Updated Monthly Operating Rept for Jul 1987,consisting of Operating Data Rept
ML20151G453
Person / Time
Site: Hope Creek PSEG icon.png
Issue date: 07/31/1987
From: Jensen H
Public Service Enterprise Group
To:
Shared Package
ML20151G258 List:
References
NUDOCS 8804190396
Download: ML20151G453 (1)


Text

- - - - - -

7 ,

. A p*

OPERATING DATA REPORT DOCKET NO.86-354 _

UNIT Hope Cre_ek DATE -

COMPLETED BY H. Jensen 7/

TELEPHONE (609i 339-5261 "

OPERATING STATUS

1. REPORTING PERIOD July 1987 GROSS HOURS IN REPORTING PERIOD 744
2. CURRENTLY AUTHORIEED POWER LEVEL (MWt) 3293 MAX. DEPEND. CAPACIzY (MWe-Net) 1067*

DESIGN ELECTRICAL RATING (HWe-Net) 1067

3. POWER LEVEL TO WHICH RESTRICTED (IF ANY) (MWe-Met) None
4. REASONS FOR RESTRICTION (IF ANY)

THIS YR TO MONTH DATE CUMULATIVE

5. NO. OF HOURS REACTOR WAS CRITICAL 705.6 4877.6 5105.6
6. REACTOR RESERVE SHUTDOWN HOURS O O O
7. HOURS GENERATOR ON LINE 705.2 4852.3 5140.3
8. U. NIT RESERVE SHUTDOWN HOURS 0 0 __ 0
9. GROSS THERMAL ENERGY GENERATED (MWH) 2,178,694 14,589,405 15,519,813 l
10. GROSS ELECTRICAL ENERGY GENERATED (MWH) 708,376# 4,865.100# 5,162,7411
11. NET ELECTRICAL ENERGY GENERATED (MWH) 677,202# 4,660,586# 4 946.410#
12. REACTOR SERVICE FACTOR 94.8 9 5. 9 , , 96.1
13. REACTOR AVAILABILITY FACTOR 94.8 95.9 96.1
14. UNIT SERVICE FACTOR 94.8 95.4 95.6
15. UNIT AVAILABILITY FACTOR 94.8 95.4 95.6
16. UNIT CAPACITY FACTOR (Using Design MDC) 85.3 85.9 86.2 UNIT CAPACITY FACTOP, s@om 17.(Using Desian MWe) 85.3 85.9 86.2 DE'18. UNIT FORCED OUTAGE RATE 5.2 4.6 4.4 88 SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE. & DURATION):

Qg 19.

SURVEILLANCE, 9/18/87, 16 DAYS REFUELING, 1/31/88, 55 DAYS am IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:

$220.

o- N/A 8d" ca

  • Estinated Value. Actual value to be determined in August 1987.

i # Values reduced by 5 MWe by direction of Newark Performance Encineer (9/02/87) to account for PJM rounding error.