, E&C 2410-21 i DEPARTMENT f

Southem Cahtomoa ECsson Company OA PROCEDURE t

. Engineering and Construction Department Rev 2 1 EFFECilVE: 02/04/871 PREPARATION, REVIEW, APPROVAL AND RELEASE OF FIELD CHANGE NOTICES FOR ISSUE TO CONSTRUCTION /STARTUP/ MAINTENANCE WITHOUT AN SCE DESIGN CHANGE PACKAGE 1

SONGS 1,2&3 A. CENERAL lt4~ORMATION D

6. The Site OA Manager, General Of flee, OA Smervisor or Designee shall opprove FCN's in occordance
1. The purpose of this proce&re is to document the with the DRADM.

preparation, review, opproval and release of a Field Chav Notice (FCN) prepafed ty the Engineering and 7. The Origino:ing Engheer for a FCN may be o Construc tion Department (E&C) or the Nclear Design Ergineer, Engineering Services Contractor (ESC)

Generation Site Department (NCS) for use wiside the Engineer, Stoflon Technical Engineer or S+ plier.

Design Chonge Pockcne (DCP) process. A field Chonge Notice will henceforth be referred to os o FCN in this 8. When it becornes necessary to concel a FCN, the cocedure, and FORM 26-264 1, Field Change Notice R Responsible Engineer shall prepare a new FCN coversheet ECN), stullbe used for the processing of FCN's. (26-264-1), enter the old FCN number in the FCN block 2.

(Keypoint 2), and irdicate the concellation by stomping The FCN is used to document minor design changes "Void" in the description oreo. The @provals of the as defined in Exhibit I to certain creas of disclosure Responsible Discipline Project Group Leaders (E&C) or R documen t s withou t revising the document until the Supervising Engineer I (NGS) and the OA Engineer (if proposed engineering changes have been physically appliccble) must be obtained prior to sWmittal to implemented. Corporate Documentotion Monogement (CDM) SONGS for issue.

3. A FCN is rot to be used to document on As-Built cordit ion. Changes to o design document which validate an As Built condition are to be prepared as a Design Change Notice (DCN) in occordance with E&C OA Procedure E&C 24 10-17.
4. The Ovolity Class (0-Class) of each FCN shall be the some os the O. Class of the original design document which it is changing or, if the O. Class of the FCN is different from the O. Class of the document being changed, a note shall be odded to the FCN clearly identifyirg the O-Class of the design change. Any FCN containing o 0-Class change, including addit ions, deletions or modifications to o O. Class assignment, stoll be @ proved by Nuclear Systems Engineering (NSE) in g ocilition to the opprovals specified in the Document Review md Approval Distribution Matrix (DRADM).
5. Design criterio for the design change are addressed os follows:
a. Unit 1: Design criteria may be prepared in f occordonce with E&C OA Proce&re E&C 24.7-13. Prepared Brt - - _ -6 r / .

Au hor ole

b. Unit s 2&3: Design criteria for design &

development are in accordonce with the Technical Specifications, Updated Final Sofety Anoly sis Apprwed By: ' 8(N #['

, ///f/y-7 M6noger,4fotion Technical Da te Report (UFSAR), Updated Fire Hozords Analysis R Z (UFHA) and Emergency Plan (EP). Deviations to Approved By: gN t/7/I7 the basic design criterio (Design Bases) are hardled R6spon:ible Division Monoger Oa te in accordance with E&C OA Procedure E&C 40 9.13 fcr UFSAR, UFHA ond EP changes; Apprwed By: N /P@ l-27 87 E&C OA Procedure E&C 40-910 for Technical GA Orgmization Manoger Date Specification changest ord ore addressed in detail in the Proposed Focility Change Pcrkcge (PFCP) Approved By: 4/A N/A prepared in occordonce with E&C OA Proce&re Ergineerirg OA Steering Date E&C 24.10-15. Committee Choirmon Poge I of 4 P

E&C 2410 2i I DEPARTMENT Southern CaMomia Edson Company OA PHOCEDUHE

, Engineering and Construction Department REV 2 l EFFECTIVE:02/04/87]

9. - This proce&re simil opply to all design work 4. Obtain a FCN rumber from COM, Drawing Control regardless of safety class within and clong the bounocry (SONGS). Prwi& COM with the distribution for the (including the ostside is) lotion zone) of SONGS 1, 2&3 FCN.

Plant Protected Areo. It shall otso @ ply to facilities o>tside the protected oreo os follows:- 5. Review to. dete rmine if other document s or document categories are offected. . If there ore such Focilities not excepted by the conditions of offected documents, indicote this on Form 26 264-l, E&C 24-10-15, Exhibit 1, Criterion B.S. which include: Block 2, and prepare and complete FORM CC(123) 183, Son Onofre Nuclear Genemting Station Configura tion

o. Switchyard Document Check List, and FORM CC(123) 184, b.

Son Onofre Nuclear Genera ting S ta tion Requiring Condensate Storage Tonk and Transfer Piping Chonge, if applicct>le. os instruc ted . in Block 2 of R System Form 26 2641. (Forms CC(123) 183 and CC(I23)184

c. Meteorological Instrumentation ore hereaf ter referred to os Forms 183/184.) Evolvole the design change for potential change to other offected d.

documents arti prepare oditional FCN's os required, if Emergency Siren ond Pojing Sy stem no other documents are offected, this shall also be indicated in Block 2 of this form.

e. Rodiation Monitoring Stotions NOTE: When several documents require rela ted
f. Circulating Water Con &its and Structures changes, one document stull be selected as the g.

governing document (e.g., the FCN to the Onsite and Offsite PMF Focilities primary drawing listed as the source document

h. Fo:llities, systems or components outside the on Forms 183/184. The Source Document should be completely identified on these forms Protected Area which eterface with and offect the and on the 26-264-1 (e.g., FCN E222 to performance or oper Atm of facilities,' systems or !173002). The other offected documents shall components inside the Protected Areo (e.g., Fire be listed on the CC(123) 184 as needing R Protection, Ireluding components stored for use on changes, with the associated FCN rurrt>ers dedicated /olternote shutdown systems, N olso listed as instructed on the 26 264-1. It is Communications, etc.). not necessory to prepare redundoit Forms 183/184 for each related FCN.
10. In oMition to this procedure, FCN4 desigr,cted os "Soleguards Inf ormation" stoll otso be processed in 6. As required FORM 26 113, Material Service accordonce with E&C OA Procedure E&C 24-10-9. Authorization (MSA), shall be compie fed to ensure material procurement. AMitionally, FORM 26 181,
11. This proce&re complies with the requirements of Design Change Pcrkoje Materiots Continuation, shall be q

the @plicoble documents referenced in the Motrix of prepared as port of the FCN pockoje when material is Reg;lotory Reference Material for E&C OA Proce&res. required.

7. Prepare FORM EO 165-1. Document Transmittal B. PROCEDURAL AC110NS (E&C), 'or CC(123) 262, - Document Transmittol (NCS)

(EO 165 I7CC(123) 262), md rou te the FCN with R ACT10N l - PREPARATION, REVIEW APO oplicable forms to the Independent Review Engineer APPROVAL OF THE FCN FOR ISSUE (IRE)/ Responsible Crcup Leoder(s) (E&C) or to the TO CONSTRUCTION /STARTUP/ IRE / Independent Rwiewers (NGS) for review ond MAINTENANCE WITHOUT A DCP comment in occordance with the DRADM.

ORIGNATING ENGitEER 8. Prepare o PFCP if required, in occordonce with E&C 24-10-15, ACTION 1.

1. Identify need to mcke o minor design change.

IRE (E&C OR NCS)

2. Review the criteria strated in Exhbit I to determine if a FCN ls omropriate. (If not omropriate, refer to 9. Utilizing the Design Review Criterio listed on the E&C QA Procedure E&C 24 0.16.) reverse side of the EO 165-1, perform on engineering revie w, document the review on Form EO 165l/ R
3. If the field change mes ts the criterio in Exhibit I, prepore o FCN.

CC(123)262, os omlicable and return to the Originating Use FO'<M 26-264-2, Field ChongeR Engineer (Step II).

Notice (FCN) Supplemental Page, os needed. F8rovide o

'tefore" ond "ofter" sketch of change.

Poge 2 of 4

k'

' E&C 24-10-21 DEPARTMENT Southern Cahtomsa Echson Company GA PROCEDLRE Engineering and Construction Department 2 hECTlvE VuuG87']

, RESPONSIELE GROUP LEADERG)(E&O OR 2. Corwert the FCN to o DCN ond issue to CDM INDEPENDENT REVIEWERS (NGS) Drawirg Control, G.O. for distribution.

10. Utiliziry the EO 1651/CC(123) 262, perform R NOTE: Corcurrently, if ten (10) DCNs (o combination engineering review. Consult the Design Review of SCE ord ESC DCN's) are out stonding Responsibility Matrix (DRRM) to ensure that all design against a drawing, request the Responsible requirements are included. Document the review on the Lead Discipline Designer to revise the drowing EO f 65 l/CC(123) 262 c.-J - reture to the Originatin9 R in accordori:e with E&C OA Procedure E&C Engineer. 24-8 7 ord issue the "As-Built" drawing to CDM Drawing Control, G.O. for distrbution.

ORIGINATING ENGNEER

3. Request the responsible Leod Discipline Designer to
11. When all comments have been resolved, route the revise the olfacted drawing.

FCN ond EO 165 l/CC(123) 262 to those individuals R 1rdicated on the DRADM for opproval, including m IRE. CDM, DRAWING CONTROL, G.O.

(Fct information Only)

12. f*orwa rd the cpproved FCN, EO 165 l/CC(123) R l 262's, ord Forms 183/184 to COM, Drawirg Control 4. Receive the SCE DCN ond distribute in accordance l (SONGS) with FORM 26-22 2, Data Transmittal. with the Project Distribution Matrix. (Refer to CDS OA

! Procedure CDM 2610-17, issue of Design Change Notices CDM, ORAWNG CONTROL GONGS) l fcr Review ond Comment or Release including Release of (For Information Only) Change Notices Converted to Design Change Notices for R SONGS I,2&3.)

13. Receive the apprcued FCN, EO 165-l/CC(123) 262's and omlicable forms from the Originating Ergineer and process in crcordance with CDS OA Proc edure R C. REFERENCES CDM 26 8-5, Receipt, Control, and Distribution of Field Chonge Notices for SONGS 1,2&3. I.

l CDS GA Procedure CDM 26 8-5, Receipt, Control, ord Distribution of Field Chonge Notices for SCE LEAD CONSTRUCTION ENGNEER GONGS SONGS 1,2&3 UNIT I) OR STARTUP OUTAGE MANAGER GONGS UNITS 2&3)(E&O OR ORIGNATING 2. CDS OA Procedure CDM 26-10-17, issue of SCE ENGREER (NGS) Design Chorne Notices for Review ord Comment or R Release including Release of Change Notices Converted 14 Receive the pink copy of the FCN from CDM, to Design Change Notices for SONGS 1,2&3 Drowing Control ord assign the work.

3. E&C QA Procedure EAC 24-7-13, Design Criterio
15. Coordinate the implemer totion of change with the Documents for Engineering Construction Project (ECP) constrtcting orgmization (e.g., Mointenonce, Storttp, Activities for SONGS Units i,2&3 Const ruc tion, instrurnentation and Controls Test er Elec trical Test). 4. E&C OA Prcce&re E&C 24-8-7, Development, i Review, Approval and Release of New and As-Built SCE
16. Upon completion of construction, re trieve the Drawirgs ord Obsoletion of Exist'ng SCE Drawirys for  !

(

original FCN from CDM Drawirg Control (SONGS) and SONGS 1,2&3 sign it (in Block 5), signifying construction and startup R ore comple tet odd any adjitional Construction Work 5. E&C OA Procedure E&C 24-10-9, Cc nfiguratien md Order (CWO), Maintenance Order (MO) or test numbers to Document Control for SONGS 1,2&3 i

i the FCN (in Block 1) ord forward to CDM, Drawing I Control (SONGS) with Form 26-22-2. 6. E&C OA Procedure E&C 24 10-15, Processing of l Proposed Fccility Charge Pockoges for SONGS 1,2&3  !

CDM, DRAWNG CONTROL GONGS)

(For Informatien Only) 7. E&C OA Procedure E&C 24 10-16 Development, (

17. Receive the originol cornpleted FCN from the R eview, approval ord Release of SCE Design Chorye I Pockages (DCP) SONGS 1,2&3 constructing orgmization and process in occordonce with CD M 26-8 5. 8. E&C OA Proce&re E&C 24 10-17, Interim Design Change Notices (IOCN)/ Design Change Notices (DCN) R SONGS 1,2&3 ACTION il - CONVERSION OF FCNS
9. E&C OA Procedure E&C 40-9-10, Preparation of SCE PROECT ADMNSTRATION Amendment Amlications for the SONGS I Provisiorul
1. Receive the compleled FCN. Operating License and the SONGS 2&3 Opera ting Lic enses Page 3 of 4 l

1

E&C 2410 21 l DEPARTMENT Southem Crldomia Edson Company OA PROCEDURE F.rG::iq and Construction Department E i27 ECTlVE:02/04/87

]

'I 10, E&C OA Procedere E&C 40-913, Control of SONGS Licensing < Document . Changes and Cmrdination of Documents Prepored for S@mittal to tre NRC in Support R a

. of on NRC Operating 1.icense for SONGS 1,2&3 II. _ FORM EO 1651, Document Transenittal

'l2. FORM 26-22 2, Data Transmittal

13. - FORM 26 113, Material Service Au thorization

'(MSA)

N

14. FORM 26-181, Design Change Pockcne Materials Confimotion IS. i ORM 26.E41, Field Change Notice (FCf1)

,16. FORA 8 76 264 2, Field Change Notice (FCN)

Supplemen to l Pcge

17. FORM 26 292, Fire Protection Design Checklist
18. - FORM 37 22 Nonemformance Report (NCR)
19. ; FORM CC(123) 183, Son Onofre Nuclear Generating Station Configarotion Document Checklist
20. FORM CC(123) 184, Son Onofre Nuclear Generating Station Cmfig;rotim Documents Rew1.ing Change R
21. FORM CC(I 23)262, Docurnent Transmittal
22. Desi (ORADM)gn Review and Approval Distribution Matrix
23. Design Review Responsibility Mattix (DRRM)
24. Emergency Plan (EP)
25. Updated Fire Hozords Analysis (ISHA)

R

26. Updated Final Sofety Aro ysis Reort (UFSAR)
27. SONGS Unit i Technical Specificctions
28. SONGS Units 2&3 Technical Specifico lons
29. Topical Ovality Assurance Monual(TOAM)

D. DO'INITIONS

1. Refer to the E&C OA Reference Procedures Monual Glossory.

Pcue 4 of 4 I' ,

E& C 24-10-21 Sourt'em Cahtomna E6 son Company DEPARTMENT GA PROCEDURE 1

Engineering and Construction Department Rev.2

[ EFFECTIVE: UZ/%/o7]

EXHlBli I l

CRITERIA FOR WRITING FIELD CHANGE NOTICES (FCNS)

A. Unless modified to suit special situations, with the opproval of the Project Engineer (E&C) or the Manager, Station Technical (NGS) (and consistent with applicable Footnotes in Exhibits of the DRADM), the FCN shall be R written for the following purposes on!y:

To make minor changes to o design document or to provide clarification to documents in order to satisfy their original design criteria. Minor changes are defined os:

1. Chonging termination details which do rot change the elementary or one-line diagrams.
2. Adding clorification notes to o drawing which do not change the design.
3. Providirq construction notes which will not change the design.
4. Making incidental dimensional changes to resolve interferences which do not require a change to the piping stress analyses or structural onalyses.

1

5. Revising drowirys identifying occeptoble design tolerances, not requiring revision of design calculations. l
6. Revising weld details to accommodate constructability which do not require the revision of engineering design calculations.
7. Non-Sofety Related setpoint changes, required to be consistent with a configuration, which do not revise engineering design calculations, Updated Final Sofety Analysis Report (UFSAR) requirements or Technical R Specificatims.
8. Reptocing components certifled by the supplier os being equivalent replacements.

R

9. Correcting the circuit and raceway schedule to ensure ogreement with other design documents such as physical loyout drawings, one-line dicgrams or elementory dio roms.
10. For Sofety-Related Systems when the design changes correct a clearly identified nonconformance dispositioned "repair" or "v2-as-is" on FORM 37-22, Nonconformance Report (NCR), and that do not fall into any category identified in Section B of this Exhibit. The NCR number shall be noted on the FCN.

fl. Chonging to Non-Sofety Related

o. Points, coatings or seolonts
b. Bulk commodities
c. Godets and pockings in Non-Sofety Related apporotus
d. Lobels, equipment togs and annunciator lenses, except on control room control panels.
3. A FCN shall ,et be used for the following changes. These changes must be issued using a DCP or DCP revision.

These criterio may be modified to suit special situotions with the opproval of the Project Engineer (E&C) or Monoger, R Statim Technical (NGSh

1. Changes to Piping and instrumentation Diograms (P&lD's), one-line diagroms, elementary diagrams, general arrangements or control panel drawings other than those allowed by Section A above.
2. Changes to American Society of Mechanical Ergineers Code or Americon National Standards Institute piping other fl on described in A-4,
3. Chonges to components, except as noted in A-8 above, roceways, roceway hongers, or materials requiring an engineering onolysis for occeptobility (except fire bcrriers).

EXHIBli l Page I of 2

E&C 2410 21 Southern Cahtornia Edason Con pany 0fp 9

Engineering and Construction Department REv. 2

[ EFFECIIVE: 02/rA/87l EXHIBIT I 4 Cornponent changes, adjitions or deletions (includes e's trical raceways arti cetes).

l S. Changes to ir.strurnent spon/ range, setpoints or cornputer sof tware which are imposed by the UFSAR/or R l T echnical Specificalions.

l l 6. Cable routing and permanent equipment location changes.

7. Changes to required codes and stondords.
8. Changes to correct a record (drawing, index, etc.) to make it conform to the As-8vilt configuration. For makirvj these changes, o DCN in occordance with E&C OA Proce<bre E&C 24 10 17, ACTlON lil, stull be used.
9. Design changes which result in a "Yes" response on FORM 26 292, Fire Protection Design Checklist.
10. Chonges to tte Updated Fire Hazard Analysis. R l

l EXHIBIT l Poje 2 of 2

i ENQlMS E 41NC AND CON sTRuCTION

.No I.E&C_ 24 10 21 Rev. 2 NUCLE AR ENGINEEMtNG s AFETY ANO LICENslNG OEPARTMENTs 9 FCN No . 1 Procedure Change Notice (PCN)

10. 02/02/88 For ESC QA Procedures ' " " " ' ' " "

2 P ocecu re T;t'e Preparation, Review, Approval and Release of the Field Change Notices for issue to Construction /Startup/ Maintenance without en SCE Design Change Package SONGS 1, 283 3 Cr.;inator J. K. Y ann /o . Sa'I t h PAX No._ 28507/86743 a Cate or g,nated 12/07/87

5. Peaser for Change Ta neae.duratfre a time timit for orocessino FCNs foltowing construction comple-tion in accorosnce with requirements of TQAM Chapter 2 A, and designate the responsibility for closure of NCS generated FCNs to Nuclear Quality Control (NQC).
6. Descr.0 tion Of Change:

In 8. PROCEDURAL ACTIONS, ACTION 1, STEP 16; revise to read as follows:

16. Within 15 days of ypv6 completion of construction, retrieve the original FCN from COM Drawing Control (SONGS) and sign it (in Block 5), signifying construction and startup are complete; add any additional Construction Work Order (CWO), Maintenance Order (MO) or test numbers to the FCN (in Block 1) and forward to CDM, Drawing Control ($0NGS) with Form 26 22 2.

NOTES: (1) This applies to FCus initiated after January 1, 1988.

(2) Step 16 to be performed by Nuclear Quality Control (NQC) for NGS generated FCWs (where NGC is the inspection agency). However, NQC may elect to have the Station Technical cognizant Engineer close a non-safety related FCE on an exception basis (not normal) if requested by NQC Management.

I l

Ace nais

//

.... ......... /~ (l YY ( /

0 }& l % kE

..y...j...'........................ N_ & t e' bMk$ " AW v b$h$m Menager of QuetIty Assurance **

u s a.. a .. =av,,.. 3 d ige o'

s E NGaN e t asMG A mo COM.f RUC f f om 9

Amo MUCLEAR (Mo0M((MIMG SAPtTV A M O (lC g N 3lNG i E&C- 24 10 21 Rev. ~2 Q R P A R 7 h4 ( M i S

9. PCN No 2 Procedure Change Notice (PCN) 04/27/88

,3 For ESC Q A Procedures ' " ' " ' " " "

2. Procecur e Title Preparation, Review, Approval and Release of Field Chant;4 Notices for issue to Construction /Startup/ Maintenance Without an SCE Design Change Package 50Nas 1, 2$3
3. Originato, D. Hadley PAX No. i '305
4. Oate Onginated 03/31/88
5. Reason for Change To clarify the allowance of telecon approvals during the design change document ggylgg.apgyjggent process, and to ensure that safety related documents receive a thorough "In (Ref. S0 224*87).
6. Description Of Change:

In B. PROCEDURAL ACTIONS, ACTION I, Step 11, add the following Note:

NOTE: When timing is critical and the required SCE personnet are not avaltable to sign a document, their review and approval may be obtained by telecon. Telecon reviews and approvals must be noted in the signature block of the E0 165 1/CC(123)262 and the field change document. If the fletd change document involves an Operational Controlled Stick File drawing, ASME III, Fire Protection or Regulatory Guide 1.29, Positions C.2 and C.3 items / services, it shall be reviewed in person by the SCE individual, and the E0 165-1/CC(123) 262 shall be revalidated, initiated and dated within 3 working days of issue.

l l

7. Acorovals

/ . .. ..

& yur ....

0 43 /

y..y.....................

WWY ....

. S.7 ... m............

.e m -.... m......x. u ., w..

AA s/MAA 14.Ve

....,f,o, ...n ,, a...,. ..

l 1

3 a ne ' ct ' __

sc e a... e. ...,e,..

i ENosN e t esNG aNO CONS f nuC f TON

, .No 1 E&C 24 10 21 MUCLC A R E NGIN E E RgNG SAP (TV A N O blC E N$tNG R e v. ~2

, O E P A A f h4 E N T $

}

Procedure Change Notice (PCN)

,a _ 06/10/88 For E&C Q A Procedures " ' " ' ' " * * "

1 Pr TW Preparation, Review, Approvat and Release of Field Change Notices for issue to l

Construction /Startup/ Maintenance Without an SCE Design Change Package SONGS 1, 243 l l

3 Ong'nator A. Ngan pax No. 28378

4. Date Onginated 04/15/88
5. Reason For Change Io provide provlsion for softwere modifications If a design change impacts any plant computer systems and revise reference to the Nonconformance Form.  !
6. Description Of Change:

In B. PROCEDURAL ACTIONS, ACTION.I, add New Step 4 to read:

4. If the field change impacts any plant computer system, contact the Station computer Group and submit a software modification request in accordance with Station Engineering Procedure 5023 V 4.70, Software Modification and Verification.

Renumber the current items 4 through 17 to 5 through 18 In C. REFERENCES, revise Item 18 to read as follows:

18. F0tV/J7/72, Nonconf ormance Report (NCR)

In C. REFERENCES, add New Item 11 to read:

11. Station Engineering Procedure 5023 V-4.70, Software Modification and Verification Renumber the current items 11 through 29 to 12 through 30
7. Aoprovals