OPERATING DATA REPORT DOCKET NO.86-354 UNIT Hope Cre_ek DATE COMPLETED BY H.
Jensen 7/
TELEPHONE (609i 339-5261 OPERATING STATUS 1.
REPORTING PERIOD July 1987 GROSS HOURS IN REPORTING PERIOD 744 2.
CURRENTLY AUTHORIEED POWER LEVEL (MWt) 3293 MAX. DEPEND. CAPACIzY (MWe-Net) 1067*
DESIGN ELECTRICAL RATING (HWe-Net) 1067 3.
POWER LEVEL TO WHICH RESTRICTED (IF ANY) (MWe-Met)
None 4.
REASONS FOR RESTRICTION (IF ANY)
THIS YR TO MONTH DATE CUMULATIVE 5.
NO. OF HOURS REACTOR WAS CRITICAL 705.6 4877.6 5105.6 6.
REACTOR RESERVE SHUTDOWN HOURS O
O O
7.
HOURS GENERATOR ON LINE 705.2 4852.3 5140.3 8.
U. NIT RESERVE SHUTDOWN HOURS 0
0 0
9.
GROSS THERMAL ENERGY GENERATED (MWH) 2,178,694 14,589,405 15,519,813 l
10.
GROSS ELECTRICAL ENERGY GENERATED (MWH) 708,376#
4,865.100#
5,162,7411 11.
NET ELECTRICAL ENERGY GENERATED (MWH) 677,202#
4,660,586#
4 946.410#
12.
REACTOR SERVICE FACTOR 94.8 9 5. 9,,
96.1 13.
REACTOR AVAILABILITY FACTOR 94.8 95.9 96.1 14.
UNIT SERVICE FACTOR 94.8 95.4 95.6 15.
UNIT AVAILABILITY FACTOR 94.8 95.4 95.6 16.
UNIT CAPACITY FACTOR (Using Design MDC) 85.3 85.9 86.2 s@om 17.
UNIT CAPACITY FACTOP, (Using Desian MWe) 85.3 85.9 86.2 DE'18.
UNIT FORCED OUTAGE RATE 5.2 4.6 4.4 88 Qg 19.
SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE. & DURATION):
SURVEILLANCE, 9/18/87, 16 DAYS REFUELING, 1/31/88, 55 DAYS am
$220.
IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:
o-N/A 8d"
- Estinated Value.
Actual value to be determined in August 1987.
ca i
- Values reduced by 5 MWe by direction of Newark Performance Encineer (9/02/87) to account for PJM rounding error.