

e 6

1 5

Date ROUTING AND TRANSMITTAL SUP sjgfg5 10: (heme emce.symtwt. room number, initish Date hukeg. AgtetylPost)

2. Snuel Chilk , SEC)
2. .

3.

}

4.

E 4

Actrom F6:e jNote and Return Appreval For Dearenes 'Per Cortversatios '

As Kequested i for Correction Prepare Repfy br:ufste } ' For Your Information iSee Me 5

_ Mment  !!nvestigate }l bgnature Medmatbn Justih ll RDAARM Please serve enclosed letter on all parties, 1.

DO NC7 use tNs form es s RE000 (f approva's. con:u rer.ces. e d sposefs.

clearances, and semAar set.cas ,

FROW (fveme, crg sir.w. Agener/PastJ R:e r No Pics t

Roger fortur:a, 01 rh,4 h men, no

/  !-

DG48-ICI OPh0NAL FORM 41 (Res. 7-7tr)

Presediae3 ey Gsa Pref' te n CFF. &ci-3123(

(k I p- AI5%

. vi

h I

  • l l

UNITED STATES OF AMERICA [

NUCLEAR REGULATORY COMMISSION I ATOMIC SAFETY AND LICENSING BOARD June 5,1985 Before Administrative Judges: -

f James'L. Kelley, Chairman ,@

Atomic Safety and Licensing Board Panel J U.S. Nuclear Regulatory Commission Washington, DC 20555 i

4 I

Dr. James H. Carpenter Glenn 0. Bright Administrative Judge Administrative Judge Atomic Safety and Licensing Atomic Safety and Licensing Board Panel Board Panel ,

U.S. Nuclear Regulatory Commission U.S. Nuclear Regulatory Commission Wasisington, DC 20555 Washington, DC 20555 i'

In the matter of ,

a CAROLINA POWER & LIGHT COMPANY Docket Nos. 50-400 OL and j NORTH CAROLINA EASTERN MUNICIPAL (ASLBP N0. 82-472-03 OL) i POWER AGENCY l

l (Shearon Harris Nuclear Power N Plant) .

Dear Administrative Judges:

We have been advised by the Office of the Executive Legal Director that parties to this proceeding have requested that a member of the Office of  ;

Investigations (01) staff be made available for a hearing scheduled later this month. We have also been advised that this 01 staff member will be testifying >

both to the conduct and contents of the OI report of investigation recently provided to you.

In that this request is a'inatter of first impression, 01 respectfully requests a three week extensior. in time so that we can consult with our counsel (0GC) and other members of the Commission to arrive at a conclusion regarding our testifying at a corcested licensing hearings, cc: S. Chilk, SECY Sincerely, '

H. Plaine, 0GC G. Cunningham, ELD Di stribution:

\ 01:s/f 2-84-021 l$f 01:c/f OI:r/f Ben B. Hayes, Director 01

  • 01
  • 4' Office of Investigations RAFortuna/jh BBHayes A

06/03/85 06/ /85 DW:198501/ Memo / Judge Kelly 4 15'i

  • PREVIGUSLY CONCURRED Lb? hl$N' k ' _