's' OPERATING DATA REPORT DOCKET NO.86-354 UNIT Hoce Creek i
DATE
_/
COMPLETED BY H.
Jensen K
TELEPllONE (609) 339-5261' OPERATING STATUS 1.
REPORTING PERIOD _Jan 1987 GROSS HOURS IN REPORTING PERIOD 744 2.
CURRENTLY AUTHORIZED POWER LEVc
.MWt) 3293
-HAX. DEPEND. CAPACITY (HWe-Net) 1039 DESIGN ELECTRICAL RATING (HWe-Net) 1067 3.
POWER LEVEL TO WHICH RESTRICTED (IF ANY) (MWe-Net)
None 4.
REASONS FOR RESTRICTION (IF ANY)
THIS YR TO i
HONTH DATE CUMULATIVE 5.
NO. OF HOURS REACTOR WAS CRITICAL 744 744 3414 6.
REACTOR RESERVE SHUTDOWN HOURS 0
0 0
7.
HOURS GENERATOR ON LINE 744 744 2422.6 8.
UNIT RESERVE SHUTDOWN HOURS 0
0 0
9.
GROSS THERMAL ENERGY GENERATED (HWH) 2,406,653
_2,406,653 6,031.568 10.
GROSS ELECTRICAL ENERGY r
GENERATED (HWH) 821,604#
821,604#
1,119,244#
[
11.
NET ELECTRICAL ENERGY GENERATED (MWH) 790,586#
790,586#
1.076,410#
12.
REACTOR SERVICE FACTOR t
13.
REACTOR AVAILABILITY FACTOR 14.
UNIT SERVICE FACTOR 15.
UNIT AVAILABILITY FACTOR t
16.
UNIT CAPACITY FACTOR r
l (Usino Desian HDC) 17.
UNIT CAPACITY FACTOR
[
j mye, (Usina Desion HWe) 1
'a,18.
UNIT FORCED OUTAGE RATE t
ho19.
SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE. DATE. & DURATION): None j
ne
?".20.
IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP: N/A i
i om
$$'21.
UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):
8,*
FORECAST ACHIEVED l
- gM INITIAL CRITICALITY 6/28/86 ia INITIAL ELECTRICITY 8/1/86 l
COMMERCIAL OPERATION Vnder review
- Values corrected to account for chance in calculation method made j
4/10/87.
, _ _.