- 4 August.23, 1988 t . . . _ .

Docket No. 50-412 DISTRIBUTION elElfitJUe- Gray File Mr. J. D. Sieber, Vice President NRC & Local PORs OGC Nuclear Group SVarga EJordan Duquesne Light Cortpany BBoger JPartlow Post Office Box 4 SNorris ACRS(10)

Shippingport, PA 15077 PTam RPichumani MHartzman

Dear Mr. Sieber:

SUBJECT:

BEAVER VALLEY UNIT 2 - DIFFERENTIAL SETTLEMENT OF BURIED PIPES (TAC 62885)

As a result _of our conti.iuing efforts spent on the subject issue, we found that additional infortration is needed. The enclosed request for additional information (RAI) describes our inforwation need to coniplete this action.

The responses ycu submitted on July 8, 1988 and October 26, 1987 are being reviewed.

Please respond within 60 days of receipt of this letter.

The reporting and/or recordkeeping requirernents contained in this letter affect fewer than ten respondents; therefore, OMB clearar,ce is not required under P.t.96-511.

Sincerely, original signed by Peter S. Tam, Project Manager Project Directorate I-4 Division of Reactor Projects I/II

Enclosure:

As stated cc w/ enclosure: See next page LA:PDi p PM:PDI i D:)P -4 BC:EMEB SNOPr7s PTam:cb N- JSt6(ts 08/p/88 LMarsh 08/03/88 08/G/86 08/2t/88

$5E* A2822 ::8:gs, PDC R*l

l

)

=

~

Mr. J. Seiber Beaver Valley Power Station

. Duquesne Light Company Units 1 8 2 i

CC:

Bureau of Radiation Protection Jay E. Silberg, Esquire Pennsylvania Departnent of Environmental :

Shaw, Pittman, Potts and Trowbridge Resources '

2300 N Street, N.W. ATTN: R. Janati Washington, DC 20037 Post Office Box 2063 Harrisburg, Pennsylvania 17120 Kenny Grada, Manager Mayor of the Borrough of Nuclear Safety Shippingport Duquesne Light Company Post Office Box 3 P. O. Box 4 Shippingport, Pennsylvania 15077 Shippingport, Pennsylvania 15077 William Lacey, Manager Ashley C. Schannauer Nuclear Operations Departnent Assistant City Solicitor Post Office Ecx 4 City of Pittsburgh Duquesne Light Company 313 City-County Puilding Shippingport, Pennsylvania 15077 Pittsburgh, Pennsylvania 15219 John A. Lee, Esquire Regional Administrator, Region 1 Duquesne Light Cortpany U.S. Nuclear Regulatory Contr.f ssion One Oxford Centre 475 Allendale Road 301 Grant Street King of Prussia, Pennsylvania 19406 Pittsburgh, Pennsylvania 15279 W.F. Cannichael, Contrissioner Resident Inspector Department of Labor U.S. Nuclear Regulatory Cormission 1800 Washington Street East Post Office Box 181 Charleston, West Virginia 25305 Shippingport, Pennsylvania 15077

. John D. Borrows Director, Pennsylvania Errergency Director, Utilities Departn,ent Management Agency Public Utilities Connission Post Office Box 3321 180 East Broad Street Harrisburg, Pennsylvania 17105-3321 Columbus, Ohio 43266-0573

s.

Request For Additional Information Differential Settlement of Buried Pipes (TAC 62885)

2. a) Provide the d/t (diameter / thickness) ratios for the 30-inch and the 24-inch diameter pipes, b) Provide the basis for the allowable limits.

c) Show that no local buckling of the pipe wall occurs at the locations of the critical section of the SWS pipes where the maximum calculated stress of 49548 psi was determined.

Principal contributor:

Mark Hartzman i

.I 1