Updated Monthly Operating Rept for Feb 1987,consisting of Operating Data Rept
ML20151G442
Person / Time
Site: Hope Creek PSEG icon.png
Issue date: 02/28/1987
From: Jensen H
Public Service Enterprise Group
To:
Shared Package
ML20151G258 List:
References
NUDOCS 8804190393
Download: ML20151G442 (1)


Text

,.e c.

OPERATING DATA REPORT DOCKET NO. _j6-354 UNIT

-. Hope Creek DATE

./

COMPLETED BY H.

Jensen TELEPHONE (609) 339-52B1 OPERATING STATUS 1.

REPORTING PERIOD Feb 1987 GROSS HOURS IN REPORTING PERIOD 672 2.

CURRENTLY AUTHORIZED POWER LEVEL (HWt) 3293 MAX. DEPEND. CAPACITY (HWe-Net) 1039 DESIGN ELECTRICAL RATING (HWe-Net) 1067 3.

POWER LEVEL TO WHICH RESTRICTED (IF ANY) (HWe-Net)

None 4.

REASONS FOR RESTRICTION (IF ANY)

THIS YR TO HONTH DATE CUMULATIVE 5.

NO. OF HOURS REACTOR WAS CRITICAL 504.7 1248.7 1536.7 6.

REACTOR RESERVE SHUTDOWN HOURS 0

0 0

7.

HOURS GENERATOR ON LINE 492.4 1236.4 1524.4 8.

UNIT RESERVE SHUTDOWN HOURS 0

0 0

9.

GROSS THERHAL ENERGY GENERATED (HWH) 1,532,186_

3,938,839 4.869,247 10.

GROSS ELECTRICAL ENERGY GENERATED (HWH) 514,164#

1,335,768#

1,633,408#

11.

NET ELECTRICAL ENERGY GENERATED (HWH) 490.892#

1,281,478#

1,567.302#

12.

REACTOR SERVICE FACTOR 75.1 88.2 90.2 13.

REACTOR AVAILABILITY FACTOR 75.1 88.2 90.2 14.

UNIT SERVICE FACTOR 73.3 87.3 89.5 15.

UNIT AVAILABILITY FACTOR 73.3 87.3 89.5 16.

UNIT CAPACITY FACTOR hD]g (Usina Desian HDC) 70.3 87.1 88.5 zo d.17.

UNIT CAPACITY FACTOR gg (Usina Desian HWe) 68.5 84.8 86.2 ow j$ 18.

UNIT FORCED OUTAGE RATE 26.7 12.7 10.5 O$19.

SHUTDOWNS SCHEDULED OVER NEXT 6 HONTHS (TYPE. DATE. & DURATION):

None o~ 20.

IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:

8d 3/1/87 CE

  1. Values connected to account for change in calculation method made 4/10/87