ML20151G446

From kanterella
Jump to navigation Jump to search
Updated Monthly Operating Rept for June 1987,consisting of Operating Data Rept
ML20151G446
Person / Time
Site: Hope Creek PSEG icon.png
Issue date: 06/30/1987
From: Jensen H
Public Service Enterprise Group
To:
Shared Package
ML20151G258 List:
References
NUDOCS 8804190394
Download: ML20151G446 (1)


Text

I*.,.A -

a.

OPERATING DATA REPORT DOCKET NO.86-354 UNIT HoDe Cregg DATE /

COMPLETED BY H. Jensen 11 TELEPHONE (609) 339-5261V OPERATING STATUS'

1. REPORTING PERIOD June 1987 GROSS HOURS IN REPORTING PERIOD 720 I
2. CURRENTLY AUTHORIZED POWER LEVEL (MWt) 3293 MAX. DEPEND. CAPACITY (HWe-Net) 1067*

DESIGN ELECTRICAL RATING (MWe-Net) 1067

3. POWER LEVEL TO WHICH RESTRICTED (IF ANY) (MWe-Net) None
4. REASONS FOR RESTRICTION (IF ANY)

THIS YR TO MONTH DATE CUMULATIVE

5. NO. OF HOURS REACTOR WAS CRITICAL 720 _ 4172 4460
6. REACTOR RESERVE SHUTDOWN HOURS 0 0 0
7. HOURS GENERATOR ON LINE 720 4147.1 4435.1
8. UNIT RESERVE SHUTDOWN HOURS 0 0 0
9. GROSS THERMAL ENERGY GENERATED (MWH) 2.212.328 Lat410.710 13.341.118
10. GROSS ELECTRICAL ENERGY GENERATED (MWH) 727.666 _j.156.724 _,4.454.364#
11. NET ELECTRICAL ENERGY GENERATED (MWH) 696.955# 3.983.384# 4.269.208#
12. REACTOR SERVICE FACTOR 100 96.1 96.3
13. REACTOR AVAILABILITY FACTOR 100 96.1 96.3
14. UNIT SERVICE FACTOR 100 95.5 95.8
15. UNIT AVAILABILITY FACTOR 100 95.5 95.8
16. UNIT CAPACITY FACTOR (Usina Desian HDC) 90.7 86.0 86.4
17. UNIT CAPACITY FACTOR (Using Design MWe) 90.7 86.0 86.4
18. UNIT FORCED OUTAGE RATE O ,

4.5 4 . 3 _,_,

l

19. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE, & DURATION):

SCHEDULED SURVEILLANCE 9/18/87, 15 DAYS

20. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP.
  1. Values corrected to account for previous errors.

~

8 8 0 4 1 9 0 3'9 4'. 8 8 0 4 1 5 PDR ADOCK 05000354 R.

DCD ____