Updated Monthly Operating Rept for Jul 1987,consisting of Operating Data Rept
ML20151G453
Person / Time
Site: Hope Creek PSEG icon.png
Issue date: 07/31/1987
From: Jensen H
Public Service Enterprise Group
To:
Shared Package
ML20151G258 List:
References
NUDOCS 8804190396
Download: ML20151G453 (1)


Text

7 A p*

OPERATING DATA REPORT DOCKET NO.86-354 UNIT Hope Cre_ek DATE COMPLETED BY H.

Jensen 7/

TELEPHONE (609i 339-5261 OPERATING STATUS 1.

REPORTING PERIOD July 1987 GROSS HOURS IN REPORTING PERIOD 744 2.

CURRENTLY AUTHORIEED POWER LEVEL (MWt) 3293 MAX. DEPEND. CAPACIzY (MWe-Net) 1067*

DESIGN ELECTRICAL RATING (HWe-Net) 1067 3.

POWER LEVEL TO WHICH RESTRICTED (IF ANY) (MWe-Met)

None 4.

REASONS FOR RESTRICTION (IF ANY)

THIS YR TO MONTH DATE CUMULATIVE 5.

NO. OF HOURS REACTOR WAS CRITICAL 705.6 4877.6 5105.6 6.

REACTOR RESERVE SHUTDOWN HOURS O

O O

7.

HOURS GENERATOR ON LINE 705.2 4852.3 5140.3 8.

U. NIT RESERVE SHUTDOWN HOURS 0

0 0

9.

GROSS THERMAL ENERGY GENERATED (MWH) 2,178,694 14,589,405 15,519,813 l

10.

GROSS ELECTRICAL ENERGY GENERATED (MWH) 708,376#

4,865.100#

5,162,7411 11.

NET ELECTRICAL ENERGY GENERATED (MWH) 677,202#

4,660,586#

4 946.410#

12.

REACTOR SERVICE FACTOR 94.8 9 5. 9,,

96.1 13.

REACTOR AVAILABILITY FACTOR 94.8 95.9 96.1 14.

UNIT SERVICE FACTOR 94.8 95.4 95.6 15.

UNIT AVAILABILITY FACTOR 94.8 95.4 95.6 16.

UNIT CAPACITY FACTOR (Using Design MDC) 85.3 85.9 86.2 s@om 17.

UNIT CAPACITY FACTOP, (Using Desian MWe) 85.3 85.9 86.2 DE'18.

UNIT FORCED OUTAGE RATE 5.2 4.6 4.4 88 Qg 19.

SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE. & DURATION):

SURVEILLANCE, 9/18/87, 16 DAYS REFUELING, 1/31/88, 55 DAYS am

$220.

IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:

o-N/A 8d"

  • Estinated Value.

Actual value to be determined in August 1987.

ca i

  1. Values reduced by 5 MWe by direction of Newark Performance Encineer (9/02/87) to account for PJM rounding error.