Letter Sequence Other |
|---|
|
|
MONTHYEARML20137N9351986-01-31031 January 1986 Proposed Corrections to Tech Specs 4.0.2,4.4.6.1,3.4.9.3 & Table 3.6-1 Project stage: Other ML20137N8961986-01-31031 January 1986 Forwards Application for Amend to License NPF-1,consisting of Change Application 135,providing Miscellaneous Corrections to Tech Specs 4.0.2,4.4.6.1,3.4.9.3 & Table 3.6-1.W/Certificate of Svc.Fee Paid Project stage: Request ML20137N9091986-01-31031 January 1986 Application for Amend to License NPF-1,consisting of License Change Application 135,making Miscellaneous Corrections to Tech Specs 4.0.2,4.4.6.1,3.4.9.3 & Table 3.6-1 Project stage: Request ML20197J9501986-05-16016 May 1986 Revised Application 135 to Amend License NPF-1,correcting Typos & Editorial Errors,Deleting Valve CV-8825 from Table 3.6-1 & Allowing Manual Valve MD-059 to Be Periodically Opened Under Administrative Control Project stage: Other ML20207D0821986-12-22022 December 1986 Forwards Revised Pages for License Change Application 124 to License NPF-1,changing Table 3.6-1 to Add Seven of Eight Valves Previously Deleted from Table,For Review & Approval. Valve MO-8106 Should Remain Deleted from Table Project stage: Other ML20212E2321987-02-26026 February 1987 Application for Amend to License NPF-1,consisting of Revised Pages for License Change Application 124 & License Change Application 135,adding Steamline Isolation Valves & Valve CV-8825 Back Onto Tech Spec Table 3.6-1 Project stage: Request ML20245A2631987-02-26026 February 1987 Proposed Tech Specs,Consisting of Revised Pages for License Change Application 124 & License Change Application 135, Adding Steamline Isolation Valves & Valve CV-8825 Back Onto Table 3.6-1 & Excluding Containment Airlocks from Criteria Project stage: Other ML20206B5621987-04-0202 April 1987 Forwards Amend 126 to License NPF-1 & Safety Evaluation. Amend Provides Editorial Corrections to Tech Spec Sections 4.4.6.1.b & 3.4.9.3 & Revises Table 3.6-1 to Permit Administrative Control of Valve MD-059 Operation Project stage: Approval ML20206A6221987-04-0303 April 1987 Revised Tech Spec Page 7,clarifying License Change Application 124 Re power-operated Valves Project stage: Other ML20205T3551987-04-0303 April 1987 Clarifies License Change Application 124 to License NPF-1, Revising Tech Spec 4.6.3.1.3 Re Testing of Power Operated Valves.Valves Should Be Tested Per Tech Spec 4.0.5.Revised Page 7 of 21 Encl Project stage: Other ML20149J8711988-02-10010 February 1988 Requests That Util Provide Revised Significant Hazards Discussion,Based on 870226 & 0403 Revs to 850729 Application for Amend to License NPF-1,changing Tech Specs Re Containment Leak Testing & Containment Isolation Valves Project stage: Other ML20151E4441988-07-11011 July 1988 Forwards Amend 147 to License NPF-1 & Safety Evaluation. Amend Revises Surveillance Requirements in Tech Spec Section 3/4.6.1.1, Containment Integrity Project stage: Approval ML20151L3921988-07-25025 July 1988 Forwards Amend 147 to License NPF-1 & Safety Evaluation. Amend Revises Surveillance Requirements for Tech Spec Section 3/4.6.1.1,Containment Integrity Project stage: Approval 1987-04-02
[Table View] |
Text
_ _ _
rebruary 10, 1988 Docket No.: 50 344 Mr. David W. Cockfield Vice President, Nuclear Portland General Electric Company 121 S. W. Salinen Street Portland, Oregon 97204 r
Dear Mr. Cockfield:
{
SUBJECT:
LICENSECHANGEAPPLICATION(LCA)124(TACNO.59562)
By letter dated July 29, 1985, Portland General Electric Company (PGE) submitted LCA 124 rcgarding changes to the Technical Specifications related to containment leak testing and containrent isolation valves.
Revisions to this application were provided in PGE letters dated February 26, and April 3,1987.
As a result of these changes, it was expressed to your staff that submittal of a revised Significant Hazards discussion for the LCA was appropriate.
l Accordingly, to facilitate the review of this atendment, we request that PGE provide the revised Significant Hazards discussion within 30 days from receipt of this letter.
Sincerely, original signed by Terrence L. Chan, Project Manager Project Directorate Y Division of Reactor Projects - !!!,
IV, Y and Special Projects Office of Nuclear Reactor Regulation cc: See next page
[
DISTRIBUTIOM l
O cket File )
JPartlow NRCTEo~ cal PORs ACRS(10)
PD V Reading DMCrutchfield r
Tchan OGC E. Jordan 0002230259 000210y4 DR ADOCK 0 O
/
DFG :DR5F/ FDV
- DE5P/E: FDV Q.'...... :............ :............ :............ :.....
i NAME :TCHAN:cw
- W aighton :
i DATE :02/t3/88
- 02A0/88 l
5 0FFICIAL RECORD COPY i
y,r:
~
p.t
' r. David W. Cockfield A
Portland General Electric Company Trojan Nuclear Plant CC:
l Senior Resident Inspector U.S. Nuclear Regulatory Comission Trojan Nuclear Plant Post Office Box 0 j
Rainier, Oregon 97048 d
l Mr. Michael J. Sykes, Chairman Board of County Comissioners Columbia County St. Helens Oregon 97501 Mr. William T Dixon Oregon Department of Energy Salem. 0 egon 97310 Regional Administrator, Region V U.S. Nuclear Regulatory Comission 1450 Maria Lane, Suite 210 Walnut Creek. Californ4 94596 l