Docket No. 50-293
Boston Edison Ccmpany
ATTN: Mr. Ralph G. Bird
.
Senior Vice President - Nuclear
'
Pilgrim Nuclear Power Station
RFD #1 Rocky Hill Road
Plymouth, Massachusetts 02360
Gentlemen:
Subject: Systematic Assessment of Licensee Performance (SALP)
Board Report No. 50-293/87-99
Enclosed for your review, prior to our scheduled meeting of August 25, 1988,
is the SALP Goard Report for Pilgrim Nuc? ear Power Station covering the period
February 1, 1987 through May 15, 1988.
In accordance with NRC policy, I have reviewed the SALP Board Report and
concur with the assigned ratings. Highlights of the report are set forth below:
1.
Category 1 performance rating was assigned to Engineering and
Technical Support which continued strong performance through the
assessment period.
2.
Category 2 ratings were given in the functional areas of Surveillance,
Fire Protection, Security and Safeguards and Assurance of Quality
dCknowledging Boston Edison Company's extensive efforts to upgrade
performance from the previously assigned Category 3 ratings.
3.
Category
3
Improving
rating was
assigned to the Radiological
Controls functional area.
The assignment of the Category 3 improving rating indicates that improvement in
the organization, programs and performance were noted in the Radiological
Controls functional area.
However,
in our view, the results of
these
initiatives were coming to fruition at the close of the assessment period, and
had not yet demonstrated the ability to sustain improved performance.
Additionally, on July 8,
1988, Region I advised you that Pilgrim remains
categorized by NRC Senior Management as. a plant that requires continued close
monitoring and demonstration of programs which establish and
implement
performance improvements.
This was done in conjuction with a letter from the
NRC's Executive Director for Operations to your Chief Executive Officer.
We
recognize the progress demonstrated to date as a result of your extensive
efforts, however, continued vigilance on your part is necessary to achieve and
sustain overall results.
NRC will also continue its increased attention to
your facility.
In this regard, we will conduct an assessment team inspection
l
to further measure the effectiveness and readiness of your management controls,
l
programs and personnel to support safe restart of the facility.
Further, I
plan to shorten the current SALP assessment period to permit an additional
!
opportunity to measure the results of your programs,
i
8808160305 000727
TICIAL RECORD COPY
SALP PILGRIM 87-99 - 0001.0.0
ADOCK 050
93
gI
gDR
o
l
g %
-
,
JUL 11 h00
!
-
Boston Edison Company
2
e
At the SALP management meeting, please be prepared to discuss your evaluation
of our assessment and the status of your performance improvement programs.
Additionally, we solicit written comments within 30 days after the meeting to
enable us to thoroughly evaluate your response and to provide you with our
conclusions relative to them.
Specifically, you are requested to respond
addressing
actions
planned
to continue
to
improve
performance
in
the
Radiological Controls area.
'
Your cooperation with us is appreciated.
Should you have any questions
concerning the SALP report, we would be pleased to discuss them with you.
Sincerely,
S/pgite10!sted in;
William T. Russell
Regional Administrator
Enclosure:
As stated
cc w/ encl:
K. Highfill, Station Director
R. Anderson, Plant Manager
J. Keyes, Licensing Division Manager
E. Robinson, Nuclear Information Manager
R. Swanson, Nuclear Engineering Department Manager
The Honorable Edward J. Markey
The Honorable Edward P. Kirby
The Honorable Peter V. Forman
B. McIntyre, Chairman, Department of Public Utilities
Chairman, Plymouth Board of Selectmen
Chairman, Ouxbury Board of Selectmen
Plymouth Civil Defense Director
P. Agnes, Assistant Secretary of Public Safety, Commonwealth of
S. Pollard, Massachusetts Secretary of Energy Resources
R. Shimshak, MASSPIRG
Public Document Room (PDR)
local Public Document Room (LPDR)
Nuclear Safety Information Center (NSIC)
NRC Resident Inspector
Commonwealth of Massachusetts (2)
Chairman Ze h
Commissioner Roberts
Commissioner Carr
Commissioner Rogers
K. Abraham, RI (18 copies)
1
0FFICIAL RECORD COPY
SALP PILGRIM 87-99 - 0002.0.0
07/14/88
i
j
.-_
..- -
,
.
-
.
..
,
]
.
4
-
'.
D
-i
t
g g7 g
a
Boston Edison Company
3
'
bec w/enci
!
Region I Docket Room (with concurrences)
!
,
l
M. Perkins, RI (w/o encl)
!
W. Russell, RI
'
!
J. Allan, RI
D. Holody, RI
l
W. Kane, RI
S. Collins, RI
J. Wiggins, RI
R. Blough, RI
i
L. Doerflein, RI
!
M. Kohl, RI
l
W. Johnston, RI
J. Durr, RI
R. Gallo, RI
W. Oliveira, RI
!
S. Ebneter, RI
j
G. Sjoblem, RI
R. Bellamy, RI
!
R. Bores, RI
I
J. Taylor, DEDO
!
B. Boger, NRR
i
R. Wessman, NRR
!
D. Mcdonald, NRR
!
F. Akstulewicz, NRR
i
Board Members
!
,
,
l
t
'
,
- RI:DRP
- RI:DRP
- RI:DRP
- DRP
I:D
CWarren/mjd
RBlough
JWiggins
lins
WKane
5
7/g./88
76.>/88
i
7/ /88
7/ /88
7/ /88
/
RI:DRA
RI:RA
JA11an
WRussell
7/ /88
7
/88
- SEE PREVIOUS CONCURRENCES
-
-
. .
.
--
. - - -
'
o
'
e
,
Boston Edison Company
3
g 3 7 jggg
o
bec w/ enc 1:
Region I Docket Room (with concurrences)
M. Perkins, RI (w/o enc 1)
W. Russell, RI
J. Allan, RI
D. Holody, RI
W. Kane, RI
S. Collins, RI
J. Wiggins, RI
R. Blough, RI
L. Doerflein, RI
M. Kohl, RI
W. Johnston, RI
J. Durr, RI
R. Gallo, RI
W. Oliveira, RI
l
S. Ebneter, RI
G. Sjoblem, RI
l
R. Bellamy, RI
I
R. Bores, RI
l
J. Taylor, OEDO
B. Boger, NRR
R. Wessman, NRR
l
0. Mcdonald, NRR
l
F. Akstulewicz, NRR
l
Board Members
G
RI:0RP
w RI:0RP
hl:DRP
RI:0RP
RI:0RP
CW ren/mjd
RBlough
)Wiggins
SCollins
WKane
7//o/88
7/2V88
7/10/88
7/ /88
7/ /88
RI:0RA
RI:RA
'
'
JAllan
WRussell
7/ /88
7/ /88
l
0FFICIAL RECORD COPY
SALP PILGRIM 87-99 - 0003.0.0
07/14/88
l
1