Updated Monthly Operating Rept for Jan 1987,consisting of Operating Data Rept
ML20151G439
Person / Time
Site: Hope Creek PSEG icon.png
Issue date: 01/31/1987
From: Jensen H
Public Service Enterprise Group
To:
Shared Package
ML20151G258 List:
References
NUDOCS 8804190391
Download: ML20151G439 (1)


Text

I

's' OPERATING DATA REPORT DOCKET NO.86-354 UNIT Hoce Creek i

DATE

_/

COMPLETED BY H.

Jensen K

TELEPllONE (609) 339-5261' OPERATING STATUS 1.

REPORTING PERIOD _Jan 1987 GROSS HOURS IN REPORTING PERIOD 744 2.

CURRENTLY AUTHORIZED POWER LEVc

.MWt) 3293

-HAX. DEPEND. CAPACITY (HWe-Net) 1039 DESIGN ELECTRICAL RATING (HWe-Net) 1067 3.

POWER LEVEL TO WHICH RESTRICTED (IF ANY) (MWe-Net)

None 4.

REASONS FOR RESTRICTION (IF ANY)

THIS YR TO i

HONTH DATE CUMULATIVE 5.

NO. OF HOURS REACTOR WAS CRITICAL 744 744 3414 6.

REACTOR RESERVE SHUTDOWN HOURS 0

0 0

7.

HOURS GENERATOR ON LINE 744 744 2422.6 8.

UNIT RESERVE SHUTDOWN HOURS 0

0 0

9.

GROSS THERMAL ENERGY GENERATED (HWH) 2,406,653

_2,406,653 6,031.568 10.

GROSS ELECTRICAL ENERGY r

GENERATED (HWH) 821,604#

821,604#

1,119,244#

[

11.

NET ELECTRICAL ENERGY GENERATED (MWH) 790,586#

790,586#

1.076,410#

12.

REACTOR SERVICE FACTOR t

13.

REACTOR AVAILABILITY FACTOR 14.

UNIT SERVICE FACTOR 15.

UNIT AVAILABILITY FACTOR t

16.

UNIT CAPACITY FACTOR r

l (Usino Desian HDC) 17.

UNIT CAPACITY FACTOR

[

j mye, (Usina Desion HWe) 1

'a,18.

UNIT FORCED OUTAGE RATE t

ho19.

SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE. DATE. & DURATION): None j

ne

?".20.

IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP: N/A i

i om

$$'21.

UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):

8,*

FORECAST ACHIEVED l

gM INITIAL CRITICALITY 6/28/86 ia INITIAL ELECTRICITY 8/1/86 l

COMMERCIAL OPERATION Vnder review

  1. Values corrected to account for chance in calculation method made j

4/10/87.