Exam Repts 50-373/OL-85-02 & 50-374/OL-85-02 on 851118-22. Exam Results:Six Senior Operators & Three Reactor Operator Candidates Passed
ML20153B944
Person / Time
Site: LaSalle  Constellation icon.png
Issue date: 02/04/1986
From: Dimmock L, Lang T, Mcmillen J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To:
Shared Package
ML20153B948 List:
References
50-373-OL-85-02, 50-373-OL-85-2, 50-374-OL-85-02, 50-374-OL-85-2, NUDOCS 8602180205
Download: ML20153B944 (69)


Text

-

U.S. NUCLEAR REGULATORY COMMISSION REGION III Report No. 50-373/374/0L Dockets No.' 50-374; 50-374 License No(s).

Licensee:

Commonwealth Edison Company Post Office Box 767-Chicago, IL :60690 Facility Name:

LaSalle County Nuclear Station Examination Administered At:

LaSalle County Nuclear Station Examination Conducted:

November 18,19,20,21 and 22, 1985 f/((

Examiners:

ag Dat'e k

y. Dinmock Mf//d f

D'atii!

f Millei J/f/)'d

[Tay v

Approved By: -J cM 1 fef 8/f b

Operating Licensing Section Date Examination Summary Examination administered during'the week of November 18, 1985 (Report No. 50-373/374/0L-85-Q To seven senior reactor operator and five reactor operator candidates.

Results:

Six Senior operator and three reactor operator candidates passed the examination.

8602180205 860204 PDR ADOCK 05000373 V

PDR

[

REPORT DETAILS 1.

Examiners T. Lang, NRC Region III L. Diamock, NRC Region III

'J. McMil19n, NRC Region III M. Spencer, EGG 2.

Examination Review Meeting Copies of the examinations and answer keys were given to facility personnel after the administration of the written examination.

The facility provided written comments to the examiners on November 22, 1985.

These comments are. enclosed as attachment 1 to this report and resolution of the comments is' included as attachment 2.

3.

Exit Meeting Ron Crawford, Training Supervisor, was informed on November 22, 1985, of those persons who clearly passed the oral / operating examination.

2

.o,

~

ATTACHMENT 1 FACILITY COMMENTS

.R0 Exam, Novembe'r' 18, 1985 Reviewed by:

L. Melander, SRO Training R. Roy, SRO Cert. Training

'W..Jakielski, SRO Operating

^

SUMMARY

OVERVIEW The following general observations are offered, intending to provide constructive feedback _ to the exam writer.for consideration when grading applicant written exams.

No LaSalle references were provided for answers to questions in Section 1.

.Some had no references at all.

Many questions had unusually large point weight value when compared to the relative importance of the topics.

Point distribution for answers to essay questions indicate a philosophy shift; i.e., more emphasis on memorization of details-:in lieu of. straight forward testing of concept understanding.

Many questions involved confusing sentence and wording factors.

Again this appears to depart from the straight forward approach of testing understanding and comprehension of operational principles.

Numerous discrepancies exist for the point values between the exam and answer key.

' In summary, it is felt.these factors significantly. detract from.the quality of

<this examination and its intent to test the' Operator's knowledge and ability to safely operate ai reactor plant.

Specific comments, which support these observations, follow this summary.

SECTION-1 1

1.1 Disparity in the number of points between the exam and answer key.

The test indicated 2.0 points and the answer key indicate'd 1.0 points.

For the question asked,.l.0 points.is a more realistic value for the subject

'~

being tested.. In _ addition, the phrase, "...the feedwater energy in

.(1bs/hr)(BTU /lba) is compared'with the' steam energy out'(1bm/hr)

(BTU /lba)...",should not be required for full credit - the question is more_than adequately' answered by the remaining paragraph.

1.'3a Student answers that indicate a stable critical neutron population'is achieved, but continue on stating that without further' Operator. action,

~

3 x

the neutron population will decay off (due to poison building) should also be accepted for full credit.

1.3b Again, there is a-disparity in the number of points on the test and the key.

The test indicates part b is worth 2.0 points while the key indicates it is worth I 5 points. The concept tested in part b is not substantially more impo: ant than that tested in part a and as such, should also be worth oni 1.0 point.

The wording of question 1.3 is very confusing. The lead in scenario is sketchy and does not clearly identify the condition which is a reactor startup with power levels below the SRM range.

The question in part b hy itself is not bad, but when it follows the question asked in part a causes considerable confusion as to what is the correct answer for either part due to the similarities in the situations.

The students were confused uy this question as well as most of the facility SRO licensed exam reviewers.

Specifically, the question reactor response if rods were pulled to one notch above the critical position.

As worded, this could be construed to mean that rods were stopped one notch before_ criticality is' achieved, which drastically changes reactor response.

Either question 1.3b should be deleted or. answers should be accepted that address the possibility that the reactor is subcritical instead of supercritical.

Also, if the question is not deleted, the following additional key change should be made.

The weighting in the answer key needs to be changed.

The important aspects in the answer should be that a supercritical condition is achieved causing reactor power to increase on a positive period until either an IRM scram is received, or, if the Operator ranged up, until negative reactivity (temp. or voids) turns power.

(See attached corrected key).

1.4b ^K/K is not a proper unit for keff.

Keff as a fraction is unitiess.

By adding ^K/K to the value of keff = 0.9 caused considerable confusion to some students.

Compounding this, is the fact that an equation ~ sheet was not provided to the students (which is required).

In accordance with NUREG 1021, ES-202, page 6 of 6, "All equations required to answer parts of the examination should appear in the equation sheet or as part of the question."

Based on the confusion generated by the misplaced units and the lack of an equation sheet, the student may have calculated the reactivity value as follows:

Kefft = 0.9 Keff2 = 0.95

- kefft = 0.95 - 0.9 = 0.0526 K/K = keff2 keff 0.95 2

As compared to the desired calculation:

t - 1 = 0.9 - 1 = _ }=_,777 p, = keff J

keff 0.9

.9 t

e 4

p = keff2 1 _ 0.95 1 = _

.05 = - 0.0526 g

keff 0.95 0.95 2

P = 0.585 As such, the answer key should be changed to accept answer b or c as acceptable or question 1.4b should be deleted.

1.5b A nonLaSalle reference was used in the answer key. According to the LaSalle Reactor Physics review lesson plan submitted with the exam reverence material, Xenon peak on a down power transient would occur 4-6 hours after the power change.

The answer key lists #2 as the correct answer (2-6 hours).

However, answer #3 (5-7 hours) fits this time frame as well as #2 did and should be counted as a correct alternate answer.

REF:

LaSalle Physics Review Lesson Plan, page 216 1.10 Question is somewhat tricky in that it asks for the primary contribution

.to heat energy added to the coolant with a subcritical reactor (decay heat).

Tiiree answers are listed that all deal with slowing down of fission products in the fuel and an Operator is trained that from the fission mechanism - the ionization by fission fragments is the biggest heat input.

Also, radioactive decay of fission products occurs also by gamma and neutron emission not solely by Betas and that the total fission energy associated with decay gammas and decay Betas is very close.

In addition, after the first refuel outage, neutron sources can be pulled

.from the core as the buildup of transuranic elements, such.as Curium produce, enough source neutrons to maintain a stable on-scale count rate.

These neutrons are produced by spontaneous fission and these fissions are a major contributor to decay heat after a long shutdown.

The major contributor to heat energy from these spontaneous fission events is the ionization by the resultant fission fragments.

Based on the misleading nature of the question and the evidence presented, the answer key should be changed to accept c as a correct answer for half credit.

REF:

LaSalle Reactor Physics Review Lesson Plan, pages 12 and 58 1.11 The question is an SR0 level question.

The subject matter in itself is testable, but the manner in which the question is asked, requires the student to have considerable reading skills to interpret the two cases being given and contrast each of their effects in order to determine the correct' answer.

According to NUREG 1021, ES-202, page 4:

"13.

Practical realistic questions that relate to operator knowledge and required operating practice should be used."

As such question 1.11 should be deleted as it does not challenge the Reactor Operator's knowledge directly, but instead concentrates on his ability to interpret a complicated and somewhat vague written description in order to answer a basic concept regarding samarium changes with power.

This is more appropriate for an SR0 rather than an R0.

5

/

SECTION 2 2.2 Also accept raergency makeup water injection source to the reactor.

Its use in this capacity is described in LGA-04, page 3 of 21, and also in LOA-SC-03.

2.7b Typographical error - should be high neutron flux or high pressure.

Either answer should be acceptable for full credit.

2.11 Whether the Operator has memorized all loads supplied by non safety-related 125 VDC buses has little effect on his ability to operate the plant safely.

Plant procedures provide reference lists so he can determine what equipment has been effected by the power failure.

In addition, reviewing the System Description, Chapter 43, objectives and review questions, the trainee is required to know loads on the vital DC buses, but not the non safety-related buses (111X, 112X, 121X, 211X, 212X, 221X).

Also, NUREG 1021, ES-202, page 4 states:

" Questions on detailed system characteristics or instrumentation, such as annunciator logic or setpoints, should be avoided unless required for safety system operation."

Based on this, question 2.11 should be deleted.

If not deleted, only those answers dealing with the safety-related DC loads should be tested, namely b, c and f.

REF:

NUREG 1021, ES-202; LaSalle System Description, Chapter 43 SECTION 3 3.1 Question does not ask for how each unit at LaSalle is effected.

At the present time, only Unit 2 has a CRD charging header low pressure scram feature and as such an answer is only required for Unit 2.

No credit should be lost if the st.: dent didn't say Unit 1 was effected as it is intuitively obvious as it doesn't have the feature and the question didn't ask for how both units would be effected.

3.2 Question needlessly confuses student by introductory statement stating RWM will generate an insert block upon receipt of the third insert error.

This is extraneous and confuses the student as to what is being asked for in parts a and b.

If a student assumed that the insert block had been applied by the lead-in statement, then no other rods than error rods can be moved and only in the direction necessary to clear the error.

Based on this, a student could answer the question as false.

For this reason, the question should be deleted.

REF:

LaSalle System Description, Chapter 18, page 26-27 3.3a In order for the recirc pump to shift to fast speed, the following interlocks must also be satisfied:

low RPV water level (<12.5"),

inadequate subcooling as indicated by low ^T between steam space and recirc pump suction (<10.1 F), and E0C-RPT not actuated.

Any of these three answers should also be accepted for full credit.

REF:

LaSalle System Description, Chapter 5, page 84-85 6

3.3b The question did not ask for what is cavitation - it asked for the basis of the interlocks which is to prevent cavitation in the recirculation system components. As such, this is a sufficient answer for full credit.

3.4 Disparity.again in point totals between the test and the answer key.

For part a, the exam indicated it.was worth 0.5 and part b was worth 2.0.

The answer key didn't have a point total for part a.

Part a should be worth 1.0 points - 0.5 points for each answer.

Part b is probably overweighted and should be reduced to 1.5 points - 0.75 points for each answer.

3.'5c Question asks for what 2 alarms are generated by the flux estimator not what conditions cause each alarm.

As such the correct answer should.also include." Flux Estimator Failure and Flux Estimator Needs Maintenance",

which are the alarms.

The answer in the key is the setpoints or conditions causing these alarms.

3.7 Question does not indicate that the component is part of RPIS/RSCS system and therefore, is ambiguous and easily confused.

According to NUREG 1021, ES-202, E.6:

" Questions on detailed system characteristics or instrumentation, such as annunciator logic or setpoints, should be avoided unless required for safety system operations.

As such, this question should be deleted.

3.8 The point distribution in the answer key is overly detail oriented.

Althour the answer key contains a word-for-word description of the operat1on of the drywell equipment drain sump pumps and input to alarms, that type of detail should not be required in the student's answer.

NUREG 1021, ES-202, Section E, points 6, 13 and 18, indicate that this type of question should be avoided.

Based on this, question 3.8 should be deleted.

If not deleted, the following answer key changes should be made:

For part a - the following answers should be acceptable for full credit:

1.

Excessive pump run time 2.

Excessive pump restarts or short restart time 3.

High drywell equipment drain sump temperature REF: LaSalle System Description, Chapter 73, pages 26 and 28 Also, the point value for this trivial interlock is excessive - if not deleted, decrease the point value of part a to 1.0 points.

3.11 For corner room spot coolers - in lieu of Unit 1 and 2 NE and NW area coolers also accept either:

1.

Division I ECCS pump corner room area (or spot) coolers 2.

LPCS/RCIC Room area cooler and A RHR Pump Room area cooler 7

Also, as a point of interest, according to NUREG 1021, ES-202, Section E,

. point 18, if a certain number of responses are expected,'n an answer,

-then the specific number should be included as part of the question.

3.12 Power available should not be necessary for full credit as having electricity available to an electric motor operated valve in order for it to operate is intuitive. Also, either +1.69# drywell pressure or -129 RPV level will cause the valve to operate.

REF:

LaSalle System Description, Chapter 38 3.14 Question is double jeopardy with question 3.2 and according to NUREG 1021, ES-202, Section E.15, should be avoided.

Also, no point value on exam or key for question and doesn't count in. point total.

Also, the question is tricky as it is a play on words, asking if the RWM will generate a rod block, when the fourth insert error is received.

The question could be misunderstood and the Operator answer true as the rod

~ block was generated on the third error and would also be in effect on the fourth error.

Consider deleting the question for this reason.

If not, the question should be worth no more than 1.0 points.

3.lb Answers 1 and 4 should be separated and counted as independent answers.

This makes 6 possible answers.

SECTION 4 4.1 Question was very confusing, part of this being due to the exam not delineating what part was part b.

Question wording was unclear and the students weren't sure IT they had to answer each of the 4 selections or pick out the best one.

Second, according to NUREG 1021, ES-202, Section E.23, states that diagrams should be included with questions such as this.

The lack of such a drawing further complicated the question.

As such, the question should be deleted.

If not deleted, grading should consider the conf.usion inherent in the question.

4.2 The Point value for this question is excessive, neither part should be worth more than 1.0 points.

4.3 According to the students, the examiner indicated that they should chose the single most correct answer, and yet the answer key lists two answers.

Also, the wording'for this question utilizing the word which causes the student to try and select the single most correct answer.

On this basis, this question should be deleted.

However,.if not deleted, question does not describe the type o'f failure that the CRD flow control system experienced.

Therefore, three of the conditions described could occur as follows:

8

a.

If CRD FCV failed closed, cooling water would be lost to the drives resulting in M temperatures.

b.

'If CRD FCV failed open, cooling water flow would be very high causing drive' temperatures-to cool off quite a bit, potential thermal shock to drives would be worse than normal on a scram.

c.

Changing header pressure flow, if the CRD pumps trip off or the flow control valve fails wide open, flow to the charging header would decrease potentially causing a low pressure problem.

As such, answer a should be counted as a correct alternate answer to this question.

RED:

LOA-RD-04, page 1 4.5 The question is included in the procedures section and does not ask for a detailed explanation of the reactor physics associated with why notch override restrictions are lifted when a bypass valve is opened.

An acceptable answer should be on that says_the open bypass valve stabilized void content which is more effective in.providing negative feedback to changes in reactor power.

Also, redistribute points as indicated on corrected key.

4.12 Procedural guidance for injecting boron into the reactor has changed significantly since the NRC exam reference material had been submitted.

Guidance for injecting boren is contained in LGA-ATWS-01 and is required whenever the reactor canrat be shut down before Suppression Pool temperature reaches the Boron Injection Temperature limit (BIT curve).

.Also acceptable should be answers that correlate the points on the curve which would apply, namely greater than 5% reactor power with Suppression Pool temperature at 110 F.

During the test, the examiners indicated that the students should put down the old answer, the new answer, or both.

As such, any of these choices should be accepted for full credit.

REF:

LGA-ATWS-01, page 5 of 13 and curve.LGSA-G7 L

9

FACILITY COMENTS '

SRO Exam, November-18, 1985 Reviewed by:

!J.~Harrington,;R0/SR0 Cert. Training.

R. Armitage, SRO Operating D..Crowl, SRO Operating

~S. Harmon, SRO Training s

The facility' reviewers feel overall', that this was a well written examinatio'n.

For the most part, questions were operationally oriented,

' written' clearly, and.were a good test of knowledge. We felt this showed improved effort on the part of the et.aminer, to produce a better quality examination.- However, even more effort is needed.to make sure questions are written clearly enough to illicit.the " correct answer" as listed on exam key.

Also, the exam keys should'be more clearly reviewed so answers correspond to.

the question asked.

5.03a-

-Increase 5.03b-Increase 5.03c Decrease Full credit.should be-given because this " literally explains".the ef.fect on critical power due to the change of the given plant.

. parameter..The question.does not ask "why" critical power changes v

'and therefore, the student should not-be' penalized for not doing so.

'5.06a Rod worth will increase because of the density change in the moduator as temperature increases.

Decreased density causes longer slowing down and thermal diffusion lengths.

Hence, thermal neutrons have a higher probability of reaching a control rod from the fuel.

'5.06b Rod worth will decrease as voids increase,-because voiding.

suppresses thermal neutron flux.

With decreased thermal flux (lower power) it will also: result in decreased rod worths, as control rod blades' absorb thermal neutrons.

4 J

5.11a Full credit should be given for part a, if the applicant states that the change is due'to buildup of fission product. poisons in the core.

REF:

License Requal Physics Lesson Plan, Revision 1, page 194 5.12-

. Equation. sheet given, does not have an applicable formula to work

~

this' count rate problem.- 'If' applicant assumes-a formula and works math correctly,tcredit should.be given.

-5.13b Clarify that stating, "without condensate depression, the condensate pumps would cavitate because of inadequate,NPSH"_, is the same as saying."due to the water at the eye of the pump being at saturation temperature."

'6.01a Question could be answered by applicant referencing surveillance requirements for jet pump operability according to T.S. 4.4.1.2.1.

10

No clarification given for type of jet pump failure; therefore, if applicant assumes a type of failure and lists indications that support this assumed failure, full credit should be given.

6.04' Containment water volume is also used to' suppress steam from reactor upon safety relief valve actuation and should be given credit.

6.05 Part one should be deleted, because the normal drain to 14A heater from 15A is open before, during and after the hi hi level trip.

This valve does not reposition.

Our procedures, LOA-FW-01, " Loss of Feedwater Heater," or LOP-HD-02, " Placing a Feedwater Heater Into Service," do not reference the normal drain on a hi hi level trip because this valve stays open.

6.09 The answer key has more to do with internal RSCS program interlocks.

The question asks for system response at two conditions:

100% power and 1% power.

Full credit should be given if the applicant gives an accurate operational response, as given on-the corrected answer

-key.

Also, at 1% power we are <75% density not greater than.

REF:

RSCS Lesson Plan, pages 4 and 5 7.01c Technical Specifications also address trainir.g startups in T.S.

3.10.6.

This states that reactor coolant temperature must be 1200S F.

The question does not specifically state IAW LGP-1-1, therefore, 1200 F is acceptable.

7.02b "Until one bypass valve is open OR main generator-is on line." This statement should be given partial credit, as this is a pertinent part of notch override restrictions A50% rod density.

7.04a Clarify that the FW003 valve is the FRV Inlet Stop, which is manually throttled, and full H edit should be given if this normal plant terminology is used.

7.04c Full credit should be given if applicant states " maximize blowdown or reject flow." Operationally this is how we eliminate "feedwater on-off cycles by maximizing blowdown to reject excess water during heatup, which prevents the FRV from opening and closing due to level oscillations.

This in turn prevents colder condensate water from cycling "on-off to the feedwater spargers.

REF:

LGP-1-1, page 10 7.07 LOA-NB-02, Stuck Open Safety Relief Valve, also states to:

1.

Start Suppression Pool Cooling.

2.

If pool temperature exceeds 100*F, refer to LGA-03.

3.

If valve remains open after 4 attempts to close @ if:

pool temperature exceeds 110 F @ if:

two 2 minutes have elapsed since valve opened, then scram the reactor.

11

(.

..~

a These are^all. acceptable answers, because the. question asks for Operator actions on a stuck open SRV. The' answer key addresses how to close the SRV. These are'all part of LOA-NB-02, immediate:

Operator actions and therefore, should be acceptable for. full credit.

7.08 LGA-ATWS-01 directs Operator to_ inject SBLC if the Boron Injection ~

Temperature (BIT) Curve-isexceeded. Full credit to applicant for

~ his response should be given.

t 7.10.

Point values for this question are excessive; however, a good a' & b

_ question. However, in 7.10b, the setpoints as _ listed on the answer

~ key are not specifically asked for and should not be needed.for full credit. Also, in 7.10a, 71%.in 2 minutes and 23% in_3.5 minutes are' acceptable answers'versus exact amperage.

-REF: System Description, Chapter 45, page 11

~

18.05b A second licensed Operator _ specifically means another licensed Reactor Operator, {LR Senior Reactor Operator.

l-4 12

ATTACHMENT 2 RESOLUTION OF FACILITY COMMENTS SUMMERY OVERVIEW Some of the general observations are not technical and indicate only a-difference in interpretation of the Examiner Standards between the reviewers and the examiner. The examination was prepared and reviewed in accordance with the guidar provided in NUREG-1021. Resolution of specific comments about questions and answers are treated-below.

1.1 Question was considered to be worth two points. Answer key was adjusted to show value.

1.3a Consideration was given to answers that demonstrated an understanding of the concept of criticality. A just critical reactor would remain at a very low stable condtlion without significant buildup of poisons or an increase in temperature.

1.3b Question was corrected to indicate proper point value. The question is a standard question from the examination question bank and has been used many times without difficulty. The comments concerning the confusing nature of the wording, will be considered in rewriting the question.

1.4b Comment accepted. Credit was given for either 2 or 3, 1.5b Consent accepted. This question is from the examination question bank.

NUREG-1021 does not prohibit the use of non-plant specific references in Section 1 and 5 of the exarnination. The answer key will' be changed to eliminate any confusion.

1.10 The examiner does not consider the question to be " tricky." The question is from the examination question bank and has been used in the past.

Based on the abovc explanation and a review of _ the reference, the alternate answer is acceptable.

1.11 The question deals with a principle of theory of the operation of a reactor and is proper material for use in an examination. Question stands.

2.2 - Comment accepted.

2.11 Operator _ knowledge of systems that are affected by the loss of a bus is considered important to the operation of the plant. Question stands.

3.1 Both answers were listed in the answer key in order to give proper credit as long as the candidate specified which unit was being discussed.

3.2 Examiner reviewed the material and agrees that there might be some confusion concerning the question, although only one candidate gave an incorrect answer to part "b".

C e<'t was given for this answer based on a review of the reference mate:ial 13

3.3a Coment accepted. Credit was given for the alternate answers.

3.3b Coment accepted. Question will be clarified in future examinations.

~3.4 Reviewers opinion of_ point values is rejected.

3.Sc Comment accepted.

3.7 Examiner believes knowledge of this system is an acceptable topic for examination, but question is deleted because of lack of clarity.

3.8 Examiner does not believe the question violates the guidance presented in the Examiner Standards. Details in the answer key were presented to facilitate grading. Credit was given for answers.that demonstrated a knowledge of the alarms.

3.11 Alternate answers accepted. Coment concerning number of responses is noted, but had no effect on grading of question.

3.12 Comment accepted. Details are presented in answer key to facilitate grading'and prevent being criticized for~ not including intuitive conditions.

3.14-Question deleted.

3.15.No change required. Credit given for 4 correct answers.

4.1 Although reviewer states that question was confusing, all candidates answered it correctly. Question will-be clarified in future examinations.

4.2 Comment is not technical. No change to point value.

4.3 Examiner has no recollection of advising candidates to select the single most correct answer and has no notes to this effect on his copy of the examination. A review of the reference material indicates an error by the examiner in developing the question, therefore, it is deleted.

4.5 The question asks for the basis for lifting the restriction at this time. Detailed answer is given to facilitate grading. Credit was given for answers that indicated an understanding of the concept.

4.12 Comment accepted. Question graded according to material supplied.

5.02 Although there were no coments made in regards to this question, a change was made to the answer key. The answer key had two answers, either of which would be acceptable. When the point value for the question was assigned, it was inadvertently split with half credit for each answer. Each answer was given full credit if applicable.

5.03 Disagree with coment.

The word " Explain" means to relate the "cause."

Answer key remains unchanged.

14

j.

5.06a&b Coment unnecessary. The coment only reworded the answer given.in the key. Answer in the key was taken directly out of the reference material and will remain unchanged. Credit was given for reasonable answers.

-5.11a Disagree with coment. There are other fission product poiso.ns that buildup, but they do not have the same effect that samarium has,

~

5.12 Coment accepted 5.13b Comment accepted. Credit was given for answers that demonstrated an understanding of the concept.

6.01a The question asks for indications of failure at full power. The reviewer gave no reference for the different types of failures that would give d1f ferent indications.

Indications listed in the. answer key would lead to the use of the surveillance requirerrents in order to determine whether the indications are valid. Answer key stands.

6.04 Reviewer did not provide a reference for the comment. No change to answer key. Only one candidate received less than full credit for answer.

6.05 Comment accepted.

Points were not taken off for Item 1 in answer key.

6.09 Coment accepted. Credit given for-alternate answer.

7.01c Coment accepted.

It should be noted that the Technical Specifications list <200 F, while the LGP lists <212 F.

An operator could comply with the LGP and be in violation of the Technical Specification.

7.02b Coment accepted, although no reference is given.

7.04a&c Comment accepted.

7.07 Coment accepted.

7.08 Coment accepted.

7.10a&b Alternate answers are acceptable. Coment concerning point value is an opinion and has no technical basis.

8.05b Coment unnecessary. Credit given for answers that indicate an understanding -that the stand-in must be a licensed individual.

Interpretation of the Technical Specification based on the coment might lead one to believe that the SR0, when he stands in for the R0 could no longer be counted as one of the required SR0's on shift.

15

MASTER COPY

~

U.S. NUCLEAR REGULATORY COMMISSION REACTOR OPERATOR LICENSE EXAMINATION i

FACILITY.

LaSalle i

REACTOR TYPE BWR DATE ADMINISTERED:

November 18, 1985 EXAMINER:

J. I. McMillen APPLICANT:

INSTRUCTIONS TO APPLICANT:

Use separate paper for the answers. Write answers on one side only.

Staple question sheet on top of the answer sheets.

Points for each question are indicated in parentheses after the question..The passing grade requires at least 70% in each category and a final grade of at least 80%.

% of Category

% of Applicant's Category Value Total Score Value JY

. - 25 1.

Principles of Nuclear Power Plant Operations, Thermodynamics, Heat Transfer and Fluid Flow.

25 25 2.

Plant Design Including Safety and Emergency Systems 23 25' 25 3.

Instruments and Controls 25 25 4.

Procedures - Normal, Abnormal, Emergency and Radiological Control 91 160 100 TOTALS Final Grade All work done on this exam is my own, I have neither given nor received aid.

Applicant's Signature

Section 1 - Principles of Nuclear Power, Plant Operation, Thermodynamics, Heat Transfer and Fluid Flow 1.1 The most common unit of flow is gallons per minute (gpm).

In a BWR, feedwater and steam flow are measured in pounds per hour (1bm/hr). Why is 1bm/hr used rather than gpm?

(2.0) 1.2 What are four (4) design or operational factors that ensure Net Positive Suction Head (NPSH) for the recirculation pumps?

(2.0)

' 1.3 A. reactor startup is incorrectly attempted without a sufficient neutron source to give indications on the nuclear instrumentation:

a.

Describe the response of the reactor if the operator stopped pulling rods at-the just critical position.

(1.0) b.

Describe the response of the reactor if the operator stopped pulling rods one notch above the critical

/4 position.

(4re) 1.4 The reactor is shutdown with a Keff of 0.9Ak/k and the source range monitor indicates 100 cps.

Rods'are withdrawn and the source range now indicates 200' cps.

Choose the correct answer for each of the.following questions.

a.

The new Keff will be:

(1.0) 1.

0.93Ak/k 2.

0.95Ak/k 3.

0.97Ak/k 4.

0.99Ak/k b.

The amount of reactivity added was:

(1.0) 1.

0.0449Ak/k 2.

0.0526Ak/k 3.

0.0585Ak/k 4.

0.0635ak/k c.

If the same amount of reactivity were added again, the reactor would be:

(1.0) 1.

Subcritical 2.

Critical 3.

Supercritical' l

4.

Prompt critical i

1.

1.5 Using the following figures, choose the correct answer for each of the~three (3) questions asked below:

100 rene I

o Time A1 A2 112 Eenon Cl 01 h1 C'

Time a.

What is the approximate time from Al to A2?

(1.0) 1.

10 hours1.157407e-4 days <br />0.00278 hours <br />1.653439e-5 weeks <br />3.805e-6 months <br /> 2.

30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br /> 3.

50 hours5.787037e-4 days <br />0.0139 hours <br />8.267196e-5 weeks <br />1.9025e-5 months <br /> 4.

70 hours8.101852e-4 days <br />0.0194 hours <br />1.157407e-4 weeks <br />2.6635e-5 months <br /> b.

What is the approximate time from B1 to B2?

(1.0) 1.

1-3 hours 2.

2-6 hours 3.

5-7 hours 4.

6-9 hours c.

Why does Xe concentration decrease from Al to D1?

(1.0)

~

1.

Xenon decay is equal to iodine decay 2.

Xenon burnout is equal to iodine decaying to Xenon.

3.

Xenon burnout is greater than iodine decaying to Xenon 4.

Xenon decay is greater than iodine decay 1.6 Answer the following statements about the Doppler Coefficient, True or False.

a.

Doppler Coefficient becomes ",, ore negative from 0 to 100% power due to the increased overlapping of resonance peaks at higher fuel temperatures.

(1.0) b.

Doppler Coefficient becomes more negative over core life due to the buildup of Pu-240 and fission products with large resonances in the epithermal range.

(1.0) 2

1.7 A reactor startup is in progress.

You have been given the estimated critical rod position for the conditions at 1200.

You start to pull rods at 0900 for the approach to critical.

How would each of the following conditions or events affect the actual critical rod position compared to the estimated critical rod position?

(Each condition or event should be considered independently of all others.) Answer as: more rod withdrawal, less rod withdrawal, or no significant effect.

a.

One reactor recirculation pump is stopped (0.5) b.

Shutdown cooling is stopped (significant decay heat)

(0.5) c.

Reactor head vent is inadvertently closed (0.5) d.

Moderator temperature gradually decreasing (0.5) e.

Reactor water cleanup system isolates (significant decay heat)

(0.5) 1.8 Match the following terms with the proper definition terms.

.a.

Natural circulation (0.5) b.

Saturated liquid (0.5) c.

Enthalpy (0.5) d.

Departure from nucleate boiling (0.5)

Definitions 1.

The point of which partial film boiling begins 2.

The point on the boiling curve where heat transfer surface temperature will rise sharply with little or no increase in heat flux 3.

The movement of a fluid base and the difference in density of the fluid caused by a differential temperature 4.

The total energy of a substance per unit mass i

~

5.

A~1iquid that cannot absorb any more energy without starting to vaporize 6.

The internal energy of a system tha!; is no longer available to do work 3

1.9 Answer the feilowing TRUE or FALSE a.

The. differential temperature necessary to transfer heat is inversely proportional to heat flux.

(0.5) b.

Pump runout is the term used to describe a centrifugal pump when it is operating with its discharge valve closed.

(0.5)

The-latent heat of vaporization is.another tefm for c.

the latent heat of condensation. hp tt* ')

(0.5) d.

One of the pump laws for centrifugal pumps states that power required by the pump motor is directly proportional to the square of the pump speed.

(0.5) e.

The faster a centrifugal pump rotates, the greater the NPSH required to prevent cavitation.

(0.5) 1.10 Decay heat is primarily produced from:

(0.5) a.

Neutron sources b.

Delayed neutrons slowing down in the fuel c.

Fission products slowing down in the fuel d.

Beta particles slowing down-in the fuel 1.11 Consider two operating history cases for~the same plaat.

In Case "A" the year is 1986 and the plant operates for 11 months at 50% power.

In Case "B" the year is 1987 and the plant operates for 11 months at 100% power.

a.

The samarium level in Case "A" is times that in Case "B."

(Select the answer)

(1.0) 1.

1/2 2.

4/5 3.

1 4.

2 b.

If the reactor is refueled arior to each of these operating history cases witi 40 new assemblies.

It would take

~in Case "A" compared to the time in Case "B" to reach the equilibrium samarium value for the new elements.

(1.0) 1.

half as long 2.

the same time 3.

twice as long 4.

four times as long END OF SECTION 1 4

Section 2 - Plant Design Including Safety and Emergency Systems 2.1 Give four reasons for using bottom entry control rods in a Boiling Water Reactor.

(GE likes the design is not one.)

(2.0) 2.2 The Standby Liquid Control line' serves several functions other than poison injection.

List four of these functions.

(2.0) i 2.3 a.

The scram discharge volume systems for Unit 1 and Unit 2 are different.

What are these differences?

(1.0) b.

What recent modifications have been made to the instrumentation on the scram discharge volumes?

Explain why this was done.

(2.0) 2.4 The signals to the RPS for Unit 1 and Unit 2 are different.

Explain this difference.

(1.0) 2.5 Each fuel bundle is surrounded by a fuel channel and these channels serve several functions.

List four of these functions.

(2.0) 2.6 Explain why it is necessary to have the turbine " slaved to" the reactor.

(1.0) 2.7 With the plant operating at 100% power what would be the effect on the plant if a.

the load limit is reduced to 75%

(.

3) b.

the max combined flow is reduced to 75%

(1.5) 2.8 The reactor is in cold shutdown.

The Reactor Water Cleanup System (RWCU) and Recirculation System thermocouples are indicating 180*F and 190 F, respectively.

Stea:n is issuing from the reactor head vent.

Explain how this could happen.

(Assume all instrumentation is properly calibrated.)

(2.0) 2.9 A Primary Containment Group Isolation signal is received and all but one of the associated isolation valves begin t close.

How does the PCIS status display-indicate that a valve is stuck full open?

(1.0) 2.10 For the following Reactor Core Isolation Cooling (RCIC)

System motor-operated valves, indicate whether the power supply is AC or DC.

(See attached drawing) a.

Inboard Isolation Valve (E51-F063)

(0.5) b.

Outboard Isolation Valve (E51-008)

(0.5) c.

Turbine Exhaust to Suppression Pool (E51-F068)

(0.5) d.

Warmup Bypass Isolation Valve (E51-F076)

(0.5) e.

Turbine Steam Supply Valve (E51-F045)

(0.5) f.

Pump Discharge Valve (E51-F013)

(0.5)

L

2.11 Match the following events with the loss of the appropriate breaker.

(1.5)

Events a.

Loss of Control Power (close/ trip) to Generator Excitation Field Breaker (0.25) b.

Loss of Narrow Range Pressure Indication on H13-P603 (0.25) c.

Loss of Main Steam Line "D" Flow Signal to Total Steam Flow Recorder (0.25) d.

Disables Narrow Range "B" Level Instrumentation (indication and signal to Reactor Level Control System)

(0.25) e.

Loss of Generator / Transformer Trip System 1 (0.25) f.

' Disables Backup Scram Valve F110A (0.25)

Bus 1.

111x 2.

211y 3.

212x 2.12 Regarding the end-of-cycle recirculation pump trip (E0C-RPT):

a.

What two conditions will initiate this trip?

(1.0) b.

What is the basis for the E0C-RPT?

(1.0) c.

When is this trip bypassed?

(0.5) 2.13 Unit 1 is operating at 80% power with the "A" TORFP and the MDRFP controlling level in three element automatic operation.

The "B" TDRFP is in manual and the operator depresses the automatic pushbutton on the M/A station for the "B" pump.

l a.

-Explain the effect this will have on the Reactor Water Level Control.

(0.5) b.

Why does this happen?

'(1.0)

END OF SECTION 2 2

i 1

7-s Section 3 - Instruments and Controls 3.1 True or False A low charging water pressure will initiate a reactor scram if the " test" switch is placed in the TEST position with the mode switch in " REFUEL-MODE."

(0.5)-

3.2 True or False The RWM will generate an " insert block" upon receipt

'of the third insert error, under the following

-conditions:

a.

When a withdraw error is received, resulting in a rod block and a rod other than the error rod is inserted (0.5) b.

During power down maneuvering, when steam flow drops below 20% for at least 5 seconds and the operating sequence is not yet latched (0.5) 3.3 The recirculation pumps have an interlock which prevents increasing pump speed above the low speed unless certain conditions are met.

a.

What are these conditions?

(1.0) b.

Explain the basis for this interlock?

(1.5) 3.4 Reactor Water Level No. 4 (31.5") has two functions.

a.

What are these two functions?

(0.5) b.

What is the basis for these functions?

(2.0) 3.5 a.

Why is the " flux estimator" used for the flux controller rather than the actual APRM signal?

(1.0) b.

What two conditions will automatically initiate a switchover to the actual APRM signal from the flux estimator? (Give applicable setpoints)

-(1.0) c.

What two alarms are generated by the flux estimator?

(1.0) 3.6 Match the ADS auto initiation signals (Column A) with the proper ~setpoint (Column B).

(2.5)

Column A a.

High drywell pressure

'k.

119 psig b.

Low Reactor Water Level 2.

-50 inches c.

Confirmatory low water level 3.

250 psig d.

LPCI/L995 discharge pressure

4.

105 seconds

e.

Time delay 5.

1.69 psig 6.

150 seconds

/#3 7.

-1249inchesd-

'h 8.

2.00 psig 4.

12.5 inches 7 *at it the fsnction of the Substitute Position

, Generator?

(0.5) 3.8 a.

Describe two conditions,.other than high level in the Drywell Equipment drain sump, that will cause the "DRYW EQUIP DRAIN SUMP TROUBLE" annunciator on panel IPM13J to alarm.

(2.0) b.

What do'es this alarm indicate to you.

(0.5) 3.9 When the reactor building exhaust Plenum Radiation Monitor system setpoint is exceeded, what automatic actions occur?

(1.5) 3.10 List six systems that can be controlled from the Remote Shutdown Panel.

(3.0)

Ju.

3.11 What are the loads supplied by Division I of.the CSC -ESW Systam?

g J-il.5) 3.12 What conditions must be present to caus'e the LPCS

. injection valve to automatically open? Include setpoints.

(2.0) 3.13 The ADS initiation logic has a time delay in it. What is the purpose of this time delay.

(1.0) d'# /#[' 4M7 rue or False A withdraw block is applied to all rods not having insert errors when the fourth insert error is receive,d.

' 3.15 The Reactor Water Level Control System receives its level input from either the A or B transmitter.

The selected transmitter provides a level signal for several other functions. What are these functions? (4 required)

(1.0)

END OF SECTION 3 2

Section 4 - Procedures - Normal, Abnormal, Emergency and Radiological Contrel 4.1 a.

Which of the following conditions would indicate Nu a failure of the #1 seal, #2 seal or both seals? '

And indicate which seal or seals have failed.

(1.5) 1.

The #2 seal pressure higher than normal and staging flow through the second seal is unchanged.

2.

The #1 and #2 seal pressure is higher than normal and staging flow through the second seal is unchanged.

3.

The #1 and #2 seal pressures decrease and staging flow is lower.

4.

The #2 seal pressure is lower and staging flow through the second seal increases.

4.2 a.

What parameter changes would indicate that an off gas

'~

hydrogen explosion had occurred? (List 4 parameters with their expected change where applicable.)

(2.0) b.

What are four of your immediate actions if the explosion has occurred?

(2.0) 4.3 Which of the following would indicate a failure of the control rod drive flow control system?

(1.0) a.

Rod drive - High temperature b.

Rod drive - Low temperature c.

Charging water - Header pressure low j

d.

Charging water - Header pressure high 4.4 When operating in automatic level control and the Reactor Water Level Control system fails,.why is it necessary to l

switch all M/A stations to manual prior to switching to the backup level control instrument? (That is, explain the l

consequences of not performing the change to manual on the M/A stations.) (Assume failure was due to loss of level sensing instrument.)

(1.5) 4.5 During startup and heatup the procedurally enforced restriction on withdrawal of control rods is lifted after a bypass valve opens.

Explain the basis for lifting this restriction under those conditions.

(1.5)

\\

L

4.6 Which of the following Process Radiation Monitoring Systems utilize Geigh-Mueller detectors?

(0.5) a.

' Main Steam Line Radiation Monitors b.

Service Water PRM c.

Control Room HVAC PRM d.

Reactor Building Closed Cooling Water PRM 4.7 You observe that a SRV has spuriously actuated and is stuck open.

a.

Briefly explain two methods to close the valve as stated per LOA-NB-02.

(0.5) b.

How would you determine that the valve has closed?

(1.0)

(Four indications necessary for full credit.)

c.

A manual scram is required if a SRV is stuck open and any one of three conditions exist.

What are these conditions?

(1.5) 4.8 The Inboard Shutdown Cooling Containment Isolation Valve (E12-F009) is normally powered from Division II switchgear with the alternate source provided by Division I.

When using the alternate power source are the following precautions TRUE or FALSE?

a.

The Outboard Shutdown Cooling Isolation Valve (E12-F008) must be closed when using the alternate power supply for the inboard valves.

(0.5)-

b.

There is no protective c.ircuitry to prevent feeding the valve motor operator from both the normal and' alternate power supplier.

(0.5) c.

The F009 valve will not automatically isolate when the valve is powered form its alternate power source.

(0.5) 4.9 During an ATWS, LGA-4 directs you to maintain the water level using condensate /feedwater, control rod drive and/or reactor core isolation cooling systems.

a.

Why is the use of these systems preferred over the high pressure core spray, low pressure core spray and low pressure coolant injection systems?

(1.25) b.

Explain the possible adverse consequences involved with using the HPCS, LPCS,'or LPCI under ATWS conditions.

(1.25) 2

?

4.10 Arrange the followi.ig LGA-03 (Primary Containment Control) operator actions in order of INCREASING Primary Containment Pressure.

(1.5) a.

Emergency Depressurization of the RPV b.

Perform RPV Flooding per LGA-05 c.

Restart a VP Chiller per LOA-VP-02 d.

Initiate Suppression Chamber sprays e.

Shutdown RR Pumps, D/W fans and initiate D/W sprays 4.11 LOA-FP-04, " Loss of Both Diesel Fire Pun.ps With a Loss of Offsite Power," requires the starting of at least one service water pump as an immediate action. What are the four immediate action steps necessary to start a service water pump?

(2.0) 4.12 Although LOA-NB-09, " Transient With Failure to Scram,"

contains a note that says the operator is not required to verify the exact number of control rods not properly inserted prior to performing immediate actions, the System Training Manual says the operator has authority to inject boron (SBLC) under certain reactor conditions. What are these conditions?

(2.0) 4.13 One of the entry conditions for LGA-02, " Secondary Containment Control," is "Any of the following parameters above the maximum normal operating value."

What are these parameters? (Values not required)

(2.5) 4.14 LGA-03, " Primary Containment Control," directs the operator to vent the containment regardless of release levels when drywell pressure exceeds a.

What is this pressure?

(0.5)

~

b.

What component is the limiting factor in setting this pressure limit?

(0.5) i END OF SECTION 4 l

l END OF TEST l

l 3

r

E

- y 4E3 s D)

].;

e

(-)

x u

m as 5.!

II el g.,

l-i a,

.s:

1 5

..Dl!

[1 3

lI f,------

il

\\,i/l G1

-2.

l.

[]

I xI 0 e

s E!

qc

@,_.p @ :]:;+

i-v si u

jayl r-----

L

,_ gi j

33 M

I..l 0 J

,i@

ll 1.1 -i.

sa i

_ g ) a::

gg : =:

a s

.i e

i LGD-E

.!I E,

I e

! @X O 8

[D-Ki i

s

)

sr s

g-us x e e

I 5

Ei

[3 y

g s

d 3:

I e

a n p

g ae g

\\..

/.

/.,

g o

[D-K!

,d@-

o G]

=

I s'

u I

..: g.

89 l:

.e

---c r o 2

3-e 3

my r

~

.'i I[IHC Oh!.!!.

.!. !! EX4Il !X-@ !X-E"* !

.....,_......._..a

.!!--[!

$ G3 gi i

!l!

{

l e

n

i O s.

R

!!s G3 -

I I'

.s --

-g 5

a t

[,

E lI

..lI

~

l 2

3 $ 2" 9

4

,u

,o

,=,

y

(

!I b,I

[4 k -( Y UA M k,.. _ $

.5 -

ANSWERS - Section 1 -. Principles of Nuclear Power, Plant Operation, Thermodynamics, Heat Transfer and Fluid Flow 1.1 Steam is a vapor'and one gallon of steam contains only a f fraction of the mass of one gallon of water (4s49); w (/d ftablishanenergybalanceacrossthereactor(4seph d.ufdd the feedwater energy in (1bm/hr) (BTU /lbm) is compared + d # g

/

i(with the steam enerav out (1bm/hr) (BTU /lbm) (4s6),)

Establishing flows in lbg/hr allows a true comparison of the two flows and a s4mple determination of whether mass is increasing or decreasing in the reactor vessel (1>.46-).

/0 Ref.:

Standard Heat Transfer Principles 1.E 1.

Located far below the normal water line to provide a large static head 2.

Feedflow less than 30%; trip to slow speed 3.

At high power operation, feedwater subcooling provide adequate NPSH 4.

Low reactor water level trips, cavitation interlock 5.

Suction valve closed trip, cavitation interlock 6.

AT steamline pump suction < 10 F; trip to slow speed 7.

No transfer to fast speed unless feedwater flow

> 30% and flow control valve is at minimum q be @ 0.5'en.

Ref.:

Standard Fluid Flow Principle

' 1. 3 a.

A chain reaction will be initiated by the neutrons in the core and power level will increase (0.5) but stabilize as some very low level (0.5).

b.

A chain reaction will be initiated and super critical multiplication will result from the pocitive reacting addition associated with the rod notch withdrawal (0.5).

Power will increase (0.25) on a period depending on the notch worth (0.25) until a safety function scram the reactor (0,25) or until sufficient negative reactivity (temp or void) (0.25) is added to stop the power increase.

Ref.:

Standard Nuclear Principles 1.4 a.

-2 b.

3 eta.

c.

3 each @ 1.o

Ref. :

Standard Nuclear Principles 1.5 a.

3 b.

2 vL 3 c.

3 eu.h @S0)

Ref.:

Standard Nuclear Principles 1.6 a.

False b.

True

<a o (/.J)

Ref. :

Standard Nuclear Principles 1.7 a.

No significant effect b.

More rod withdrawal c.

No significant effect d.

Less rod withdrawal e.

More rod withdrawal 9 g,5.)

Ref. :

Standard Nuclear Principles 1.8 a.

3 b.

5 c.

4 d.

1 enth @ to.()

Ref. :

Standard Heat Transfer Principles 1.9 a.

False b.

False c.

True d.

False e.-

True

_,,g g g,f)

Ref.:

'~

I #'

1.10 d dt O l

Ref.:

l -

1.11 a.

3 b.

3 Q

Ref.:

I-END OF SECTION 1 I

2

ANSWERS - Section 2 - Plant Design Including Safety and Emergency Systems 2.1 a.

Less time required for refueling

~

b.

Internal moisture removal and steam separation can be more easily accomplished

~

c.

With a large % of voids in the upper part of the core power is reduced in this area.

If rods entered from the top, flux would be overdepressed.

O' d.

~ Bottom entry rods can be used for axial power shaping.

Helps control flux peaking in local area of core and yields optimum burnup.

Ref.:

LaSalle Training Manual, Volume II, Chapter 7, p. 8 2.2 a.

Core AP measurement b.

HPCS line break detection c.

Jet pu:np AP tap d.

RWCU bottom head drain flow tap o#a a.

e CR0 drive water and cooling water AP tap yl

.4, e E

E*M Nm.DicQ-te A mM LaSalle Trainin Ref. : ' 4.6R - 0V f-S. g Manual, Volume I, Chapter 2, p. 56 2.3 a.

Unit 2 has 2 vent and 2 drain valves in series.

Cl 0) b.

Two additional scram level switches were added. These Q 0) are AP instruments to provide diversity ir, measurement.

Ref.:

LaSalle Training Manual, Volume II, Chapter 8, p. 38 2.4 Unit 2 receives a signal from the CRD system which is (l.c) effective in "Startup" and " Refuel."

Ref.:

LaSalle Training Manual, Volume II, Chapter 8, p. 70 2.5 1.

Channels the coolant flow upward (90% through the channel 10% bypassed) 2.

Bearing surface for control rod blades 3.

Protection for fuel rods during handling 4.

Primary resistance to lateral acceleration loading on the assembly 5.

Insures correct control rod clearance 6,y o.r,..

Ref.:

LaSalle Training Manual, Volume I, Chapter 4, p. 14

2.6 A pressure control system was necessary so that reactor pressure is first changed and then turbine power (0.25) because an increase in reactor pressure would cause voids to compress and collapse (0.25) increasing moderator content (add reactivity)

(0.25).

This power increase would cause pressure to increase further and cause a possible divergent transient (0.25).

(The opposite is also true', i.e., lower power decreases pressure more voids,etc.)

Ref. :

LaSalle Training Manual, Volume IV, Chapter 26, p. 12 2.7 a.

Turbine control valves close, bypass valves open to

(. l 0) pass 25%.

b.

Control valves close.

Bypass valves do not open.

Reactor k'

pressure increases; voids collapse, adding reactivity power goes up.

Cycle repeats.

Reactor scrams: q high neutron flux err high pressure.

e W

Ref. :

LaSalle Training Manual, Volume IV, Chapter 26, p. 12 2.8 It is possible to have thermal stratification in the core (1.0).

Lacking sufficient circulation, the RWCU bottom drain and recirculation loop thermocouples will read significantly lower than the temperature at the surface of the water in the vessel (0.5).

If insufficient heat is-removed, this condition will result in raising the surface temperature above the boiling point (0.5).

Alternate If vessel level is not above steam separator drain lines (1.0) and you decrease shutdown cooling flow (0.5), there may not be adequate flow through the core to prevent surface temperature from rising to boiling point (0.5).

Ref. :

LaSalle Training Manual, Volume I, Chapter 2, p. 84 l

2.9 A valve not moving would remain flashing indicating that it (s. o )

was stuck open.

Valves that reach 90% open position are solid amber.

Ref.:

LaSalle Training Manual, Chapter 49 l

2.10 a.

AC b.

AC c.

DC d.

AC e.

DC f.

DC g,g Ref.:

LOP-R1-01E 2

2.11'a.

111x I

-b.

211y 1 c.

211y J d.

212x f e.

111x i f.

211y J g [o,t()

Ref.:

LOA-DC-02, pgs. 5/10 2.12 a.

1.

Turbine trip (closure of Main Turbine Stop valves) 2*9 2.

Generator load reject (fast closure of the main (0, f)

Turbine Control RETS pressure low)

(Full credit will not be given if only items in one are listed) b.

Improve MCPR consequences for the above transients (i.e.,

g,0 )

pressure transients) or recover loss of thermal margin which occurs at end of cycle c.

< 30% reactor power (30% first stage pressure)

/0*C 2.13 a.

No change (o. d b.

Since "A" TDRFP and MDRFP are already in automatic and the RWLC system is interlocked so that no more

[/, al than 2 components can be controlled automatically in 3 element control the third component does not become part of the auto control.

Ref. :

System Training Manual, Chapter 31 END OF SECTION 2

1

?

3

ANSWERS - Section 3 - Instruments and Controls 3.1 True, Unit 2; False, Unit 1 (O'h Ref.:

LaSalle Training Manual, Volume II, Chapter 8, p. 40 (o4) 3.2 a.

True b.

True (a.C Ref.:

LaSalle Training Manual, Volume II, Chapter 18, p. 24 Feedflowf30%andFlowControlValveatminimum O'

3.3 a.

b.

Cavitation in flow control valve due to inadequate subcooling (0.5).

If fast speed were permitted there would be velocity increase (0.25) and a pressure decrease (0.25) at the valve.

Bubbles would form in the valve and collapse at they exit causing valve damage (0.5).

Ref.:

LaSalle Training Manual, Volume I, Chapter 5, pgs. 70-71 3.4 a.

1.

Low level alarm

[O.

2.

Recirculation flow control valve runback permissive b.

1.

Level below which steam carry under would significantly affect the subcooling available for the recirculation pump NPSH.

(1.0) 2.

With less than 2 feed pumps operating, the recirculation Flow Control Valve will auto close to a minimum position to reduce power within capability of one feed pump.

(1.0)

Ref.:

LaSalle Training Manual, Volume I, Chapter 3, p. 36

' 3. 5 a.

APRM signal is noisy and would cause the flow control (l.o) valve to oscillate or (flux estimator. signal is almost noise free providing steady signal to FCV).

(o.d b.

1.

Actual APRM signal reaches 110%

2.

Actual flux and estimated flux differ by more than 5%

@'c)

Mb c.

1.

APRM raw signal selected for continuous 20 minute / k (o,f) period If logic switches between raw APRM and estimated 8 uf'A $ j Mi k O

L' 2.

g signal more than 200 times in 5 minutes Ref.:

LaSalle Training Manual, Chapter 6, p. 16 & 22

3.6 a.

5 b.

7 c.

9 d.

1 7

g(e,[/

e.

4 b2My7 cat)

Ref.:

System Training Manual, Chapter 37, p. 26 3.7 lhis is a deviceps t% posiUun data Trom the RPIS f

(ide Anti ^ ~ use seie u ed red end red drivi,g @ ls) to generate the next expected position of the rod being driven.

Ref.:

Systems Training Manual, pgs. 40 & 41 3.8 a)

Pump starts; a timer actuates (0.25); timer interval corresponds to time for pump to pump 20 gpm leak (0.5);

if pump runs past this time alarm sound (0.25).

If pump stops prior to this time (0.25) a second timer starts (0.25). This timer looks at restart time (0.25).

If pump starts before timer runs out (0.25).

b)

Alarm indicates leak has progressed to 20 gpm (0.5).

Ref.:

Systems Training Manual, Chapter 73, p. 26 3.9 a.

Start SBGT and associated samples (0.5) b.

Isolate Reactor Building ventilation (0.5) c.

Close primary containment vent and purge (0.5)

Ref.:

LaSalle Systems Training Manual, Chapter 72, pgs. 94 & 95 3.10 RCIC; RHR Loca_B (does not include valves for Steam Condensing mode), RHR service water pumps C and D and B Hx outlet valve (688), three safety relief valves H, K, P; recirculation pumo A suction valve;RBCCW pump 1A; a"*1,4 sarvice watar jnckay map OA and strainer outlet valve

  1. g'j (1WS113); plant evacua. tion siren.

Ref.:

LaSalle Systems Training Manual, Chapter 74, pgs. 40 & 41 3.11 RHR Heat Exchanger A; UnFt 1 and 2 LPCS pump'; motor coole RHR pump A _ seal cooler Diesel y

'*1 aenerator "0" cooler; m

TJnit 1 and 2 NF an NW area cooler; fiisl ~p~561 emergency makeup Mb supply A.

Ref.:

LaSalle Systems Training Manual, Chapter 40, p. 52 & 53 3.12 Power available to 141y; Level 1 (-129"); 1.69 psig drywell pressure;lessNhan500psigreactorpressureand<500psig between F005 and F006.

(2.0)

L'Salle Systems Training Manual, Chapter 38, pgs. 52 & 53 Ref.:

a 2

4 3.13 Time delay is to assure the HPCS has enough time to operate Q'

yet not so long that the LPCS/LPCI. systems would be unable to cool the core.

Ref.:

LaSalle Systems Training Manual, Chapter 37, pgs. 52 & 53

]!

'3:14 False-[)jg(c-Ref.:

LaSalle Systems Training Manual, Chapter 18, p. 46 3.15 1.

Upset / narrow range recorders 2.

Recirculation runback permissive (alarm / trip) 3.

Pump down shift (alarm / trip)

Q

2. [m 4.

High/ low level alarm

]

Ref.:

LaSalle Systems Training Manual,. Chapter 3, p. 14 END OF SECTION 3 i

l l

l l

3

ANSWERS - Section 4 - Procedures - Normal, Abnormal, Emergency and Radiological Control M

b,q[

4.1 a.

4 b.

2 Ref.:

LaSalle Training Manual, Volume I, Chapter 5, p. 30 4.2 a.

Sudden abnormal change in prefilter hP, after' filter 4

AP and off gas system pressure; high off gas system flow; A4 (,o.d high pretreatment radiation monitor; high charcoal 48 adsorber vault temperature; high area radiation in off gas.

b.

1.

Initiate load reduction (LOA-GG-01) 2.

Warn all personnel to stay clear of off gas areas 3.

Notify shift supervisor and Load Dispatcher d,

4.

Check "Adsorber Bed High Temperature" alarm (clear)

A,ha.$ )

5.

Check all off gas area radiation monitors 4.*

Ref.:

LOA, Volume 2, LOA-0G-02 4.3 Ref.:

LOA, Volume 2, LOA-R0-04 4.4 Switching to other level instrument prior to transferring all M/A stations to manual will cause excessive reactor

-level swings (0.5) and feedwater pipe vibrations (0.5).

This is due to the large variation that exists between the failed instrument and the backup instrument (0.5).

Ref. :

LOA, Volume 2, LOA-RL-01

. 4. 5 At that condition the core would contain voids (0.25) and the voids suppress the flux (0.25) thus improving the peak to average flux ratio (0.25).

This. reduces the notch worth of all rods (0.25).

The open bypass valve stabilizes pressure and the void' content is also more stable (0.25) and much more effective in providing negative reactivity feedback (0.25).

Re f. :

LaSalle Tiaining Manual, Volume III, Chapter 19, pgs. 40 & 41 4.6 c.

(o,S)

Ref.:

LaSalle Training Manuai, Chapter 72, p. 32

4.7 a.

1.

Cycle control switch from auto to open and (2Q back to auto 2.

Remove fuses for affected valve to deenergize

(.2b control circuit

-Alternate 3.

Operate keylock for ADS valve 4.

Hand switch at remote panel for HKP b.

Valve position indication (clear); leak detector;

,g generator load; steamflow; no rumbling noises; down 4pf comer piping temperature normal; suppression pool normal; radiation levels normal.

1.

Valve remains open for 2 minutes fo4) 2.

Valve remains open after a maximum of 4 attempts (0 5')

to close 3.

Suppression pool temperature reaches 110 F Ref.:

LOA, Volume I, LOA-NB-02 4.8 a.

F h(0**d b.

T p

c.

T Ref. :

LOP-RH-07, p. 4 Volume VIII, Chapter 49, pgs. 40 & 62 4.9 a.

Condensate /feedwater, control rod drive and reactor core isolation cooling inject outside the shroud (0.5) which allows for mixing of the cold unborated water being injected (0.5) with the warm water in the down comer prior to entering the core (0.25).

b.

Use of HPCS, LPCS or LPCI injects cold water directly into the core (1.0) and could cause a power surge (0.25).

4.10 c, d, e, a, b-or c, d, a, b, e edch (d'h Ref.:

LGA-03, Step C.4 4.11 a.

Dispatch operator to close discharge valve on selected

/o d pump.

b.

Restore power to bus by closing cross tie breakers

@h

[141x(241x) and 142x(242x) - ACB 1415(2415) and

.ACB 1425(2425)].

2

4, c.

Start selected service water pump.

(Select pump (b4)

I according to DG availability.

Do not exceed amp 494 or load 2860KW.)

@'b

d.

Open service water pump discharge isolation valve.

Ref.:

LOA-FP-04, pgs. 1-2 4.12 Rx water level not maintained (0.5). or suppression pool water temperature reaches 110*F (0.5); an W ither a.

5 or more adjacent rods not inserted to at least 06 or (0.5) b.

30 or more rods not inserted to at least 06 (0.5)

Ref.:

LOA-NB-09, p. 2 LaSalle Systems Training Manual, Volume II, Chapter 10,

p. 48 4.13 Area temperature (0.5) area differential temperature (0.5) area radiation level (0.5). Area water level (0.5); Rx building or Fuel Pool Cooling ventilation exhaust radiation level (0.5).

Ref.:

LGA-02, p. 1 4.14 a.

60 psig ed(84) b.

SRV actuators Ref.:

LGA-03, p 15 END OF SECTION 4 3

s.

k &

U.S. NUCLEAR REGULATORY COMISSION SENIOR REACTOR OPERATOR LICENSE EXAMINATION FACILITY:

LaSalle REACTOR TYPE BWR DATE ADMINISTERED:

November 18, 1985 EXAMINER:

T. E. Lang APPLICANT:

INSTRUCTIONS TO APPLICANT:

Use separate paper for the answers. Write answers on one side only.

Staple question sheet on top of the answer sheets.

Points for each question are indicated in parentheses after the question.

The passing grade requires at least 70% in each category and a final grade of at least 80%.

% of

~

"~

Category

% of Applicant's Category Value Total Scorc Value 25.5 25.8 5.

Theory of Nuclear Power Plant Operations, Fluids and Thermodynamics 25 25.2 6.

Plant Design, Control and Instrumentation 25 25.2 7.

Procedures - Normal, Abnormal Emergency and Radiological Control

-23.5 23.8 8.

Administrative Procedures, Conditions and Limitations 99 100 TOTALS Final Grade All work done on this exam is mj own, I have neither given nor received aid.

Applicant's Signature

Theory of Nuclear Power Plant Operations, Fluids and Thermodynamics 5.01 For the following condition, state if the Fuel Temperature Coefficient becomes more or less negative.

a.

Increase in fuel temperature (0.5) b.

Increase in moderator temperature (0.5) c.

Increase in void fraction (0.5) 5.02 Define the following items:

a.

Latent. Mat of vaporization (1.0) b.

Critical Point (1.0) c.

Satura;ed Liquid (1.0) 5.03 Explain the effects of increasing the following core parameters oa steady state critical power.

a.

Core flow (1.0) b.

Inlet subcooling (1.0) c.

Reactor pres:ure (1.0) 5.04 If equilibrium xenon is obtained (the reactor has been operating at constant power for many hours), and the reactor power is doubled, will the new equilibrium xenon concentration be twice as great? Explain your answer.

(2.0) 5.05 You increase core power by pulling control rods around the center fuel bundle. Assuming that recirculation flow is kept constant would the flow through the center bundle increase, decrease, or stay the same? Explain your answer.

h..,

4 g4 (2.0)

-5.06 Explain how and why Rod Worth changes for the following conditions.

a.

Increase in moderator temperature (1.0) b.

Increase in void fraction (1.0)

t 5.07 Your reactor operator informs you that MAPRAT is 1.02

).

a.

Is the MAPRAT, as stated, conservative?

Explain your answer.

(0.75) b.

In regards to MAPRAT, which of the following (0.75) statements are True and which are False?

I 1.

MAPRAT maintained within limits ensures that transition boiling will not occur in 99% of the fuel bundles.

2.

Maintaining MAPRAT limits ensures that the MFLPD limits are met.

3.

Maintaining MAPRAT limits ensures that peak clad temperature will not r,each 2200'F during a LOCA.

5.08 a.

What are three coefficients of reactivity and what is a typical value of each?

(1.5) b.

How are the above coefficients of reactivity 4

affected by core age? (Less negative, more. negative or remain the same)

(1.5)

J 5.09 A fluid is at 400*F and 600 psig.

Is it subcooled or super heated and by how many degrees?

(1.0) 5.10 If reactor power level is increased from 50 MW to 370 MW in two minutes, what is the doubling time? (Show all work)

(2.0) 5.11 Using.the attached enrve:

~

a.

Why does core reactivity decrease from point A to point B?

(0.5) b.

Why does core reactivity increase from point B to point C?

(0.5) c.

Why does core reactivity decrease from point C i

to point D?

(0.5) 5.12 With an initial Keff of 0.9, sufficient control rods are withdrawn to increase the count rate by a factor of 10. What is the final Keff of the core?

(2.0)

I l

I 2

1 5.13 a.

Define " Condensate Depression."

(0.5) b.

Is it necessary for plants to operate with

" Condensate Depression?" Explain your answer.

(0.5) i

~

END OF SECTION

~

9'

+w

's@

i t

3

b Plant Design, Control and Instrumentation 6.01 a.

What are four indications of a failed jet pump?

Assume full power conditions.

(2.0) b.

Why is jet pump integrity important in regards to

~

accident conditions?

(0.5)'

6.02 What are the five ranges of vessel level instrumentation?

Be specific and include setpoints. 4/f 4 A h % 4 d (2.5)

LJ w w=

-A.

6.03 In regards t} Recirculation Pump Cavitation Interlocks:

a.

What are the two cavitation interlocks which will trip the pumps from 100% to 25% speed?

(2.0) i b.

. Are the interlocks above actuated immediately once their respective setpoints are reached? If not

-why not?

(0.5) 4 6.04 The design of the suppression chamber incorporates a free air volume and a containment water volume. What is the purpose or function of each?

(2.0) 6.05 What will happen to the inlet and outlet flow paths for the shell side of the 15A feedwater heater on an i

increasing level condition in the 15A heater? Assume level continues to increase to the trip points.

(3.0) 6.06 Reactor Water level can be automatically controlled in the two modes.

(Single Element and Three Element) a.

For each mode of operation what input signals are used to control level.

(2.0) b.

What components are controlled or regulated in each mode of operation? Be specific, include how many components can be controlled in each mode.

(2.0)-

4 6.07 For each of the following, state whether a Rod Block, Half-scram, or No Reactor Protection System Action is generated for that~ condition. Note:

If two or more actions are generated, i.e., rod block and half-scram, state the most severe, i.e., half-scram.

a.

APRM B downscale, Mode Switch in Run (0.5) ngstoA C, Mode Switch in Startup (0.5) b.

12 L 7Bupscale(>108% slow)ModeSwitch c.

Flow Units A an in Run (0.5) d.

Reactor water level 55", Reactor Power 18% Mode Switch in Run (0.5) d

..,n---.n.-.-.,-r---,.-.

,.vr w-,-

--.-..-.-m,--

6.08 There are two means of bypassing the operation of the R8M automatically. What are these two means?

(2.0) 6.0iHowdoestheRSCSrespondwhenanRPISfailureoccurs?

Assume both high power (100% power) and low power (1% power) conditions.

(2.0) 6.10 In regards to the Control Rod Drive System:

a.

What prevents a control rod drive. pump from going into " Runout" following a scram?

(1.0) b.

How does the on-line FCV respond following a scram?

(0.5)

.6.11 The SBLC system has a minimum injection time of 50 minutes to prevent reactivity " Chugging." What is_ reactivity ~

" Chugging," and why is it disadvantageous?

(1.0)

END OF SECTION e

2

Procedures - Normal, Abnormal, Emergency and Radiological Control 7.01 During a training startup with one RHR loop in the Shutdown Cooling Mode, three items are required to be verified once per hour. What are these three items?

(1.5) 7.02 What restrictions apply to the use of " Notch Override" switch during a unit startup?

(2.5) 7.03 What four items must be logged once the reactor has (1.0) been brought critical?

7.04 What actions must be performed to the Feedwater System and the RWCU System to prevent or minimize feedwater nozzle, sparger, and header, thermal stress at low flow conditions? Two actions required for full credit.

(2.0) 7.05 During a normal unit shutdown you are cautioned not to open the turbine vacuum breaker at high RPMs. Why is

- this caution necessary?

(1.0) 7.06 Define the following terms:

a.

High Radiation Area (1.0) b.

Radiation Area (2.0) 7.07 What action must be taken on a stuck open safety relief valve?

(1.5) 7.08 The operator is not required to verify the exact number of control rods. not properly inserted before taking the immediate actions on an ATWS but there are some guidelines d

@t are these guidelines?

(3.0)

Wha as to when to inject SBLC.

dw.

W w W

7.09 What automatic actions occur on a high reactor water level (level 8)? Four automatic actions required for

' full credit.

(2.0) 7.10 If the generator trips during a Stator Cooling Runback:

a.

What are two' conditions which could have initiated the trip?

(2.0) b.-

What are two initiating signals for the Stator Cooling Runback?

(2.0) 7.11 According to LaSalle " General Precautions," if directed to open the ADS SRVs or-if ADS initiates automatically, DO NOT close the ADS valves unless one of two conditions exist. What are these two conditions?

(2.0) 4

- - ~

.. ~,

---,-w--

,w,7-, - ------,-

4 7.12 Other than "As directed" what are the entry conditions for Level / Pressure control LGA-01? Be specific, include all setpoints.

(1.5)-

END OF SECTION i

.e

.e F

I 4

3 4

2

Administrative Procedures, Conditions and Limitations

^

8.01 Define the following terms according to your Technical Specifications.

t.-im ch a.

Li:;f t:d ontrol Rod Pattern (1.0) b.

Channel Check (1.0) 8.02 What is required in order to implement a " Temporary System Change" on backshifts and weekends? Include in your answer any specific requirements such as qualifications?

(2.0) 8.03 In order to remove a safety-related system from service the outage must have independent verification.

a.

Can anyone verify the. system is removed from service?

Explain your answer.

(1.0) b.

Under what conditions can the second verification be waived?

(1.0) 8.04 Other than on-shift personnel what other personnel have unlimited access during normal operations? Six required for full credit.

(3.0) 8.05 a.

10 CFR 50.54 states, "An operator or Senior Operator licensed pursuant to Part 55 shall be at the controls at all times during operation of the facility." What must an operator do to meet this requirement?

(2.0) b.

If a unit operator finds it necessary to leave the "at the controls" area who must stand-in for him?

(0.5)

"8.06 What three (3) actions must be completed within one hour if one control rod is determined inoperable due to being immovable,'as a result of excessive friction or mechanical interference, or known to be untrippable?

(3.0) 8.07 For each of the following conditions, state whether you would consider the system operable or inoperable for Condition 1 plant operation.

For each one you consider inoperable, briefly state why you determined the system to be inoperable (i.e., why it cannot perform its intended function).

a.

The LPCS " Keep Filled" pressure alarm has actuated and subsequent high point venting of the LPCS discharge piping does not result in water issuing from the vents.

(1.5) b.

Two Suppression Chamber Vacuum Breakers cannot be shut.

(1.5)

-.,,.n.

8.08 What is meant by Primary Containment Integrity?

(3.0) 8.09 According to Technical Specifications, what is the basis of the following scram.

a.

Main Steam Line Isolation Valve Closure (1.0) b.

Main Steam Line Radiation High (1.0) c.

Turbine Step __ Valve Closure (1.0)

END OF TEST m

2

'L:

(A)

(C) l

,a tse

=

sw i

s=

- (B) i n s.

l 6

i 3,e g,

(D) e a e e

e esas aan amen aseems 1

~

Figure 11. Esff Ts. OBre 298 8

e a

g i

e e

i J

l 1

ll l

l l

4 1

I e

i l

\\

9 6

.._.,.._m

,y-,._v._,.,.--r-_,,__,._,-..

4 l

m T able 1.

Belussted Sleem: Temperatute Table Ahs Prus.

30eofat WWome Enthol07 Entre 97 1emt it Der Set Set Set Set.

Sat.

Set Temt fsht Se in.

Laget tvet Water beet Ever V90er Leget feet Utter Fahr t

0 v,

een

=0 Se 0#8 h e a,

sen s,

t 37s-O m859 00140n 330s : ales ?

- 8 0i79 1075 5 1075 5 e0000 f len li/n '

wa*

Se 8 0 00600 0 0:6078 306I e 3061 9 I 996 4074 4 1976 4 0 # 41 21762 31832 MS HB 0 3039) 0016C70 3519 0 NMO 4 006 40732 30772 SWel Inti 2 H22 NO S4 0 31249 0 016019 MMI JW42 S tig M723 1870 1 4 0122 LIMI 2 3063 24 et 8 87663 tmeelt sees t 3s45 8 0 077 M710 1079 0 0 0167 F H32 Fille 4BA 43 e e une 941019 !???4 22724 leGM N69 8 1979 9 elti 2 1375 2.1527 4r8 eeA t ielt?

0 046019 2112 4 2112 8 12 001 8587 IN07 W42 2 1717 2 3459 es a est e l53is 9040?O IM57 INS 7 44 087 3574 1081 6 2 till 2 1393 46 0 48 8 S tulo 0 010023 1830 0 88300 Mell 8086 4 8W25 1 2.8006 23327 48 8 e

98 0 0 l7796 00lH?3 '8798 0 17008 46 064 80653 80814 9 0161 ' 'Afte 2 1262 58 9001 ett

$19145 004074 8589 2 3500 2 30 067 19642 MB4J 9 0800.

N8 0 206M 9 0160?6 34874 lati4 058 1531 8005 I tesM. '4696 2 1197 '

61 4 i

2 1134 Os 9 Be t SP2163 0 016478 1363 6 8303 6 Olt 1961 9 2006 0 steps. 'Wel 2 3070 MA ISS 423tL3 Sta6 ell 1292J 12922 050 N603 N06 9 8536 festi 2 3000 34 80 0 0 76611 0 016033 SM76 IM76 30 060 MH7 le77 0 OblS f 8391 3Sp6 50 93 e e 37494 40 tun lift 2 1179 2 mett lebei 1888 6 8Ott3 2 0791 2 8885 W4 4

to 9 8 79457 001M39 1996 S Bel 65 atoss 19574 ImsS em37 2 0197 2 mit Sea de t 0 31626 0016M3 909 0 Sell 30 0 %

30663 1000 4 0 0670 k Wts 2 076a 30 00 4 0 33089 0 016046 GM S ONS 2 064 leblJ IWlJ 4 8708 13006 2 470s 5.0 i

ISS S M?t?

0 016050 000 3 Ott o N E2 1864 0 3002 3 0 0745 8 9000 2 0645 he

~

is t 0 30s:4 004 %4 014 3 414 3 Stet 1529 IW30

$ 8783 I t00s 2 0547 Its he 0 41560 00lW68 Pu t 76s l 42 0s6 3051 8 50938 tell 1 9700 2 0529 Wa Nt 0 44470 001063 7174 717 4 48 083 19507 1064 7

$NSO t614 2 0s72 at Me 9 67461 841606) 473 8 4739 46040 8089.5 SNS6 8806 { #20 s

2 0415 Me WG Steles e016077 633 3 GH3

  1. 037 lest 4 19064 0032 3 98M 2 WSt m.

Sum St4m ml ml W on Imu iWu Wu ium ens m.t u

Os 4 8 57702 4415097 160 3 HC3 52 029 1086 3 20042 1906 8 9747. 0248 Os8

'0193 58 061$10 0016057 3775 127 5 68 0?6 19850 8000 0 10:3 l tlll,

St

~ IBA SMS68 0016403 496 8 4968 960:2 Me33 1909 9

$3079 s tesc ; t0!M

  1. 8 We 8 00813 0 016099 4HI Get 90 018 1942 7 1100 0 l115 10B70 2 0006 We et t S M313 0 016106 481 3 441 3 00 014 IW16 8101 4 162 Sett

.'0033 94 Os t 9 79t47 00:l:11 414 3 414 3 62 010 1980 5 1102 5 let 0797 9080 tes 05 0 8 ko72 0 016117 M20 M29 6e 006 1939 3 1103 3 De 8704 tt?8 88 38 0 0B3%

00i61H 370 9 370 9 N 00J 843sJ lies 2 50 A6t ?, 3876 084

}

NO9 0 04974 0 016130 350 4 Sto 4 I

nu imH 40an7 un un

67. tot 1037 I 11051 iit7tS I 8530 1 9875 ma.

ant iint mui. 44 sm I

tes 4 8 etMS 9 016184 313 1 313 I il 992 10M 8 Ilth 8 I h6 43 0 9775 90sJ f

l# 8 IINF 0016tH 79614 79618 F3 M 30H 6 ll07 6 it 407 4778 WPS 95 8 000 0 IJ030 004168 20028 MlJO PlM 30824 slW S i t,437

. Alm lAN WA 110 0

??50 0 916145 537

55J9 77 98 Sit e 80 3 471 tel 9677 198 3 112 4 3605 0916173 837
5135 MW 4302 Of Iti I

9 182A Hee 4/99 0 016100 til

'3827 I 97 079 8 14 W

0 ft4A 1t8 0

$133 9 016188 SM

. 26 8%

97 4279 11 S7{i

.7 b6 13 tila 196 0 4006 80161 % 28420

'8421 97 GNO i

2i 618. J[iis.

6

, ftM ING~

l H27 0 016704 3325 303M 97 3825 6 till6

!19046 LMS3 43M tua 172 8 1 7891 0 014713 897 94 192 96 06 ten S 1834 4 lleet 7613 0293 WlJ IM S 128

. 090:

SO4723 88373 19324 1 96 33 till I llitt 7583 ONP 1964 thi 0 016 ?79 434 08 L7409 5

2

.Il{ia Il I i ilMt Mit

$702 1984

$NG

!I960 004238 Mlet 18547 N

IA I tl303.. F374 Allt 154 198 0

. L27M 0 016747 19737 857J3 07 96 10100

'187 0 ll1817 7796 3 3117 1N0

. 447 0

. '24%

'4717

$416766 letW

$4966 etM

$448 7 lit 6 ti1968

??)7 8 9064 1Ra th e Lies?

084274 ISS SS 13537 408 96 6016 4 IN3 i ntle 70H 4900 128 004MS M740 M241 Ma tt 3017 5 lit t I I:W4 7140 0074 9804 H80 lata

<MB

$34204 SMW 17918 19 96 80l$ 2, 128 )

l ll 58 4006.3NI SMS tett 7 W97 Itell?tt M

P300 47 5 014 0 122 0 i i 005 10010 14095 900 0 tel t -

10s ti iS43c3 11 Il 1827 eM 412 9 377 8 t

i Ltie 35057 tee les 8 aIMP l 10163:2 il r4 Il 76 Il 96 Il 7

!!)$

i LEl M10 See8 988 0 3 Ni3 00lH22 906 68 06 19 13 M S

IM S i

We 4 761 tea HSA 4bati 444D2 lel40 let it in 2 J

.375 3 16'117 le 3 72 i tela 199 0 S PIN 0014W3 7M 07

' IF #

2 1851 file 496 4646 900 4 til t 390u Ottust 7 66 68 1 16 0

'874 1

'883 MH IStA Ins t 4 802b 0016M3 to

$2

..'th 8

177 7

'716

, 6300 tha ins t 4 3004 0 016374 M

57 IJllt 6

IN6

'M8 1 6318 150 tese 43197 441HS4 02 2 43 l&E 4 IIM 4 28 SAM 6 Af6 24 tess 4 7414 8016MS 77J7 77M Iff96 lett? 11302 023t3 16tM Set?

Me mit 4t?22 004406 MW Mt?

IM M 8001 0 lial t tel 18188 Jeet toe s

$ 7174 0016417 1830 70 77 13t M 000 8 191 8 177 t4042 i

906 8

$4623 4 0164?8 4767 0748 633 97 ful 182 6 sal 95 8

$ 7223 9004440 M 70 4400 835 97 0074 1834 SJe48

'ANI.

USS S tP'4 0 016458 6704 67 N 83797 006 7 IlW 2

'Dett 124 till 6 77 %

40164H M 41 99 45

$3098 006 4 1135 0 4758 lita 184 0 6MM Stikle MM M 97 348 98 0880 1835 0 1637 300s "

i 1M4 Htt 4 0690 004466 54 H

$461 H3M 9026 lIM 6 Ottte M66 ISBN til8 litt FJWO telWS8 &lJ4 NJ6 letW Gel d sl37 4

$Jte 4646 14847 4384

  • Ise sesen sanee av ameessene

%4 l

e

{

~

t en Tettle 1. Satutsted Sleem: Temperature Totale-Coarthenaed Att Prens 30echt Wolvme Inthaipy (agrapy leme 10 Set Set Sal Sal.

Sal Sat Sal temp fahr SS mi iseme Eve 0 Wapor te0we lose Water teIce feet W40er fahr 1

0 se esa og he h eg h a s,

le sa I

300 0 73110 Il084510 9021 50 77 H000 900 7 1138 7 0 7638 1440 14111 test Msg 7 050 ll$16527 40172 48609 890 0:

900 0 IIM O 02462 ISell t0075 182 8 tes t 703 l0165M 46 237 46789 157 01 98 8 IIM O 07ete i ins 0 tes t 808 8 M8 i198654 7 as N3 de 400 IM 02 006 6 !!40 5 027M l 7 alse let 8 900 0 947 i i4644H 42 WI 476N 396 03 005 3 1841 3 01766 33713 L 869 198 4 telt 9 380 0 088572 # tst 4 957 150 04 l 1142 8 0247 13140 17934 IIII 10*.

9 787 01650S 337 State 100 05 8 1142 9 0 2018 ISN2 1 7900 192 8 j

Its t 30 168 16998 000 3'024 162 &S 16 1143 7 Ofts8 19037 8.70$5 Its e g

808 0 le MS IMil MS N 364 M4 06 WO4 lide 4 02079 8 4952 8 rust N60 198 0

!!abe 18674 34 tb4 - 3e 970 H&Se 9703 18e1 02910 84m8 S Hg8 100 4

' 310 0 ll.SM 9 014537 flM2 33639 MGM 977.9 IH60 0 7080 leM 3 7764 386 sea t 12 517 seleM4 a lM 31151

]?t il 9754 16475 030D5 3 497 3 7000

  1. st N89 33 MS 3 0l # 91 N 067 28 879 a75 84 0728 4849 0 S H58 1 4578 17637 N80 212 8 H M6 0 016719 3 782
  1. 6 799 10017 970 3 1150 5 0 3123 { 4s47 ! ?t66 felt feet H MI 8 014747 34 078 M 004 804JG

$57.0 lilla 0J181 3 432J 4 7tOS M4 3563 17106 g011775 23 331 140 ISS23 9657 till4 03NI I 4701 3 7447 til0 37e 0 18 5 %

50160D5 71 129 195 39227 062 6 Blu t 0320 leest 1.7300 Fis t 230 0 Se tti 9 016634 N OH 0?3 996JI 900 0 llM 3 43M9 I M61 1 7370 Not

  1. 32 8 fl 567 3016t54 [6 701 18 710 30035 9574 tilta SM17 lasa2 17M0 site alle 23 214 4046095 s7AS4 17471 30440 the $ 1110 1 0J476 8J725 1 7201 33s 4 300 0 M TBS 841H76 M 904 M 271 letal 952 1 llel 0 3533 13000 17 42 300 0 Bes e M B78 0 016950 15 743 IlMO 312 SO 989 5 110 0 0 Me1 4 3894 8 7005 384 0 See e 36 796 0 016900 le 264 84 781
  1. 16 56 946 8 11634 0 Het 1J379 8 70?8 300 0 352 8 30 883 0 017022 13 350 13 375 370 67 Sea l lied ?

0 3706 13M6 18977 att e

  1. 88 33 MI 0 417066 11570 8298 R449 941 4 1846 1 SJ7H IJIH 14917 alte SIBI N 827 00170Bt Il fel Il 762 370 76 SN5 II674 0 H!t iJo83 1406*

Seet 388 0 37 GH 0 017123 II 075 II Os7 332 83 935 9 lies 7 0 3876 IJt33 14000 Sts 8 318 0 4 900 0 017:57 MJSs 30 375 FM 91 033 8 1840 G M32 82023 167M 305 m3 43249 0 017193 O ut 9 755 760 99 930 3 1871 3 SJtB7 82715 14702 f72 0 till 46147 0 417220 1862

$J00 MS89 9274 1872.5 0 4043 IJ007 lette

  1. 16 8 Net 49 200 0 *l7764 0 077 Gud Mll?

9Ni 1173 8 0 4000 3t01 IMS) 3N8 364 0

$2 414 0 01730 IMO 1453 l'13 3 921 1 3 75 0 0 4154 2396 16Ss4

  1. se 300 0

$5 795 00l?M M14 6007

.974 914 8 l l4 2 0 4208 2700 lMle e

Stf t M 350 0 01730 2301 2875

.Gil 915 9 I 77 4 04M3 JIt6 s 6aat t

tell 63 0H 0 01741 60Mt 6 H33 265 6 913 0 3 786 0 4317 IJO6? 84000 0

f 8

67 005

-00lHS 64443 6 4650

.99 7 910 0 179 7 4372 11979 16351 NEI 73 0 907 0 IN G 4476 $1077 1 6303 80s t 0

ti llt 0 01789 6 09 %

6 1130 13 0 79 953 0 01757 $4M6 64747

.'70 0 90s0 192 0 4479 38776 16M6 308 4 8

Men 0 01753 5 7655 5700 396 8 08004 0236l 6 8673 &lget

.02 8 903 0 alWI

$4SH 8 1676 34309 313 8 I

  1. NL3 007.0 110s l 04t06 1.1676 14142 N64 l

l Not 0964 GN706 4 0961 4etM sted 0 lies:

Ona0 1.14n lail6 N9t t

304 4 Os 4M l i61770 46a18 euls 291 6 16 8806 7 0 4092 19378 30073 pse

$10 0 IW 7sl liel??4 4 4030 4 4708 3N 7 5 11871 0 474% 18N0 18075 370 8 SBIA leb t07 ll$1779 4 8708 4 1966 NFS Wla llN 2 g4700 51183 ISWI Nat NGO 181 020 I t01703 3 9801 300H 3671 Sell 8800 1 e4060 SJOB6 83086 Sitt

- ~

' Seet 187 987 0 01707 : Pett

.17070 311J l l70 8 lap t 0 4907 leges 14087 ass 8 Ose 8 SN 430 0 01797

.ll0M

.leell Dill 175 5 Isl 0 449H I N04 130st tes t See 9 131 943 0 01797

.lJ423

.leMe ist 7

. lT2 2 191 I 83006 lette 14006 Set 8 I4078

.l2603 03 9 088 9 192 7 930be 14705 14763 Ria N10 330 838 00181

.M Sitte

.OSI N6S 185 6 s$110 ISHI 13728 NSA 266 M6474 00lN6.

300 0 853 010 0 01011 fest? fM73 3

067 3 81984 0 5161 1 517 13470 as08

' ente 5

090 6 182 7 0 5717 letM 1907

  1. s8

. 0007 Sts 8 940 103 0 01016

'Mll

.'6073 8

Ott l IIM S OSM) $43N l HOS 308 8 SIBA SMll?

0 01634

.'WSI let ill telui 350 0 372 0 177 M4 0 01076.

$433 0

SSl 4 1196 7 03314 1 9780 3DM4 971 0 2 4279

  1. 4462 J

080 8 11974 GSNS 30 48 talla pet 300t 196 ??t 0 918 % :'3170 2 3353 334 084 S 11W 0 0 Wll l 0057 IWF3 30s 0 30s e 305 798 0 01047.' file 223N MP9 080 8 litt 7 0WM 9 9064 1 M37 364 8 Wee fil270 0010a7

'llM
'8311 2

0172 91993 0 5Sl4 0 9874 5397 301 8 9 04853 t ests ;' OMS 5

g3_3 4 1l99 9

$537 St'84 SI)?

Isle Nie 72b bl6 306 0 PM 193 00:0$0 13791 it477 4

scu t 1200 4 S teif 0 9606 Aall N68 40B 0 JSt 0918p leans '

$630 375 3 075 9 1701 0 G W67 0 9007 6774 408 8 408 0 PM 901610 l itet 7827 379 4 972 0 4381 5 4 6717 095 0 S7M 40s e 480 8 70 630 01075 0877

.3064 W30 slet 1701 9 G SP46 0 9479

$19b EIS O ll62 14 2 1797 4 S tel6 0 93s1 6167 elle 493 8 DW Stt ills 7 D40 308 1 s

82024 0 9006 0 9253

.Alle slet 496 8 617 01087 IHW

, tall N23 est9 95 0 0100s 3 4008 lsee?

306' t 2 1793 I I Itell 9 9346 W

40B4 408 0 2J91 0 01900 $450s l494 401.l i 1703 5 ille64 s0077 30st est

<l00 4 agge 40s 4884 461 0 01986 3 591 g 3707

  1. S

0 $203 7 Sie 361 00 0 01913 1 4 3706 1 32179 430:1 793 9 1308 0 ii0063 00W3 ese ett h603 0 01019 the007 IJ0006 484 6 300 7 130sJ i 6182 Omit Im 415 8 400 0 301 W 0 01976

,19763 21687 419 0 30% 4 18984 0 6161 g0779 iGN 400 4 l

eas t 39796 0 01933 18474 10006 473 6 Mil 830s 4 0 6710 0 00s) latu ess e 400 0 454 00 0 09940 l itFlf 17:57 4700 176 7 8304 7 067M 00M7 140ll 400 4 tite 7 in7e4 i 77 I ell 772 3 ises s

$630s 0 8478 lent mis

$ situ SSint l$8e}2 I

est 43 14 e7s n7s utsa 06n6 Sain leni eest est esO n es

+

w

--+=+

v

,,,.--------=--,---.-w,--

m y-e,

w.y

.--n-------*-,e

-t

.-w---

-w

4 E

Table 1. Saturated Steam: Temtsef ature Table-continered lethalp[$st Abs Pstst 30etdec telume (ntrapy lemp lb Der

$41

$et Sal.

$al

$st Temp fehr

$4 In litet leap Wapor Latet leap Wapoe Istet Evap Vapor Fahr t

9 o,

ela

'8 he has h g s,

Sta la I

4006 4M 07 00!Mt 0 97463 09904 asl3 7632 8088 SMOS M?tt 14708 400 0 Set 406 M 0019M StM00 095HF es4 8 758 6 Ute ?

0 6464 85/13 14667 4M S 400 90s t) 0 01976 0 09605 0 91862 4W7 Pbs 0 3704 6 0 6502 00177.4 4629 408 8 4724 SM 67 0 01964 046M5 0 08329 auf Mt3 170s g SM51 88047 1407 4720 4M4 tel18 4 01982 08f980 Stette ett 9 M45 1204J

$#99 02996 8 4606 ella 408 0 904 15

$0f000 0 79784 04.717 464 5 739 6 I?ts i SOMS 8 7071 I S10 408 9 40s 4 S07 01 3 03004 0 70413 07527 4HI FM 7 8038 SMt6 D NS$ 14801 4688 408 0 Sie 10 17 073MJ & PMSS 47I8 779 7 1203 5 0 6745 0 H00 44ees 40s e 40!O 633 03 M 0 707 % 0 U870 478 5, 774 6 1703 1 0Ut3 0 Mia 54e07 482 O WG 696 61 0070M 94W65 0701III 4032 7395 1202 7 84M2 4 7628 8 4370 4088 WOS 600 N 0 030s3 OgHet 067492 4079 714 3 1202 2 00000 0 74s3 5 4333 000 s 8

00s t 705 78 0070$1 to?tM 0 64991 492 7 709 0 1201 7 MM $ 7357 1 4796 Sta t 800 8 73140 0 07067 0 60530 0 62592 475 703 7 1201 I 4067 0 U18 3.4718 000 9 i

512 8 757 U

$37077 0 Milt ' 860209 902 3 0061 Ift:$

ISIS OP I 4721 612 0 470m 87.105 g

=0 7m M Sami enew tuon.

suJ n?P nal 9 Ima me Ont O!? n Gen! OsMM 95mM in0 afa ino Gnn SMn lain met 874 0 Osl os 902 02 0 51814 05M16 516 9 ~ 675 5 197J 7731 0 6839 8 4070 490 0 6013 198 2 0 7182 0 6976 1 4108 474 8 070 0 070 31 8 02117 0 49043 0 619 %

124 8 832 8 000 M 0 02173 0 47947 0 50070 526 0 Etl 186 4 7700 06757 3 4012 532 0 Sal t 033 87 0021M 0 4 l23 0 48257 531 7

  1. 36 1954 7329 SH6% IJsl2 636 0 000 0 9079 0 07146 044M7 0 46513 SMS M75 !!ts 3 0 7370 04577 1 3954 580 0 One 8 093 N 0 02157 04M77 04404 ts! 8 MI3 lit 31 0 7427 0 6489 1 3915 tes e M60 8079 49 0 02169 0410a8 0 41217 544 9 6a5 0 liti t

$ 7476 O M00 1576 ts4 0 882 0 1962 69 0 02:42 0 39479 0 41660 552 0 638 5 1190 6 0 75?S 8 6311 IJ837 M28 008 3 3007Jb5 0028M 9 37906 0 40160

$$7J E120 11 # 2 47575 0 6222 IJ797 804J 000 0 1133 30 0 02707 G M507 SJ8714 962 4 475 3 1187 7 0 7675 06137 1 3757 968 0 864 8

' 3170 10 0 02221 0 36099 0 37320 M76 410 5 1106 1 0 7674 0 6081 IJ716 808 8 000 0

!?07 4 0 02235 C H741 0 3H7%

H29 till llM S

&M25 ESMO IJ675 050 0 0720 1246 M 8022st 03NM 4 34678 M83

  1. 45 1167 7 8 7775 050$9 INM 872 0 010 8 8705 74 002M4 SJil62 03MM 963 7 307J 8100 9 0 7076 ESM6 IJbt?

095 8

.. J00 8 13M 17

$07279 8 79937 0 32216

$39 I let 9 1179 0 0 7076 15673 3JH0 900 0 m

0080 IM77 0 82295 0 ?8713 0 31048 594 6 3024 l176 9 079N 0 6500 13607 004 8 000 0 5410 0 0 82311 0 27608 019919 0001

$74 7 IINS 9 7978 0 6485 IJe64 000 8 002 8 14533 002N3 026499 020827 005 7 006 8 18726 40030 4 5390 $ M70 001 0 Seta 1897A 002M5 02 San SJ7770 Sit e 560 4 II?0J 6 81182 45293 IJ375 00s 4 I

WI 15432 0 07,,,

02,4,3,s,.4026,7,47

$60,,4 4171 1167 7 S el,M 0.196 95 IJ130 Set t 1,89 7 00, 0

0, 7

69 M

,,6, 3 08,7 9,

8 J,0.

.9 600 0 1617J

$ 07402 0223M 0 24796 620 8 633 6 1162 4 0 8740 04M7 IJ2M 000 8 012 9 16468 0 074.*2 0 71442 0 73065 GM8 624 7 IIH5 0 0208 0 4096 IJigo Ott a 816 4 17359 0 02444 020$16 0 22960 M08 Sit e late s 40MO 04794 IJ141 086 8 Of0 8 17069 0024M 0 l9615 4 22001 M69 906J 1153 7 0 0003 0 4009 1 207 ONS j

$74 9 1839 0 0 02475 0 18737 0 tIFM M31 496 6 liet 8

$$a68 04503 1 3048 674 0 470 8 1992 4 00Mia 4 17890 02035 669 5 406 7 8846 8 0 0514 04474 IJ004 SNS sta IMFC 00MM 0 17044 019563 065 9 476 4 1142 2 0 0578 04M4 IJtM Dit Sale 3002 4 00hu $16?M 188792 672 4 467 IIM I LE20 04FH IJ079 Gatt 300 0 7059 9 0 07!15 0 16477 0,0021 0791 4646 1932 7 IM 04tM IJ023 080 8 L

ess e 2110 3 00Mn tietas 0 TM9

$559 de3 3 3129 0 l l6746 0 4016 IJM1 essa esel

?!?8 I 90Mit G IM76 0,65 M 092 9 4381 1174 0 i LWO6 03093 latte 488 0 est e 2nt?

s0M91 0 13174 0 l6016 100 0 410 7 1110 7 i tN66 08747 INM 0824 Ste t 2308 7 0827M 0 1238) 0 15115 M74 4h? 1813.1 80HI SJ687 IJS67 0063

~

008 8 7365 7 0 07300 011M3 9 14431 714 9 321 1107 0 l406s N95 EM07 !)ett 800 9 Sea t 7438 1 0 07011 0 10647 sl3757 772 9

$U P 1800 6 3

3MI 12426 Gas t 540 pate l 0 07850 ele??9 013007 731 5 521 19835

$91N 0 IJM7 008 0 6724 Ple64 00 Mil Settle 017sM N02 3s57 3005 9 5 0212 J0M $J766 472 0 636 8 3W68 8 02979 0N798 O !!700 M92 af05 18774 4 0787 0J007 $JIF9 636 3 000 0 2700 6 0 83037 0 00000 0 11117 fn85 3101 1050 5 StMS 82770 IJ006 000 8 Sea s 27821 0 03114 007Mt 09040 768 2 390 7 19t8 4 0 0847 42617 l 190s tes t F0574 00!?3e GN695 0 06799 778 8 282 8087 0 Gebl5 02337 1 0 72 000 0 008 0 l

Fee ett e 002 9 79M S 3 01313 0 05797 0 00110 MOS ps3 3 10334 SEM 9 2110 8.' HI 006 8 30134 00NS5 0 08916 0 5373 med 288 10lPJ 0 9749 0 8048 l

telt 100 0 30M 3 00M62 0 03057 0 07519 0??4 1727 0057 8 0001 01490 1.1300 300 0 307 0 3:355 00M 74 0 03173 00H97 s35 0 ka7 079 7 14006 GIMG l 175 303 0 see s 31772 S telCf 0 0?!92 0 06300

$$42 192 0 966 7 SlH 0 0076 s ite6 90s 8 198 0 3190 3 0 04427 0 0130s 0 05730 073 0 614 SM4 5 79 0 0677 1 9536 308 8 M6 07*

32061 0 05078 0 00000 0 05078 906 0 00 906 0 A612 00000 lett!

306 47'

' Cast 6al temper 31irrt 4

.--m.-

--..e.-..,-,,,-m,y__

.,_--y

.,-.-.-._m--__y

~

i i

Tat.le 2: Saturated Steam: Pre.sure Tetrie U

i samfic 4ene inta.ipy

Entrop, A.s P.oess temp S

Set.

b.at.

S 51 imd Esop Wo.or b.et S

S Abs Press b.et.

.e d Es.op W.et iW5. In.

fahr ed f.ep spor pr irl. in.

t v.

's.

  • i.

h fL. !)2 l", '

g gg

  • .g P

g s

[*m.t.

i >.i n mn i.n ii

'i n

=

wei m,.5 o

,'i g

.u m.

n m

o

.=

ff m.

ut.iM,

"'st da li M.t "Ri it'.4 12i 3

??

tin a

ius.

aim m

om lt!it.E.il

!!l m.

x en 2 o u

1.U Tlu!!

"Eh 2 min 1

onI,

' W

>1 in,.

u emm

uni m.

..n

.au m

m.

.==

== mm E.

m,.n. wn.

n,.o..i n

mi nun n

im, ina m.

u n.

==

n um ims mn onu n.o,

.n in.

ins

==

.mn=

Eni

. n.u. tim ti.=

.:n, m.

.m.

,u n,

imu 1,n.i I.

.m.

n

.m uiu u

. im.

.l=e=

um on

.un om im.

m.

==

ui.nn.

n s.n, a

i.ui um mu im um mu

=

mm

.mn.

u.in u..n mi un mn

.u i co.

um i n.s.,

n

=n mu

..o.

un, m

n o.

n.m

.u n.

m m.i l.n.u 1,.n.n m.

.i.n

.n imi

.m im i

.u m

m

.a i n u.m.

m m

i wa,

.im.

=

o m.

i..,

i

=.n i.m.s mu

.o.

nin m

.uu imi i.m..

mn

.om u.m. w.

=>

m m.i im.

.u.

i mu

.m m.i.m,r u.n ma wa un, m.,

n

. Iso.

inn lm, m.

m

.m..,

m wn u

u Sali3 ik..u.

3.J 3,M3

.1 13 30 3.

39 5 it 7 9

i

.i.

n.im.

,ran

=

mi

.n n:

.i..

ou m,sn m.

.,m im.n r a.n in ma m.

un.

n.

.n ya

.m.

L a,.

n.im n

s n.

sm o.m un imi im.

.n. u.i m.m.

.u.n.

m

=>

im o m.

m

==

mom Iini, N.!!

m m

on o

M.w

.l it i;,.l

'l'il 3 2 5:

i

-.,m o..n

.n,.

iS a.

n

.en.i ml uu, i t.n mo o,

m r

mo n.M 121.m.$ Sn..,

i om o

1 2

22 2 42.

10 4.

nl a135 A

.E!

ilHi l!!ml!!=IE:

E!

l"l1 lm.!

M IunE.10 l.W

.Ei.

.u u n.u i... nm, un o

mn

. ms.

Aon.

wn, un mi n.

u.

,un m.

f

.n.u. mn.!.!!!0 iuml!! !.!!!!!

nii.

imi, l n !!n!

2 U

.mn nm nu un enn mn un.mo

.e n.

m.

m i..i

.u.

m m.n

=

.nu uo

.a enn im.

nu mm eum.um emu a

nn mu no, Im.

u.m.,

m.

m.

n.,

.nn em wu uni no, m.u, m.

m.

m.

n.

.nn

n.. n..,

i

. n,.

1.m.u..

.uws

.mn m.

m, nn m

unn,.

un m,

m, n.

.n u.u m.

un.

c m.

E, m

nu,

.a

.m.

.u.n.n

.m.

.m.,

m.

nu

.ne u..

.E.i.

mu

.n.

.m.m.

m,i u

nu t

mu

.u.

u,.

m.

un un.

lmi nn uo nn um s.

Lin u

.mn

=>

a au.

==

u.m.

a

.mu a

m

.n.

.u nu Inn

.u.

..w m.

.n.

.r u,.

um

==

nu eum u,

%m E.

an

.t m, mn eu.

u unn m.

i,n.

.n.

u sn my min lum n.n. twa, i

m..,

o m.s i

su

. m,

.isn Co.

no u

n.,i

.u.m w

om.

sm uun.nn m.,

4..

7 ens u.

inu un m s.

.u.

.mm

.mn.

m:

4..

v.

uu i

=>

m.in n

un uno iW:

m!!

Ina lEijl is!!

Mi s1 ilt 3

IM lM

!=l mu i

.m.

xu 1l11 "m!! u"It! $2 1

till "t"?

I:Ri El

=!

E!!

lit!

12 m

21) til "th

'li.",i E

E:

En

  1. i!

llIn!! ! 1:

M i

'.Hl Inn E

ilin l:!!!

12.!"".

1!!!

"tM " ti.l ".M i

itt.,

IE.m 11

M

[in".

En.

mn u

un u

n "oav i m.

o u..

u le m

.m n.

.m mn M..

.um. l u.n an.,

l.i lin.

En

. n.

l.

I=n

n.

..m n

.&n mu un.

l.m.

i m

m u.

n.on.

. i.n 4o, m,

u.ni m

.n Eil m.s,

.n

.u.n

.m i.e

.m.n n

.mu ti.=

=n w

.m im E

.m..

m.

n.e s mn

.n l m.

=u

.o mn

==

n.

u.mu.

su u.

un l

!un unu mi i

. n.

mr

.o

.mi m.

n m.

m,

=

m

=

.r U

  • cutus p=w, e

,..------,-.-,.r.

-.---e---,--.-.--------e.---.,,.-m-v-----m.<

-=vw-,.

,e--.

m..,.---

e-w-----w--,,, - ---w w

w ly#.T!c*is c /s p.po H = 1/ O-k) 3Ci=3.*/ x 10 I' 3q p g, g,, - A t ops =1tN=lu Ao/A 2 (d = 20/gI 2

w=g-.s, Ao=.6023 x 10 , A=ato. ic weight A tt) = V E '$e Vn:=6CI:/d2 n = v/(1+d) 2(x) = 2o e **

6 g, y f g3,7xiot o)

L(1/n)" I"I"}#F i- (E p)/Ap

~At 2(t)=2o e

'" '# (D- 01 g.14 =In (2)/A 1" / 4 I $~P /AP P

I CP=(CPbase} (

} ( ^}

9 otyg + xvfg) = yVg p = f L y 2 (D29c) g

/

1 in = 2.54 ca '

P.c= VDA/p

~

1 gal = 3.785 liters Q=P.CP at gP. g h pv 2 I kg = 2.205 lb D 29c W = PA /A f = 64/Re T = T T /(T +T }

b 30 seer N) * '4'l T**~

an.

9 N

9

..,,-,,,,-..--.,,,,._.,.._,,,n-,,,,.,n

,-e

, -,,,.,,n-e.,----e-.gr

,-w,,

..,n,

_,,w_-,,,,,,,,..,,,,,,.m-,.,m,_.-mw.+-e----7,,.

i M

W*

ANSWERS - Theory of Nuclear Power Plant Operations, i

Fluids and Thermodynamics 5.01 a.

Less (0.5) b.

More (0.5) c.

More (0.5)

Ref.:

Reactor Physics Review, pgs. 150 & 160 5.02 a.

Latent Heat of Vaporization - The thermal energy which must be added to a substance to change its state from saturated liquid to saturated vapor.

(This heat must also be removed from a substance to change its state from saturated vapor back to saturated liquid.)

(1.0) b.

Critical Point (K) - The critical point represents the highest temperature (critical temperature) and pressure (critical pressure) at which a gas and liquid can exist in equilibrium as distinguishable phases.

(1.0)

... c.

Saturated Liquid - The state of a substance wherein (given a constant pressure):

Any further addition of thermal energy in the form of i

a heat will result in vaporization (boiling) of.the substance at a constant temperature (saturation temperature) until all of the substance is evaporated.

(0,5) augJ/,.

(/.b)

OR fo /4 ~

,~s.

Any further removal of thermal energy in the form of heat will result in lowering the temperature of the substance.

(9:#)

J Note:

Either a further addition or removal will be accepted for full credit.

Ref. :

Reactor Physics Review, Thermodynamics, p. 44 i

5.03 a.

Increasing the bundle mass flow rate also causes critical power to increase.

The higher mass flow rate provides a more efficient heat transfer mechanism.

Therefore, a greater coolant enthalpy increase is required to reach saturation conditions.

Thus, for the same bundle power conditions, the margin to OTB.has increased.

(1.0) l

i b.

An event that increases bundle inlet subcooling (such as removing a feedwater heater from service) causes an increase in critical power.

For a given flow rate, a greater coolant enthalpy rise is required to reach saturation conditions.

Therefore, the bundle power required to produce critical quality /0TB is also increased.

(1.0) c.

Increasing bundle pressure, in the normal reactor operating pressure range, causes critical power to decrease.

Consulting the steam tables, at high pressure (>800 psia), the latent heat of vaporization (hf ) decreases as pressure is increased.

Therefore, 9

the bundle power required to reach OTB also decreases as pressure increases.

(1.0)

Note:

(0.25) pts for direction either increase or decrease.

(0.75) pts for explanation.

Ref.:

Core Thermal Hydraulics, pgs. 56 & 58 5.04 No. The production rate is directly proportional to

~ power level, but removal rate is proportional to xenon concentration and it contains a power dependent term, thermal neutron flux.

Since flux is directly proportional to power level, the burnout term becomes more significant.

This results in an equilibrium xenon value which is higher than the original value, but not twice as high.

This is demonstrated in Figure 70 which is shown here.

(2.0)

Ref.:

Reactor Physics Review, p. 216 5.05 As fuel temperature is increased (due to Control Rod Pull) more voiding is created. Therefore, more back pressure which would mean less flow (1.0).

However, because of core orificing back pressure is less significant and flow through the bundle is almost the same (1.0).

(2.0)

Ref.:

Core Thermal Hydraulics, pgs. 20 & 22 5.06 a.

Moderator Temperature Effects on Rod Worth.

First, it must be realized that regardless of its dimensions, a control rod is still localized poison.

The neutrons which interact with a control rod, travelled a measurable distance to reach the control rod.

It stands to reason that the further a neutron travels while slowing and while thermal, the better the chances of interacting with a control rod. As moderator temperature increases during reactor heatup, the density decreases. This decreased density will yield t

longer slowing down lengths, and longer thermal l

2

diffusion length.

Hence, thermal neutrons from further within a fuel bundle will visit a control blade.

Rod worth will increase as the reactor heats up to operating temperatures around 545*F.

(1.0) b.

Void Effects on Rod Worth.

Recall from the discussion on voids and neutron flux, that a small increase in void fraction made a large change in moderator density.

It would seem that this effect would follow the guidelines of a temperature change. However, as with the previous discussions, void effects are much more pronounced. The key is that the increased slowing down and thermal diffusion lengths will result in a considerable increase in the average energy of the neutron flux. Thus, more fast and epithermal neutrons will result. The fast nonleakage probability decreases, and the resonances of U-238 and Pu-240 will have a greater to strip the epithermal neutrons from the generation.

The net effect is lower or decreased thermal flux. While decreased thermal flux will cause a decrease in power, it will also result in a decreased worth of the control rods.

Remember, if you have no

~

~

thermal neutrons, you cannot turn power in a reactor by the use of control rods.

In case of voids and control rods, power is turned because of the decrease in thermal neutrons available to cause thermal fission.

(1.0)

Ref.:

Reactor Physics Review, p. 190 5.07 a.

The process computer compares the APLHGR in a node to the MAPLHGR limit for the node in a ratio called MAPRAT.

MAPRAT _ APLHGR MAPLHGR limit As long as the largest MAPRAT is less than one, we are assured that we have not exceeded this thermal limit.

Therefore, the MAPRAT as stated is not conservative.

(0.75).

b.

1.

F (0.25) 2.

F (0.25) 3.

T (0.25)

Ref.:

Core Thermal Hydraulics, pgs. 46 & 50

~

5.08 a.

Voids 1 x 10 3 Ak/k (0.5)

Temperature 1 x 10,4 Ak/k (0.5)

Doppler 1 x 10 5 Ak/k (0.5) 3

b.

Less negative (0.5)

Less negative

,(0.5)

More negative (0.5)

Ref.:

Reactor Theory, p.168 5.09 400*F sat. pressure = 247.26 psia 600 psig = 614.7 psia: sat. temperature = 488.7*F Fluid is subcooled (0.5) by 88.7*F (0,5)

Partial credit given if 14.7 is forgotten.

(1.0)

Ref.: Thermodynamics / Steam Tables 5.10 P = Poe T/T 370 = 50e 120 sec/T T = 59.95 sec.

(1.'0)

... Doubling time =

T

= 41.49 sec (1.0) g Ref.:

Reactor Physics 5.11 a.

Decreases mainly due to samarium build-in (0.5) b.

Increases mainly due to gadolinia burnout.

(May also give credit for Pu-239 build-in)

(0.5) c.

Decrease due to fuel depletion.

(0.5)

Ref.:

Reactor Physics

..5.12 CR (1 - Keff ) = CR (1 - Keff )

2 i

2 2

CR /CR2 = 10 2

CR (1 -'Keff )/CR2 (1 - Keff )

1 i

2 (1 - 0.9)/10 = (1 - Keff )

2 (0.1)/10 = 1 - Keff2

.01 = 1 - Keff2 i

Keff2 = 1 - 0.01 Keff2 = 0.99 (2.0)

Ref.:

Reactor Physics Review, p. 72

+-

i 4

l

5.13 a.

The subcooling of condensate, i.e., the condensed liquid existing ~in the hotwell usually is about 8'F below saturation temperature.

(0.5) b.

Without " Condensate Depression" the condensate pumps would cavitate due to the water at the eye of the pump being at saturation temperature.

(0.5)

Ref.:

Reactor Physics Review END OF SECTION og

,,o e

l l

l l

?_

5

ANSWERS - Plant Design, Control and Instrumentation 6.01 a.

An increase in indicated core flow (0.5)

An increase in affected recirculation loop flow (0.5)

A decrease in generator output (0.5)

A decrease in core plate AP (0.5)'

b.

Will accept either of the answers below for full credit.

(0.5) 1.

During a line break, an intact jet pump will act as a flow restrictor, and limit blowdown, while a broken jet pump will increase the blowdown area.

2.

An intact jet pump acts as a standpipe which prevents water from draining below two thirds core height.

Ref. :

Reactor Vessel and Internals, Chapter 2

~

~

0 + 60 (0.5) 6.02 narrow range-wide range

-150 to +60 (0.5) upset range O to +180 (0.5) shutdown range O to +400 (0.5) fuel zone

-111 to -311 (0.5)

Ref.:

RPU Instrumentation 6.03 a.

1.

If the temperature difference between steamline and pump suction is less than 10.1*F.

(1.0) 2.

If feedwater flow is less than 30%

(1.0) b.

These interlocks activate fifteen seconds after the condition is indicated in order to prevent spurious trips from temporary changes in temperature or feedwater flow.

(0.5)

Ref.:

Recirc., Chapter 5, p. 70 6.04 The containment water volume function is to provide a standby reservoir of water capable of quenching the steam resulting from a loss of coolant accident.

(1.0)

The suppression chamber gas volume, is of sufficient size to accommodate, under accident conditions, all the non-condensable gases within the drywell without exceeding the design pressure capabilities of the primary structure.

(1.0)

Ref.:

Primary Containment, Chapter 48, p. 20 6.05 1.

Normal drain to 14A heater full open.

-(0.5) 2.

Emergency drain valve opens.

(0.5) 3.

15A Extraction Steam Inlet Stop Valve closes.

(0.5) 4.

LP Heater 15A Drain Input from HP heater 16A Normal Drain Valve closes.

(0.5) 5.

LP Heater 15A Input from HP 16B Normal Drain Valve closes.

(0.5) 6.

LP Heater 15A/B/C Extraction Non-Return Check Valve closes.

(0.5)

Ref.:

Feedwater Heaters and Drains, Chapter 30, pgs. 58/60 level (0.5) 60.6 a.

Single Element level, feed flow Three Element steam flow (1.5) b.

Single Element one component (Turbine A-Valve-Turbine B)

(1.0) two components, two TDRFP or Three Element one TDRFP and FRV (1.0)

Ref.:

RWLC, Chapter 31, pgs. 6 & 8 6.07 a.

Rod block (0.5) b.

Half-scram (0.5) c.

Rod Block (0.5) d.

No Reactor Protection System Action (0.5)

Ref.:

APRMs, Chapter 14, p. 104 6.08 1.

If the Reference APRM downscale trip occurs (Setpoint < 30% power) the associated RBM is automaticaT1y bypassed.

(1.0) 2.

If an edge or peripheral control rod is selected, both RBM channels are bypassed automatically.

(1.0)

Ref.:

RBM, Chapter 15, p. 62 6.09 1.

< 75% rod density RPIS failure blocks all rod movement.

(1.0) 2.

> 75% rod density RPIS - N/A (1.0)

~~

Ref.:

RSCS, Chapter 19, pgs. 18 & 19 2

L

6.10 a.

After a scram the CR0 pumps will try to charge all 185 accumulators at once. To prevent " Runout" and pump damage a. series of restricting orifices in the charging line will limit flow to approximately 200 gpm.

(Setpoint not required for full credit)

(1.0)-

b.

After a scram the FCV diverts most of the water to recharge the accumulators.

The FCV does not shut fully, which minimizes water hammer on downstream piping, when the scram is reset.

(0,5)

Ref.: CRD Hydraulics, Chapter 8, pgs. 22 & 24 6.11 Reactivity " Chugging" is when a mass of water with a high sodium penetaborate concentration is periodically cycled in and out of the core.

(0.5)

This results in extreme power oscillations, which could damage fuel.

(0.5)

Ref.:

SBLC, Chapter 10, pgs. 30 & 31 END OF SECTION J

b 3

ANSWERS - Procedures - Normal, Abnormal. Emergency and Radiological Control 7.01 a.

Reactor Vessel shall be verified to be unpressurized.

(0.5) b.

Thermal power less than 1% of rated thermal power.

(0.5) c.

Reactor Coolant Temperature less than 212*F.

(0.5)

Ref.:

LGP 1-1, p. 8 7.02 a.

When 25% of the control rods have been pulled to position 48 (0.5).

Discontinue use of the " Notch Override" switch for control and withdrawals between positions 0 and 12 (0.5)

(1.0) b.

When 50% of the control rods have been pulled to position 48 (0.5).

Discontinue the use of the

~

~

" Notch override" switch between rod position 00 and 24 (0.5) while startup and reactor heatup are in progress (0.5).

(1.5)

Ref.:

LGP 1-1, p. 12 7.03 a.

Time (0.25) b.

Rod Position (0.25) c.

Coolant Temperature (0.25) d.

Reactor Period (0.25)

Ref.:

LGP 1-1, p. 13 7.04 To minimize feedwater nozzle, sparger, and header thermal stress at low flow conditions:

a.

FRV Inlet Stop will be manually throttled b.

Reactor Water Cleanup return flow will be maintained as high as possible.

c.

Feedwater on-off cycles should be eliminated Any two for full credit (2.0)

Re f. :

LGP 1-2, p. 7 7.05 Opening the vacuum breaker at high RPMs imposes excessive loads on the turbine last stage buckets.

(1.0)

Ref. :

Normal Unit Shutdown Procedure l

l

7.06 a.

High Radiation Area - Any area accessible to personnel in which there exists radiation at such levels that a major portion of the body could receive in any one hour a dose in excess of 100 millitem.

(1.0) b.

Radiation Area - Any area accessible to personne1'in which there exists radiation at such levels that a major portion of the body could receive in any one hour a dose in excess of 5 millires (1.0) or in any 5 consecutive days a dose in excess of 100 millirem (1.0).

(2.0)

Ref.:

Radiation Protection Definitions

,7.07 Attempt to close the valve as follows 1.

Cycle the SRV from auto to open and back to auto.

(0.5) 2.

Remove the valve fuses.

(0.5) 3.

Replace the fuse and observe the valve indication to see if the valve closed.

4.

Scram the reactor if the SRV did not close af ter two minutes.

(0.5)

Note:

Part 3 is implied in Part 2 and if not mentioned by the candidate no credit will be lost.

Ref.:

LOA-NB-02, p. 2 7.08 If five or more adjacent rods are not inserted to et least notch position 06 (1.0) or thirty or more rods are not inserted to at least notch position 06 (1.0)

AND Reactor Vessel Water level cannot be maintained above +12.5" (0.5) or Suppression Pool temperature reaches 110'F (0.5).

(3.0)

Ref. :

LOA-N8-09, p. 2 7.09 a.

Trip Main Turbine (0.5) i b.

Close the RCIC Turbine Steam Supply Valve (0.5) c.

Trip the Reactor Feed Pumps (0.5) d.

Close the HPCS injection valve (0.5)

Ref.:

LOA-N8-10, p. 2 7.10 a.

Stator amps less than 21,831 in two minutes (1.0) or stator amps less than 7057 in 3 1/2 minutes (1.0).

(2.0) b.

46 psig Stator Inlet Pressure (1.0) or 81*C Stator-Outlet Temperature (1.0).

(2.0) 2

Ref. :

LOA-GC-01 7.11 a.

Directed by an LGA caution to stay above 57 psig (1.0) b.

Misoperation in the auto mode is confirmed by at least two independent indications (1.0)

Ref.:

LGA-GP 7.12 Boron has not been injected into the RPV to shutdown the reactor (03 AND a.

RPV water level (0.2) below +12.5" (0.2) b.

RPV pressure (0.2) above 1043 psig (0.2) c.

Drywell pressure (0.2) above 1.69 psig (0.2)

(1.5)

Ref.:

LGA 0.1 END OF SECTION i

i 1

4 4

1 l

l 3

.._r....

,__._,_,___.____,_______,__.__.m_._______,.

ANSWERS - Administrative Procedures, Conditions and Limitations 8.01 a.

Limiting Control Rod Pattern - shall be a pattern which results in the core being on a thermal hydraulic limit, i.e., operating on a limiting valve for APLHGR, LHGR or MCPR.

(1.0) b.

Channel check shall be the qualitative assessment of channel behavior dudng operation by observation.

This determination shall include, where possible comparison of the channel indication and/or status with other indications and/or status derived from

~

independent instrument channels measuring the same parameter.

(1.0)

Re f. :

T.S. Definitions 8.02 On backshifts and weekends if an immediate " Temporary System Change" is required, it may be implemented provided the safety evaluation is completed (0.5) and reviewed by two SR0s (0.5) and the change is authorized by the Shif t

- Engineer (0.5). One of the SR0s must have an engineering degree such as the SCRE (0.5).

(2.0)

Ref.:

LAP 240-6, p. 3 8.03 a.

The person making the inspection for verification should be at least as qualified as the person placing the outage.

(1.0) b.

When the second verification involves high radiation conditions, the second verification can be waived.

(1.0)

Ref.:

LAP 900-4

~8.04 Any six for full credit.

1.

Station Manager 2.

Superintendents 3.

Assistant Superintendents 4.

Operating Engineers 5.

Technical Staff Supervisor 6.

Region III Resident Inspectors 7.

Station QA 8.

Station Security (3.0)

Ref.:

LAP 1100-12

8.05 a.

"At the controls" means that the unit operator will be in line-of-sight of the unit front panels, that he is in a position to monitor plant parameters, and that he is in a position to take immediate action, if required.

(2.0) b.

A second licensed operator, normally the center desk operator.

(0.5)

Ref.:

LAP 1600-2 8.06 a.

' Verify the inop rod is separated from all.other inop rods by at least two control cells in all directions.

(1.0) b.

Electrically or mechanically disarm the associated directional control valves.

(1.0) c.

Verify adequate shutdown margin.

(1.0)

Ref.:

T.S., pgs. 3/4 1-1 & 1-3 8.07 a.

Inoperable LPCS (0.5).

Potential for water hammer in discharge piping and possible discharge piping damage

~

(1.0).

(1.5) b.

Inoperable Vacuum Relief System (0.5). Would allow bypassing the suppression pool in case of an accident (1.0).

(1.5)

Ref.:

T.S., pgs. 3/4 5-4, 1-20 & 6-35 and B 3/4 5-1, 1-4 & 6-4 8.08 a.

All primary containment penetrations required to be closed are either:

1.

Capable of being closed by an operable primary containment automatic isolation system or; (0.25) 2.

Closed by at least one manual valve, blind flange, or deactivated automatic valve secured in its closed position.

(0.25) b.

All primary containment equipment hatches are closed and sealed.

(0.5) c.

Each primary containment air lock is operable.

(0.5) d.

The primary containment leakage rates are within limits.

(0.5) e.

The suppression chamber is operable.

(0,5)

+

2

The sealing mechanism associated with each primary f.

containment penetration; e.g., welds, bellows or (0.5) 0-rings, is operable.

Ref.:

LaSalle Technical Specifications Main Steam Line Isolation Valve - Closure 8.09 a.

t The main steam line isolation valve closure trip was provided to limit the amount of fission product The MSIVs release for certain postulated events.

are closed automatically from measured parameters such as high steam flow, high steam line radiation, low reactor water level, high steam tunnel temperature and low steam line pressure. The MSIVs closure scram anticipates the pressure and flux transients which could follow MSIV closure and thereby protects reactor vessel pressure and fuel thermal / hydraulic (1.0)

Safety Limits.

b.

Main Steam Line Radiation - High The main steam line radiation detectors are provided When to detect a cross failure of the fuel cladding.

the high radiation is detected a trip is initiated to reduce the continued failure of fuel cladding.

At the same time the main steam line isolation valves are closed to limit the release of fission products.

The trip setting is high enough above background radiation levels to prevent spurious trips yet low enough to promptly detect gross failures in the fuel No credit was taken for operation of this cladding.

trip in the accident analyses; however, its functional capability at the specified trip setting is required by this specification to enhance the overall reliability (1.0) of the Reactor Protection System.

Turbine Stop Valve - Closure c.

The turbine stop valve closure trip anticipates the pressure, neutron flux, and heat flux increases that With would result from closure of the stop valves.

a trip setting of 5% of valve closure from full open, the resultant increase in heat flux is such that (1.0) adequate thermal margins are maintained.

Ref.:

T.S., B2-11 & 82-12 END OF SECTION 3

-