Updated Monthly Operating Rept for Feb 1987,consisting of Operating Data Rept
ML20151G442
Person / Time
Site: Hope Creek PSEG icon.png
Issue date: 02/28/1987
From: Jensen H
Public Service Enterprise Group
To:
Shared Package
ML20151G258 List:
References
NUDOCS 8804190393
Download: ML20151G442 (1)


Text

,.e c.

OPERATING DATA REPORT DOCKET NO. _j6-354 UNIT -. Hope Creek DATE ./

COMPLETED BY H. Jensen  %

TELEPHONE (609) 339-52B1 OPERATING STATUS

1. REPORTING PERIOD Feb 1987 GROSS HOURS IN REPORTING PERIOD 672
2. CURRENTLY AUTHORIZED POWER LEVEL (HWt) 3293 MAX. DEPEND. CAPACITY (HWe-Net) 1039 DESIGN ELECTRICAL RATING (HWe-Net) 1067
3. POWER LEVEL TO WHICH RESTRICTED (IF ANY) (HWe-Net) None
4. REASONS FOR RESTRICTION (IF ANY)

THIS YR TO HONTH DATE CUMULATIVE

5. NO. OF HOURS REACTOR WAS CRITICAL 504.7 1248.7 1536.7
6. REACTOR RESERVE SHUTDOWN HOURS 0 0 0
7. HOURS GENERATOR ON LINE 492.4 1236.4 1524.4
8. UNIT RESERVE SHUTDOWN HOURS 0 0 0
9. GROSS THERHAL ENERGY GENERATED (HWH) 1,532,186_ 3,938,839 4.869,247
10. GROSS ELECTRICAL ENERGY GENERATED (HWH) 514,164# 1,335,768# 1,633,408#
11. NET ELECTRICAL ENERGY GENERATED (HWH) 490.892# 1,281,478# 1,567.302#
12. REACTOR SERVICE FACTOR 75.1 88.2 90.2
13. REACTOR AVAILABILITY FACTOR 75.1 88.2 90.2
14. UNIT SERVICE FACTOR 73.3 87.3 ___

89.5

15. UNIT AVAILABILITY FACTOR 73.3 87.3 89.5
16. UNIT CAPACITY FACTOR hD]g (Usina Desian HDC) 70.3 87.1 88.5 zo d.17. UNIT CAPACITY FACTOR gg (Usina Desian HWe) 68.5 84.8 86.2 ow j$ 18. UNIT FORCED OUTAGE RATE 26.7 12.7 10.5 O$19. SHUTDOWNS SCHEDULED OVER NEXT 6 HONTHS (TYPE. DATE. & DURATION):

$$ None o~ 20. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:

8d 3/1/87 CE # Values connected to account for change in calculation method made 4/10/87