Category:OPERATING LICENSES-APPLIATION TO AMEND-RENEW EXISTING
MONTHYEARML20217F3431999-10-15015 October 1999 Application for Amends to Licenses NPF-9,NPF-17,NPF-35 & NPF-52,to Change TS Re Requirements for Insp of RCP flywheels.Marked-up & Reprinted Ts,Encl ML20216E6531999-09-13013 September 1999 Application for Amends to Licenses NPF-9 & NPF-17,revising TS Making Permanent One Time Only Changes Incorporated Into TS 3.7.9,allowing Up to 24 Hours to Restore Control Room Pressure Boundary to Operable Status.With marked-up TS ML20211G6631999-08-27027 August 1999 Application for Amend to License NPF-9,revising Tech Specs 3.1.4, Rod Group Alignment Limits ML20196H7471999-06-24024 June 1999 Application for Amends to Licenses NPF-9,NPF-17,NPF-35 & NPF-52,revising TS 2.0, Safety Limits, TS 3.3.1, Reactor Trip Sys Instrumentation & TS 3.4.1, RCS Pressure,Temp & Flow Departure from Nucleate Boiling (DNB) Limits ML20195F2871999-06-10010 June 1999 Application for Amends to Licenses NPF-9 & NPF-17, Facilitating one-time Addition of Condition G & Administrative Controls Note to TS 3.7.9, Cravs ML20206M9251999-05-0606 May 1999 Supplement to LARs & 1022,for Amends to Licenses NPF-9,NPF-17,NPF-52,respectively & NPF-62,revising List of Ref Documents Contained in TS 5.6.5b Re COLR Requirements ML20206B0691999-04-0606 April 1999 Application for Amends to Licenses NPF-9 & NPF-17,expanding Allowable Values for Interlocks P-6 (Intermediate Range Neutron Flux) & P-10 (Power Range Neutron Flux) in TS 3.3.1, Table 3.3.1-1,Function 16 ML20205L2091999-04-0505 April 1999 Application for Amends to Licenses NPF-9 & NPF-17,changing TS to Provide Revised SFP Storage Configurations,Revised SFP Storage Criteria & Revised Fuel Enrichment & Burnup Requirements.Analysis & Tss,Encl ML20237B6161998-08-14014 August 1998 Application for Amends to Licenses NPF-9,NPF-17,NPF-52 & NPF-52,revising TS Related to Ice Condenser Ice Bed ML20247E3831998-05-0808 May 1998 Application for Amends to Licenses NPF-9 & NPF-17,revising Power Range Neutron Flux High Trip Setpoints in Event of Inoperable MSSVs & Deleting References to 3-loop Operation in Current TS 3.7.1.1(b) & Table 3.7-2 ML20217N9181998-03-0303 March 1998 Application for Amends to Licenses NPF-9 & NPF-17,locating New Meteorological Tower to Be Installed at Plant ML20197G4261997-12-17017 December 1997 Application for Amends to Licenses NPF-9,NPF-17,NPF-35 & NPF-52,respectively,ref Updated or Recently Approved Methodologies Used to Calculate cycle-specific Limits Contained in COLR ML20217H5451997-10-13013 October 1997 Application for Amends to Licenses NPF-9 & NPF-17,requesting Replacement of Three Safety Related Narrow Range Refueling Water Storage Tank Level Instruments W/Three Safety Related Wide Range Level Instruments ML20212A2421997-10-0606 October 1997 Application for Amends to Licenses NPF-9 & NPF-17,deleting All References to Steam Line Low Pressure Safety Injection Function ML20148F4691997-05-27027 May 1997 Application for Amends to Licenses NPF-9 & NPF-17,converting Current TS to Be Consistent W/Improved Std Ts,Per NUREG-1431 ML20133D3901997-01-0606 January 1997 Application for Amends to Licenses NPF-9 & NPF-17,requesting Rev to Allow Operation of Containment Purge Ventilation Sys During Modes 3 & 4 During Startup from Steam Generator Replacement Outage ML20135B0191996-11-26026 November 1996 Application for Amends to Licenses NPF-9 & NPF-17,requesting Change to TS 3.8.2 Re DC Sources ML20134M1461996-11-0101 November 1996 Application for Amends to Exigent Licenses NPF-9 & NPF-17, Allowing Use of Low Specific Gravity Cells in Vital 125 Volt Dc Sys When Desired ML20129F7461996-10-22022 October 1996 Application for Amends to Licenses NPF-9 & NPF-17,requesting to Allow Continued Unit Operation at Elevated Containment Lower Compartment Temps for Period Not to Exceed 72 Cumulative Hours ML20113C7061996-06-21021 June 1996 Application for Amends to Licenses NPF-9,NPF-17,NPF-35, NPF-52,revising Term Lifting Loads Used in Manipulator Crane TS 3.9.6b.2 to Lifting Force. in Addition Redefining Auxiliary Hoist Min Capacities ML20100R4511996-03-0404 March 1996 Application for Amends to Licenses NPF-9 & NPF-17,deleting Flow Monitoring Sys from TS 3.4.6.1 & Associated SRs ML20100Q3111996-03-0404 March 1996 Application for Amends to Licenses NPF-9 & NPF-17,deleting Seismic Qualification Requirement for Containment Atmosphere Particulate Radiation Monitors ML20095E9261995-12-14014 December 1995 Application for Amends to Licenses NPF-9,NPF-17,NPF-35 & NPF-52,revising TS for DGs by Incorporating Guidance & Recommendations in NUREG-1366,GL 93-05,GL 94-01 & NUREG-1431 ML20095E8031995-12-12012 December 1995 Application for Amend to Licenses NPF-9 & NPF-17,making McGuire Afd Limit Equations Identical to Previously Approved by NRC for Catawba Nuclear Station ML20092K4381995-09-18018 September 1995 Application for Amends to Licenses NPF-9 & NPF-17,revising Table 2.2-1, Reactor Trip Sys Instrumentation Trip Setpoints ML20098A4461995-09-18018 September 1995 Supplemental Application for Amend to License NPF-35, Revising Table 2.2-1, Reactor Trip Sys Instrumentation Trip Setpoints ML20092B1371995-09-0101 September 1995 Application for Amends to Licenses NPF-9 & NPF-17,revising TS 3/4.6.5 to Reduce Require Ice Weight in Containment Ice Condenser of Each Unit from 2,099,790 Lbs to 1,516,800 Lbs ML20082M7921995-04-12012 April 1995 Application for Amends to Licenses NPF-35,NPF-52,NPF-9 & NPF-17,respectively to Relocate Requirements for Turbine Overspeed Protection Instrumentation from TS to Selected Licensee Commitment Manual ML20082B3871995-03-29029 March 1995 Application for Amends to Licenses NPF-9 & NPF-17 Re Heat Up & Cool Down Curves LTOP ML20078E4731995-01-18018 January 1995 Application for Amends to Licenses NPF-9,NPF-17,NPF-35 & NPF-52,respectively.Amends Relocate Requirements for Seismic Instrumentation,Meteorological Instrumentation & loose-part Detection Sys from TS to SLC Manual for Station ML20080F7901995-01-18018 January 1995 Application for Amends to Licenses NPF-9 & NPF-17 to TS Re Amends That Allow Analog Channel Operational Test Interval for Radiation Monitoring Instrumentation to Be Increased from Monthly to Quarterly ML20080C7371994-12-0707 December 1994 Application for Amends to Licenses NPF-9 & NPF-17,revising TS Table 3.3-6 Action Statment Re Control Room Air Intake at Times When Radiation Monitors (EMF-43A & 43B) Inoperable ML20076M6881994-11-0202 November 1994 Application for Amends to Licenses NPF-9,NPF-17,NPF-35 & NPF-52,deleting App B,Environ Protection Plan & Modifying Portion of License Condition 2.C.(2) So as to Delete Portion Which Refers to Environ Protection Plan ML20073L0711994-10-0404 October 1994 Application for Amends to Licenses NPF-9 & NPF-17,correcting Technical Deficiency Existing in TS Caused Difficulty to Plant Operations Re Number of Centrifugal Charging Pumps in Modes 4,5 & 6 ML20073J8981994-09-30030 September 1994 Application for Amends to Licenses NPF-9 & NPF-17,proposing Rev Related to Replacment of Steam Generators ML20073H2811994-09-28028 September 1994 Application for Amends to Licenses NPF-9 & NPF-17,updating Loss of Power Functional Unit of ESFAS Instrumentation TS Tables 3.3-3,3.3-4,3.3-5 & 4.3-2 ML20073E9071994-09-15015 September 1994 Application for Amends to Licenses NPF-9 & NPF-17,revising TS Bases 3/4.9.2, Refueling Operations;Instrumentation, Allowing Use of Newly Installed Wide Range Neutron Flux Monitors ML20072Q8171994-08-25025 August 1994 Application for Amends to Licenses NPF-9,NPF-17,NPF-35 & NPF-52,increasing AFW Pump & Sys Testing Interval from Monthly to Quarterly & Adopting Clarification Note from Revised STS for Westinghouse Plants,Per NUREG-1366 ML20070H5781994-07-18018 July 1994 Application for Amends to Licenses NPF-9,NPF-17,NPF-35 & NPF-52,separating TS Into Two (2) Vols for Each Station ML20070F3341994-07-13013 July 1994 Application for Amends to Licenses NPF-35,NPF-52,NPF-9 & NPF-17,revising TS 4.6.2d,by Increasing Surveillance Interval of Containment Spray Sys Header Air or Smoke Test from Five to Ten Years ML20069Q4021994-06-13013 June 1994 Application for Amends to Licenses NPF-9 & NPF-17,proposing Ts,By Increasing Initial Fuel Enrichment Limit from Current Maximum of 4.0 Weight % to 4.75 Weight % & Establish New Loading Patterns for New & Irradiated Fuel in SPF ML20069D1971994-05-24024 May 1994 Application for Amends to Licenses NPF-9,NPF-17,NPF-35 & NPF-52,proposing Changes to TS by Relocating Specific Boron Concentration Values to Core Operating Limits Rept ML20065B4241994-03-25025 March 1994 Application to Amend to Licenses NPF-9 & NPF-17,requesting Revision of TS 3/4.7.13 Re Description of Groundwater Monitors ML20064C9171994-02-25025 February 1994 Application for Amends to Licenses NPF-9 & NPF-17,adding Four Instruments to TS 3.3.3.6 Tables 3.3-10 & 4.3-7 as Part of Accident Monitoring Instrumentation (Ami) & Deleting Five Instruments from Subj Tables That Are Not Part of Ami ML20059G6911994-01-10010 January 1994 Application for Amends to Licenses NPF-9,NPF-17,NPF-35 & NPF-52,revising TS 4.2.5.3 to Change Method for Measuring RCS Flow Rate During 18-month Surveillance ML20058A5451993-11-11011 November 1993 Application for Amends to Licenses NPF-9 & NPF-17,proposing Changes by Revising Certain Surveillance Requirements for ECCS Subsystems ML20059H6811993-11-0404 November 1993 Application for Amends to Licenses NPF-9 & NPF-17,changing One Time Allowed Outage Time Extension for Train of Control Area Ventilation Sys in Order to Facilitate Maint on Sys Needed to Improve Sys Reliability ML20059C3841993-10-25025 October 1993 Application for Amends to Licenses NPF-9,NPF-17,NPF-35 & NPF-52,changing TS to Reduce Required Min Measured RCS Flow from 385,000 Gpm to 382,000 Gpm,Per Std B&W TS Presented in NUREG-1430 ML20046A0911993-07-13013 July 1993 Application for Amends to Licenses NPF-9 & NPF-17,revising Boron Concentration Limits within RWST & within Cold Leg Accumulators in Order to Support Safe Operation of Unit 2, Cycle 9 & Subsequent Cycles ML20045D9711993-06-23023 June 1993 Application for Amends to Licenses NPF-9 & NPF-17 Making One Time Change to Make Allowable Combined Leakage Rate in TS 3.6.1.2 from Current Value of 0.07 La to 0.104 La 1999-09-13
[Table view] Category:TEXT-LICENSE APPLICATIONS & PERMITS
MONTHYEARML20217F3431999-10-15015 October 1999 Application for Amends to Licenses NPF-9,NPF-17,NPF-35 & NPF-52,to Change TS Re Requirements for Insp of RCP flywheels.Marked-up & Reprinted Ts,Encl ML20216E6531999-09-13013 September 1999 Application for Amends to Licenses NPF-9 & NPF-17,revising TS Making Permanent One Time Only Changes Incorporated Into TS 3.7.9,allowing Up to 24 Hours to Restore Control Room Pressure Boundary to Operable Status.With marked-up TS ML20211G6631999-08-27027 August 1999 Application for Amend to License NPF-9,revising Tech Specs 3.1.4, Rod Group Alignment Limits ML20196H7471999-06-24024 June 1999 Application for Amends to Licenses NPF-9,NPF-17,NPF-35 & NPF-52,revising TS 2.0, Safety Limits, TS 3.3.1, Reactor Trip Sys Instrumentation & TS 3.4.1, RCS Pressure,Temp & Flow Departure from Nucleate Boiling (DNB) Limits ML20195F2871999-06-10010 June 1999 Application for Amends to Licenses NPF-9 & NPF-17, Facilitating one-time Addition of Condition G & Administrative Controls Note to TS 3.7.9, Cravs ML20206M9251999-05-0606 May 1999 Supplement to LARs & 1022,for Amends to Licenses NPF-9,NPF-17,NPF-52,respectively & NPF-62,revising List of Ref Documents Contained in TS 5.6.5b Re COLR Requirements ML20206B0691999-04-0606 April 1999 Application for Amends to Licenses NPF-9 & NPF-17,expanding Allowable Values for Interlocks P-6 (Intermediate Range Neutron Flux) & P-10 (Power Range Neutron Flux) in TS 3.3.1, Table 3.3.1-1,Function 16 ML20205L2091999-04-0505 April 1999 Application for Amends to Licenses NPF-9 & NPF-17,changing TS to Provide Revised SFP Storage Configurations,Revised SFP Storage Criteria & Revised Fuel Enrichment & Burnup Requirements.Analysis & Tss,Encl ML20237B6161998-08-14014 August 1998 Application for Amends to Licenses NPF-9,NPF-17,NPF-52 & NPF-52,revising TS Related to Ice Condenser Ice Bed ML20247E3831998-05-0808 May 1998 Application for Amends to Licenses NPF-9 & NPF-17,revising Power Range Neutron Flux High Trip Setpoints in Event of Inoperable MSSVs & Deleting References to 3-loop Operation in Current TS 3.7.1.1(b) & Table 3.7-2 ML20217N9181998-03-0303 March 1998 Application for Amends to Licenses NPF-9 & NPF-17,locating New Meteorological Tower to Be Installed at Plant ML20197G4261997-12-17017 December 1997 Application for Amends to Licenses NPF-9,NPF-17,NPF-35 & NPF-52,respectively,ref Updated or Recently Approved Methodologies Used to Calculate cycle-specific Limits Contained in COLR ML20217H5451997-10-13013 October 1997 Application for Amends to Licenses NPF-9 & NPF-17,requesting Replacement of Three Safety Related Narrow Range Refueling Water Storage Tank Level Instruments W/Three Safety Related Wide Range Level Instruments ML20212A2421997-10-0606 October 1997 Application for Amends to Licenses NPF-9 & NPF-17,deleting All References to Steam Line Low Pressure Safety Injection Function ML20148F4691997-05-27027 May 1997 Application for Amends to Licenses NPF-9 & NPF-17,converting Current TS to Be Consistent W/Improved Std Ts,Per NUREG-1431 ML20133D3901997-01-0606 January 1997 Application for Amends to Licenses NPF-9 & NPF-17,requesting Rev to Allow Operation of Containment Purge Ventilation Sys During Modes 3 & 4 During Startup from Steam Generator Replacement Outage ML20135B0191996-11-26026 November 1996 Application for Amends to Licenses NPF-9 & NPF-17,requesting Change to TS 3.8.2 Re DC Sources ML20134M1461996-11-0101 November 1996 Application for Amends to Exigent Licenses NPF-9 & NPF-17, Allowing Use of Low Specific Gravity Cells in Vital 125 Volt Dc Sys When Desired ML20129F7461996-10-22022 October 1996 Application for Amends to Licenses NPF-9 & NPF-17,requesting to Allow Continued Unit Operation at Elevated Containment Lower Compartment Temps for Period Not to Exceed 72 Cumulative Hours ML20113C7061996-06-21021 June 1996 Application for Amends to Licenses NPF-9,NPF-17,NPF-35, NPF-52,revising Term Lifting Loads Used in Manipulator Crane TS 3.9.6b.2 to Lifting Force. in Addition Redefining Auxiliary Hoist Min Capacities ML20100Q3111996-03-0404 March 1996 Application for Amends to Licenses NPF-9 & NPF-17,deleting Seismic Qualification Requirement for Containment Atmosphere Particulate Radiation Monitors ML20100R4511996-03-0404 March 1996 Application for Amends to Licenses NPF-9 & NPF-17,deleting Flow Monitoring Sys from TS 3.4.6.1 & Associated SRs ML20095E9261995-12-14014 December 1995 Application for Amends to Licenses NPF-9,NPF-17,NPF-35 & NPF-52,revising TS for DGs by Incorporating Guidance & Recommendations in NUREG-1366,GL 93-05,GL 94-01 & NUREG-1431 ML20095E8031995-12-12012 December 1995 Application for Amend to Licenses NPF-9 & NPF-17,making McGuire Afd Limit Equations Identical to Previously Approved by NRC for Catawba Nuclear Station ML20098A4461995-09-18018 September 1995 Supplemental Application for Amend to License NPF-35, Revising Table 2.2-1, Reactor Trip Sys Instrumentation Trip Setpoints ML20092K4381995-09-18018 September 1995 Application for Amends to Licenses NPF-9 & NPF-17,revising Table 2.2-1, Reactor Trip Sys Instrumentation Trip Setpoints ML20092B1371995-09-0101 September 1995 Application for Amends to Licenses NPF-9 & NPF-17,revising TS 3/4.6.5 to Reduce Require Ice Weight in Containment Ice Condenser of Each Unit from 2,099,790 Lbs to 1,516,800 Lbs ML20082M7921995-04-12012 April 1995 Application for Amends to Licenses NPF-35,NPF-52,NPF-9 & NPF-17,respectively to Relocate Requirements for Turbine Overspeed Protection Instrumentation from TS to Selected Licensee Commitment Manual ML20082B3871995-03-29029 March 1995 Application for Amends to Licenses NPF-9 & NPF-17 Re Heat Up & Cool Down Curves LTOP ML20078E4731995-01-18018 January 1995 Application for Amends to Licenses NPF-9,NPF-17,NPF-35 & NPF-52,respectively.Amends Relocate Requirements for Seismic Instrumentation,Meteorological Instrumentation & loose-part Detection Sys from TS to SLC Manual for Station ML20080F7901995-01-18018 January 1995 Application for Amends to Licenses NPF-9 & NPF-17 to TS Re Amends That Allow Analog Channel Operational Test Interval for Radiation Monitoring Instrumentation to Be Increased from Monthly to Quarterly ML20080C7371994-12-0707 December 1994 Application for Amends to Licenses NPF-9 & NPF-17,revising TS Table 3.3-6 Action Statment Re Control Room Air Intake at Times When Radiation Monitors (EMF-43A & 43B) Inoperable ML20076M6881994-11-0202 November 1994 Application for Amends to Licenses NPF-9,NPF-17,NPF-35 & NPF-52,deleting App B,Environ Protection Plan & Modifying Portion of License Condition 2.C.(2) So as to Delete Portion Which Refers to Environ Protection Plan ML20073L0711994-10-0404 October 1994 Application for Amends to Licenses NPF-9 & NPF-17,correcting Technical Deficiency Existing in TS Caused Difficulty to Plant Operations Re Number of Centrifugal Charging Pumps in Modes 4,5 & 6 ML20073J8981994-09-30030 September 1994 Application for Amends to Licenses NPF-9 & NPF-17,proposing Rev Related to Replacment of Steam Generators ML20073H2811994-09-28028 September 1994 Application for Amends to Licenses NPF-9 & NPF-17,updating Loss of Power Functional Unit of ESFAS Instrumentation TS Tables 3.3-3,3.3-4,3.3-5 & 4.3-2 ML20073E9071994-09-15015 September 1994 Application for Amends to Licenses NPF-9 & NPF-17,revising TS Bases 3/4.9.2, Refueling Operations;Instrumentation, Allowing Use of Newly Installed Wide Range Neutron Flux Monitors ML20072Q8171994-08-25025 August 1994 Application for Amends to Licenses NPF-9,NPF-17,NPF-35 & NPF-52,increasing AFW Pump & Sys Testing Interval from Monthly to Quarterly & Adopting Clarification Note from Revised STS for Westinghouse Plants,Per NUREG-1366 ML20070H5781994-07-18018 July 1994 Application for Amends to Licenses NPF-9,NPF-17,NPF-35 & NPF-52,separating TS Into Two (2) Vols for Each Station ML20070F3341994-07-13013 July 1994 Application for Amends to Licenses NPF-35,NPF-52,NPF-9 & NPF-17,revising TS 4.6.2d,by Increasing Surveillance Interval of Containment Spray Sys Header Air or Smoke Test from Five to Ten Years ML20069Q4021994-06-13013 June 1994 Application for Amends to Licenses NPF-9 & NPF-17,proposing Ts,By Increasing Initial Fuel Enrichment Limit from Current Maximum of 4.0 Weight % to 4.75 Weight % & Establish New Loading Patterns for New & Irradiated Fuel in SPF ML20069D1971994-05-24024 May 1994 Application for Amends to Licenses NPF-9,NPF-17,NPF-35 & NPF-52,proposing Changes to TS by Relocating Specific Boron Concentration Values to Core Operating Limits Rept ML20065B4241994-03-25025 March 1994 Application to Amend to Licenses NPF-9 & NPF-17,requesting Revision of TS 3/4.7.13 Re Description of Groundwater Monitors ML20064C9171994-02-25025 February 1994 Application for Amends to Licenses NPF-9 & NPF-17,adding Four Instruments to TS 3.3.3.6 Tables 3.3-10 & 4.3-7 as Part of Accident Monitoring Instrumentation (Ami) & Deleting Five Instruments from Subj Tables That Are Not Part of Ami ML20059G6911994-01-10010 January 1994 Application for Amends to Licenses NPF-9,NPF-17,NPF-35 & NPF-52,revising TS 4.2.5.3 to Change Method for Measuring RCS Flow Rate During 18-month Surveillance ML20058A5451993-11-11011 November 1993 Application for Amends to Licenses NPF-9 & NPF-17,proposing Changes by Revising Certain Surveillance Requirements for ECCS Subsystems ML20059H6811993-11-0404 November 1993 Application for Amends to Licenses NPF-9 & NPF-17,changing One Time Allowed Outage Time Extension for Train of Control Area Ventilation Sys in Order to Facilitate Maint on Sys Needed to Improve Sys Reliability ML20059C3841993-10-25025 October 1993 Application for Amends to Licenses NPF-9,NPF-17,NPF-35 & NPF-52,changing TS to Reduce Required Min Measured RCS Flow from 385,000 Gpm to 382,000 Gpm,Per Std B&W TS Presented in NUREG-1430 ML20057A0351993-08-26026 August 1993 Amends 138 & 120 to Licenses NPF-9 & NPF-17,respectively, Revising Boron Concentration Limits within Refueling Water Storage Tank ML20056F1021993-08-0909 August 1993 Corrected Amends 135 and 117 to Licenses NPF-9 & NPF-17, Respectively 1999-09-13
[Table view] |