Text
- --___ _ _ _ _ _ _ _ _ _ _ _ _ .
.
.
UNITED STATES
.[panaGu,'o
NUCLEAR REGULATORY COMMISSION
g
REGloN H
$
- g
. , ,
101 M ARtETT A STREET. N.W.
r
I
Oo%....*/
OCT 2 31978
In Reply Refer To:
RII:TJD
50-302/78-23
i
Florida Power Corporation
Atta:
Mr. W. P. Stewart, Director
Power Production
P. O. Box 14042, Mail Stop C-4
St. Petersburg, Florida
33733
Gentlemen:
This refers to the inspecticn conducted by Messrs. D. R. Quick and
T. J. Donat of this office on August 30, - September 1, 1978, of
activities authorized by NRC Operating License No. DPR-72 for the
Crystal River Unit 3 facility, and to the discusnon of our findings
held with Mr. G. P. Beatty at the conclusion of the inspection.
Areas examined during this inspection included review of Operator
Training on Small Break Interim actions, qualificatiot; of safety-
related electrical equipment, safety injection system reset features,
review of plant operations, and system realignments in support of startup
activities. Within these areas, the inspection consisted of selective
examinations of procedures and representative records, interviews with
personnel, and observations by the inspectors.
We have examined actions you have taken with regard to previously
unresolved items. The status of these items is discussed in the
enclosed report.
During the inspection, it was found that certain activities under your
license appear to be in noncompliance with NRC requirements. This
item and references to pertinent requirements are listed in the Notice
of Violation enclosed berewith as Appendix A.
This notice is sent to
you pursuant to the provisions of Section 2.201 of the NRC's " Rules of
Practice," Part 2, Title 10, Code of Federal Regulations.
Section 2.201
requires you to submit to this office, within 20 days of your receipt of
this notice, a written statement or explanation in reply including:
(1)
l
corrective steps which have been taken by you, and the results achieved;
(2) corrective steps which will be taken to avoid further noncompliance;
l
and (3) the date when full compliance will be achieved.
.
In accordance with Section 2.790 of the NRC's " Rules of Practice,"
Part 2, Title 10, Code of Federal Regulations, a copy of this letter
and the enclosed inspection report will be placed in the NRC's Public
Document Room.
If this report contains any infotuation that you (or
your contractor) believe to be proprietary, it is necessary that you
78120500 @ @
L
l
l
_ _ _ - _ _ _ _ _ _ _ _ _ __ _ _ _ _ _ _ _ _ _ _ _
_
.
-
- _ _ _ - _ _ _ _ _ _ _ _ _
,
OCT 2 31978
e
i
.
Florida Power Corporation
-2-
make a written application within 20 days to this office to withhold
such information from public disclosure.
Any such application must
include a full statement of the reasons on the basis of which it is
claimed that the information is proprietary, and should be prepared so
that proprietary information identified in the application is contained
in a separate part of the document.
If we do not hear from you in this
regard within the specified period, the report will be placed in the
Public Document Room.
Should you have any questions concerning this letter, we will be glad to
discuss them with you.
Sincerely,
-
x=:
Y
F. J. Long, Chief
Reactor Operations and Nuclear
Support Branch
Enclosures:
1.
Appendix A, Notice of Violation
2.
Inspection Report No. 50-302/78-23
cc w/ enc 1:
Mr. G. P. Beatty, Jr.
Nuclear Plant Superintendent
P. O. Box 1228
Crystal River, Florida 32629
_ _ _ - _ _ _ _ - _ - _ _ _ _ _ _